Angelus Calaguas
- License
- E16165
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E16165 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Vision Consulting Services
- On San Francisco permits
- Dec 2017 to Jul 2022
4 permits since 2000 (engineer on 4 permits): 2 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Commercial Interior Builders Inc (2), Skyline Construction
- Architects
- Nelson Algaze (4)
- Engineers
- Lin Vinh Tran (4)
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 18, 2022 | Completed final sign-off Mar 2023 | 901 Market St | Skyline Construction | 4/flr restroom, corridor and elevator lobby renovation on approx 3018 sqft includes floor and wall finishes, power, lighting. etc.Details
4/flr restroom, corridor and elevator lobby renovation on approx 3018 sqft includes floor and wall finishes, power, lighting. etc. | $22,000 |
| Jun 10, 2022 | Expired or cancelled cancelled Jan 2026 | 595 Buckingham Wy | ste 561: tenant improvement work on 1074 sqft of the total floor area. new wall, power, lighting and finishes.Details
ste 561: tenant improvement work on 1074 sqft of the total floor area. new wall, power, lighting and finishes. | $166,157 | |
| Dec 20, 2017 | Completed final sign-off Apr 2018 | 901 Market St | Commercial Interior Builders Inc | 3rd fl: adding partitions to create conference rooms on the 3rd fl. ti to include walls, power, ceiling, lighting, new finishes, doors and millwork.Details
3rd fl: adding partitions to create conference rooms on the 3rd fl. ti to include walls, power, ceiling, lighting, new finishes, doors and millwork. | $100,000 |
| Dec 12, 2017 | Never finaled issued Jan 2018, no final | 901 Market St | Commercial Interior Builders Inc | 3/f- remodel existing bathroom for ada compliances. n/a ordinance #155-13Details
3/f- remodel existing bathroom for ada compliances. n/a ordinance #155-13 | $5,000 |