Craig Rossi
- Listed as
- authorized agent-others, contractor
- Firm
- Rossi Builders Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Apr 2026
498 permits since 2000 (contractor on 498 permits, authorized agent-others on 6 permits): 408 completed, 8 in progress, 47 never finaled, 35 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. Their ranked record as a contractor is on their contractor page. How to read these records
Most recent permits
Showing the 100 most recent of 498.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 9, 2026 | In progress issued Apr 2026 | 555 California St | Rossi Builders Inc. | 43rd floor: project consisting of demolition of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power constuction of new non structural partitions, glazing doors ceilings, lighting, finishes, and power.Details
43rd floor: project consisting of demolition of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power constuction of new non structural partitions, glazing doors ceilings, lighting, finishes, and power. | $717,438 |
| Apr 6, 2026 | In progress issued Apr 2026 | 555 California St | Rossi Builders Inc. | ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power.Details
ste 3360 33rd flr: consists of demolition and construction of non-structural partitions, glazing, doors, ceilings, lighting, finishes, and power. | $408,300 |
| Apr 1, 2026 | In progress issued Apr 2026 | 555 California St | Rossi Builders Inc. | ste 3350: prjoect consists of demolition and construction of non- structural partitions, glazing, doors, ceilings, lighting, finishes, and electrical.Details
ste 3350: prjoect consists of demolition and construction of non- structural partitions, glazing, doors, ceilings, lighting, finishes, and electrical. | $252,050 |
| Mar 31, 2026 | In progress issued Apr 2026 | 555 California St | Rossi Builders Inc. | 23/fl-suite 2300 for ti to include construction of (n) non structrual partitions, glazing, doors, ceilings, lights, finishes, and electrical. no change in occupancy or use or square footage.Details
23/fl-suite 2300 for ti to include construction of (n) non structrual partitions, glazing, doors, ceilings, lights, finishes, and electrical. no change in occupancy or use or square footage. | $1,120,932 |
| Mar 9, 2026 | Completed final sign-off Jul 2026 | 555 California St | Rossi Builders Inc. | 23rd floor ste 2325: construction of new non-structural partitions, glazing, doors, millwork, ceiling, lighting, pwer and finishes. there will be no change in occupancy, use, or floor area. prior building demolished under pa #202508284089.Details
23rd floor ste 2325: construction of new non-structural partitions, glazing, doors, millwork, ceiling, lighting, pwer and finishes. there will be no change in occupancy, use, or floor area. prior building demolished under pa #202508284089. | $1,259,852 |
| Feb 19, 2026 | Completed final sign-off Apr 2026 | 3120 Mission St | Rossi Builders Inc. | interior non structural ti ro resolve nov #202650676. barrier removal scope to remove and reinstall existing restrooms. addition of one new water closet. existing ceiling, lighting, electrical and mech to remain.Details
interior non structural ti ro resolve nov #202650676. barrier removal scope to remove and reinstall existing restrooms. addition of one new water closet. existing ceiling, lighting, electrical and mech to remain. | $85,000 |
| Feb 11, 2026 | In progress issued Mar 2026 | 502 Jefferson St | Rossi Builders Inc. | deferred mechanical, electrical and plumbing for pa #2022-1011-4038Details
deferred mechanical, electrical and plumbing for pa #2022-1011-4038 | $300,000 |
| Oct 3, 2025 | Completed final sign-off Feb 2026 | 4 Embarcadero Center | Rossi Builders Inc. | 32/f: suite #3200 - alteration of 2 private offices by moving shared wall. work will enlarge 1 office and reduce the size of the second.electrical and data work, glazin at to offices to be reconfigured. replacememt of crpet tiles.Details
32/f: suite #3200 - alteration of 2 private offices by moving shared wall. work will enlarge 1 office and reduce the size of the second.electrical and data work, glazin at to offices to be reconfigured. replacememt of crpet tiles. | $85,000 |
| Sep 15, 2025 | Completed final sign-off Oct 2026 | 1650 Owens St | Rossi Builders Inc. | rev to pa# 2023-1221-2902: improvements include selective demo walls and installing new autoclave with minor mep upgrades the new layoutDetails
rev to pa# 2023-1221-2902: improvements include selective demo walls and installing new autoclave with minor mep upgrades the new layout | $1,097,966 |
| Aug 25, 2025 | Completed final sign-off Jan 2026 | 465 California St | Rossi Builders Inc. | 14th flr t.i. in (e) hi-rise downtown bldg. work to include new partitions, millwork, doors, glazing, ceiling, new finishes. associcatd mep as deferred submiittal.Details
14th flr t.i. in (e) hi-rise downtown bldg. work to include new partitions, millwork, doors, glazing, ceiling, new finishes. associcatd mep as deferred submiittal. | $890,150 |
| May 5, 2025 | Completed final sign-off Jun 2025 | 350 Rhode Island St | Rossi Builders Inc. | 2/f suite 240 - interior demo of 1 wall and construction of 3 conference rooms. mechanical, electrical, and fire life safety will be deferred permits.Details
2/f suite 240 - interior demo of 1 wall and construction of 3 conference rooms. mechanical, electrical, and fire life safety will be deferred permits. | $300,000 |
| Dec 18, 2024 | Completed final sign-off Dec 2024 | 114 Sansome St | Rossi Builders Inc. | ste 1000 & 1100 work include permitting existing phone booths with anchorageDetails
ste 1000 & 1100 work include permitting existing phone booths with anchorage | $8,500 |
| Aug 16, 2024 | In progress filed Aug 2024, not yet issued | 657 Howard St | Rossi Builders Inc. | revision to pa# 2023-1212-2341 change in occupancy of flex & lounge spaces. assembly permitDetails
revision to pa# 2023-1212-2341 change in occupancy of flex & lounge spaces. assembly permit | |
| Jun 21, 2024 | Completed final sign-off Sep 2024 | 601 California St | Rossi Builders Inc. | 3/f ste# 300: ti- (n) construction consists of (n) offices and phone rooms. demo of 2 walls. any alteration to mep, sprinklers and/or life safety systems will be under separate permits - ref pa# 202209152486Details
3/f ste# 300: ti- (n) construction consists of (n) offices and phone rooms. demo of 2 walls. any alteration to mep, sprinklers and/or life safety systems will be under separate permits - ref pa# 202209152486 | $195,000 |
| May 15, 2024 | Completed final sign-off Jan 2025 | 390 09th St | Rossi Builders Inc. | voluntary seismic upgrade. add power door operator to restroom 1, replace (e) restroom signage, replace (e) stair handrails and guardrailsDetails
voluntary seismic upgrade. add power door operator to restroom 1, replace (e) restroom signage, replace (e) stair handrails and guardrails | $250,000 |
| May 3, 2024 | In progress issued Oct 2025 | 502 Jefferson St | Rossi Builders Inc. | install new exterior sauna room at existing deck (at grade)Details
install new exterior sauna room at existing deck (at grade) | $40,000 |
| Mar 18, 2024 | Completed final sign-off Aug 2024 | 220 Jackson St | Rossi Builders Inc. | 3rd fl ste 350: deferred mech & elec for pa# 202402226337. mechanical: install new duct work and diffusers from existing air handler. electrical: new power & signal decives throughtout space.Details
3rd fl ste 350: deferred mech & elec for pa# 202402226337. mechanical: install new duct work and diffusers from existing air handler. electrical: new power & signal decives throughtout space. | $45,000 |
| Mar 15, 2024 | Completed final sign-off Sep 2024 | 657 Howard St | Rossi Builders Inc. | revision 202312122341- mechanical/hvac design change to (e) units and duct runsDetails
revision 202312122341- mechanical/hvac design change to (e) units and duct runs | |
| Feb 22, 2024 | Completed final sign-off Aug 2024 | 220 Jackson St | Rossi Builders Inc. | 3/f/ unit 350. ti of single ste, demo of non structural partitions and bldg (n) non structural partitions. all new or revised mep, life safety work (sep will be design build and submitted for permit separately). bldg is fully sprinklerd. ada upgrade to building entry area.Details
3/f/ unit 350. ti of single ste, demo of non structural partitions and bldg (n) non structural partitions. all new or revised mep, life safety work (sep will be design build and submitted for permit separately). bldg is fully sprinklerd. ada upgrade to building entry area. | $502,473 |
| Feb 6, 2024 | Completed final sign-off Mar 2024 | 220 Jackson St | Rossi Builders Inc. | suite 350-soft demo of office suite. ab-017. fully sprinklered under sep permitDetails
suite 350-soft demo of office suite. ab-017. fully sprinklered under sep permit | $8,000 |
| Dec 21, 2023 | Completed final sign-off Oct 2026 | 1650 Owens St | Rossi Builders Inc. | 5/f lab improvements. selective demo of non-structural walls, doors, ceilings, finishes, mep work to suppor the new bsl3 lab layout. mep layout in mostly existing.Details
5/f lab improvements. selective demo of non-structural walls, doors, ceilings, finishes, mep work to suppor the new bsl3 lab layout. mep layout in mostly existing. | $1,800,000 |
| Dec 21, 2023 | Completed final sign-off Apr 2024 | 188 Octavia St | Rossi Builders Inc. | revision to permit# 202309076123: removal of restroom and sink modifications from scope of work. minor changes to millwork, ceilings, lighting, and electrical. (ground floor)Details
revision to permit# 202309076123: removal of restroom and sink modifications from scope of work. minor changes to millwork, ceilings, lighting, and electrical. (ground floor) | |
| Dec 12, 2023 | Completed final sign-off Sep 2024 | 657 Howard St | Rossi Builders Inc. | the project consists of an interior remodel to an (e) 4464 sf art gallery to accommodate the goethe institut, a german culture language institute. the scope includes modification of interior elements, hvac & lighting. this is phase 2 of 2. refe ti phase 1- 202301120086.Details
the project consists of an interior remodel to an (e) 4464 sf art gallery to accommodate the goethe institut, a german culture language institute. the scope includes modification of interior elements, hvac & lighting. this is phase 2 of 2. refe ti phase 1- 202301120086. | $235,048 |
| Nov 8, 2023 | Completed final sign-off May 2025 | 350 Rhode Island St | Rossi Builders Inc. | 2/f-ste# 220/230: interior demo at non-structural partitions and millwork. new interior partitions at breakroom, finishes and relocate at workstations. lighting & power, mep, life safety, and sprinkler under separate permit.Details
2/f-ste# 220/230: interior demo at non-structural partitions and millwork. new interior partitions at breakroom, finishes and relocate at workstations. lighting & power, mep, life safety, and sprinkler under separate permit. | $850,000 |
| Sep 7, 2023 | Completed final sign-off Apr 2024 | 188 Octavia St | Rossi Builders Inc. | project consists of a ti in an (e) commercial space for adventurous sports. project to include modifications to (e) layout, plumbing, lighting & hvac. new element include: lightning and outlets, millwork, plumbing, hvac and large exercise equipment.Details
project consists of a ti in an (e) commercial space for adventurous sports. project to include modifications to (e) layout, plumbing, lighting & hvac. new element include: lightning and outlets, millwork, plumbing, hvac and large exercise equipment. | $283,587 |
| May 24, 2023 | Never finaled issued May 2023, no final | 450 Shotwell St | Rossi Builders Inc. | deferred pre fabricated cold rooms from 202303173904Details
deferred pre fabricated cold rooms from 202303173904 | $10,000 |
| Apr 18, 2023 | Completed final sign-off Aug 2024 | 235 Pine St | Rossi Builders Inc. | suite 1800: rebalance existing boxes ref 202301301010. elec/plumbing under sep coverDetails
suite 1800: rebalance existing boxes ref 202301301010. elec/plumbing under sep cover | $15,000 |
| Apr 12, 2023 | Completed final sign-off May 2023 | 2320 Sutter St | Rossi Builders Inc., Komac Electric Inc | reference 202211216942 and 202302162086 add additional duct smoke detectorDetails
reference 202211216942 and 202302162086 add additional duct smoke detector | $2,500 |
| Apr 11, 2023 | Never finaled issued May 2023, no final | 450 Shotwell St | Rossi Builders Inc. | deferred mep ref pa# 2023-0317-3904Details
deferred mep ref pa# 2023-0317-3904 | $800,000 |
| Mar 17, 2023 | Completed final sign-off Oct 2023 | 450 Shotwell St | Rossi Builders Inc. | t.i. of (e) building for food based pdr space w/accessory office use, nonstructural partitions, no exterior work to occur. ref 20208101499/r1 and 202009234840/r1.Details
t.i. of (e) building for food based pdr space w/accessory office use, nonstructural partitions, no exterior work to occur. ref 20208101499/r1 and 202009234840/r1. | $950,000 |
| Feb 16, 2023 | Completed final sign-off Sep 2023 | 2320 Sutter St | Rossi Builders Inc. | revison to pa# 202211216942, changed hvac manufacturer, add electricalDetails
revison to pa# 202211216942, changed hvac manufacturer, add electrical | $3,000 |
| Jan 30, 2023 | Completed final sign-off Aug 2024 | 235 Pine St | Rossi Builders Inc. | demo and construction of non load bearing partitions, e modifications t oceiling grid and tile reswitching. new doors, frames, new millwork, new sinks, new finishes. ste 1800Details
demo and construction of non load bearing partitions, e modifications t oceiling grid and tile reswitching. new doors, frames, new millwork, new sinks, new finishes. ste 1800 | $750,000 |
| Jan 12, 2023 | Never finaled issued Sep 2023, no final | 657 Howard St | Rossi Builders Inc. | 1/f: interior t.i., minor modification to walls, hvac, lighting, & plumbing. phase 1 of 2.Details
1/f: interior t.i., minor modification to walls, hvac, lighting, & plumbing. phase 1 of 2. | $269,208 |
| Jan 9, 2023 | Expired or cancelled withdrawn Apr 2023 | 1 Daniel Burnham Ct | Rossi Builders Inc. | 3/f - suite 300 and 310: tenant improvement (medical office) to include new interior walls, new plumbing, electrical and mechanical fixtures. no exterior or site work.Details
3/f - suite 300 and 310: tenant improvement (medical office) to include new interior walls, new plumbing, electrical and mechanical fixtures. no exterior or site work. | $400,000 |
| Jan 5, 2023 | Completed final sign-off Apr 2024 | 1 Daniel Burnham Ct | Rossi Builders Inc. | mechanical title 24 for 202210285397, office spaceDetails
mechanical title 24 for 202210285397, office space | $20,000 |
| Dec 12, 2022 | Completed final sign-off Apr 2023 | 185 Berry St | Rossi Builders Inc. | ste #2300: limited demo of lighting, construction of new conference rooms partitions, doors/framing/hardware/power & data, new ceiling and lighting finishes.Details
ste #2300: limited demo of lighting, construction of new conference rooms partitions, doors/framing/hardware/power & data, new ceiling and lighting finishes. | $50,000 |
| Nov 21, 2022 | Completed final sign-off Sep 2023 | 2320 Sutter St | Rossi Builders Inc. | replacing 2 hvac units; replace 1 electrical panel in unoccupied ste 101 ref pa 202204122078 (r1)Details
replacing 2 hvac units; replace 1 electrical panel in unoccupied ste 101 ref pa 202204122078 (r1) | $20,000 |
| Oct 28, 2022 | Completed final sign-off Apr 2024 | 1 Daniel Burnham Ct | Rossi Builders Inc. | 3rd floor/suite #370c: interior t.i. includes demolition and construction of non-structural partitions, electrical, millwork and finishes. includes one new single user accessible restroom within the suite.Details
3rd floor/suite #370c: interior t.i. includes demolition and construction of non-structural partitions, electrical, millwork and finishes. includes one new single user accessible restroom within the suite. | $317,000 |
| Oct 11, 2022 | In progress issued Feb 2024 | 502 Jefferson St | Rossi Builders Inc. | exterior alteration & additions & interior remodel to an (e) 2-story wood frame bldg. 1st fl: demo & replace (e) 1-story kitchen & weight rm approx 887 sq. 2nd fl: (n) roof deck atop weight rm approx 605 sf, extend (e) egress stair. roof: remove/replace access stair & walkway to (e) cupolaDetails
exterior alteration & additions & interior remodel to an (e) 2-story wood frame bldg. 1st fl: demo & replace (e) 1-story kitchen & weight rm approx 887 sq. 2nd fl: (n) roof deck atop weight rm approx 605 sf, extend (e) egress stair. roof: remove/replace access stair & walkway to (e) cupola | $1,252,000 |
| Jul 27, 2022 | Completed final sign-off Oct 2024 | 350 Rhode Island St | Rossi Builders Inc. | new prefabricated freestanding pergola for (e) roof top deck. no structural. no mepDetails
new prefabricated freestanding pergola for (e) roof top deck. no structural. no mep | $32,000 |
| Jul 13, 2022 | Completed final sign-off Dec 2022 | 1 Daniel Burnham Ct | Rossi Builders Inc. | 2nd fl ste 262: mep for pa# 202205124100.Details
2nd fl ste 262: mep for pa# 202205124100. | |
| Jul 6, 2022 | Completed final sign-off Apr 2024 | 465 California St | Rossi Builders Inc. | 9th /f ti: mod of (e) ti to include selective demo and construction of non load bearing partitions existing modifications to ceiling grid and tile, light fixture relocation and new re-swtiching, now conference room, door and frame. new finishes. mep deferredDetails
9th /f ti: mod of (e) ti to include selective demo and construction of non load bearing partitions existing modifications to ceiling grid and tile, light fixture relocation and new re-swtiching, now conference room, door and frame. new finishes. mep deferred | $275,000 |
| May 24, 2022 | Never finaled filed May 2022, never issued | 1128 Market St | Rossi Builders Inc. | 3rd flr spec suite: tenant improvement. roof: infrastructure upgrades and mechanical rooms on each floor.Details
3rd flr spec suite: tenant improvement. roof: infrastructure upgrades and mechanical rooms on each floor. | $2,027,534 |
| May 18, 2022 | Expired or cancelled suspend Jan 2023 | 1128 Market St | Rossi Builders Inc. | ground floor: tenant improvement. roof: infrastructure upgrades. new mech on rooftop.Details
ground floor: tenant improvement. roof: infrastructure upgrades. new mech on rooftop. | $1,867,147 |
| May 18, 2022 | Never finaled filed May 2022, never issued | 1128 Market St | Rossi Builders Inc. | 2/f spec suite: t.i. & infrastucture upgrades on roof & mechanical rooms on each floorDetails
2/f spec suite: t.i. & infrastucture upgrades on roof & mechanical rooms on each floor | $1,896,195 |
| May 12, 2022 | Completed final sign-off Dec 2022 | 1 Daniel Burnham Ct | Rossi Builders Inc. | 2nd floor: ste 262c: demolition and construction of non-structural partitions, electrical, millwork, and finishes. includes 1 new single occupant all-gender accessible restroom within the suite. no structural work included in scope. no increase in area. no change in occupancy or use.Details
2nd floor: ste 262c: demolition and construction of non-structural partitions, electrical, millwork, and finishes. includes 1 new single occupant all-gender accessible restroom within the suite. no structural work included in scope. no increase in area. no change in occupancy or use. | $141,904 |
| May 2, 2022 | Completed final sign-off May 2023 | 465 California St | Rossi Builders Inc. | g/f:interior demo of ground floor space. demo non-structural partitions, ceiling, finishes. ti under separate permit requird. sprinkler under separate permits.Details
g/f:interior demo of ground floor space. demo non-structural partitions, ceiling, finishes. ti under separate permit requird. sprinkler under separate permits. | $32,000 |
| Apr 12, 2022 | Completed final sign-off May 2023 | 2320 Sutter St | Rossi Builders Inc. | voluntary seismic retroift including including plywood sheathing on existing walls. constructing a new stud wall in an unoccupied suite, and constructing (2) new foundations. misc accessibility upgradeDetails
voluntary seismic retroift including including plywood sheathing on existing walls. constructing a new stud wall in an unoccupied suite, and constructing (2) new foundations. misc accessibility upgrade | $150,000 |
| Mar 7, 2022 | Completed final sign-off Mar 2023 | 180 Townsend St | Rossi Builders Inc. | submitting deferred structural drawing per 202101152837, a1.01d.Details
submitting deferred structural drawing per 202101152837, a1.01d. | |
| Jan 26, 2022 | Completed final sign-off May 2022 | 500 03rd St | Rossi Builders Inc. | ste 110 mep permit: electrical - power receptacles revision and lighting alterations. plumbing - replace sinks, add under sink mounted waterheaters. ref. permit 202111122242.Details
ste 110 mep permit: electrical - power receptacles revision and lighting alterations. plumbing - replace sinks, add under sink mounted waterheaters. ref. permit 202111122242. | $130,000 |
| Jan 24, 2022 | Completed final sign-off Mar 2023 | 221 Main St | Rossi Builders Inc. | suite 1340: interior t.i. in (e) space. rmeove (e) walls. replace with full height, upgarde building security card readers, match (e) finishes. no exterior or restroom work.Details
suite 1340: interior t.i. in (e) space. rmeove (e) walls. replace with full height, upgarde building security card readers, match (e) finishes. no exterior or restroom work. | $528,197 |
| Dec 15, 2021 | Completed final sign-off May 2022 | 350 Rhode Island St | Rossi Builders Inc. | suite 220: demo existing duct as shown on plans , install new duct as shown on plans, upgrade pneumatic controls install (2) new vav w/ reheat coil. install new exhaust fan.Details
suite 220: demo existing duct as shown on plans , install new duct as shown on plans, upgrade pneumatic controls install (2) new vav w/ reheat coil. install new exhaust fan. | $28,000 |
| Dec 13, 2021 | Completed final sign-off Apr 2022 | 350 Rhode Island St | Rossi Builders Inc. | added scope of work to floor 2 common restroom permit#2021/10271275.replace all fixtures,partitions, equipt lighting and finishes. no structural work to be performed.Details
added scope of work to floor 2 common restroom permit#2021/10271275.replace all fixtures,partitions, equipt lighting and finishes. no structural work to be performed. | $50,000 |
| Nov 29, 2021 | Completed final sign-off Apr 2022 | 4 Embarcadero Center | Rossi Builders Inc. | 32/f: ref #202109178613. mep deferredDetails
32/f: ref #202109178613. mep deferred | $295,000 |
| Nov 29, 2021 | Completed final sign-off Apr 2022 | 4 Embarcadero Center | Rossi Builders Inc. | 32/f: ref #202109178613. modify wall separating office from convenience stair per sffd plan check. revise womens bathroom layout. minor modification to some offices.Details
32/f: ref #202109178613. modify wall separating office from convenience stair per sffd plan check. revise womens bathroom layout. minor modification to some offices. | $100 |
| Nov 12, 2021 | Completed final sign-off May 2022 | 500 03rd St | Rossi Builders Inc. | suite 110: interior renovation: new ceiling tiles, new light fixtures, new flooring throughout. selectrive demo and construction as shower on plans. deferrered mep & fire/life safety. maher n/a.Details
suite 110: interior renovation: new ceiling tiles, new light fixtures, new flooring throughout. selectrive demo and construction as shower on plans. deferrered mep & fire/life safety. maher n/a. | $199,000 |
| Nov 5, 2021 | Completed final sign-off Oct 2024 | 350 Rhode Island St | Rossi Builders Inc. | addition of roof deck & elevator extension to roof of an (e) building - applicant has removed the proposed 12 foot tall pergola as of 11/5/2021Details
addition of roof deck & elevator extension to roof of an (e) building - applicant has removed the proposed 12 foot tall pergola as of 11/5/2021 | $1,200,000 |
| Oct 27, 2021 | Completed final sign-off Apr 2022 | 350 Rhode Island St | Rossi Builders Inc. | suite 220:consist of interior demolition of non-structural elements including but not necessarly limited to interior partitions,doors finishes,ceilings,lighting,mechanical & electrical outlets & switches.restroom ada accessiblitiy upgrades.Details
suite 220:consist of interior demolition of non-structural elements including but not necessarly limited to interior partitions,doors finishes,ceilings,lighting,mechanical & electrical outlets & switches.restroom ada accessiblitiy upgrades. | $540,284 |
| Sep 17, 2021 | Completed final sign-off Apr 2022 | 4 Embarcadero Center | Rossi Builders Inc. | partial office ti on 32nd fl. 21,500 sf. incl new private offices partial restroom remodel. encl stair to 31st fl w/2hr rating no changes to site, ext appear or (e) bldg struc are required. modifications to mech, elec, plumb, automatic fire sprinkler and fire alarm to be submitted under sep permits.Details
partial office ti on 32nd fl. 21,500 sf. incl new private offices partial restroom remodel. encl stair to 31st fl w/2hr rating no changes to site, ext appear or (e) bldg struc are required. modifications to mech, elec, plumb, automatic fire sprinkler and fire alarm to be submitted under sep permits. | $1,200,000 |
| Aug 31, 2021 | Completed final sign-off Jan 2023 | 360 Spear St | Rossi Builders Inc. | work consists of demolition of extg concrete ramp and guard rail and installation of new concrete loading dock and guard rail.Details
work consists of demolition of extg concrete ramp and guard rail and installation of new concrete loading dock and guard rail. | $175,000 |
| Aug 6, 2021 | Completed final sign-off Nov 2022 | 360 Spear St | Rossi Builders Inc. | replacement of (e) fixed aluminum louver system with new aluminum storefront framing to match existing. new in-swinging doors at mechanical store front and relocation of (e) interior wallDetails
replacement of (e) fixed aluminum louver system with new aluminum storefront framing to match existing. new in-swinging doors at mechanical store front and relocation of (e) interior wall | $65,000 |
| Aug 6, 2021 | Completed final sign-off Dec 2021 | 451 Castro St | Rossi Builders Inc. | barrier removal for main entrance door. provide electrical power door. replace (e) front window and tiles in kind.Details
barrier removal for main entrance door. provide electrical power door. replace (e) front window and tiles in kind. | $7,000 |
| Jun 29, 2021 | Completed final sign-off Jul 2021 | 475 Sansome St | Rossi Builders Inc. | 17/f: demising wall. maher n/a. suites 1700/1720Details
17/f: demising wall. maher n/a. suites 1700/1720 | $10,000 |
| Jun 10, 2021 | Completed final sign-off Dec 2022 | 1 Daniel Burnham Ct | Rossi Builders Inc. | unit 170c:rev to pa202009194540-changes to interior finish selections - carpet, tile, paint colors, etc.new hard lid, gypsum, ceiling above reception area, new light fixtures selection.no revision to layout or number or rooms.(e) automatic fire sprinklers and life safety devices to remain.Details
unit 170c:rev to pa202009194540-changes to interior finish selections - carpet, tile, paint colors, etc.new hard lid, gypsum, ceiling above reception area, new light fixtures selection.no revision to layout or number or rooms.(e) automatic fire sprinklers and life safety devices to remain. | |
| Feb 1, 2021 | Never finaled issued Feb 2021, no final | 200 Sansome St | Rossi Builders Inc. | 3/f: title 24 electrical compliance. ref pa 202006299297.maher n/a.Details
3/f: title 24 electrical compliance. ref pa 202006299297.maher n/a. | $59,500 |
| Jan 15, 2021 | Completed final sign-off Mar 2023 | 180 Townsend St | Rossi Builders Inc. | in-kind door replacement of qualifying historic building.Details
in-kind door replacement of qualifying historic building. | $50,000 |
| Dec 9, 2020 | Completed final sign-off Jun 2021 | 1 Daniel Burnham Ct | Rossi Builders Inc. | 4/f: suite 400 - demo and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes incl restroom upgrades. fire alarm and fire sprinkler deferred.Details
4/f: suite 400 - demo and construction of non-structural partitions, ceilings, lighting, electrical, millwork and finishes incl restroom upgrades. fire alarm and fire sprinkler deferred. | $430,611 |
| Dec 3, 2020 | Completed final sign-off May 2021 | 360 Spear St | Rossi Builders Inc. | 4th fl: modifications to base building mechanical system at tenant space.Details
4th fl: modifications to base building mechanical system at tenant space. | $175,000 |
| Oct 29, 2020 | Completed final sign-off Nov 2021 | 360 Spear St | Rossi Builders Inc. | permit to memorialize planning commision motion 20588 authorizing the conversion of portions of internet service exchange use & accessory parking area on 1/f & south half of 2/f to laboratory use greater than 25000gsf. additional restrm/bathrm work w/ lockers & bicycle parking features. maher n/aDetails
permit to memorialize planning commision motion 20588 authorizing the conversion of portions of internet service exchange use & accessory parking area on 1/f & south half of 2/f to laboratory use greater than 25000gsf. additional restrm/bathrm work w/ lockers & bicycle parking features. maher n/a | |
| Oct 26, 2020 | Completed final sign-off Jan 2021 | 360 Spear St | Rossi Builders Inc. | 4th floor fire alarm voice evacuation system. deferred permit from bpa 2020-0803-1183.Details
4th floor fire alarm voice evacuation system. deferred permit from bpa 2020-0803-1183. | $50,000 |
| Oct 22, 2020 | Completed final sign-off Nov 2021 | 360 Spear St | Rossi Builders Inc. | 4/f: work includes modifications to base building electrical and mechanical systems, new finishes and lighting in stairs, and implementation of base building utility sub metering, no work is proposed in spaces occupied by internet service exchange uses on the 2nd and 5th floors. no exterior workDetails
4/f: work includes modifications to base building electrical and mechanical systems, new finishes and lighting in stairs, and implementation of base building utility sub metering, no work is proposed in spaces occupied by internet service exchange uses on the 2nd and 5th floors. no exterior work | $75,000 |
| Oct 1, 2020 | Expired or cancelled withdrawn Dec 2020 | 360 Spear St | Rossi Builders Inc. | revision to pa 202008051183. per aprvd minutes of sffd pre-app meeting and plan of action: reduce occupancy of 4th flr prior to voice alarm install. once speakers are provided throughout 4th flr, tenant to revert to speaker egress factors aproved under bpa 202008051183.Details
revision to pa 202008051183. per aprvd minutes of sffd pre-app meeting and plan of action: reduce occupancy of 4th flr prior to voice alarm install. once speakers are provided throughout 4th flr, tenant to revert to speaker egress factors aproved under bpa 202008051183. | |
| Sep 30, 2020 | Never finaled issued Jul 2021, no final | 200 Sansome St | Rossi Builders Inc. | 12/f: upgrade accessible all gender toilets, selective new partitions, doors, casework, ceilings, light fixtures, mechanical diffuser. maher n/aDetails
12/f: upgrade accessible all gender toilets, selective new partitions, doors, casework, ceilings, light fixtures, mechanical diffuser. maher n/a | $198,218 |
| Sep 19, 2020 | Completed final sign-off Dec 2022 | 1 Daniel Burnham Ct | Rossi Builders Inc. | ti for office space on ground floor. non-bearing partition walls, replacement of finishes, new electrical lighting and receptacles.Details
ti for office space on ground floor. non-bearing partition walls, replacement of finishes, new electrical lighting and receptacles. | $205,000 |
| Sep 19, 2020 | Completed final sign-off Dec 2020 | 185 Berry St | Rossi Builders Inc. | selected demo, new partitions, doors, frames, hardware, power, data, light fixtures, patching and repairing existing finishes and ceiling grid. mech - install 1 new vav box, revise duct work for new floor plan. elec. - wiring and controls.Details
selected demo, new partitions, doors, frames, hardware, power, data, light fixtures, patching and repairing existing finishes and ceiling grid. mech - install 1 new vav box, revise duct work for new floor plan. elec. - wiring and controls. | $305,505 |
| Sep 15, 2020 | Completed final sign-off Nov 2021 | 360 Spear St | Rossi Builders Inc. | revision to pa 201907246806. work consists of future tenant shell space, construct portions of 1st & 2nd flrs. work incl (n) secondary entrance, demising walls, trash rm, upgrades to mech & electr. t.i under separate permit. no work proposed in space occupied by internet exchange use on 2nd flr.Details
revision to pa 201907246806. work consists of future tenant shell space, construct portions of 1st & 2nd flrs. work incl (n) secondary entrance, demising walls, trash rm, upgrades to mech & electr. t.i under separate permit. no work proposed in space occupied by internet exchange use on 2nd flr. | $750,000 |
| Sep 11, 2020 | Completed final sign-off May 2021 | 360 Spear St | Rossi Builders Inc. | 1st, 2nd & 4th fl - install 8 emon dmons on 3 floors to moniotr energy usageDetails
1st, 2nd & 4th fl - install 8 emon dmons on 3 floors to moniotr energy usage | $25,000 |
| Aug 7, 2020 | Completed final sign-off Dec 2020 | 185 Berry St | Rossi Builders Inc. | suite 200: selective demo of partitions, door/frames/hardware, power/data and ceiling/lighting. new partitions, oors/frames/hardware, power/data, light fixtures, patching/repairing of (e) finishes & ceiling grid. life safety & fire protection modifications will be submitted uner separate cover.Details
suite 200: selective demo of partitions, door/frames/hardware, power/data and ceiling/lighting. new partitions, oors/frames/hardware, power/data, light fixtures, patching/repairing of (e) finishes & ceiling grid. life safety & fire protection modifications will be submitted uner separate cover. | $259,000 |
| Aug 7, 2020 | Never finaled issued Aug 2020, no final | 200 Sansome St | Rossi Builders Inc. | 12/f: demo of selective (e) partitions, doors, casework, ceiling, lighting fixtures. (e) mechanical diffuseres, sprinklers, life safety & fire alarm systems to remain.Details
12/f: demo of selective (e) partitions, doors, casework, ceiling, lighting fixtures. (e) mechanical diffuseres, sprinklers, life safety & fire alarm systems to remain. | $159,000 |
| Aug 5, 2020 | Completed final sign-off Dec 2020 | 360 Spear St | Rossi Builders Inc. | suite 400 on 4th fl ti: new non-structural partitions, lighting 7 finishes. fire alarm & fire sprinkler under separate permit. maher naDetails
suite 400 on 4th fl ti: new non-structural partitions, lighting 7 finishes. fire alarm & fire sprinkler under separate permit. maher na | $3,678,903 |
| Jul 6, 2020 | Completed final sign-off Nov 2020 | 360 Spear St | Rossi Builders Inc. | revision to app#201812279189 to reflect installation of exterior gas meter enclosure following approved pg&e design.Details
revision to app#201812279189 to reflect installation of exterior gas meter enclosure following approved pg&e design. | |
| Jun 29, 2020 | Completed final sign-off Feb 2021 | 200 Sansome St | Rossi Builders Inc. | addition of new partitions, floor finishes, casework, lighting/mechanical deferreed under seperate permit.Details
addition of new partitions, floor finishes, casework, lighting/mechanical deferreed under seperate permit. | $100,000 |
| Feb 25, 2020 | Completed final sign-off Oct 2020 | 200 Sansome St | Rossi Builders Inc. | demo of e partitions, floor finishes, casework e acoustical ceiling, grid, tiles, lighting fixtures, mech diffuser as shown on drawingDetails
demo of e partitions, floor finishes, casework e acoustical ceiling, grid, tiles, lighting fixtures, mech diffuser as shown on drawing | $9,000 |
| Jan 24, 2020 | Completed final sign-off Feb 2020 | 100 Pine St | Rossi Builders Inc. | 2910: add and relocate diffusers and registers, add and reroute ductwork, relocate thermostat and air balance rf 201908269827Details
2910: add and relocate diffusers and registers, add and reroute ductwork, relocate thermostat and air balance rf 201908269827 | |
| Jan 13, 2020 | Completed final sign-off Feb 2020 | 100 Pine St | Rossi Builders Inc. | ref pa# 201908269827; title 24- electricalDetails
ref pa# 201908269827; title 24- electrical | |
| Oct 17, 2019 | Completed final sign-off Feb 2021 | 200 Sansome St | Rossi Builders Inc. | voluntary barrier removal in e toilet r0oms on 3rd fl work includes selective demo new partitons, doors finishes to install two single occupant all gender rest rooms.Details
voluntary barrier removal in e toilet r0oms on 3rd fl work includes selective demo new partitons, doors finishes to install two single occupant all gender rest rooms. | $175,000 |
| Oct 17, 2019 | Completed final sign-off Feb 2020 | 425 California St | Rossi Builders Inc. | suite 1400. interior tenant improvement. demo of non-structural partitions, new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. lobby, officesDetails
suite 1400. interior tenant improvement. demo of non-structural partitions, new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. lobby, offices | $1,200,000 |
| Oct 4, 2019 | Never finaled issued Oct 2019, no final | 300 16th St | Rossi Builders Inc. | revision to pa 2019-0723-6723 - bulletin 1 minor revisions to original scope including architectural plus mepDetails
revision to pa 2019-0723-6723 - bulletin 1 minor revisions to original scope including architectural plus mep | |
| Oct 1, 2019 | Completed final sign-off May 2020 | 1700 Owens St | Rossi Builders Inc. | revision to 201905019428, structural updates to pergola. maher n/aDetails
revision to 201905019428, structural updates to pergola. maher n/a | |
| Sep 24, 2019 | Completed final sign-off Oct 2019 | 717 Market St | Rossi Builders Inc. | ground floor: install box truss assembly for future display, rlocate hand drying machine. no mechanical or plumbing work. electical work under seperate trade permit.Details
ground floor: install box truss assembly for future display, rlocate hand drying machine. no mechanical or plumbing work. electical work under seperate trade permit. | $21,064 |
| Sep 20, 2019 | Completed final sign-off Nov 2019 | 135 Main St | Rossi Builders Inc. | 11th fl. interior office t.i.workspace, reception area open office area, and private offices, no change existing copy room server room, and break room at the back of office.Details
11th fl. interior office t.i.workspace, reception area open office area, and private offices, no change existing copy room server room, and break room at the back of office. | $235,000 |
| Aug 26, 2019 | Completed final sign-off Feb 2020 | 100 Pine St | Rossi Builders Inc. | suite #2900: the scope of work inlcludes non-load bearing partition sidelight, power portion of ceiling grid and tile. new non load bearing interior partition, lighting, power and finishes. mep will be deffered. n/a for maherDetails
suite #2900: the scope of work inlcludes non-load bearing partition sidelight, power portion of ceiling grid and tile. new non load bearing interior partition, lighting, power and finishes. mep will be deffered. n/a for maher | $690,000 |
| Aug 16, 2019 | Completed final sign-off Feb 2020 | 425 California St | Rossi Builders Inc. | ti for suite 300: new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. maher naDetails
ti for suite 300: new non-structural partitions, millwork, new restrooms. mep and fire life safety under separate permit. maher na | $1,000,000 |
| Aug 13, 2019 | Completed final sign-off Dec 2020 | 360 Spear St | Rossi Builders Inc. | new panel board on roof to serve new rooftop mech equipment, new lighting on floor 1-5, new power signal on floor 1Details
new panel board on roof to serve new rooftop mech equipment, new lighting on floor 1-5, new power signal on floor 1 | $150,000 |
| Aug 12, 2019 | Never finaled issued Aug 2019, no final | 5 03rd St | Rossi Builders Inc. | replace sidewalk hatch w/steel sheet to match (e). comply with dpw notice of violation 1146361.Details
replace sidewalk hatch w/steel sheet to match (e). comply with dpw notice of violation 1146361. | $5,000 |
| Aug 7, 2019 | Completed final sign-off Dec 2020 | 360 Spear St | Rossi Builders Inc. | hvac - mechanical improvements including new heating & cooling condensing units, makeup air furnace and exhaust fans. additions of new makeup and exhaust air risers, refrigrant piping riser, two fan coils.Details
hvac - mechanical improvements including new heating & cooling condensing units, makeup air furnace and exhaust fans. additions of new makeup and exhaust air risers, refrigrant piping riser, two fan coils. | $575,000 |
| Jul 24, 2019 | Completed final sign-off Nov 2021 | 360 Spear St | Rossi Builders Inc. | base building improvements on a portion of the ground floor as a revision to base building improvements on approved pa 2018-1212-8090 & 2018-1227-9204. remodeling of 2 restrooms, installation of (n) partitions in prep of vacant spaceDetails
base building improvements on a portion of the ground floor as a revision to base building improvements on approved pa 2018-1212-8090 & 2018-1227-9204. remodeling of 2 restrooms, installation of (n) partitions in prep of vacant space | $500,000 |
| Jul 23, 2019 | Never finaled issued Sep 2019, no final | 300 16th St | Rossi Builders Inc. | interior ti of existing shell. new restrooms, kitchen, floor, finishes, ceilings, lighting, mechanical, fire sprinklers, electrical work, millwork, non-structural partitions, and interior signage. no changes to existing base building, structure. no change in use or occupancyDetails
interior ti of existing shell. new restrooms, kitchen, floor, finishes, ceilings, lighting, mechanical, fire sprinklers, electrical work, millwork, non-structural partitions, and interior signage. no changes to existing base building, structure. no change in use or occupancy | $2,920,000 |
| Jun 11, 2019 | Completed final sign-off Aug 2019 | 1700 Owens St | Rossi Builders Inc. | ref pa# 2019-0425-8886: electrical scope- furnish and install new lighting at conference office and meeting area and connect to exieting lighting circuits.Details
ref pa# 2019-0425-8886: electrical scope- furnish and install new lighting at conference office and meeting area and connect to exieting lighting circuits. | $57,000 |
| Jun 11, 2019 | Completed final sign-off Aug 2019 | 1700 Owens St | Rossi Builders Inc. | ste: 535: ref pa# 2019-0425-8886: hvac- grille, ductwork to be demolished and relocated.Details
ste: 535: ref pa# 2019-0425-8886: hvac- grille, ductwork to be demolished and relocated. | $19,000 |