Block 3717, lot 023
123 Mission St
- City’s use
- Commercial Misc
- Built
- 1987
- Stories
- 2
- Building
- 18,042 sq ft
- Lot
- 18,042 sq ft
- Zoning
- C3O
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 18, 2019 | Expired or cancelled cancelled Jan 2026 | 123 Mission St | Truebeck Construction | 15th fl. non-structural interior demolition n/a maher ab-017 sprinkler upturn permit# 2019-1106-6548Details
15th fl. non-structural interior demolition n/a maher ab-017 sprinkler upturn permit# 2019-1106-6548 | $8,000 |
| Oct 18, 2019 | Expired or cancelled cancelled Jan 2026 | 123 Mission St | Truebeck Construction | 10th fl. non-structural interior demolition n/a maher ab-017 sprinkler upturn permit #201911066549Details
10th fl. non-structural interior demolition n/a maher ab-017 sprinkler upturn permit #201911066549 | $8,000 |
| Oct 18, 2019 | Expired or cancelled cancelled Jan 2026 | 123 Mission St | Truebeck Construction | 11th fl. non-structural interior demolition n/a maher ab-017Details
11th fl. non-structural interior demolition n/a maher ab-017 | $8,000 |
| Oct 18, 2019 | Expired or cancelled cancelled Jan 2026 | 123 Mission St | Truebeck Construction | 8th fl. non-structural interior demolition n/a maher ab-017 sprinkler upturn permit #201911066545Details
8th fl. non-structural interior demolition n/a maher ab-017 sprinkler upturn permit #201911066545 | $8,000 |
| Oct 18, 2019 | Expired or cancelled cancelled Jan 2026 | 123 Mission St | Truebeck Construction | 9th fl. non-structural interior demolition n/a maher ab-017Details
9th fl. non-structural interior demolition n/a maher ab-017 | $22,000 |
| Oct 2, 2019 | Never finaled issued Oct 2019, no final | 123 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm - 2 control relay for fan coil units in elevator machine room. ref pa #201907105484. maher naDetails
fire alarm - 2 control relay for fan coil units in elevator machine room. ref pa #201907105484. maher na | $1,200 |
| Jul 10, 2019 | Completed final sign-off Jan 2020 | 123 Mission St | Acco Engineered Systems Inc. Dba Acco En | remove 1 packaged unit, replace w/ 1 vrf system for elevator machinery roomDetails
remove 1 packaged unit, replace w/ 1 vrf system for elevator machinery room | $90,000 |
| May 10, 2019 | Completed final sign-off Jul 2019 | 123 Mission St | Bcci Construction Company | ste 800 - revision to pa 2018-1108-5397 demo of all partitions, finishes, ceilings, ceiling grids, lights, mechanical, electrical and plumbingDetails
ste 800 - revision to pa 2018-1108-5397 demo of all partitions, finishes, ceilings, ceiling grids, lights, mechanical, electrical and plumbing | |
| May 3, 2019 | Never finaled issued May 2019, no final | 123 Mission St | Accutite Technology Engineering | street spaceDetails
street space | |
| Feb 11, 2019 | Expired or cancelled cancelled Aug 2019 | 123 Mission St | Bcci Construction Company | 8th fl mech only to support apprvd arch install 4 new vav boxes. ref 201811085397Details
8th fl mech only to support apprvd arch install 4 new vav boxes. ref 201811085397 | $30,000 |
| Jan 28, 2019 | Never finaled issued Jan 2019, no final | 123 Mission St | Anderson, Rowe & Buckley, Inc. | 8th fl - ref pa 2018-1108-5397 (e) fire sprinkler system ti. relocate 7 pendent sprinklers, 2 relocated uprights. change out 7 pendent sprinklers. add 1 pendentDetails
8th fl - ref pa 2018-1108-5397 (e) fire sprinkler system ti. relocate 7 pendent sprinklers, 2 relocated uprights. change out 7 pendent sprinklers. add 1 pendent | $9,000 |
| Nov 8, 2018 | Expired or cancelled cancelled Oct 2019 | 123 Mission St | Bcci Construction Company | suite 800: selective demo & construction of non-load bearing partitions, new ceilings grid & tile & open ceiling, new light fixtures & new switching, new office doors & frames, salvage & reuse of (e) materials if practicable, new millwork & new sink & new bldg standard finishes.Details
suite 800: selective demo & construction of non-load bearing partitions, new ceilings grid & tile & open ceiling, new light fixtures & new switching, new office doors & frames, salvage & reuse of (e) materials if practicable, new millwork & new sink & new bldg standard finishes. | $788,100 |
| May 4, 2018 | Completed final sign-off May 2018 | 123 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm ti 4th and 5th fl. 4th : add 33 speaker strobes, 5 speakers, 1 duct detector for heat pump with shutdown, 5th add 32 speaker strobes and 5 speakers only ref 201801199017, and 201801199023 maher not reqDetails
fire alarm ti 4th and 5th fl. 4th : add 33 speaker strobes, 5 speakers, 1 duct detector for heat pump with shutdown, 5th add 32 speaker strobes and 5 speakers only ref 201801199017, and 201801199023 maher not req | $35,000 |
| Mar 22, 2018 | Completed final sign-off Jul 2018 | 123 Mission St | Principal Builders Inc. | minor tenant improvement to existing tenant space on 27th fl. to demo and construct new partitions. n/a for maher.Details
minor tenant improvement to existing tenant space on 27th fl. to demo and construct new partitions. n/a for maher. | $65,450 |
| Mar 8, 2018 | Completed final sign-off May 2018 | 123 Mission St | Red Hawk Fire & Security Ca Llc | work done on 18th and 28th floors. work includes on the 28th floor 3 s/s , 18th floor includes relocation 20 s/s additional 9 new s/s, 1 smoke maher naDetails
work done on 18th and 28th floors. work includes on the 28th floor 3 s/s , 18th floor includes relocation 20 s/s additional 9 new s/s, 1 smoke maher na | $10,000 |
| Feb 16, 2018 | Completed final sign-off Jul 2019 | 123 Mission St | Bcci Construction Company | electrical and mechanical work associated w 201801199017 for new fsdDetails
electrical and mechanical work associated w 201801199017 for new fsd | $532,480 |
| Feb 16, 2018 | Completed final sign-off Jul 2019 | 123 Mission St | Bcci Construction Company | mechanical and electrical work associated with 201801199023Details
mechanical and electrical work associated with 201801199023 | $532,480 |
| Jan 19, 2018 | Completed final sign-off Jul 2019 | 123 Mission St | Bcci Construction Company | 5th floor: new non-structural partitions for office, conference rooms, etc, and finishes per attached drawing set of previously demolished floor. clean extg restrooms. n/a maherDetails
5th floor: new non-structural partitions for office, conference rooms, etc, and finishes per attached drawing set of previously demolished floor. clean extg restrooms. n/a maher | $1,300,000 |
| Jan 19, 2018 | Completed final sign-off Jul 2019 | 123 Mission St | Bcci Construction Company | 4th floor: new non-structural partitions for office, conference rooms, etc, and finishes per attached drawing set of previously demolished floor. clean extg restrooms. n/a maherDetails
4th floor: new non-structural partitions for office, conference rooms, etc, and finishes per attached drawing set of previously demolished floor. clean extg restrooms. n/a maher | $1,300,000 |
| Jul 26, 2017 | Completed final sign-off Aug 2017 | 123 Mission St | Golden Gate Fire Protection Inc | 23/f: fire sprinkler only. relocate one pendent, add one pendent. ref t.i. pa#201706230180. n/a maher ordinanceDetails
23/f: fire sprinkler only. relocate one pendent, add one pendent. ref t.i. pa#201706230180. n/a maher ordinance | $500 |
| Jun 23, 2017 | Completed final sign-off Sep 2017 | 123 Mission St | Gci, Inc | 23rd floor - partial commercial tenant improvement. selective demo non-structural partitoins, new doors, partitions & architectural finishes. no changes in use. no structural work. n/a maher ordinanceDetails
23rd floor - partial commercial tenant improvement. selective demo non-structural partitoins, new doors, partitions & architectural finishes. no changes in use. no structural work. n/a maher ordinance | $100,000 |
| May 30, 2017 | Completed final sign-off Jul 2017 | 123 Mission St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 16th fl. add 13 speakers, 30 speaker strobes, 1 power supply, 6 duct detectors for fsds 4 dual monitoring modules for fsds and 1 smoke detector ref 201703151485Details
fire alarm ti on 16th fl. add 13 speakers, 30 speaker strobes, 1 power supply, 6 duct detectors for fsds 4 dual monitoring modules for fsds and 1 smoke detector ref 201703151485 | $10,000 |
| Dec 14, 2016 | Never finaled issued Dec 2016, no final | 123 Mission St | Skyline Construction | addition of new offices to converence rooms including new elec and new plumbing. no structural. floor is currently unoccupiedDetails
addition of new offices to converence rooms including new elec and new plumbing. no structural. floor is currently unoccupied | $455,193 |
| Jul 28, 2016 | Completed final sign-off Aug 2016 | 123 Mission St | R L H Fire Protection Inc | 14th flr: fire sprinkler ti 201606099542, 25 relocated, 17 added sprinklers (pendants),16 added upright & replace 44 pendant sprinklers w/upright sprinklers.38 deleted pendant sprinklers; maher n/aDetails
14th flr: fire sprinkler ti 201606099542, 25 relocated, 17 added sprinklers (pendants),16 added upright & replace 44 pendant sprinklers w/upright sprinklers.38 deleted pendant sprinklers; maher n/a | $31,000 |
| Jul 28, 2016 | Completed final sign-off Sep 2016 | 123 Mission St | R L H Fire Protection Inc | 12th flr: fire sprinkler ti 201606099546; relocate 25, add 16 pendant sprinklers,add 16 upright & replace 44 pendant w/upright.delete 38 pendant sprinklers; maher n/aDetails
12th flr: fire sprinkler ti 201606099546; relocate 25, add 16 pendant sprinklers,add 16 upright & replace 44 pendant w/upright.delete 38 pendant sprinklers; maher n/a | $31,000 |
| Jul 22, 2016 | Never finaled issued Aug 2016, no final | 123 Mission St | Principal Builders Inc. | tenant improvement on 15th floor to construct new partitions, doors, ceiling,millwork, finishes. mep. life safety/sprinklers pulled under separate permitDetails
tenant improvement on 15th floor to construct new partitions, doors, ceiling,millwork, finishes. mep. life safety/sprinklers pulled under separate permit | $1,274,280 |
| Jun 9, 2016 | Completed final sign-off Nov 2016 | 123 Mission St | Principal Builders Inc. | 14th floor tenant improvement to construct new partition doors, millwork, finishes ceilings, & m.e.p. fire alarms, sprinkelrs under separate permit.Details
14th floor tenant improvement to construct new partition doors, millwork, finishes ceilings, & m.e.p. fire alarms, sprinkelrs under separate permit. | $1,274,640 |
| Jun 9, 2016 | Completed final sign-off Nov 2016 | 123 Mission St | Principal Builders Inc. | 12th floor tenant improvement to construct new partition, doors, millwork, finishes, ceilings, & m.e.p. fire alarms, sprinkelrs under separate permit.Details
12th floor tenant improvement to construct new partition, doors, millwork, finishes, ceilings, & m.e.p. fire alarms, sprinkelrs under separate permit. | $1,274,640 |
| Apr 14, 2016 | Never finaled issued Jun 2016, no final | 123 Mission St | revision to issued pa 201502269377;new structural engr of record is dci engineers;revise plans for canopy framing only to increase structural efficiency following the structural framing methodology/basis of design consistent w/permitted drwg;interior renovations to main reception/security desk;Details
revision to issued pa 201502269377;new structural engr of record is dci engineers;revise plans for canopy framing only to increase structural efficiency following the structural framing methodology/basis of design consistent w/permitted drwg;interior renovations to main reception/security desk; | $10,000 | |
| Feb 29, 2016 | Completed final sign-off Mar 2016 | 123 Mission St | Anderson, Rowe & Buckley, Inc. | 24th floor: extg fire sprinkler system. t.i. 6 relocated sprinklers and 3 removed sprinklers. ref app#2016-0127-8130. n/a for maher.Details
24th floor: extg fire sprinkler system. t.i. 6 relocated sprinklers and 3 removed sprinklers. ref app#2016-0127-8130. n/a for maher. | $3,000 |
| Jul 16, 2015 | Completed final sign-off Oct 2015 | 123 Mission St | Bcci Construction Company | revision to 201505015136 to revise lighting fixtures. n/a ordinance #155-13Details
revision to 201505015136 to revise lighting fixtures. n/a ordinance #155-13 | $1,500 |
| Jun 29, 2015 | Completed final sign-off Jul 2015 | 123 Mission St | Red Hawk Fire & Security Ca Llc | 17th flr: tenant improvement,adding 8 speakers, 21 speaker/strobes, 1 strobe 7 relays & 5 duct det's, ref. 201505015136; maher n/aDetails
17th flr: tenant improvement,adding 8 speakers, 21 speaker/strobes, 1 strobe 7 relays & 5 duct det's, ref. 201505015136; maher n/a | $10,000 |
| Jun 1, 2015 | Completed final sign-off Aug 2015 | 123 Mission St | Principal Builders Inc. | mep for t.i. on 25th floor to install new equipment and fixtures. ref app#201504012503 for t.i. work. n/a for the maher.Details
mep for t.i. on 25th floor to install new equipment and fixtures. ref app#201504012503 for t.i. work. n/a for the maher. | $403,049 |
| Jun 1, 2015 | Completed final sign-off Aug 2015 | 123 Mission St | Principal Builders Inc. | 27th floor: mep for t.i. to install new equipment and fixture. ref app#201504012504. n/a for the maher. life safety deferred.Details
27th floor: mep for t.i. to install new equipment and fixture. ref app#201504012504. n/a for the maher. life safety deferred. | $443,188 |
| May 22, 2015 | Completed final sign-off Jul 2015 | 123 Mission St | Red Hawk Fire & Security Ca Llc | 27th floor: 13 speaker/strobes, 3 strobes. ref. 201504012504. maher not reqDetails
27th floor: 13 speaker/strobes, 3 strobes. ref. 201504012504. maher not req | $7,500 |
| May 22, 2015 | Completed final sign-off Jul 2015 | 123 Mission St | Red Hawk Fire & Security Ca Llc | 25th floor: 6 new speakers and 26 speaker strobes. n/a maher ord. # 155-13Details
25th floor: 6 new speakers and 26 speaker strobes. n/a maher ord. # 155-13 | $7,500 |
| May 1, 2015 | Completed final sign-off Oct 2015 | 123 Mission St | Bcci Construction Company | 17th floor: t.i. including demolition, new partitions, doors, sidelights, lighting, power finishes and associated mep. fire and ls under seperate permit. n/a for the maher ordinance.Details
17th floor: t.i. including demolition, new partitions, doors, sidelights, lighting, power finishes and associated mep. fire and ls under seperate permit. n/a for the maher ordinance. | $1,251,166 |
| Apr 14, 2015 | Completed final sign-off May 2015 | 123 Mission St | Red Hawk Fire & Security Ca Llc | adding one smoke detector, six speakers & relocation of one existing strobe. t.i. pa# 201503231591. n/a ordinance #155-13Details
adding one smoke detector, six speakers & relocation of one existing strobe. t.i. pa# 201503231591. n/a ordinance #155-13 | $7,500 |
| Apr 1, 2015 | Completed final sign-off Aug 2015 | 123 Mission St | Principal Builders Inc. | 25th floor for selective demo, & constructions of doors, glazing, framing, & finishes, as well as minor partitions. mep, fire sprinklers & life safety on separate permit. n/a maher ordinanceDetails
25th floor for selective demo, & constructions of doors, glazing, framing, & finishes, as well as minor partitions. mep, fire sprinklers & life safety on separate permit. n/a maher ordinance | $248,471 |
| Apr 1, 2015 | Completed final sign-off Apr 2015 | 123 Mission St | Golden Gate Fire Protection Inc | floors 5,6,7,8,18: add 1 sprinkler head in (e) emergency closet. maher - not req'dDetails
floors 5,6,7,8,18: add 1 sprinkler head in (e) emergency closet. maher - not req'd | $2,575 |
| Apr 1, 2015 | Completed final sign-off Aug 2015 | 123 Mission St | Principal Builders Inc. | 27flr tenant improvement for selective demo and construction of doors, glazing framing, and finishes, as well as minor partitions, mep, fire sprinklers and life safety on separate permit; maher n/aDetails
27flr tenant improvement for selective demo and construction of doors, glazing framing, and finishes, as well as minor partitions, mep, fire sprinklers and life safety on separate permit; maher n/a | $294,004 |
| Mar 31, 2015 | Completed final sign-off Jun 2015 | 123 Mission St | Principal Builders Inc. | 26th flr: mep title 24 for ti to replace and install new equip and relocate (e) equip. ref pa# 2015 0323 1591. maher - not req'dDetails
26th flr: mep title 24 for ti to replace and install new equip and relocate (e) equip. ref pa# 2015 0323 1591. maher - not req'd | $87,409 |
| Mar 23, 2015 | Completed final sign-off Jun 2015 | 123 Mission St | Principal Builders Inc. | 26th flr: ti - demo and build new non structural non rated partitions, doors and minor finishes in (e) tenant space. any mep, sprinklers and life safety will be submitted under seperate permit as req'd. maher - not req'dDetails
26th flr: ti - demo and build new non structural non rated partitions, doors and minor finishes in (e) tenant space. any mep, sprinklers and life safety will be submitted under seperate permit as req'd. maher - not req'd | $45,591 |
| Feb 26, 2015 | Never finaled issued Nov 2015, no final | 123 Mission St | lobby remodel including new glass window wall & plaza remodel. n/a for the maher ordinanceDetails
lobby remodel including new glass window wall & plaza remodel. n/a for the maher ordinance | $1,000,000 | |
| Aug 8, 2014 | Never finaled issued Aug 2014, no final | 123 Mission St | Red Hawk Fire & Security Ca Llc | add 7 new audible visual notification devices; add 7 new smoke dectors; add 2 new duct dectors; add 7 new control relays and 4 pr-1; add 3 new ct-2 modules. reference permit 2014-0408-2691Details
add 7 new audible visual notification devices; add 7 new smoke dectors; add 2 new duct dectors; add 7 new control relays and 4 pr-1; add 3 new ct-2 modules. reference permit 2014-0408-2691 | $7,500 |
| Aug 28, 2013 | Completed final sign-off Feb 2015 | 123 Mission St | Skyline Construction | 9/f- demolition of existing non-structural partitions associated power & telecom outlets, plumbing and finishes, existing ceiling lighting, soffits and associated ceiling items.Details
9/f- demolition of existing non-structural partitions associated power & telecom outlets, plumbing and finishes, existing ceiling lighting, soffits and associated ceiling items. | $10,000 |
| Nov 5, 2012 | Completed final sign-off Jan 2013 | 123 Mission St | Gci, Inc | to obtain final inspection for work approved udner pa #2011.0805.1812. all work is complete. (12th,14th & 15th floor)Details
to obtain final inspection for work approved udner pa #2011.0805.1812. all work is complete. (12th,14th & 15th floor) | |
| Jul 18, 2012 | Never finaled issued Jul 2012, no final | 123 Mission St | Golden Gate Fire Protection Inc | fire sprinker system upgrade. relocate 15 pendent sprinkler heads on the 10th flr.Details
fire sprinker system upgrade. relocate 15 pendent sprinkler heads on the 10th flr. | $7,725 |
| Jul 12, 2012 | Completed final sign-off Aug 2012 | 123 Mission St | Capitol Electric Const | install 3-ceiling mounted speakers, 4-ceiling mounted speaker/strobes and relocate 5-existing speaker/strobes.Details
install 3-ceiling mounted speakers, 4-ceiling mounted speaker/strobes and relocate 5-existing speaker/strobes. | $7,380 |
| May 17, 2012 | Never finaled issued May 2012, no final | 123 Mission St | Capitol Electric Const | 26th floor-install new & relocate life safety devices tie into (e) power supply. devices include: 10 speakers, 26 strobes & 2 smoke detectorsDetails
26th floor-install new & relocate life safety devices tie into (e) power supply. devices include: 10 speakers, 26 strobes & 2 smoke detectors | $11,325 |
| Apr 26, 2012 | Completed final sign-off Jun 2012 | 123 Mission St | Novo Construction Inc | 26th floor.tenant improvement: demolition of ceiling heights partitions to accomodate new free standing furniture and associated patch/repair of affecte walls and finishes. mech work included.Details
26th floor.tenant improvement: demolition of ceiling heights partitions to accomodate new free standing furniture and associated patch/repair of affecte walls and finishes. mech work included. | $125,000 |
| Apr 18, 2012 | Completed final sign-off May 2012 | 123 Mission St | Pioneer Fire Inc. | 11th floor, suite #375-relocate 26, add 6 & delete 2 fire sprinklersDetails
11th floor, suite #375-relocate 26, add 6 & delete 2 fire sprinklers | $9,000 |
| Apr 9, 2012 | Completed final sign-off Aug 2012 | 123 Mission St | Gci, Inc | interior uprades of restrooms including partitions, fixtures, ceilings, lights, finishes to full code compliance. mep design build under separate permit including title 24Details
interior uprades of restrooms including partitions, fixtures, ceilings, lights, finishes to full code compliance. mep design build under separate permit including title 24 | $50,000 |
| Apr 6, 2012 | Completed final sign-off Aug 2012 | 123 Mission St | Capitol Electric Const | 11th floor: install new life safety devices for t.i. work located on 11th floor. install 17 speakers, 23 ceiling speaker/strobe, 3 ceiling strobe, 2 wall strobe, 9 smoke detector, and 2 control modules.Details
11th floor: install new life safety devices for t.i. work located on 11th floor. install 17 speakers, 23 ceiling speaker/strobe, 3 ceiling strobe, 2 wall strobe, 9 smoke detector, and 2 control modules. | $15,870 |
| Mar 9, 2012 | Completed final sign-off Jun 2012 | 123 Mission St | Gci, Inc | 11th floor:new ti with mep on the 11th floor to demo and construct new non-load bearing patitions, doors, finishes and equipment.Details
11th floor:new ti with mep on the 11th floor to demo and construct new non-load bearing patitions, doors, finishes and equipment. | $850,000 |
| Mar 2, 2012 | Never finaled issued Apr 2012, no final | 123 Mission St | Gci, Inc | 11th floor-interior upgrade of restrooms including new partitions & finishes. m.e.p is design build to be submitted uinder a seperate permit. including t-24 calcsDetails
11th floor-interior upgrade of restrooms including new partitions & finishes. m.e.p is design build to be submitted uinder a seperate permit. including t-24 calcs | $15,000 |
| Mar 1, 2012 | Completed final sign-off Mar 2012 | 123 Mission St | Capitol Electric Const | 4th/5th/6th floors-install audible visual notification devices to tie into (e) system. smoke detectors, control modules, detectors for fire/smoke damper & fan control on 3 floors. refer arch pa's #2011-1228-1406, 2011-1228-1407, 2011-1228-1383Details
4th/5th/6th floors-install audible visual notification devices to tie into (e) system. smoke detectors, control modules, detectors for fire/smoke damper & fan control on 3 floors. refer arch pa's #2011-1228-1406, 2011-1228-1407, 2011-1228-1383 | $25,437 |
| Dec 28, 2011 | Expired or cancelled cancelled Jan 2026 | 123 Mission St | interior upgrade of restrooms including new and relocated accessories, mechanical, electrical, and plumbing work to be under separate permitDetails
interior upgrade of restrooms including new and relocated accessories, mechanical, electrical, and plumbing work to be under separate permit | $50,000 | |
| Nov 14, 2011 | Completed final sign-off Dec 2011 | 123 Mission St | Capitol Electric Const | provide new life safety devices for 8th floor tenant. install (30) ceiling mounted speaker/strobe, (5) smoke detector, (2) ceiling mount speaker, (2) fire smoke detector and (2) wall mounted strobe.Details
provide new life safety devices for 8th floor tenant. install (30) ceiling mounted speaker/strobe, (5) smoke detector, (2) ceiling mount speaker, (2) fire smoke detector and (2) wall mounted strobe. | $21,000 |
| Nov 4, 2011 | Completed final sign-off Nov 2011 | 123 Mission St | Golden Gate Fire Protection Inc | 8th floor-fire sprinkler system upgrades-relocate 49 pendent sprinkler heads, upgrade branch line restraintsDetails
8th floor-fire sprinkler system upgrades-relocate 49 pendent sprinkler heads, upgrade branch line restraints | $25,235 |
| Oct 18, 2011 | Completed final sign-off Jan 2012 | 123 Mission St | Gci, Inc | mechanical, electrical and plumbing work for t.i. on the 8th floor. reference arch. pa# 2011-1011-6503Details
mechanical, electrical and plumbing work for t.i. on the 8th floor. reference arch. pa# 2011-1011-6503 | $200,000 |
| Oct 11, 2011 | Completed final sign-off Jan 2012 | 123 Mission St | Gci, Inc | office ti interior buuld out of od ffice space incl. new partitions and finishes. mep, ls, fs under separate permitDetails
office ti interior buuld out of od ffice space incl. new partitions and finishes. mep, ls, fs under separate permit | $300,000 |
| Sep 30, 2011 | Completed final sign-off Oct 2011 | 123 Mission St | Red Hawk Fire & Security Ca Llc | 7th floor-fire alarm t.i-7 ceiling speakers, 22 ceiling speaker strobes, 2 smoke detectorsDetails
7th floor-fire alarm t.i-7 ceiling speakers, 22 ceiling speaker strobes, 2 smoke detectors | $12,235 |
| Sep 14, 2011 | Completed final sign-off Sep 2011 | 123 Mission St | Skyline Construction | revision to app#201108081960. minor alterations to tenant suiteDetails
revision to app#201108081960. minor alterations to tenant suite | |
| Sep 13, 2011 | Never finaled issued Sep 2011, no final | 123 Mission St | Capitol Electric Const | 25th floor-raise up 7 wall mounted strobes to ada height (80" to center)Details
25th floor-raise up 7 wall mounted strobes to ada height (80" to center) | $4,000 |
| Sep 13, 2011 | Completed final sign-off Sep 2011 | 123 Mission St | Capitol Electric Const | 10th floor-install new life safety devices, 8 speaker strobes, 4 speakers, 1 smoke detector, 1 control relay & 1 monitor relay & 2 fsdDetails
10th floor-install new life safety devices, 8 speaker strobes, 4 speakers, 1 smoke detector, 1 control relay & 1 monitor relay & 2 fsd | $10,000 |
| Aug 30, 2011 | Completed final sign-off Sep 2011 | 123 Mission St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade. relocate 11 pendant sprinkler heads on the 10 th floor. upgrade end line bracing. add 1 headDetails
fire sprinkler system upgrade. relocate 11 pendant sprinkler heads on the 10 th floor. upgrade end line bracing. add 1 head | $6,200 |
| Aug 8, 2011 | Completed final sign-off Sep 2011 | 123 Mission St | Skyline Construction | 10th floor interior buildout of office space including new partitions, mechanical, electrical & plumbing.Details
10th floor interior buildout of office space including new partitions, mechanical, electrical & plumbing. | $125,000 |
| Aug 5, 2011 | Completed final sign-off Oct 2011 | 123 Mission St | Capitol Electric Const | install life safety devices on 12th, 14th & 15th floors. each floor includes relocated 6 life safety decives, install 23 new ceiling mounted speaker strobes, 2 strobes , 5 smoke detectors, 3 duct detectors, 5 control relaysDetails
install life safety devices on 12th, 14th & 15th floors. each floor includes relocated 6 life safety decives, install 23 new ceiling mounted speaker strobes, 2 strobes , 5 smoke detectors, 3 duct detectors, 5 control relays | $58,435 |
| Jul 27, 2011 | Completed final sign-off Aug 2011 | 123 Mission St | Golden Gate Fire Protection Inc | 12th, 14th & 15th floor fire sprinkler system upgrade, relcoate 240 pendent sprinklers, delete 6 heads & add 2 heads.Details
12th, 14th & 15th floor fire sprinkler system upgrade, relcoate 240 pendent sprinklers, delete 6 heads & add 2 heads. | $120,000 |
| Jul 26, 2011 | Never finaled issued Aug 2011, no final | 123 Mission St | Dpr Construction | demo of existing tenant improvements to include paritions, electrical data at ceiling assemblies, minor mech, minimal plumb, all interior finishes. new build out shall include new partitions, doors, glazing, interior finishes. mech and elec with monor millwork/plumbingDetails
demo of existing tenant improvements to include paritions, electrical data at ceiling assemblies, minor mech, minimal plumb, all interior finishes. new build out shall include new partitions, doors, glazing, interior finishes. mech and elec with monor millwork/plumbing | $450,000 |
| Jun 28, 2011 | Completed final sign-off Nov 2011 | 123 Mission St | Skyline Construction | work at 7th floor: interior upgrade of restrooms including new toilet partitions and finishes for accessibility compliance (barrier removal)Details
work at 7th floor: interior upgrade of restrooms including new toilet partitions and finishes for accessibility compliance (barrier removal) | $50,000 |
| Apr 21, 2011 | Completed final sign-off Nov 2011 | 123 Mission St | Skyline Construction | 9th floor-interior upgrade of restroom including new partions & finishes for accessiblity compliance (bathroom remodel) 9th floorDetails
9th floor-interior upgrade of restroom including new partions & finishes for accessiblity compliance (bathroom remodel) 9th floor | $50,000 |
| Apr 21, 2011 | Completed final sign-off Nov 2011 | 123 Mission St | Skyline Construction | 25th floor-interior upgrade of restroom including new partitions & finishes for accessiblity compliance ( barrior removal) 25th floor.Details
25th floor-interior upgrade of restroom including new partitions & finishes for accessiblity compliance ( barrior removal) 25th floor. | $50,000 |
| Mar 17, 2011 | Completed final sign-off Nov 2012 | 123 Mission St | Gci, Inc | tenant improvement of existing office, including new partition, ceilings, lighting, finishe electrical & hvac.Details
tenant improvement of existing office, including new partition, ceilings, lighting, finishe electrical & hvac. | $1,000,000 |
| Mar 17, 2011 | Completed final sign-off May 2011 | 123 Mission St | Anderson, Rowe & Buckley, Inc. | 19th floor-t.i. (e) fire sprinkler system-98 sprinklers removed, 100 sprinklers addedDetails
19th floor-t.i. (e) fire sprinkler system-98 sprinklers removed, 100 sprinklers added | $50,000 |
| Mar 16, 2011 | Completed final sign-off Nov 2012 | 123 Mission St | Gci, Inc | floor 14 t.i. of existing office including new partitions, ceiling, lighting, finishes electrical & hvac.Details
floor 14 t.i. of existing office including new partitions, ceiling, lighting, finishes electrical & hvac. | $1,000,000 |
| Mar 14, 2011 | Completed final sign-off Nov 2012 | 123 Mission St | Gci, Inc | t.i. of extg office including new partitions, ceiling lighting finishes, electrical & hvacDetails
t.i. of extg office including new partitions, ceiling lighting finishes, electrical & hvac | $1,100,000 |
| Feb 22, 2011 | Never finaled issued Feb 2011, no final | 123 Mission St | street space & parking meterDetails
street space & parking meter | ||
| Nov 3, 2010 | Never finaled issued Nov 2010, no final | 123 Mission St | Toll Architectural Graphics | to erect two non electrical and nonilluminated signDetails
to erect two non electrical and nonilluminated sign | $8,000 |
| Oct 27, 2010 | Never finaled issued Oct 2010, no final | 123 Mission St | street space and mta parkingDetails
street space and mta parking | ||
| Sep 22, 2010 | Never finaled issued Sep 2010, no final | 123 Mission St | Diversified Fire Products | fire alarm ti 21 speaker strobes, 2 strobe only, 1 smoke detector, 5 control relays, 4 duct detectorsDetails
fire alarm ti 21 speaker strobes, 2 strobe only, 1 smoke detector, 5 control relays, 4 duct detectors | $20,300 |
| Sep 22, 2010 | Completed final sign-off Jan 2011 | 123 Mission St | Diversified Fire Products | fire alarm t.i.: 22 speaker strobes,1 strobe only, 4 duct detectors.5 control relays, 1 smoke detector.Details
fire alarm t.i.: 22 speaker strobes,1 strobe only, 4 duct detectors.5 control relays, 1 smoke detector. | $20,300 |
| Sep 22, 2010 | Completed final sign-off Jan 2011 | 123 Mission St | Diversified Fire Products | 22nd floor fire alarm t.i.:23 speaker strobes,1 strobes,5 control relays, 1 smoke detector,4 duct detectors.Details
22nd floor fire alarm t.i.:23 speaker strobes,1 strobes,5 control relays, 1 smoke detector,4 duct detectors. | $20,300 |
| Sep 22, 2010 | Completed final sign-off Jan 2011 | 123 Mission St | Diversified Fire Products | fire alarm ti: 26 speaker strobes, 2 strobe only, 5 duct detectors, 6 control relays, 1 smoke detectors, 2 door holdersDetails
fire alarm ti: 26 speaker strobes, 2 strobe only, 5 duct detectors, 6 control relays, 1 smoke detectors, 2 door holders | $20,300 |
| Sep 22, 2010 | Completed final sign-off Dec 2010 | 123 Mission St | Diversified Fire Products | 20th floor fire alarm ti: 23 speaker strobes, 1 smoke detector, 1 strobe only, 4 duct detectors, 5 control relaysDetails
20th floor fire alarm ti: 23 speaker strobes, 1 smoke detector, 1 strobe only, 4 duct detectors, 5 control relays | $20,300 |
| Sep 9, 2010 | Completed final sign-off Dec 2010 | 123 Mission St | Anderson, Rowe & Buckley, Inc. | 20th & 21st floors-tenant improvement (e) fire sprinkler system-added sprinklers-213, removed sprinklers-202- new bracingDetails
20th & 21st floors-tenant improvement (e) fire sprinkler system-added sprinklers-213, removed sprinklers-202- new bracing | $42,000 |
| Aug 20, 2010 | Completed final sign-off Jan 2011 | 123 Mission St | Anderson, Rowe & Buckley, Inc. | tenant improvements, existing fire sprinkler systems, 22nd fl: 104 speakers added. 23rd fl 110 speakers addedDetails
tenant improvements, existing fire sprinkler systems, 22nd fl: 104 speakers added. 23rd fl 110 speakers added | $50,000 |
| Jul 30, 2010 | Never finaled issued Jul 2010, no final | 123 Mission St | street spaceDetails
street space | ||
| Jul 29, 2010 | Completed final sign-off Dec 2010 | 123 Mission St | Bcci Construction Company | 20th floor tenant improvement of (e) office space including new partitoin, ceiling, lighting, finishes, electrical & hvac. no exterior or structural work, ls & sprinklers under separate permit.Details
20th floor tenant improvement of (e) office space including new partitoin, ceiling, lighting, finishes, electrical & hvac. no exterior or structural work, ls & sprinklers under separate permit. | $750,000 |
| Jul 28, 2010 | Never finaled issued Jul 2010, no final | 123 Mission St | street spaceDetails
street space | ||
| Jul 19, 2010 | Completed final sign-off Oct 2011 | 123 Mission St | Bcci Construction Company | 19th floor tenant improvement of (e) offic espace including new partitions, ceiling, lighting, finishes, electrical & hvac. no exterior for structural work. ls & sprinkler under separate permit.Details
19th floor tenant improvement of (e) offic espace including new partitions, ceiling, lighting, finishes, electrical & hvac. no exterior for structural work. ls & sprinkler under separate permit. | $750,000 |
| Jul 14, 2010 | Completed final sign-off Dec 2010 | 123 Mission St | Bcci Construction Company | office ti on the 21st floor including new partitions, ceiling, lighting, finishes, electrical and hvac. no exterior or structural work. la and fire sprinklers under separate permitDetails
office ti on the 21st floor including new partitions, ceiling, lighting, finishes, electrical and hvac. no exterior or structural work. la and fire sprinklers under separate permit | $750,000 |
| Jul 6, 2010 | Completed final sign-off Dec 2010 | 123 Mission St | Bcci Construction Company | office ti on the 22nd fl. incl. new partitions, ceilings, lighting, finishes, electrical & hvac. no exterior or struc work, ls and sprunklerss under separate permitDetails
office ti on the 22nd fl. incl. new partitions, ceilings, lighting, finishes, electrical & hvac. no exterior or struc work, ls and sprunklerss under separate permit | $750,000 |
| Jul 6, 2010 | Completed final sign-off Dec 2010 | 123 Mission St | Bcci Construction Company | office ti on the 23rd fl. incl. new partitions, ceiling, lighting, finishes, electrical and hvac. no exterior or struc. work. ls and sprinkler under separate permit. ol established...assembly permit required....Details
office ti on the 23rd fl. incl. new partitions, ceiling, lighting, finishes, electrical and hvac. no exterior or struc. work. ls and sprinkler under separate permit. ol established...assembly permit required.... | $750,000 |
| Mar 1, 2010 | Completed final sign-off Apr 2010 | 123 Mission St | Richlen Construction | ground single faced sign.Details
ground single faced sign. | $1,000 |
| Jan 14, 2010 | Never finaled issued Jan 2010, no final | 123 Mission St | Capitol Electric Const | install new audio and visual notification devices, a detector, monitor modules for fire/smoke damper controlDetails
install new audio and visual notification devices, a detector, monitor modules for fire/smoke damper control | $4,000 |
| Jan 6, 2010 | Never finaled issued Jan 2010, no final | 123 Mission St | Richlen Construction | mechanical and electrical for tenant improvement to include 2 new vav boxes and 4 fire smoke dampers. (arch 200912012281)Details
mechanical and electrical for tenant improvement to include 2 new vav boxes and 4 fire smoke dampers. (arch 200912012281) | $49,000 |
| Jan 5, 2010 | Never finaled issued Jan 2010, no final | 123 Mission St | Pioneer Fire Inc. | 10th floor. relocated 25 fire sprinklers and removed 2 fire sprinklers.Details
10th floor. relocated 25 fire sprinklers and removed 2 fire sprinklers. | $6,200 |
| Dec 1, 2009 | Completed final sign-off May 2010 | 123 Mission St | Richlen Construction | interior tenant improvement of office space including new partitions, ceiling, lighting, power and finishes. mep sep permit. no structural work to be performed.Details
interior tenant improvement of office space including new partitions, ceiling, lighting, power and finishes. mep sep permit. no structural work to be performed. | $389,756 |
| Nov 12, 2009 | Completed final sign-off Sep 2010 | 123 Mission St | Capitol Electric Const | 1st floor-provide new fire alarm devices to lobby renovation which includes new auditable/visual notification devices. control modules & monitor modules for return fan 5 addition. addition of return fan 5 on firefighter's graphic fan control panelDetails
1st floor-provide new fire alarm devices to lobby renovation which includes new auditable/visual notification devices. control modules & monitor modules for return fan 5 addition. addition of return fan 5 on firefighter's graphic fan control panel | $7,000 |
| Oct 1, 2009 | Never finaled issued Oct 2009, no final | 123 Mission St | street space permitDetails
street space permit | ||
| Jul 23, 2009 | Never finaled issued Jul 2009, no final | 123 Mission St | street space permit only.Details
street space permit only. | ||
| May 20, 2009 | Completed final sign-off Sep 2010 | 123 Mission St | Capitol Electric Const | install 3 ceiling speaker/strobe and relocate 1 pull station o first floor.Details
install 3 ceiling speaker/strobe and relocate 1 pull station o first floor. | $4,500 |
| Apr 22, 2009 | Completed final sign-off Sep 2010 | 123 Mission St | Anderson, Rowe & Buckley, Inc. | tenant improvements to the existing fire sprinkler system, 24 relocated sprinklers, 5 removed sprinklers.Details
tenant improvements to the existing fire sprinkler system, 24 relocated sprinklers, 5 removed sprinklers. | $5,800 |
| Feb 13, 2009 | Completed final sign-off Sep 2010 | 123 Mission St | Richlen Construction | ground floor lobby improvement of an existing building. new non-load bearing partition, ceiling & finishes. new mechanical, electrical & plumbing as required. fire sprinkler & life safety under separate permit. new canopy at mission st.Details
ground floor lobby improvement of an existing building. new non-load bearing partition, ceiling & finishes. new mechanical, electrical & plumbing as required. fire sprinkler & life safety under separate permit. new canopy at mission st. | $1,650,000 |
| May 2, 2008 | Expired or cancelled cancelled Jan 2026 | 123 Mission St | remove and replace fire pump with the same unit. basement level.Details
remove and replace fire pump with the same unit. basement level. | $1,500 | |
| Nov 16, 2007 | Never finaled issued Nov 2007, no final | 123 Mission St | Skyline Construction | 22nd floor-convert copy room to pantry with associated millworkDetails
22nd floor-convert copy room to pantry with associated millwork | $2,000 |
| Nov 13, 2007 | Never finaled issued Nov 2007, no final | 123 Mission St | Skyline Construction | 22nd floor - electrical work for break room, mechanical work - new transfer fan.Details
22nd floor - electrical work for break room, mechanical work - new transfer fan. | $9,185 |
| Oct 25, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Diversified Fire Products | fire alarm t.i. for 28th floor: 3 relays, 4 fsds, 1 wp strobe, 6 smokes, 10 speakers, 2 sprinkler/strobes, 1 duct smoke, 2 ceiling strobe, 1 sd relocate.Details
fire alarm t.i. for 28th floor: 3 relays, 4 fsds, 1 wp strobe, 6 smokes, 10 speakers, 2 sprinkler/strobes, 1 duct smoke, 2 ceiling strobe, 1 sd relocate. | $17,829 |
| Oct 11, 2007 | Never finaled issued Oct 2007, no final | 123 Mission St | Richlen Construction | revision to app# 200707257729/ remove corridor water fountain from job scopeDetails
revision to app# 200707257729/ remove corridor water fountain from job scope | |
| Oct 11, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Richlen Construction | revision to app# 200707257726 to remove corridor water fountain from scopeDetails
revision to app# 200707257726 to remove corridor water fountain from scope | |
| Oct 11, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Richlen Construction | revision to app# 200707257723/ remove corridor water fountain from scope of work 28th floorDetails
revision to app# 200707257723/ remove corridor water fountain from scope of work 28th floor | |
| Oct 4, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Diversified Fire Products | 18th floor - fire alarm t.i.. add 1 control relay,2 smoke detectors, 1 duct detectors, 20 speaker/strobe , 3 fsds.Details
18th floor - fire alarm t.i.. add 1 control relay,2 smoke detectors, 1 duct detectors, 20 speaker/strobe , 3 fsds. | $11,856 |
| Sep 24, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Gci, Inc | mechanical, electrical and sprinklers (calc's)- 28th floor-new fire smoke dampers included. life safety under separate application.Details
mechanical, electrical and sprinklers (calc's)- 28th floor-new fire smoke dampers included. life safety under separate application. | $365,000 |
| Aug 29, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Ayoob & Peery Plumbing Co Inc | 27th floor - relocate (8) fire sprinkler heads.Details
27th floor - relocate (8) fire sprinkler heads. | $1,500 |
| Aug 29, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Ayoob & Peery Plumbing Co Inc | 18 floor - relocate (8) fire sprinkler head.Details
18 floor - relocate (8) fire sprinkler head. | $1,500 |
| Aug 28, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Richlen Construction | electrical & mechanical for 18th fl t.i. ref#200708078909.Details
electrical & mechanical for 18th fl t.i. ref#200708078909. | $240,000 |
| Aug 28, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Dpw Inc. | relocate 41, add 16, remove 2 sprinkler heads, 18th floorDetails
relocate 41, add 16, remove 2 sprinkler heads, 18th floor | $11,780 |
| Aug 7, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | t.i. consists of construction of partitions for new office & conference rooms, new lighting fixtures & areas of new ceiling, new electrical locations, new finishes, new millwork & accessible sink at break room. mep & fire/life safety under seperate permit.Details
t.i. consists of construction of partitions for new office & conference rooms, new lighting fixtures & areas of new ceiling, new electrical locations, new finishes, new millwork & accessible sink at break room. mep & fire/life safety under seperate permit. | $331,175 | |
| Jul 31, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Gci, Inc | full floor ti demolition and replacment of partitions and doors, upgrade of restroom to compliance. electric/mech/fire on separate permitDetails
full floor ti demolition and replacment of partitions and doors, upgrade of restroom to compliance. electric/mech/fire on separate permit | $500,000 |
| Jul 25, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Richlen Construction | tenanat impr0vement: restrooms, elevator lobby and corridor, non load bearing, partition,m suspended ceilings, finishes, new rest rooms, fistures on 18th flDetails
tenanat impr0vement: restrooms, elevator lobby and corridor, non load bearing, partition,m suspended ceilings, finishes, new rest rooms, fistures on 18th fl | $200,000 |
| Jul 25, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Richlen Construction | 27th floor tenant improvement: restrooms, elevator lobby & corridor, suspended ceiling.Details
27th floor tenant improvement: restrooms, elevator lobby & corridor, suspended ceiling. | $200,000 |
| Jul 25, 2007 | Completed final sign-off Mar 2008 | 123 Mission St | Richlen Construction | tenant improvement, restrooms, non load bearing partitions, finishes new rest foom fixtures on 28th floorDetails
tenant improvement, restrooms, non load bearing partitions, finishes new rest foom fixtures on 28th floor | $120,000 |
| Jul 24, 2007 | Completed final sign-off Sep 2007 | 123 Mission St | Diversified Fire Products | fire alarm t.i. for washington mutual. 1 control relay, 2 smoke detectors, 1 dd, 2 strobes, 10 sprinkler/strobes.Details
fire alarm t.i. for washington mutual. 1 control relay, 2 smoke detectors, 1 dd, 2 strobes, 10 sprinkler/strobes. | $12,238 |
| Jul 3, 2007 | Completed final sign-off Sep 2007 | 123 Mission St | Potter Fire Protection | relocate 10 and add 1, and plug 1 fire sprinkler on the 27th floor onlyDetails
relocate 10 and add 1, and plug 1 fire sprinkler on the 27th floor only | $2,750 |
| Jun 21, 2007 | Completed final sign-off Sep 2007 | 123 Mission St | remodel of 27th floor for new office tenat. new private offices. open area to be cubical arrangement. mpe, fire alarm and sprinkers under separte permit.Details
remodel of 27th floor for new office tenat. new private offices. open area to be cubical arrangement. mpe, fire alarm and sprinkers under separte permit. | $165,000 | |
| Jun 4, 2007 | Never finaled issued Jun 2007, no final | 123 Mission St | San Marin Construction Inc. | 27th floor: interior demolition, no structural demolition. accessibility compliance work exempt per sfbc ab-017. construction on space under separate application.Details
27th floor: interior demolition, no structural demolition. accessibility compliance work exempt per sfbc ab-017. construction on space under separate application. | $13,500 |
| Mar 1, 2006 | Expired or cancelled expired Oct 2007 | 123 Mission St | Tyco Integrated Security | upgrade of access control system (e) readers, and panels only floors 4,5,6,7, 8, 9, 19, does not involve locks.Details
upgrade of access control system (e) readers, and panels only floors 4,5,6,7, 8, 9, 19, does not involve locks. | $81,000 |
| Jan 4, 2006 | Expired or cancelled expired Oct 2007 | 123 Mission St | oti-1 17th fl-ls.Details
oti-1 17th fl-ls. | $28,000 | |
| Sep 27, 2005 | Completed final sign-off Feb 2006 | 123 Mission St | Capitol Electric Const | replace 12 (e) speaker strobes with synchronized speaker strobes on floor 17Details
replace 12 (e) speaker strobes with synchronized speaker strobes on floor 17 | $5,500 |
| Mar 30, 2005 | Completed final sign-off Jun 2005 | 123 Mission St | Richlen Construction | oti-1 24th fl-el,me, ls, sp.Details
oti-1 24th fl-el,me, ls, sp. | $33,176 |
| Dec 17, 2004 | Completed final sign-off Dec 2004 | 123 Mission St | Paradigm General Contractors | renew pa 200003013139Details
renew pa 200003013139 | |
| Oct 29, 2004 | Completed final sign-off Dec 2004 | 123 Mission St | Paradigm General Contractors | oti-1,15th/fl no oti-2.Details
oti-1,15th/fl no oti-2. | $3,000 |
| Aug 4, 2004 | Completed final sign-off Dec 2004 | 123 Mission St | Capitol Electric Const | replace existing strobes with synchronized strobes on 10, 11, 12, 15, and 16th floorsDetails
replace existing strobes with synchronized strobes on 10, 11, 12, 15, and 16th floors | $22,000 |
| Sep 2, 2003 | Completed final sign-off Dec 2004 | 123 Mission St | Capitol Electric Const | fire alarm upgrade for entire bldgDetails
fire alarm upgrade for entire bldg | $550,000 |
| Mar 6, 2003 | Expired or cancelled expired Jul 2005 | 123 Mission St | Paradigm General Contractors | install one power supply and four life safety strobesDetails
install one power supply and four life safety strobes | $6,000 |
| Sep 27, 2002 | Completed final sign-off May 2003 | 123 Mission St | Paradigm General Contractors | 27/fl- no hvac, no plumbing, minor electrical, relocate lightsDetails
27/fl- no hvac, no plumbing, minor electrical, relocate lights | $3,000 |
| Nov 8, 2001 | Completed final sign-off Mar 2002 | 123 Mission St | Paradigm General Contractors | oti-2 14/f el me ls spDetails
oti-2 14/f el me ls sp | $75,000 |
| Nov 6, 2001 | Expired or cancelled expired Sep 2003 | 123 Mission St | Reeve-Knight Construction Inc. | g/f-renew appl#9913953/200106151672 for remain work: waterproofing @ entrance, install door, drywallDetails
g/f-renew appl#9913953/200106151672 for remain work: waterproofing @ entrance, install door, drywall | $30,000 |
| Oct 12, 2001 | Expired or cancelled cancelled Mar 2003 | 123 Mission St | Honeywell | upgrade fire alarm system communication panelDetails
upgrade fire alarm system communication panel | $150,329 |
| Sep 19, 2001 | Completed final sign-off Dec 2001 | 123 Mission St | Paradigm General Contractors | request demo oti 200109047441 for interior non structural demo onlyDetails
request demo oti 200109047441 for interior non structural demo only | $17,000 |
| Sep 4, 2001 | Completed final sign-off Mar 2002 | 123 Mission St | Paradigm General Contractors | oti-1 14th floor - el, me, l/s, spDetails
oti-1 14th floor - el, me, l/s, sp | $75,000 |
| Sep 4, 2001 | Expired or cancelled withdrawn Mar 2002 | 123 Mission St | Paradigm General Contractors | oti-2 14th fl el, meDetails
oti-2 14th fl el, me | $115,000 |
| Jun 15, 2001 | Completed final sign-off Dec 2001 | 123 Mission St | renew expired permit 9913953 for final inspection.Details
renew expired permit 9913953 for final inspection. | ||
| Jun 5, 2001 | Completed final sign-off Feb 2002 | 123 Mission St | revise to app #200103214789 and app #200103214788 revise t/i mech and elect plans on 25/fDetails
revise to app #200103214789 and app #200103214788 revise t/i mech and elect plans on 25/f | ||
| Jun 5, 2001 | Completed final sign-off Feb 2002 | 123 Mission St | revise to app #200103214791 and 200103214792 revise t/i mech and electrical plans on 26/fDetails
revise to app #200103214791 and 200103214792 revise t/i mech and electrical plans on 26/f | ||
| Jun 5, 2001 | Completed final sign-off Feb 2002 | 123 Mission St | revise to app #200102031331 and app #200102021205 revise t/i mech and elect plans on 24/fDetails
revise to app #200102031331 and app #200102021205 revise t/i mech and elect plans on 24/f | ||
| May 31, 2001 | Expired or cancelled expired Sep 2003 | 123 Mission St | Intelligent Technologies & Services Inc | install a fire single hazard panel for a preaction detection systemDetails
install a fire single hazard panel for a preaction detection system | $841 |
| May 17, 2001 | Expired or cancelled expired Sep 2003 | 123 Mission St | Ayoob & Peery Plumbing Co Inc | add & relocate f/s heads per tenant inprovementsDetails
add & relocate f/s heads per tenant inprovements | $5,500 |
| May 17, 2001 | Expired or cancelled expired Sep 2003 | 123 Mission St | Ayoob & Peery Plumbing Co Inc | add & relocate f/s heads fen tenant improvementsDetails
add & relocate f/s heads fen tenant improvements | $5,800 |
| May 11, 2001 | Completed final sign-off Feb 2002 | 123 Mission St | Ayoob & Peery Plumbing Co Inc | install new fire sprinkler pre action system & relocate &add heads pertenant improvement at 24th fl.Details
install new fire sprinkler pre action system & relocate &add heads pertenant improvement at 24th fl. | $13,500 |
| May 10, 2001 | Completed final sign-off Jul 2001 | 123 Mission St | Turner Construction**See 210639**** | oti-4, 22nd floor, me onlyDetails
oti-4, 22nd floor, me only | $95,000 |
| May 9, 2001 | Expired or cancelled expired Dec 2004 | 123 Mission St | Acco Engineered Systems Inc. Dba Acco En | cooling tower, (3) three pump, hvac unit, pipingDetails
cooling tower, (3) three pump, hvac unit, piping | $350,000 |
| May 7, 2001 | Completed final sign-off Feb 2002 | 123 Mission St | Richlen Construction | life safety alterations on 24th,25th & 26th flrsDetails
life safety alterations on 24th,25th & 26th flrs | $80,000 |
| Apr 30, 2001 | Expired or cancelled expired Sep 2003 | 123 Mission St | Premier Fire Protection Inc | remove and replace all central omega fire sprinkler with new vilking model m quick response fire sprDetails
remove and replace all central omega fire sprinkler with new vilking model m quick response fire spr | $17,000 |
| Apr 16, 2001 | Completed final sign-off Jul 2001 | 123 Mission St | Turner Construction**See 210639**** | oti-1 restrooms upgrade to full accessibility barrier removal no increase in office space.Details
oti-1 restrooms upgrade to full accessibility barrier removal no increase in office space. | $19,000 |
| Apr 16, 2001 | Completed final sign-off Jul 2001 | 123 Mission St | Turner Construction**See 210639**** | restroom upgrade to full accessibility/barriel removalDetails
restroom upgrade to full accessibility/barriel removal | $19,000 |
| Apr 16, 2001 | Completed final sign-off Jul 2001 | 123 Mission St | Turner Construction**See 210639**** | upgrade testrooms to full accessibilityDetails
upgrade testrooms to full accessibility | $19,000 |
| Apr 11, 2001 | Expired or cancelled expired Aug 2001 | 123 Mission St | Turner Construction**See 210639**** | oti-2, rev, 21st fl, ltg onlyDetails
oti-2, rev, 21st fl, ltg only | $1,000 |
| Apr 9, 2001 | Completed final sign-off Jul 2001 | 123 Mission St | Turner Construction**See 210639**** | oti-3 22nd floor/lifesafty/sprinklerDetails
oti-3 22nd floor/lifesafty/sprinkler | $150,000 |
| Apr 9, 2001 | Expired or cancelled expired Aug 2001 | 123 Mission St | Turner Construction**See 210639**** | oti-2 (rev.) 20th floor, el onlyDetails
oti-2 (rev.) 20th floor, el only | $1,000 |
| Apr 5, 2001 | Completed final sign-off Jul 2001 | 123 Mission St | Turner Construction**See 210639**** | oti-2 (rev) 23rd floor el onlyDetails
oti-2 (rev) 23rd floor el only | $1,000 |
| Mar 21, 2001 | Completed final sign-off Feb 2002 | 123 Mission St | provide mechanical and electrical on 25th floorDetails
provide mechanical and electrical on 25th floor | $250,000 | |
| Mar 21, 2001 | Completed final sign-off Feb 2002 | 123 Mission St | provide tenant improvement on 26th floorDetails
provide tenant improvement on 26th floor | $250,000 | |
| Mar 21, 2001 | Completed final sign-off Feb 2002 | 123 Mission St | provide mechanical and electrical on 26th floorDetails
provide mechanical and electrical on 26th floor | $250,000 | |
| Mar 21, 2001 | Completed final sign-off Feb 2002 | 123 Mission St | provide tenant improvement on 25th floorDetails
provide tenant improvement on 25th floor | $250,000 | |
| Mar 2, 2001 | Completed final sign-off Jul 2001 | 123 Mission St | Service West Inc | install (35) modular furniture cubicles w/70" high panels. at 23rd fl.Details
install (35) modular furniture cubicles w/70" high panels. at 23rd fl. | $30,000 |
| Mar 2, 2001 | Expired or cancelled expired Mar 2002 | 123 Mission St | Service West Inc | install (35) modular furniture cubicles w/70" high panels 22nd fl. onlyDetails
install (35) modular furniture cubicles w/70" high panels 22nd fl. only | $30,000 |
| Feb 26, 2001 | Completed final sign-off Jul 2001 | 123 Mission St | Turner Construction**See 210639**** | oti-2 23rd fl el,me,ls,spDetails
oti-2 23rd fl el,me,ls,sp | $300,000 |
| Feb 26, 2001 | Completed final sign-off Jul 2001 | 123 Mission St | Turner Construction**See 210639**** | oti-2 22nd fl spDetails
oti-2 22nd fl sp | $300,000 |
| Feb 9, 2001 | Completed final sign-off Feb 2002 | 123 Mission St | non structural interior demo of tenant improvement on 24/f-26th floorsDetails
non structural interior demo of tenant improvement on 24/f-26th floors | $150,000 | |
| Feb 3, 2001 | Completed final sign-off Feb 2002 | 123 Mission St | provide tenant improvement per plansDetails
provide tenant improvement per plans | $250,000 | |
| Feb 3, 2001 | Expired or cancelled withdrawn Jul 2001 | 123 Mission St | provide life safety per plansDetails
provide life safety per plans | ||
| Feb 2, 2001 | Completed final sign-off Feb 2002 | 123 Mission St | provide electrical and mechanical per plans for 24th floorDetails
provide electrical and mechanical per plans for 24th floor | ||
| Nov 15, 2000 | Expired or cancelled expired Nov 2001 | 123 Mission St | Service West Inc | install modular stations (apprvd 200010183344)Details
install modular stations (apprvd 200010183344) | $27,500 |
| Nov 15, 2000 | Expired or cancelled expired Apr 2001 | 123 Mission St | Turner Construction**See 210639**** | oti-1, revision-ltg, mech, ls, sprink,-20th floorDetails
oti-1, revision-ltg, mech, ls, sprink,-20th floor | |
| Nov 15, 2000 | Expired or cancelled expired May 2001 | 123 Mission St | Service West Inc | install modular stations on the 20th flr (200010183344)Details
install modular stations on the 20th flr (200010183344) | $9,600 |
| Nov 13, 2000 | Expired or cancelled expired Apr 2001 | 123 Mission St | Turner Construction**See 210639**** | oti-1 rev el ls onlyDetails
oti-1 rev el ls only | $500 |
| Oct 27, 2000 | Completed final sign-off Dec 2000 | 123 Mission St | Cic Associates, Inc | oti-4:(9th)l/sDetails
oti-4:(9th)l/s | $40,000 |
| Oct 23, 2000 | Expired or cancelled expired Dec 2001 | 123 Mission St | Turner Construction**See 210639**** | oti-3 21/f l/sDetails
oti-3 21/f l/s | $100,000 |
| Oct 18, 2000 | Expired or cancelled expired Oct 2001 | 123 Mission St | Turner Construction**See 210639**** | oti-2 21st floor el me spDetails
oti-2 21st floor el me sp | $200,000 |
| Oct 18, 2000 | Expired or cancelled expired Nov 2001 | 123 Mission St | Turner Construction**See 210639**** | oti 2,20th floor-el, me, ls,spDetails
oti 2,20th floor-el, me, ls,sp | $300,000 |
| Oct 5, 2000 | Expired or cancelled expired Oct 2002 | 123 Mission St | Turner Construction**See 210639**** | oti-1 20th fl el, me, ls, spDetails
oti-1 20th fl el, me, ls, sp | $350,000 |
| Sep 28, 2000 | Completed final sign-off Dec 2000 | 123 Mission St | Cic Associates, Inc | oti- 3 9th floor s-pDetails
oti- 3 9th floor s-p | $15,875 |
| Sep 14, 2000 | Completed final sign-off Jul 2001 | 123 Mission St | Turner Construction**See 210639**** | oti-1, 23rd floor , el, me, l/s & spDetails
oti-1, 23rd floor , el, me, l/s & sp | $350,000 |
| Sep 8, 2000 | Completed final sign-off Dec 2000 | 123 Mission St | Cic Associates, Inc | oti-2 el me 9th floorDetails
oti-2 el me 9th floor | $238,000 |
| Sep 6, 2000 | Completed final sign-off Jul 2001 | 123 Mission St | Turner Construction**See 210639**** | oti 1 restroom work. demolition walls doors etc. build back walls partitions doors, millwork etc.Details
oti 1 restroom work. demolition walls doors etc. build back walls partitions doors, millwork etc. | $350,000 |
| Sep 6, 2000 | Completed final sign-off Jul 2001 | 123 Mission St | Turner Construction**See 210639**** | struct alter. accommodate file storge,equip loads disabled access issues addressed in sep permit t.iDetails
struct alter. accommodate file storge,equip loads disabled access issues addressed in sep permit t.i | $20,000 |
| Sep 6, 2000 | Expired or cancelled expired Oct 2002 | 123 Mission St | Turner Construction**See 210639**** | oti-1, el, me, l/s, sp-21st floorDetails
oti-1, el, me, l/s, sp-21st floor | $350,000 |
| Sep 5, 2000 | Completed final sign-off Apr 2001 | 123 Mission St | Paradigm General Contractors | replace door closers in rated door assemblesao fls: 10,11,012, 14,15 ,16,17,18,22,23,24,25,26,27 & 2Details
replace door closers in rated door assemblesao fls: 10,11,012, 14,15 ,16,17,18,22,23,24,25,26,27 & 2 | $6,000 |
| Aug 29, 2000 | Completed final sign-off Dec 2000 | 123 Mission St | Cic Associates, Inc | oti-1 9th floor el, me, ls,spDetails
oti-1 9th floor el, me, ls,sp | $112,000 |
| May 19, 2000 | Expired or cancelled expired Sep 2000 | 123 Mission St | Turner Construction**See 210639**** | restroom barrier removal/relocate strobesDetails
restroom barrier removal/relocate strobes | $4,000 |
| May 9, 2000 | Completed final sign-off Dec 2000 | 123 Mission St | Cic Associates, Inc | oti 4 6th floor, ls onlyDetails
oti 4 6th floor, ls only | $40,000 |
| May 9, 2000 | Completed final sign-off Dec 2000 | 123 Mission St | Cic Associates, Inc | oti 4 5th floor, ls onlyDetails
oti 4 5th floor, ls only | $40,000 |
| May 2, 2000 | Completed final sign-off Dec 2000 | 123 Mission St | Cic Associates, Inc | oti-4, 4th floor, spDetails
oti-4, 4th floor, sp | $17,000 |
| Apr 12, 2000 | Completed final sign-off Dec 2000 | 123 Mission St | Cic Associates, Inc | oti 3 5th floor, spDetails
oti 3 5th floor, sp | $17,000 |
| Apr 12, 2000 | Completed final sign-off Dec 2000 | 123 Mission St | Cic Associates, Inc | oti 3 6th floor, spDetails
oti 3 6th floor, sp | $17,000 |
| Apr 12, 2000 | Completed final sign-off Dec 2000 | 123 Mission St | Cic Associates, Inc | oti 3 4th floor, ls onlyDetails
oti 3 4th floor, ls only | $40,000 |
| Apr 11, 2000 | Expired or cancelled expired Aug 2000 | 123 Mission St | Turner Construction**See 210639**** | oti-2, non, 5th floorDetails
oti-2, non, 5th floor | $4,000 |