Permit GraphShortlistSan Francisco building permits since 2000

Scott Dunlap

License
C22069
Architect
About the California Architects Board
Look the license up with the state (Architects Board)
Listed as
architect
Firm
Gensler
Based in
San Francisco
On San Francisco permits
Aug 2004 to Mar 2019

46 permits since 2000 (architect on 46 permits): 23 completed, 8 never finaled, 15 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Field Construction Inc. (15), Dpr Construction (6), Bcci Construction Company (3), Novo Construction Inc (3), Richlen Construction (3), Skyline Construction (3), Fisher Development Inc (2), Gci, Inc (2), Hathaway Dinwiddie Co. (2), Swinerton Builders (2), Granite Excavation & Demolition Inc, Principal Builders Inc., Webcor Construction Lp
Architects
Glenn Rescalvo
Engineers
Glumac Internation (7), Aaron Strauch (2), Shakell Ahmed (2), Todd Gottshall (2), Allen Scott Nudell, Amit Wadhwa, Mark Kehoe, Valeria Balderramos

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 13, 2019Completed
final sign-off May 2020
72 Ellis StGranite Excavation & Demolition Incdemolish type 3, underground parking garage. **comply to maher, route to dph**
Details
Permit
201903135088
Permit issued
Jun 25, 2019
Final sign-off
May 26, 2020

demolish type 3, underground parking garage. **comply to maher, route to dph**

Open the permit page

$200,000
Jan 22, 2016Never finaled
issued Jun 2016, no final
601 California StFisher Development Inc22nd floor: interior ti - drywall, millwork, ceilings, doors & finishes. new shaft at elevator lobby & mep under seperate permit
Details
Permit
201601227687
Permit issued
Jun 1, 2016

22nd floor: interior ti - drywall, millwork, ceilings, doors & finishes. new shaft at elevator lobby & mep under seperate permit

Open the permit page

$973,760
Jan 7, 2016Completed
final sign-off May 2017
601 California StFisher Development Inc21st flr: interior tenant improvement incl. drywall, millwork,ceilings,minor demo,doors & finishes; mechanical & elec under separate permit
Details
Permit
201601076559
Permit issued
Jun 1, 2016
Final sign-off
May 12, 2017

21st flr: interior tenant improvement incl. drywall, millwork,ceilings,minor demo,doors & finishes; mechanical & elec under separate permit

Open the permit page

$973,760
Aug 3, 2015Completed
final sign-off Dec 2022
72 Ellis StWebcor Construction Lpto erect 13 stories, 1 basement, 195 hotel room & retail building. (r-1,m,b,a-2,a-3) ** maher: compliance with ordinance no# 155-13 required **
Details
Permit
201508033157
Permit issued
Feb 26, 2019
Final sign-off
Dec 15, 2022

to erect 13 stories, 1 basement, 195 hotel room & retail building. (r-1,m,b,a-2,a-3) ** maher: compliance with ordinance no# 155-13 required **

Open the permit page

$30,000,000
Feb 23, 2015Completed
final sign-off Apr 2017
303 02nd StGci, Inctenant improvements on 7th floor - conference rooms, private offices, pantry, open offices & phone rooms. mep under separate permit. maher - not req'd
Details
Permit
201502239019
Permit issued
Mar 12, 2015
Final sign-off
Apr 27, 2017

tenant improvements on 7th floor - conference rooms, private offices, pantry, open offices & phone rooms. mep under separate permit. maher - not req'd

Open the permit page

$2,800,000
Feb 11, 2015Never finaled
issued Feb 2015, no final
303 02nd StSkyline Construction7th floor: reconstruction demolition under ab-17 n/a for the maher
Details
Permit
201502118104
Permit issued
Feb 26, 2015

7th floor: reconstruction demolition under ab-17 n/a for the maher

Open the permit page

$220,000
Jan 21, 2015Completed
final sign-off Mar 2015
2 Folsom StSwinerton Builders2nd flr: tenant improvement interior upgrades to one 2nd floor coffee area and ada improvements to 3 restrooms on 2nd flr; maher n/a
Details
Permit
201501216195
Permit issued
Jan 23, 2015
Final sign-off
Mar 17, 2015

2nd flr: tenant improvement interior upgrades to one 2nd floor coffee area and ada improvements to 3 restrooms on 2nd flr; maher n/a

Open the permit page

$61,800
Oct 29, 2014Never finaled
issued Sep 2015, no final
470 Castro StGci, Increvision to 2013101240180. removal of overhang/projection on 2nd fl balconey due to existing condition. change facade scope at adjacent tenant
Details
Permit
201410290218
Permit issued
Sep 23, 2015

revision to 2013101240180. removal of overhang/projection on 2nd fl balconey due to existing condition. change facade scope at adjacent tenant

Open the permit page

Oct 2, 2014Completed
final sign-off May 2015
1275 Market StDpr Constructionnew extended egress stairs. (stairs #2) from floor 3 to 6 per 2010 code. reference core and shell pa#2013.1107.1334. structural only.
Details
Permit
201410027888
Permit issued
Oct 3, 2014
Final sign-off
May 8, 2015

new extended egress stairs. (stairs #2) from floor 3 to 6 per 2010 code. reference core and shell pa#2013.1107.1334. structural only.

Open the permit page

$180,000
Jul 30, 2014Completed
final sign-off May 2015
1275 Market StDpr Constructionnew interconnecting stair floor 7-8, 9-10, 11-12,13-14, 15-16. no more than two stories connected. n/a for the interim
Details
Permit
201407302561
Permit issued
Oct 2, 2014
Final sign-off
May 8, 2015

new interconnecting stair floor 7-8, 9-10, 11-12,13-14, 15-16. no more than two stories connected. n/a for the interim

Open the permit page

$221,000
Jun 27, 2014Never finaled
issued Jan 2015, no final
1275 Market StDpr Constructionlevel 1: ti non load bearing walls, floor & ceiling finishes,ramp & level chanles, lighting,restrms,stepped seating,window wall modification & temp enclosur.level 2: new kitchen, fitness ctr, restrms,non load bearing walls, floor & ceiling finishes.level b1: new shop, bike storage,locker rm, storage
Details
Permit
201406279881
Permit issued
Jan 16, 2015

level 1: ti non load bearing walls, floor & ceiling finishes,ramp & level chanles, lighting,restrms,stepped seating,window wall modification & temp enclosur.level 2: new kitchen, fitness ctr, restrms,non load bearing walls, floor & ceiling finishes.level b1: new shop, bike storage,locker rm, storage

Open the permit page

$7,020,000
Jun 17, 2014Expired or cancelled
cancelled Sep 2014
1 Montgomery StBcci Construction Companyconversion of 2 conference rooms into 3 individual offices and 1 small converence rm. addition of non fire rated partitions at three location. mech, fire/life safety alterations under separate permit
Details
Permit
201406178633
Permit issued
Jul 3, 2014

conversion of 2 conference rooms into 3 individual offices and 1 small converence rm. addition of non fire rated partitions at three location. mech, fire/life safety alterations under separate permit

Open the permit page

$75,000
May 22, 2014Completed
final sign-off Apr 2016
1275 Market StDpr Constructionref p/a#201311071334. t-1 package 2: level 3-6 t.i include new non load bearing partitions, floor finishes, ceiling elements & lighting, new furnishing + a new 2-hr rated exit stair extention. level 7-11: t-i improvements incl. new non load bearing walls, finishes, ceiling elements lighting +
Details
Permit
201405226490
Permit issued
Aug 25, 2014
Final sign-off
Apr 14, 2016

ref p/a#201311071334. t-1 package 2: level 3-6 t.i include new non load bearing partitions, floor finishes, ceiling elements & lighting, new furnishing + a new 2-hr rated exit stair extention. level 7-11: t-i improvements incl. new non load bearing walls, finishes, ceiling elements lighting +

Open the permit page

$23,660,000
Mar 26, 2014Completed
final sign-off May 2015
1275 Market StDpr Constructionrevision to appl #2013.0529.8068 - demolition of exterior storefront glazing, exterior non-load bearing walls, barrier removal of non compliant conc. stair & (2) single story exterior terraces.
Details
Permit
201403261731
Permit issued
May 13, 2014
Final sign-off
May 8, 2015

revision to appl #2013.0529.8068 - demolition of exterior storefront glazing, exterior non-load bearing walls, barrier removal of non compliant conc. stair & (2) single story exterior terraces.

Open the permit page

$300,000
Feb 3, 2014Completed
final sign-off Apr 2016
1275 Market StDpr Construction(b3-2nd floor) t/i of (e)office bldg for new structural openings for level b3 thru levl 2, new struct. openings for future stairs, slab openings and new structural members temp. guardrails will be used. stairs & handrails to be submitted under separate permit.
Details
Permit
201402037623
Permit issued
Mar 26, 2014
Final sign-off
Apr 14, 2016

(b3-2nd floor) t/i of (e)office bldg for new structural openings for level b3 thru levl 2, new struct. openings for future stairs, slab openings and new structural members temp. guardrails will be used. stairs & handrails to be submitted under separate permit.

Open the permit page

$780,000
Mar 20, 2012Completed
final sign-off Jun 2013
50 Fremont StHathaway Dinwiddie Co.interior non structural demo to extg tenant space on the 32nd floor. all work to comply with ab-017.
Details
Permit
201203206470
Permit issued
Mar 20, 2012
Final sign-off
Jun 28, 2013

interior non structural demo to extg tenant space on the 32nd floor. all work to comply with ab-017.

Open the permit page

$7,000
Mar 7, 2012Completed
final sign-off Jun 2013
50 Fremont StHathaway Dinwiddie Co.floors 27,28,29,30 & 31 interior non-structural demo. all work to comply w/ab-017.
Details
Permit
201203075592
Permit issued
Mar 12, 2012
Final sign-off
Jun 28, 2013

floors 27,28,29,30 & 31 interior non-structural demo. all work to comply w/ab-017.

Open the permit page

$35,000
Feb 26, 2010Completed
final sign-off Jan 2011
650 California StBcci Construction Companytenant improvement on the 31st. flr. including new non-load bearing partitions, ceilings finishes & associated mechanical & electrical work. life safety & fire sprinkler under separate permit.
Details
Permit
201002267190
Permit issued
Mar 3, 2010
Final sign-off
Jan 24, 2011

tenant improvement on the 31st. flr. including new non-load bearing partitions, ceilings finishes & associated mechanical & electrical work. life safety & fire sprinkler under separate permit.

Open the permit page

$930,000
Jun 26, 2008Expired or cancelled
withdrawn Nov 2016
1515 03rd Sterect a 6 stories office/lab/retail building.
Details
Permit
200806265407

erect a 6 stories office/lab/retail building.

Open the permit page

$36,400,000
May 19, 2008Completed
final sign-off Dec 2008
1 Embarcadero CenterBcci Construction Companyinterior tenant improvement on the 33rd fl. including demo, new walls,ceiling work,doors,millwork and finishes; mech,elec,new and relocated ducting,power,signal, new lighting, stair for tenant convinience to be under separate permit.
Details
Permit
200805192359
Permit issued
May 19, 2008
Final sign-off
Dec 10, 2008

interior tenant improvement on the 33rd fl. including demo, new walls,ceiling work,doors,millwork and finishes; mech,elec,new and relocated ducting,power,signal, new lighting, stair for tenant convinience to be under separate permit.

Open the permit page

$1,026,000
Dec 21, 2007Completed
final sign-off Feb 2009
555 California StPrincipal Builders Inc.39th floor: tenant improvement - partial remodel work includes demolition, new non-load bearing partitions, ceilings, carpet & paint. new m.e.p. fire sprinklers & life safety under separate permit.
Details
Permit
200712211057
Permit issued
Jan 30, 2008
Final sign-off
Feb 24, 2009

39th floor: tenant improvement - partial remodel work includes demolition, new non-load bearing partitions, ceilings, carpet & paint. new m.e.p. fire sprinklers & life safety under separate permit.

Open the permit page

$300,000
Oct 11, 2007Completed
final sign-off Mar 2008
123 Mission StRichlen Constructionrevision to app# 200707257723/ remove corridor water fountain from scope of work 28th floor
Details
Permit
200710115141
Permit issued
Oct 11, 2007
Final sign-off
Mar 27, 2008

revision to app# 200707257723/ remove corridor water fountain from scope of work 28th floor

Open the permit page

Oct 11, 2007Completed
final sign-off Mar 2008
123 Mission StRichlen Constructionrevision to app# 200707257726 to remove corridor water fountain from scope
Details
Permit
200710115140
Permit issued
Oct 11, 2007
Final sign-off
Mar 27, 2008

revision to app# 200707257726 to remove corridor water fountain from scope

Open the permit page

Oct 11, 2007Never finaled
issued Oct 2007, no final
123 Mission StRichlen Constructionrevision to app# 200707257729/ remove corridor water fountain from job scope
Details
Permit
200710115142
Permit issued
Oct 11, 2007

revision to app# 200707257729/ remove corridor water fountain from job scope

Open the permit page

Nov 8, 2005Never finaled
issued Jan 2006, no final
235 02nd StNovo Construction Incoti-2 basement el me
Details
Permit
200511087657
Permit issued
Jan 17, 2006

oti-2 basement el me

Open the permit page

$450,000
Nov 8, 2005Never finaled
issued Jan 2006, no final
235 02nd StNovo Construction Incoti-1, basement, el, me, ls, sp.
Details
Permit
200511087655
Permit issued
Jan 9, 2006

oti-1, basement, el, me, ls, sp.

Open the permit page

$650,000
Oct 28, 2005Expired or cancelled
expired Apr 2007
3 Embarcadero CenterField Construction Inc.oti-3,7th floor-ls.
Details
Permit
200510286791
Permit issued
Oct 28, 2005

oti-3,7th floor-ls.

Open the permit page

$3,000
Sep 29, 2005Expired or cancelled
expired Mar 2008
3 Embarcadero CenterField Construction Inc.floor boxes for 8/f conference room. add new. oti appl#200507218233
Details
Permit
200509294319
Permit issued
Sep 29, 2005

floor boxes for 8/f conference room. add new. oti appl#200507218233

Open the permit page

$2,500
Sep 27, 2005Completed
final sign-off May 2007
3 Embarcadero CenterField Construction Inc.oti-2 6th floor el, me
Details
Permit
200509273931
Permit issued
Dec 7, 2005
Final sign-off
May 7, 2007

oti-2 6th floor el, me

Open the permit page

$420,000
Sep 27, 2005Expired or cancelled
expired Dec 2006
3 Embarcadero CenterField Construction Inc.oti-2 7th floor el, me
Details
Permit
200509273939
Permit issued
Oct 18, 2005

oti-2 7th floor el, me

Open the permit page

$170,000
Aug 31, 2005Completed
final sign-off May 2007
3 Embarcadero CenterField Construction Inc.oti-1, 6th floor, el, me, ls, sp.
Details
Permit
200508311677
Permit issued
Nov 4, 2005
Final sign-off
May 7, 2007

oti-1, 6th floor, el, me, ls, sp.

Open the permit page

$200,000
Aug 31, 2005Expired or cancelled
expired Dec 2006
3 Embarcadero CenterField Construction Inc.oti-1,7th/fl-el, me,ls, sp.
Details
Permit
200508311675
Permit issued
Sep 21, 2005

oti-1,7th/fl-el, me,ls, sp.

Open the permit page

$24,824
Aug 18, 2005Expired or cancelled
expired May 2007
3 Embarcadero CenterField Construction Inc.firesprinklers. this application is to revise drawings previously app#200507218203.
Details
Permit
200508180595
Permit issued
Aug 18, 2005

firesprinklers. this application is to revise drawings previously app#200507218203.

Open the permit page

Aug 18, 2005Expired or cancelled
expired Apr 2007
3 Embarcadero CenterField Construction Inc.oti-3, 8th/fl -sp.
Details
Permit
200508180592
Permit issued
Aug 18, 2005

oti-3, 8th/fl -sp.

Open the permit page

$8,000
Jul 21, 2005Expired or cancelled
expired Apr 2007
3 Embarcadero CenterField Construction Inc.oti-1 8th floor, el,me,ls,sp
Details
Permit
200507218233
Permit issued
Aug 4, 2005

oti-1 8th floor, el,me,ls,sp

Open the permit page

$80,000
Jul 5, 2005Expired or cancelled
expired May 2007
3 Embarcadero CenterField Construction Inc.oti-2 9th/f,me, el.
Details
Permit
200507056755
Permit issued
Aug 5, 2005

oti-2 9th/f,me, el.

Open the permit page

$100,000
Jul 5, 2005Expired or cancelled
expired May 2007
3 Embarcadero CenterField Construction Inc.oti-2 10th/f,me, el.
Details
Permit
200507056753
Permit issued
Aug 4, 2005

oti-2 10th/f,me, el.

Open the permit page

$100,000
May 19, 2005Expired or cancelled
expired Mar 2008
3 Embarcadero CenterField Construction Inc.oti-1 10th fl-el, me, ls, sp
Details
Permit
200505192885
Permit issued
Jun 10, 2005

oti-1 10th fl-el, me, ls, sp

Open the permit page

$250,000
May 19, 2005Expired or cancelled
expired Apr 2007
3 Embarcadero CenterField Construction Inc.oti-1, 9th fl-el,me, ls, sp.
Details
Permit
200505192881
Permit issued
Jul 11, 2005

oti-1, 9th fl-el,me, ls, sp.

Open the permit page

$200,000
May 19, 2005Expired or cancelled
expired May 2007
3 Embarcadero CenterField Construction Inc.oti-1 10th fl-el, me, ls, sp,. (south)
Details
Permit
200505192886
Permit issued
Jun 29, 2005

oti-1 10th fl-el, me, ls, sp,. (south)

Open the permit page

$250,000
May 19, 2005Expired or cancelled
expired May 2007
3 Embarcadero CenterField Construction Inc.oti-1 9th fl south-el, me, ls, sp.
Details
Permit
200505192882
Permit issued
Jun 10, 2005

oti-1 9th fl south-el, me, ls, sp.

Open the permit page

$100,000
May 6, 2005Completed
final sign-off Nov 2005
50 Beale StSkyline Constructionoti-1 13th floor el me ls sp
Details
Permit
200505061763
Permit issued
May 18, 2005
Final sign-off
Nov 14, 2005

oti-1 13th floor el me ls sp

Open the permit page

$100,000
May 6, 2005Never finaled
issued Jun 2005, no final
50 Beale StSkyline Constructionoti-1 12th floor el me ls sp
Details
Permit
200505061765
Permit issued
Jun 1, 2005

oti-1 12th floor el me ls sp

Open the permit page

$100,000
Mar 15, 2005Completed
final sign-off Jun 2005
555 California St22/f-(n)suspended coustical ceiling,new lighting,(n)reconfiguration mech & electrical.21/f-remove 2
Details
Permit
200503157499
Permit issued
Mar 15, 2005
Final sign-off
Jun 9, 2005

22/f-(n)suspended coustical ceiling,new lighting,(n)reconfiguration mech & electrical.21/f-remove 2

Open the permit page

$390,000
Mar 11, 2005Completed
final sign-off Nov 2005
425 Market StNovo Construction Incoti-1,6th/fl-el,me, ls, sp.
Details
Permit
200503117285
Permit issued
Mar 16, 2005
Final sign-off
Nov 23, 2005

oti-1,6th/fl-el,me, ls, sp.

Open the permit page

$2,500
Aug 23, 2004Completed
final sign-off Feb 2005
500 Howard StSwinerton Buildersbuild out of cafe, f/a,ansul,sprinkler under seperate permit
Details
Permit
200408232293
Permit issued
Dec 6, 2004
Final sign-off
Feb 17, 2005

build out of cafe, f/a,ansul,sprinkler under seperate permit

Open the permit page

$800,000