Block 3717, lot 022
123 Mission St
- City’s use
- Commercial Office
- Built
- 1987
- Stories
- 29
- Building
- 387,598 sq ft
- Lot
- 25,208 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
70 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 24, 2023 | Completed final sign-off May 2023 | 123 Mission St | Everon Llc | upgrade (e) communication on fire alarm system from phone lines to cellular communicatorDetails
upgrade (e) communication on fire alarm system from phone lines to cellular communicator | |
| Sep 30, 2021 | Completed final sign-off Nov 2021 | 123 Mission St | R L H Fire Protection Inc | fire sprinkler: voluntary elevator modernization, remove sprinklers and piping from elevator machine rooms and shafts based on sffd approved letter dated 3/4/2021Details
fire sprinkler: voluntary elevator modernization, remove sprinklers and piping from elevator machine rooms and shafts based on sffd approved letter dated 3/4/2021 | $5,000 |
| Nov 22, 2019 | Expired or cancelled cancelled Jan 2026 | 123 Mission St | Truebeck Construction | l15 - restroom upgrades includes demo & new construction of toilet rooms fixtures, partitions, accessories, finishes, ceiling & lighting. mep deferred.Details
l15 - restroom upgrades includes demo & new construction of toilet rooms fixtures, partitions, accessories, finishes, ceiling & lighting. mep deferred. | $20,000 |
| Nov 22, 2019 | Expired or cancelled cancelled Jan 2026 | 123 Mission St | Truebeck Construction | l8 - restroom upgrades includes demo & new construction of toilet rooms fixtures, partitions, accessories, finishes, ceiling & lighting. mep deferred.Details
l8 - restroom upgrades includes demo & new construction of toilet rooms fixtures, partitions, accessories, finishes, ceiling & lighting. mep deferred. | $20,000 |
| Nov 22, 2019 | Expired or cancelled cancelled Jan 2026 | 123 Mission St | Truebeck Construction | l10 - restroom upgrades includes demo & new construction of toilet rooms fixtures, partitions, accessories, finishes, ceiling & lighting. mep deferred.Details
l10 - restroom upgrades includes demo & new construction of toilet rooms fixtures, partitions, accessories, finishes, ceiling & lighting. mep deferred. | $20,000 |
| Nov 15, 2019 | Never finaled issued Nov 2019, no final | 123 Mission St | Truebeck Construction | minor upgrades to path of travel including barier removal. work limited to garage. surface changes only. n/a maherDetails
minor upgrades to path of travel including barier removal. work limited to garage. surface changes only. n/a maher | $10,000 |
| Nov 6, 2019 | Never finaled issued Nov 2019, no final | 123 Mission St | Cosco Fire Protection Inc. | 10th fl: remove (e) pendent head sprinklers within the area of work & restore (e) upright protection throughout area of work, remove unused line piping, prepare space for future t.i 64 headsDetails
10th fl: remove (e) pendent head sprinklers within the area of work & restore (e) upright protection throughout area of work, remove unused line piping, prepare space for future t.i 64 heads | $5,300 |
| Nov 6, 2019 | Never finaled issued Nov 2019, no final | 123 Mission St | Cosco Fire Protection Inc. | 15th fl. remove (e) pendent head sprinklers within the area of work & restore (e) upright protection throughout area of work, remove unused line piping, prepare space for future t.iDetails
15th fl. remove (e) pendent head sprinklers within the area of work & restore (e) upright protection throughout area of work, remove unused line piping, prepare space for future t.i | $5,300 |
| Nov 6, 2019 | Never finaled issued Nov 2019, no final | 123 Mission St | Cosco Fire Protection Inc. | 8th fl: remove (e) pendent head sprinklers within the area of work & restore (e) upright protection throughout area of work, remove unused line piping, prepare space for future t.i 64 headsDetails
8th fl: remove (e) pendent head sprinklers within the area of work & restore (e) upright protection throughout area of work, remove unused line piping, prepare space for future t.i 64 heads | $5,300 |
| Jul 9, 2019 | Completed final sign-off Sep 2019 | 123 Mission St | Red Hawk Fire & Security Ca Llc | 18/f: install fire alarm: add 3 speaker stobes & 4 speakers only. ref t.i. pa#201906274549. maher n/a.Details
18/f: install fire alarm: add 3 speaker stobes & 4 speakers only. ref t.i. pa#201906274549. maher n/a. | $3,800 |
| Jul 3, 2019 | Completed final sign-off Aug 2019 | 123 Mission St | R L H Fire Protection Inc | ref pa# 201906274549; fire sprinkler permit, add 6 pendent sprinklers for new phone booths on the 18th fl.Details
ref pa# 201906274549; fire sprinkler permit, add 6 pendent sprinklers for new phone booths on the 18th fl. | $3,000 |
| Jun 27, 2019 | Completed final sign-off Sep 2019 | 123 Mission St | Bcci Construction Company | 18th fl: architectural permit to remodel breakroom. new cabinetry and finishes. structural pages included for (n) phone booths.Details
18th fl: architectural permit to remodel breakroom. new cabinetry and finishes. structural pages included for (n) phone booths. | $99,300 |
| May 30, 2019 | Completed final sign-off Jul 2019 | 123 Mission St | Bcci Construction Company | 4th & 5th fl - revision to previously approved permit. upgrade bathrooms to full compliance. ref pa #201801199017 & 201801199023Details
4th & 5th fl - revision to previously approved permit. upgrade bathrooms to full compliance. ref pa #201801199017 & 201801199023 | |
| May 30, 2019 | Completed final sign-off Jun 2019 | 123 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm revision to pa 2019-0131-1806 change fire alarm design from tenant build out to market ready. ref pa 2019-0510-0351Details
fire alarm revision to pa 2019-0131-1806 change fire alarm design from tenant build out to market ready. ref pa 2019-0510-0351 | $2,000 |
| May 17, 2019 | Completed final sign-off Aug 2019 | 123 Mission St | Bcci Construction Company | evacuation maps for 4th 7 5th fl (4 per floor, total 8)Details
evacuation maps for 4th 7 5th fl (4 per floor, total 8) | $3,600 |
| Apr 10, 2019 | Completed final sign-off Aug 2019 | 123 Mission St | Matrix Hg Inc | 29th fl - replace (2) boilers & distribution pumps and other hydronic specialtiesDetails
29th fl - replace (2) boilers & distribution pumps and other hydronic specialties | $246,000 |
| Feb 15, 2019 | Expired or cancelled cancelled Aug 2019 | 123 Mission St | Bcci Construction Company | 8th fl - electrical only permit to support architectural. retrofit lighting power & signal, wiring, lighting & controls. ref pa #201811085397.Details
8th fl - electrical only permit to support architectural. retrofit lighting power & signal, wiring, lighting & controls. ref pa #201811085397. | $50,000 |
| Jan 31, 2019 | Completed final sign-off Jun 2019 | 123 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. add (11) speaker strobes & (3) speakersDetails
fire alarm t.i. add (11) speaker strobes & (3) speakers | $9,000 |
| Dec 26, 2018 | Never finaled filed Dec 2018, never issued | 123 Mission St | renovation/remodel of lobby & plaza, expanding ground level retail into arcade & addition of retail portico in plaza, scope incudes selective demo, new storefronts, entry doors & exterior, interior finishes & signage, mep,fire sprinkler deferred.**comply w/ maher, route to dph**Details
renovation/remodel of lobby & plaza, expanding ground level retail into arcade & addition of retail portico in plaza, scope incudes selective demo, new storefronts, entry doors & exterior, interior finishes & signage, mep,fire sprinkler deferred.**comply w/ maher, route to dph** | $10,000,000 | |
| May 22, 2018 | Completed final sign-off Jan 2020 | 123 Mission St | Bcci Construction Company | 4th & 5th flr - revision to approved stair permit btw 4th & 5th flr change finishes replace glass panels with steel cable. ref 201801199016 maher naDetails
4th & 5th flr - revision to approved stair permit btw 4th & 5th flr change finishes replace glass panels with steel cable. ref 201801199016 maher na | $20,000 |
| Apr 30, 2018 | Never finaled issued May 2018, no final | 123 Mission St | Red Hawk Fire & Security Ca Llc | fire alram - ti 27th flr - add 1 speaker strobe and relocate 5 (e) speaker strobes. ref 201803224363. n/a for maher.Details
fire alram - ti 27th flr - add 1 speaker strobe and relocate 5 (e) speaker strobes. ref 201803224363. n/a for maher. | $1,000 |
| Apr 6, 2018 | Completed final sign-off Jul 2018 | 123 Mission St | Principal Builders Inc. | title 24 lighting, to add lighting & power to existing tennant space on 27 floor - please see pa # 2018-0322-4363 for ref. n/a maherDetails
title 24 lighting, to add lighting & power to existing tennant space on 27 floor - please see pa # 2018-0322-4363 for ref. n/a maher | $11,900 |
| Apr 2, 2018 | Completed final sign-off Jul 2018 | 123 Mission St | Principal Builders Inc. | t-24 mechanical to install new hvac systems on 27th fl. see pa #201803224363 for ti work. maher naDetails
t-24 mechanical to install new hvac systems on 27th fl. see pa #201803224363 for ti work. maher na | $12,750 |
| Feb 14, 2018 | Completed final sign-off May 2018 | 123 Mission St | Golden Gate Fire Protection Inc | 4&5/f: fire sprinkler only 2017-1208-5898 - relocate 47 pendents, add 7 relocate 17 uprights, add 8 for 4th floor; relocate 37 pendents; add 5, relocate 27 uprights; add 2 fl for 5th floor. all for master card on both floor (71 hd) 5th fl (79 hd) 4th flDetails
4&5/f: fire sprinkler only 2017-1208-5898 - relocate 47 pendents, add 7 relocate 17 uprights, add 8 for 4th floor; relocate 37 pendents; add 5, relocate 27 uprights; add 2 fl for 5th floor. all for master card on both floor (71 hd) 5th fl (79 hd) 4th fl | $37,500 |
| Feb 12, 2018 | Completed final sign-off May 2018 | 123 Mission St | R L H Fire Protection Inc | 28th floor: fire sprinkler t.i. 7 relocated pendent, 1 deleted pendent; 3 replaced pendent with upright sprinklers. ref app#201712075795Details
28th floor: fire sprinkler t.i. 7 relocated pendent, 1 deleted pendent; 3 replaced pendent with upright sprinklers. ref app#201712075795 | $3,000 |
| Feb 12, 2018 | Completed final sign-off Mar 2018 | 123 Mission St | R L H Fire Protection Inc | 18th floor: fire sprinkler t.i. 95 relocated pendents, 3 added pendents; 1 delete. ref app#201712075785 n/a for maherDetails
18th floor: fire sprinkler t.i. 95 relocated pendents, 3 added pendents; 1 delete. ref app#201712075785 n/a for maher | $20,000 |
| Jan 19, 2018 | Completed final sign-off Jul 2019 | 123 Mission St | Bcci Construction Company | 5th flr: demo of (e) structural slab and structural support beams. new communicating stair and new structural support beams maher naDetails
5th flr: demo of (e) structural slab and structural support beams. new communicating stair and new structural support beams maher na | $300,000 |
| Dec 12, 2017 | Completed final sign-off May 2019 | 123 Mission St | Bcci Construction Company | 4th & 5th flr: demo of non structural partitions accoustical ceiling & lighting, ref sprinkler 201712085893Details
4th & 5th flr: demo of non structural partitions accoustical ceiling & lighting, ref sprinkler 201712085893 | $40,000 |
| Dec 8, 2017 | Never finaled issued Dec 2017, no final | 123 Mission St | Golden Gate Fire Protection Inc | 4/f & 5/f- fire sprinkler only, return back to shell system, relocate 63 heads (upright) per floor, total 126 total. n/a ordinance #155-13Details
4/f & 5/f- fire sprinkler only, return back to shell system, relocate 63 heads (upright) per floor, total 126 total. n/a ordinance #155-13 | $31,500 |
| Dec 7, 2017 | Completed final sign-off Jul 2018 | 123 Mission St | Richlen Construction | 28th fl: interior ti improvement of warm shell space, construction to include new partitions, finishes, lighting and equipment. mep. maher naDetails
28th fl: interior ti improvement of warm shell space, construction to include new partitions, finishes, lighting and equipment. mep. maher na | $27,300 |
| Dec 7, 2017 | Completed final sign-off Jul 2018 | 123 Mission St | Richlen Construction | 18th floor only: interior ti of warm shell space, construction to include new partitions, finishes, lighting and equipment. mep. maher naDetails
18th floor only: interior ti of warm shell space, construction to include new partitions, finishes, lighting and equipment. mep. maher na | $376,144 |
| Nov 22, 2017 | Never finaled issued Nov 2017, no final | 123 Mission St | Richlen Construction | 18th fl: demo permit only of existing non structural partitions, associated power and telecom outlets, plumbing, ceiling, light fixtures finishes. maher naDetails
18th fl: demo permit only of existing non structural partitions, associated power and telecom outlets, plumbing, ceiling, light fixtures finishes. maher na | $90,000 |
| May 10, 2017 | Expired or cancelled cancelled Jan 2026 | 123 Mission St | Skyline Construction | 4, 5 and 6 interior demo of non-load bearing partitions, restrooms ceilings, lighting elements, millwork, doors, glazing finishes & mep. ab-017Details
4, 5 and 6 interior demo of non-load bearing partitions, restrooms ceilings, lighting elements, millwork, doors, glazing finishes & mep. ab-017 | $55,000 |
| Apr 24, 2017 | Completed final sign-off Aug 2017 | 123 Mission St | Skyline Construction | 16/f- revision to pa#201703151485 to change mothers room #1660 to storage. change focus room 1626 to mother's room. arch t.i. pa#201703151485Details
16/f- revision to pa#201703151485 to change mothers room #1660 to storage. change focus room 1626 to mother's room. arch t.i. pa#201703151485 | |
| Apr 14, 2017 | Never finaled issued Apr 2017, no final | 123 Mission St | Golden Gate Fire Protection Inc | fire sprinkler ref 201703151485: 16th flr: relocate 88 uprights maher naDetails
fire sprinkler ref 201703151485: 16th flr: relocate 88 uprights maher na | $60,375 |
| Apr 10, 2017 | Completed final sign-off Feb 2018 | 123 Mission St | Skyline Construction | mechanical, electrical & plumbing for ti on the 16th floor. ref pa 2017-0315-1485. fire alarm deferred.Details
mechanical, electrical & plumbing for ti on the 16th floor. ref pa 2017-0315-1485. fire alarm deferred. | $350,000 |
| Mar 17, 2017 | Completed final sign-off Mar 2017 | 123 Mission St | Red Hawk Fire & Security Ca Llc | 9th floor fire alarm t.i. - add 3 speakers & 2 speaker/strobes. ref pa #201612144908. n/a maher ordinanceDetails
9th floor fire alarm t.i. - add 3 speakers & 2 speaker/strobes. ref pa #201612144908. n/a maher ordinance | $2,500 |
| Mar 15, 2017 | Completed final sign-off Feb 2018 | 123 Mission St | Skyline Construction | non structural construction and toilet upgrades to comply with current ada mep, life safety, fire sprinkler under separate permitDetails
non structural construction and toilet upgrades to comply with current ada mep, life safety, fire sprinkler under separate permit | $1,300,000 |
| Feb 17, 2017 | Completed final sign-off Mar 2017 | 123 Mission St | Golden Gate Fire Protection Inc | 9th floor: fire sprinkler only. relocate 12 pendents for ncc group. ref app#201612144908. n/a for maher.Details
9th floor: fire sprinkler only. relocate 12 pendents for ncc group. ref app#201612144908. n/a for maher. | $3,000 |
| Sep 20, 2016 | Never finaled issued Sep 2016, no final | 123 Mission St | Principal Builders Inc. | demo of partitions, doors, millwork and finishes on 11th flr space to reamin vacant per ab017 future ti permit w/full ada pending maher naDetails
demo of partitions, doors, millwork and finishes on 11th flr space to reamin vacant per ab017 future ti permit w/full ada pending maher na | $67,080 |
| Sep 1, 2016 | Completed final sign-off Sep 2016 | 123 Mission St | Red Hawk Fire & Security Ca Llc | 12th floor fire alarm for t.i. - add 30 new speaker strobes, 10 speakers, 1 relay for door holder, 1 relay for security interface, 1 smoke detector & 2 amplifiers. ref t.i. #201606099546. n/a maher ordinanceDetails
12th floor fire alarm for t.i. - add 30 new speaker strobes, 10 speakers, 1 relay for door holder, 1 relay for security interface, 1 smoke detector & 2 amplifiers. ref t.i. #201606099546. n/a maher ordinance | $25,000 |
| Sep 1, 2016 | Never finaled issued Sep 2016, no final | 123 Mission St | Red Hawk Fire & Security Ca Llc | 15th floor fire alarm for t.i. - add 30 new speaker strobes, 1 relay for door holder, 1 relay for security interface, 1 smoke detector & 2 amplifiers. ref t.i. #201607223119. n/a maher ordinanceDetails
15th floor fire alarm for t.i. - add 30 new speaker strobes, 1 relay for door holder, 1 relay for security interface, 1 smoke detector & 2 amplifiers. ref t.i. #201607223119. n/a maher ordinance | $25,000 |
| Sep 1, 2016 | Completed final sign-off Sep 2016 | 123 Mission St | Red Hawk Fire & Security Ca Llc | 14th floor fire alarm for t.i. - add 30 new speaker strobes, 11 speakers, 1 relay for door holder, 1 relay for security interface, 1 smoke detector & 1 amplifiers. ref t.i. #201606099542. n/a maher ordinanceDetails
14th floor fire alarm for t.i. - add 30 new speaker strobes, 11 speakers, 1 relay for door holder, 1 relay for security interface, 1 smoke detector & 1 amplifiers. ref t.i. #201606099542. n/a maher ordinance | $22,000 |
| Jun 1, 2016 | Completed final sign-off Nov 2016 | 123 Mission St | Principal Builders Inc. | demo of existing partitions, doors, millwork and finishes, space to remain vacant under ab017 on 12th floor. n/a ordinance #155-13Details
demo of existing partitions, doors, millwork and finishes, space to remain vacant under ab017 on 12th floor. n/a ordinance #155-13 | $78,260 |
| Jun 1, 2016 | Completed final sign-off Nov 2016 | 123 Mission St | Principal Builders Inc. | demo of existing partitions, doors, millwork and finishes, space to remain vacant under ab017 on 14/f. n/a ordinance #155-13Details
demo of existing partitions, doors, millwork and finishes, space to remain vacant under ab017 on 14/f. n/a ordinance #155-13 | $78,260 |
| Jun 1, 2016 | Completed final sign-off Nov 2016 | 123 Mission St | Principal Builders Inc. | demo of existing partitions, doors, millwork and finishes, space to remain vacant under ab017 on 15th floor. n/a ordinance #155-13Details
demo of existing partitions, doors, millwork and finishes, space to remain vacant under ab017 on 15th floor. n/a ordinance #155-13 | $78,260 |
| Mar 18, 2016 | Never finaled issued Mar 2016, no final | 123 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm ti add 2 relay modules for heat pump & fsd inside server room. revise existing smoke detector. add 2 monitoring module for damper status monitoring. ref pa 2016-0211-9429Details
fire alarm ti add 2 relay modules for heat pump & fsd inside server room. revise existing smoke detector. add 2 monitoring module for damper status monitoring. ref pa 2016-0211-9429 | $2,400 |
| Mar 17, 2016 | Completed final sign-off Apr 2016 | 123 Mission St | Red Hawk Fire & Security Ca Llc | 24th floor: fire alarm to add 16 speaker/strobes, and 3 speakers. ref app#201601278130Details
24th floor: fire alarm to add 16 speaker/strobes, and 3 speakers. ref app#201601278130 | $10,000 |
| Feb 11, 2016 | Never finaled issued Feb 2016, no final | 123 Mission St | Gci, Inc | relocation of storage door, no structural, mechanical or plumbing work. new electrical under separate permit.Details
relocation of storage door, no structural, mechanical or plumbing work. new electrical under separate permit. | $40,000 |
| Feb 11, 2016 | Never finaled issued Mar 2016, no final | 123 Mission St | Gci, Inc | enlarge existing server room, includes new mechanical and electrical. no structural or plumbing work. maher naDetails
enlarge existing server room, includes new mechanical and electrical. no structural or plumbing work. maher na | $10,000 |
| Jan 27, 2016 | Completed final sign-off Aug 2016 | 123 Mission St | Principal Builders Inc. | 24th - ti includes demo of non structural partitions and build new non stuctures partition/ mep included. fire/life safety not included - will be design build and submitted sep if needed. building fully sprinklered.Details
24th - ti includes demo of non structural partitions and build new non stuctures partition/ mep included. fire/life safety not included - will be design build and submitted sep if needed. building fully sprinklered. | $312,703 |
| Jun 17, 2015 | Completed final sign-off Jul 2015 | 123 Mission St | Golden Gate Fire Protection Inc | fire sprinkler only: relocate 10 upright sprinklers, add 92 pendents. total 102 heads for applied predicitive tech. on the 17/f. t.i. pa#201505015136. n/a ordinance #155-13Details
fire sprinkler only: relocate 10 upright sprinklers, add 92 pendents. total 102 heads for applied predicitive tech. on the 17/f. t.i. pa#201505015136. n/a ordinance #155-13 | $51,000 |
| May 21, 2015 | Completed final sign-off Jul 2015 | 123 Mission St | Pribuss Engineering Inc | 25th & 27th floor: t.i. fire sprinkler under appl. 2015.0323.1591 & 2015.0401.2504. add 8 heads and relocate 19 heads. maher n/a.Details
25th & 27th floor: t.i. fire sprinkler under appl. 2015.0323.1591 & 2015.0401.2504. add 8 heads and relocate 19 heads. maher n/a. | $13,895 |
| Apr 7, 2015 | Completed final sign-off May 2015 | 123 Mission St | Pribuss Engineering Inc | 26th floor: fire sprinkler t.i. relocates 5 sprinkler heads and add 4 sprinkler heads. maher n/a.Details
26th floor: fire sprinkler t.i. relocates 5 sprinkler heads and add 4 sprinkler heads. maher n/a. | $4,632 |
| Dec 10, 2014 | Completed final sign-off Dec 2014 | 123 Mission St | Golden Gate Fire Protection Inc | relocate 4 pendent sprinklers on the 18/f, t.i. pa#201410300284. n/a ordinance #155-13Details
relocate 4 pendent sprinklers on the 18/f, t.i. pa#201410300284. n/a ordinance #155-13 | $2,060 |
| Nov 6, 2014 | Completed final sign-off Jun 2015 | 123 Mission St | Rossi Builders Inc. | new air distribution being modified to serve and new space plan. ref. application #2014.10.30.0284. n/a for the maherDetails
new air distribution being modified to serve and new space plan. ref. application #2014.10.30.0284. n/a for the maher | $10,000 |
| Oct 30, 2014 | Completed final sign-off Jun 2015 | 123 Mission St | Rossi Builders Inc. | 18th floor ste 1800 - interior t.i.: minor demo & construction of non-structural partition, electrical & plumbing. mep, life safety, sprinklers are separate design build a separate submitteds. n/a maher ordinanceDetails
18th floor ste 1800 - interior t.i.: minor demo & construction of non-structural partition, electrical & plumbing. mep, life safety, sprinklers are separate design build a separate submitteds. n/a maher ordinance | $66,500 |
| Jun 3, 2014 | Completed final sign-off Jul 2014 | 123 Mission St | Golden Gate Fire Protection Inc | relocate 94 pendent sprinklers on the 9th floor. compliance with ordinance 155-13 not required. t.i. 2014.0408.2691Details
relocate 94 pendent sprinklers on the 9th floor. compliance with ordinance 155-13 not required. t.i. 2014.0408.2691 | $48,410 |
| May 8, 2014 | Completed final sign-off Feb 2015 | 123 Mission St | Skyline Construction | mechanical and electrical work for tenant improvement on 9th floor. arch pa# 201404082691. n/a ordinance #155-13Details
mechanical and electrical work for tenant improvement on 9th floor. arch pa# 201404082691. n/a ordinance #155-13 | $45,000 |
| Apr 8, 2014 | Completed final sign-off Feb 2015 | 123 Mission St | Skyline Construction | tenant improvement to include non rated, non structural interior partitions, suspended acoustical ceilings system and pantry case mep&fire like safety under seperate work permit. maher 155-13 not requiredDetails
tenant improvement to include non rated, non structural interior partitions, suspended acoustical ceilings system and pantry case mep&fire like safety under seperate work permit. maher 155-13 not required | $950,000 |
| Mar 11, 2014 | Never finaled issued Mar 2014, no final | 123 Mission St | Gci, Inc | exist. demising partition (non-structural) and addition of one new exit sign. t-24 electical permit to follow. no mep or sprinklers to be impacted.Details
exist. demising partition (non-structural) and addition of one new exit sign. t-24 electical permit to follow. no mep or sprinklers to be impacted. | $1,000 |
| Oct 17, 2013 | Completed final sign-off Jan 2014 | 123 Mission St | Novo Construction Inc | 6th floor-partial floor tenant improvement including selective demolition, partition, ceiling & finishes.Details
6th floor-partial floor tenant improvement including selective demolition, partition, ceiling & finishes. | $3,000 |
| Jun 11, 2012 | Completed final sign-off Aug 2012 | 123 Mission St | Skyline Construction | mechanical, electrical, plumbing on the 10th fl. add new or relocate existing heads, new piping and lighting. ref 201206061938Details
mechanical, electrical, plumbing on the 10th fl. add new or relocate existing heads, new piping and lighting. ref 201206061938 | $25,000 |
| Jun 6, 2012 | Completed final sign-off Mar 2013 | 123 Mission St | Skyline Construction | 10th floor-interior build out of office space including new non structural partitions, relocation of (e) light fixtures. new power & finishes. demolition of demising wall between 2 suites turning 2 suites into 1Details
10th floor-interior build out of office space including new non structural partitions, relocation of (e) light fixtures. new power & finishes. demolition of demising wall between 2 suites turning 2 suites into 1 | $240,000 |
| Feb 27, 2012 | Never finaled issued Feb 2012, no final | 123 Mission St | Golden Gate Fire Protection Inc | floor 4th, 5th, 6th fire sprinkler system upgrade, relocate 249 pendent sprinklers, relocate 75 uprights & add 60 upright sprinklers. upgrade branch line restraints and siesmic calc's.Details
floor 4th, 5th, 6th fire sprinkler system upgrade, relocate 249 pendent sprinklers, relocate 75 uprights & add 60 upright sprinklers. upgrade branch line restraints and siesmic calc's. | $198,275 |
| Dec 28, 2011 | Completed final sign-off Aug 2012 | 123 Mission St | Skyline Construction | 5th floor-full floor (except restrooms) office t.i.-selective demo, new partitions, ceilings, finishes, electrical, mechanical & plumbing. under seperate permits: fire sprinklers & life safetyDetails
5th floor-full floor (except restrooms) office t.i.-selective demo, new partitions, ceilings, finishes, electrical, mechanical & plumbing. under seperate permits: fire sprinklers & life safety | $714,800 |
| Dec 28, 2011 | Completed final sign-off Aug 2012 | 123 Mission St | Skyline Construction | 6th floor-full floor (except restrooms) office. tennat improvement,selective demo, new partitions, ceilings, finishes, electrical, mechanical, plmg. under seperate permits:fire sprinklers, life safety.Details
6th floor-full floor (except restrooms) office. tennat improvement,selective demo, new partitions, ceilings, finishes, electrical, mechanical, plmg. under seperate permits:fire sprinklers, life safety. | $714,829 |
| Dec 28, 2011 | Completed final sign-off Aug 2012 | 123 Mission St | Skyline Construction | 4th floor-full floor (except restrooms) office t.i.-selective demo, new partitions, ceilings, finishes, electrical, mechanical & plumbing. under seperate permits: fire sprinklers & life safetyDetails
4th floor-full floor (except restrooms) office t.i.-selective demo, new partitions, ceilings, finishes, electrical, mechanical & plumbing. under seperate permits: fire sprinklers & life safety | $715,000 |
| Nov 8, 2011 | Completed final sign-off Mar 2013 | 123 Mission St | Skyline Construction | floor 4, 5, 6 - demolition of existing non-bearing partitions, ceilings, lighting, mechanical & plumbing. no structural work to be performed, existing & occupancy to be addressed under separate permit.Details
floor 4, 5, 6 - demolition of existing non-bearing partitions, ceilings, lighting, mechanical & plumbing. no structural work to be performed, existing & occupancy to be addressed under separate permit. | $75,000 |
| Aug 30, 2011 | Never finaled issued Aug 2011, no final | 123 Mission St | Ayoob & Peery Plumbing Co Inc | add, relocate and remove fire sprinkler heads per tenant imp. 19 add, 79 relocate,4 remove.Details
add, relocate and remove fire sprinkler heads per tenant imp. 19 add, 79 relocate,4 remove. | $35,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Skyline Construction (12), Red Hawk Fire & Security Ca Llc (10), Golden Gate Fire Protection Inc (8), Bcci Construction Company (7), Principal Builders Inc. (7), R L H Fire Protection Inc (4), Truebeck Construction (4), Cosco Fire Protection Inc. (3), Gci, Inc (3), Richlen Construction (3), Pribuss Engineering Inc (2), Rossi Builders Inc. (2), Ayoob & Peery Plumbing Co Inc, Everon Llc, Matrix Hg Inc, Novo Construction Inc
- Architects
- Joelle Rosander (6), Riley E. Bunn (3), Lee Moulton (2), Amit Wadhwa, Carey Woo, David Galullo, Douglas Zucker, Ingemar San Juan Gosiengfiao, James Stefanski, Karen Stolzenberg, Roy Militar
- Engineers
- Amit Wadhwa (3), Levi G. Abarte (2), Alexander Joseph Pacheco
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.