Joelle Kristina Rosander

License
C34103
Look the license up with the state
Listed as
architect, engineer
Firm
M. Moser Associates
Based in
San Francisco
On San Francisco permits
Mar 2015 to Dec 2019

47 permits since 2000 (architect on 45 permits, engineer on 2 permits): 44 completed, 3 never finaled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 18, 2019Completed
final sign-off May 2020
250 Brannan StNovo Construction Inc1st floor: revision to app#201907125792 to move mens and womens ada stall toilet and grab bars for code complianc. ref app#201907125792
Details
Permit
201912189859
Status
complete
Filed
Dec 18, 2019
Permit issued
Dec 18, 2019
Final sign-off
May 18, 2020
Declared cost
$15,000
Address
250 Brannan St

1st floor: revision to app#201907125792 to move mens and womens ada stall toilet and grab bars for code complianc. ref app#201907125792

Open the permit page

$15,000
Nov 26, 2019Completed
final sign-off May 2021
650 California StBcci Construction Company33rd fl - ti work includes demo of existing tenant walls, ceiling. new drywall and demountable galss partitions, furn and finishes for offices. break room for employee use only
Details
Permit
201911268224
Status
complete
Filed
Nov 26, 2019
Permit issued
Feb 5, 2020
Final sign-off
May 19, 2021
Declared cost
$4,678,605
Address
650 California St

33rd fl - ti work includes demo of existing tenant walls, ceiling. new drywall and demountable galss partitions, furn and finishes for offices. break room for employee use only

Open the permit page

$4,678,605
Nov 6, 2019Completed
final sign-off Feb 2020
570 Pacific AvAecore Inc.2nd fl: t.i. selective demo of partitions etc, (n) interior partitions doors and glazing, mep, and fire protection under separate permit
Details
Permit
201911066607
Status
complete
Filed
Nov 6, 2019
Permit issued
Nov 20, 2019
Final sign-off
Feb 21, 2020
Declared cost
$331,100
Address
570 Pacific Av

2nd fl: t.i. selective demo of partitions etc, (n) interior partitions doors and glazing, mep, and fire protection under separate permit

Open the permit page

$331,100
Nov 5, 2019Completed
final sign-off May 2021
650 California StBcci Construction Company32nd floor: demo extg walls and ceilings. new drywall and demountable glass partitions, furn, and finishes for officers.
Details
Permit
201911056459
Status
complete
Filed
Nov 5, 2019
Permit issued
Nov 7, 2019
Final sign-off
May 19, 2021
Declared cost
$4,000,000
Address
650 California St

32nd floor: demo extg walls and ceilings. new drywall and demountable glass partitions, furn, and finishes for officers.

Open the permit page

$4,000,000
Oct 1, 2019Completed
final sign-off May 2020
1700 Owens StRossi Builders Inc.revision to 201905019428, structural updates to pergola. maher n/a
Details
Permit
201910013233
Status
complete
Filed
Oct 1, 2019
Permit issued
Oct 22, 2019
Final sign-off
May 19, 2020
Address
1700 Owens St

revision to 201905019428, structural updates to pergola. maher n/a

Open the permit page

Sep 30, 2019Completed
final sign-off Dec 2019
650 California StBcci Construction Company28th fl - work inlcudes selective removal of furniture, light fixture, relocateion and power relocation. new drywall, furniture and finishes
Details
Permit
201909303110
Status
complete
Filed
Sep 30, 2019
Permit issued
Oct 21, 2019
Final sign-off
Dec 23, 2019
Declared cost
$135,000
Address
650 California St

28th fl - work inlcudes selective removal of furniture, light fixture, relocateion and power relocation. new drywall, furniture and finishes

Open the permit page

$135,000
Jul 22, 2019Completed
final sign-off Feb 2020
250 Brannan StNovo Construction Inc2nd fl - selective demo of non-load beams partitions, ceiling and finishes ab017
Details
Permit
201907226459
Status
complete
Filed
Jul 22, 2019
Permit issued
Jul 24, 2019
Final sign-off
Feb 28, 2020
Declared cost
$15,000
Address
250 Brannan St

2nd fl - selective demo of non-load beams partitions, ceiling and finishes ab017

Open the permit page

$15,000
Jul 22, 2019Never finaled
issued Jul 2019, no final
250 Brannan StNovo Construction Incbasement selective demo of non-load beams partitions, ceiling and finishes ab017
Details
Permit
201907226458
Status
issued
Filed
Jul 22, 2019
Permit issued
Jul 24, 2019
Declared cost
$15,000
Address
250 Brannan St

basement selective demo of non-load beams partitions, ceiling and finishes ab017

Open the permit page

$15,000
Jul 22, 2019Completed
final sign-off Feb 2020
250 Brannan StNovo Construction Inc1st fl: selective demo of non-load beams partitions, cieling and finishes ab017
Details
Permit
201907226457
Status
complete
Filed
Jul 22, 2019
Permit issued
Jul 24, 2019
Final sign-off
Feb 28, 2020
Declared cost
$15,000
Address
250 Brannan St

1st fl: selective demo of non-load beams partitions, cieling and finishes ab017

Open the permit page

$15,000
Jun 21, 2019Completed
final sign-off Dec 2019
250 Brannan StNovo Construction Incinterior ti at 3rd fl. work includes new partitions, finishes, lighting, equipment maher not req
Details
Permit
201906214140
Status
complete
Filed
Jun 21, 2019
Permit issued
Jul 2, 2019
Final sign-off
Dec 10, 2019
Declared cost
$1,638,416
Address
250 Brannan St

interior ti at 3rd fl. work includes new partitions, finishes, lighting, equipment maher not req

Open the permit page

$1,638,416
Jun 10, 2019Completed
final sign-off Dec 2019
505 Sansome StSkyline Construction20th flr. interior demo and configuration of office space to incl 2 private offices and wellness.
Details
Permit
201906102952
Status
complete
Filed
Jun 10, 2019
Permit issued
Jun 10, 2019
Final sign-off
Dec 30, 2019
Declared cost
$35,000
Address
505 Sansome St

20th flr. interior demo and configuration of office space to incl 2 private offices and wellness.

Open the permit page

$35,000
May 30, 2019Completed
final sign-off Dec 2019
250 Brannan StNovo Construction Incselective demolition of non-load bearing partitions ceilings and finishes on the 3rd floor. ab-017.
Details
Permit
201905301998
Status
complete
Filed
May 30, 2019
Permit issued
Jun 5, 2019
Final sign-off
Dec 16, 2019
Declared cost
$15,000
Address
250 Brannan St

selective demolition of non-load bearing partitions ceilings and finishes on the 3rd floor. ab-017.

Open the permit page

$15,000
May 13, 2019Never finaled
issued May 2019, no final
139 Townsend StDpr Constructionsuite 150. interior improvements of (e) office space incl non-structural partitions, finishes, lighting and equipment. defferred submittals for fire sprinkler, smoke detection and fire alarm system. n/a for maher
Details
Permit
201905130430
Status
issued
Filed
May 13, 2019
Permit issued
May 20, 2019
Declared cost
$426,100
Address
139 Townsend St

suite 150. interior improvements of (e) office space incl non-structural partitions, finishes, lighting and equipment. defferred submittals for fire sprinkler, smoke detection and fire alarm system. n/a for maher

Open the permit page

$426,100
May 1, 2019Completed
final sign-off May 2020
1700 Owens StRossi Builders Inc.revision to 201809059128 addition of pergola at southeast plaza to serve (e) retail
Details
Permit
201905019428
Status
complete
Filed
May 1, 2019
Permit issued
Aug 27, 2019
Final sign-off
May 19, 2020
Declared cost
$22,000
Address
1700 Owens St

revision to 201809059128 addition of pergola at southeast plaza to serve (e) retail

Open the permit page

$22,000
Apr 19, 2019Completed
final sign-off Dec 2019
510 Townsend StPrincipal Builders Inc.provide new automatic rollup door, tied into bld life safety system
Details
Permit
201904198469
Status
complete
Filed
Apr 19, 2019
Permit issued
Apr 30, 2019
Final sign-off
Dec 24, 2019
Declared cost
$10,000
Address
510 Townsend St

provide new automatic rollup door, tied into bld life safety system

Open the permit page

$10,000
Jan 9, 2019Completed
final sign-off May 2020
1700 Owens StRossi Builders Inc.revision to 201809059128 - replace fireplace spec
Details
Permit
201901099888
Status
complete
Filed
Jan 9, 2019
Permit issued
Jan 14, 2019
Final sign-off
May 19, 2020
Declared cost
$10,000
Address
1700 Owens St

revision to 201809059128 - replace fireplace spec

Open the permit page

$10,000
Apr 30, 2018Completed
final sign-off Apr 2021
1550 Bryant StNovo Construction Increvision to pa 2018-0123-9238 to modify approved construction plan. add two restricted access doors at reception / lounge area at second floor.
Details
Permit
201804307723
Status
complete
Filed
Apr 30, 2018
Permit issued
Jun 20, 2018
Final sign-off
Apr 8, 2021
Address
1550 Bryant St

revision to pa 2018-0123-9238 to modify approved construction plan. add two restricted access doors at reception / lounge area at second floor.

Open the permit page

Mar 14, 2018Completed
final sign-off Jan 2020
510 Townsend StPrincipal Builders Inc.health routing only ref 201706270517
Details
Permit
201803143647
Status
complete
Filed
Mar 14, 2018
Permit issued
Mar 14, 2018
Final sign-off
Jan 29, 2020
Address
510 Townsend St

health routing only ref 201706270517

Open the permit page

Mar 12, 2018Completed
final sign-off May 2018
77 Maiden LnNovo Construction Inc6th floor:revision to app#201712085976 to revised previously approved floor plan. capp#201712085976
Details
Permit
201803123384
Status
complete
Filed
Mar 12, 2018
Permit issued
Mar 13, 2018
Final sign-off
May 8, 2018
Address
77 Maiden Ln

6th floor:revision to app#201712085976 to revised previously approved floor plan. capp#201712085976

Open the permit page

Feb 15, 2018Completed
final sign-off Aug 2018
1550 Bryant StNovo Construction Increvision to pa 201801239238 add food service equipment for office kitchen
Details
Permit
201802151357
Status
complete
Filed
Feb 15, 2018
Permit issued
Feb 22, 2018
Final sign-off
Aug 13, 2018
Declared cost
$140,000
Address
1550 Bryant St

revision to pa 201801239238 add food service equipment for office kitchen

Open the permit page

$140,000
Jan 23, 2018Completed
final sign-off Aug 2018
1550 Bryant StNovo Construction Inc2nd fl - ti on 2nd floor to include new non load bearing partitions, finishes and millwork. mep & fire life safety under separate permit
Details
Permit
201801239238
Status
complete
Filed
Jan 23, 2018
Permit issued
Jan 29, 2018
Final sign-off
Aug 13, 2018
Declared cost
$400,000
Address
1550 Bryant St

2nd fl - ti on 2nd floor to include new non load bearing partitions, finishes and millwork. mep & fire life safety under separate permit

Open the permit page

$400,000
Dec 8, 2017Completed
final sign-off Jun 2018
77 Maiden LnNovo Construction Inc7th fl - new partitions, finishes, lighting and equipment. meps, life safety or sprinler under separate permit. mep is required.
Details
Permit
201712085968
Status
complete
Filed
Dec 8, 2017
Permit issued
Jan 25, 2018
Final sign-off
Jun 20, 2018
Declared cost
$350,000
Address
77 Maiden Ln

7th fl - new partitions, finishes, lighting and equipment. meps, life safety or sprinler under separate permit. mep is required.

Open the permit page

$350,000
Dec 8, 2017Completed
final sign-off May 2018
77 Maiden LnNovo Construction Inc5th fl - new partitions, finishes, lighting and equipment. meps, life safety or sprinller under separate permit. if needed
Details
Permit
201712085973
Status
complete
Filed
Dec 8, 2017
Permit issued
Jan 25, 2018
Final sign-off
May 8, 2018
Declared cost
$700,000
Address
77 Maiden Ln

5th fl - new partitions, finishes, lighting and equipment. meps, life safety or sprinller under separate permit. if needed

Open the permit page

$700,000
Dec 8, 2017Completed
final sign-off May 2018
77 Maiden LnNovo Construction Inc6th fl - new partitions, finishes, lighting and equipment. meps, life safety or sprinller under separate permit. if needed
Details
Permit
201712085976
Status
complete
Filed
Dec 8, 2017
Permit issued
Jan 25, 2018
Final sign-off
May 8, 2018
Declared cost
$1,100,000
Address
77 Maiden Ln

6th fl - new partitions, finishes, lighting and equipment. meps, life safety or sprinller under separate permit. if needed

Open the permit page

$1,100,000
Dec 7, 2017Completed
final sign-off Jul 2018
123 Mission StRichlen Construction28th fl: interior ti improvement of warm shell space, construction to include new partitions, finishes, lighting and equipment. mep. maher na
Details
Permit
201712075795
Status
complete
Filed
Dec 7, 2017
Permit issued
Jan 11, 2018
Final sign-off
Jul 27, 2018
Declared cost
$27,300
Address
123 Mission St

28th fl: interior ti improvement of warm shell space, construction to include new partitions, finishes, lighting and equipment. mep. maher na

Open the permit page

$27,300
Dec 7, 2017Completed
final sign-off Jul 2018
123 Mission StRichlen Construction18th floor only: interior ti of warm shell space, construction to include new partitions, finishes, lighting and equipment. mep. maher na
Details
Permit
201712075787
Status
complete
Filed
Dec 7, 2017
Permit issued
Jan 11, 2018
Final sign-off
Jul 27, 2018
Declared cost
$376,144
Address
123 Mission St

18th floor only: interior ti of warm shell space, construction to include new partitions, finishes, lighting and equipment. mep. maher na

Open the permit page

$376,144
Nov 1, 2017Completed
final sign-off Sep 2019
510 Townsend StPrincipal Builders Inc.revision to approved pa #201708033839 to conforporate a 2" depressed slab at the 4th fl in leiu of slab pour back. maher na
Details
Permit
201711012841
Status
complete
Filed
Nov 1, 2017
Permit issued
Nov 3, 2017
Final sign-off
Sep 11, 2019
Address
510 Townsend St

revision to approved pa #201708033839 to conforporate a 2" depressed slab at the 4th fl in leiu of slab pour back. maher na

Open the permit page

Aug 17, 2017Completed
final sign-off Mar 2018
88 Kearny StField Construction Inc.2/f: rev to pa#201706219993. removal of partition from scope.
Details
Permit
201708175077
Status
complete
Filed
Aug 17, 2017
Permit issued
Aug 25, 2017
Final sign-off
Mar 26, 2018
Address
88 Kearny St

2/f: rev to pa#201706219993. removal of partition from scope.

Open the permit page

Aug 3, 2017Completed
final sign-off Sep 2019
510 Townsend StPrincipal Builders Inc.4th fl: interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under separate permit. new bldg. pa#201503050110. n/a ordinance #155-13
Details
Permit
201708033839
Status
complete
Filed
Aug 3, 2017
Permit issued
Aug 11, 2017
Final sign-off
Sep 11, 2019
Declared cost
$600,000
Address
510 Townsend St

4th fl: interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under separate permit. new bldg. pa#201503050110. n/a ordinance #155-13

Open the permit page

$600,000
Aug 3, 2017Completed
final sign-off Sep 2019
510 Townsend StPrincipal Builders Inc.5th fl: interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under separate permit. new bldg. pa#201503050110. n/a ordinance #155-13
Details
Permit
201708033842
Status
complete
Filed
Aug 3, 2017
Permit issued
Aug 16, 2017
Final sign-off
Sep 11, 2019
Declared cost
$600,000
Address
510 Townsend St

5th fl: interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under separate permit. new bldg. pa#201503050110. n/a ordinance #155-13

Open the permit page

$600,000
Aug 1, 2017Completed
final sign-off Sep 2019
510 Townsend StPrincipal Builders Inc.3/f- interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under seperate permit. new bldg. pa#201503050110. n/a ordinance #155-13
Details
Permit
201708013474
Status
complete
Filed
Aug 1, 2017
Permit issued
Aug 10, 2017
Final sign-off
Sep 10, 2019
Declared cost
$600,000
Address
510 Townsend St

3/f- interior t.i. of warm shell space, construction to include new partitions, finishes, lighting and equipment. fire protection under seperate permit. new bldg. pa#201503050110. n/a ordinance #155-13

Open the permit page

$600,000
Jul 12, 2017Completed
final sign-off Aug 2018
1 Front StNovo Construction Inc21/f: t.i. to include new partitions, finishes, lighting, pantry & restrooms. alarm, sprinkler deferred. (interstory stairway to 20/f under separate permit for both architectural and structural).
Details
Permit
201707121621
Status
complete
Filed
Jul 12, 2017
Permit issued
Jul 24, 2017
Final sign-off
Aug 29, 2018
Declared cost
$1,964,000
Address
1 Front St

21/f: t.i. to include new partitions, finishes, lighting, pantry & restrooms. alarm, sprinkler deferred. (interstory stairway to 20/f under separate permit for both architectural and structural).

Open the permit page

$1,964,000
Jul 12, 2017Completed
final sign-off Aug 2018
1 Front StNovo Construction Inc20/f: t.i. to include new partitions, finishes, lighting, pantry & restrooms. alarm, sprinkler deferred.(interstory stairway under separate permit for both architectural and structural).
Details
Permit
201707121620
Status
complete
Filed
Jul 12, 2017
Permit issued
Jul 24, 2017
Final sign-off
Aug 29, 2018
Declared cost
$1,964,000
Address
1 Front St

20/f: t.i. to include new partitions, finishes, lighting, pantry & restrooms. alarm, sprinkler deferred.(interstory stairway under separate permit for both architectural and structural).

Open the permit page

$1,964,000
Jun 27, 2017Completed
final sign-off Nov 2019
510 Townsend StPrincipal Builders Inc.interior ti of shell space on 6th & 7th flrs. (n) partitions, finishes, mep, (n) kitchen & dining areas. fitout of (e) roof terrace.
Details
Permit
201706270517
Status
complete
Filed
Jun 27, 2017
Permit issued
Dec 13, 2017
Final sign-off
Nov 21, 2019
Declared cost
$2,000,000
Address
510 Townsend St

interior ti of shell space on 6th & 7th flrs. (n) partitions, finishes, mep, (n) kitchen & dining areas. fitout of (e) roof terrace.

Open the permit page

$2,000,000
May 23, 2017Completed
final sign-off Sep 2019
510 Townsend StPrincipal Builders Inc.interior tenant improvement of fully sprinklered building. new partitions, finishes, lighting, equipment on 2nd floor. n/a maher
Details
Permit
201705237372
Status
complete
Filed
May 23, 2017
Permit issued
Jul 5, 2017
Final sign-off
Sep 10, 2019
Declared cost
$2,850,000
Address
510 Townsend St

interior tenant improvement of fully sprinklered building. new partitions, finishes, lighting, equipment on 2nd floor. n/a maher

Open the permit page

$2,850,000
Apr 14, 2017Completed
final sign-off Aug 2017
303 02nd StBcci Construction Companyrevision to pa #201703151499 in response to field inspector request to correct da checklist. maher n/a
Details
Permit
201704144024
Status
complete
Filed
Apr 14, 2017
Permit issued
Apr 14, 2017
Final sign-off
Aug 28, 2017
Address
303 02nd St

revision to pa #201703151499 in response to field inspector request to correct da checklist. maher n/a

Open the permit page

Mar 29, 2017Completed
final sign-off Nov 2019
510 Townsend StPrincipal Builders Inc.basement & 1st flr: ti for new bld approved under pa 201503050110. work includes new partitions, finishes, mep. fire protection under seperate permit. no exterioe work maher na
Details
Permit
201703292700
Status
complete
Filed
Mar 29, 2017
Permit issued
Jun 30, 2017
Final sign-off
Nov 21, 2019
Declared cost
$2,500,000
Address
510 Townsend St

basement & 1st flr: ti for new bld approved under pa 201503050110. work includes new partitions, finishes, mep. fire protection under seperate permit. no exterioe work maher na

Open the permit page

$2,500,000
Mar 15, 2017Completed
final sign-off May 2018
303 02nd StBcci Construction Company6/f-interior t.i. to include a new corridor, drywall & finishes. mech. & electrical under seperate permit. n/a ordinance #155-13
Details
Permit
201703151499
Status
complete
Filed
Mar 15, 2017
Permit issued
Mar 16, 2017
Final sign-off
May 9, 2018
Declared cost
$79,680
Address
303 02nd St

6/f-interior t.i. to include a new corridor, drywall & finishes. mech. & electrical under seperate permit. n/a ordinance #155-13

Open the permit page

$79,680
Sep 20, 2016Never finaled
issued Sep 2016, no final
123 Mission StPrincipal Builders Inc.demo of partitions, doors, millwork and finishes on 11th flr space to reamin vacant per ab017 future ti permit w/full ada pending maher na
Details
Permit
201609208273
Status
issued
Filed
Sep 20, 2016
Permit issued
Sep 20, 2016
Declared cost
$67,080
Address
123 Mission St

demo of partitions, doors, millwork and finishes on 11th flr space to reamin vacant per ab017 future ti permit w/full ada pending maher na

Open the permit page

$67,080
Jun 9, 2016Completed
final sign-off Nov 2016
123 Mission StPrincipal Builders Inc.12th floor tenant improvement to construct new partition, doors, millwork, finishes, ceilings, & m.e.p. fire alarms, sprinkelrs under separate permit.
Details
Permit
201606099546
Status
complete
Filed
Jun 9, 2016
Permit issued
Jun 21, 2016
Final sign-off
Nov 7, 2016
Declared cost
$1,274,640
Address
123 Mission St

12th floor tenant improvement to construct new partition, doors, millwork, finishes, ceilings, & m.e.p. fire alarms, sprinkelrs under separate permit.

Open the permit page

$1,274,640
Jun 9, 2016Completed
final sign-off Nov 2016
123 Mission StPrincipal Builders Inc.14th floor tenant improvement to construct new partition doors, millwork, finishes ceilings, & m.e.p. fire alarms, sprinkelrs under separate permit.
Details
Permit
201606099542
Status
complete
Filed
Jun 9, 2016
Permit issued
Jun 21, 2016
Final sign-off
Nov 7, 2016
Declared cost
$1,274,640
Address
123 Mission St

14th floor tenant improvement to construct new partition doors, millwork, finishes ceilings, & m.e.p. fire alarms, sprinkelrs under separate permit.

Open the permit page

$1,274,640
Jun 1, 2016Completed
final sign-off Nov 2016
123 Mission StPrincipal Builders Inc.demo of existing partitions, doors, millwork and finishes, space to remain vacant under ab017 on 14/f. n/a ordinance #155-13
Details
Permit
201606018876
Status
complete
Filed
Jun 1, 2016
Permit issued
Jun 1, 2016
Final sign-off
Nov 9, 2016
Declared cost
$78,260
Address
123 Mission St

demo of existing partitions, doors, millwork and finishes, space to remain vacant under ab017 on 14/f. n/a ordinance #155-13

Open the permit page

$78,260
Jun 1, 2016Completed
final sign-off Nov 2016
123 Mission StPrincipal Builders Inc.demo of existing partitions, doors, millwork and finishes, space to remain vacant under ab017 on 15th floor. n/a ordinance #155-13
Details
Permit
201606018877
Status
complete
Filed
Jun 1, 2016
Permit issued
Jun 1, 2016
Final sign-off
Nov 9, 2016
Declared cost
$78,260
Address
123 Mission St

demo of existing partitions, doors, millwork and finishes, space to remain vacant under ab017 on 15th floor. n/a ordinance #155-13

Open the permit page

$78,260
Jun 1, 2016Completed
final sign-off Nov 2016
123 Mission StPrincipal Builders Inc.demo of existing partitions, doors, millwork and finishes, space to remain vacant under ab017 on 12th floor. n/a ordinance #155-13
Details
Permit
201606018874
Status
complete
Filed
Jun 1, 2016
Permit issued
Jun 1, 2016
Final sign-off
Nov 9, 2016
Declared cost
$78,260
Address
123 Mission St

demo of existing partitions, doors, millwork and finishes, space to remain vacant under ab017 on 12th floor. n/a ordinance #155-13

Open the permit page

$78,260
Dec 4, 2015Completed
final sign-off Jun 2016
1700 Owens StBcci Construction Companyt.i. of an (e) office and common area on the 5/f, scope of work to demo 9e) offices to create open work space. n/a ordinance #155-13
Details
Permit
201512044170
Status
complete
Filed
Dec 4, 2015
Permit issued
Dec 11, 2015
Final sign-off
Jun 27, 2016
Declared cost
$748,000
Address
1700 Owens St

t.i. of an (e) office and common area on the 5/f, scope of work to demo 9e) offices to create open work space. n/a ordinance #155-13

Open the permit page

$748,000
Nov 13, 2015Completed
final sign-off Jul 2016
1 Market StDpr Constructionspear tower, 19th floor - demolition of walls, flooring, mechanical and electrical systems, ceiling tiles per ab-17. n/a ordinance #155-13
Details
Permit
201511132500
Status
complete
Filed
Nov 13, 2015
Permit issued
Nov 20, 2015
Final sign-off
Jul 19, 2016
Declared cost
$110,000
Address
1 Market St

spear tower, 19th floor - demolition of walls, flooring, mechanical and electrical systems, ceiling tiles per ab-17. n/a ordinance #155-13

Open the permit page

$110,000
Mar 17, 2015Completed
final sign-off Feb 2016
101 California StBcci Construction Companyrev. to pa#201501145728 to show reduced scope of work, a portion of the suite is no longer in scope. n/a ordinance #155-13
Details
Permit
201503171086
Status
complete
Filed
Mar 17, 2015
Permit issued
Mar 17, 2015
Final sign-off
Feb 4, 2016
Address
101 California St

rev. to pa#201501145728 to show reduced scope of work, a portion of the suite is no longer in scope. n/a ordinance #155-13

Open the permit page