Mark Kehoe
- Listed as
- architect, attorney, engineer
- Firm
- Slack & Kurtz
- On San Francisco permits
- Dec 2004 to Jan 2006
4 permits since 2000 (engineer on 2 permits, architect on 1 permit, attorney on 1 permit): 1 completed, 3 expired or cancelled.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 11, 2006 | Expired or cancelled expired Jun 2007 | 1 Harrison St | Fuel Oil System | revision to pa# 2005/10/05/4802 & procedural revision to plans, as marked 4.Details
revision to pa# 2005/10/05/4802 & procedural revision to plans, as marked 4. | |
| Oct 5, 2005 | Expired or cancelled expired May 2007 | 1 Harrison St | Fuel Oil System | install main diesel tank / piping to rooftop generator.Details
install main diesel tank / piping to rooftop generator. | $30,000 |
| Mar 15, 2005 | Completed final sign-off Jun 2005 | 555 California St | 22/f-(n)suspended coustical ceiling,new lighting,(n)reconfiguration mech & electrical.21/f-remove 2Details
22/f-(n)suspended coustical ceiling,new lighting,(n)reconfiguration mech & electrical.21/f-remove 2 | $390,000 | |
| Dec 20, 2004 | Expired or cancelled expired Jun 2007 | 1 Harrison St | adding 3 walls to 2nd, 3rd, & 4th floor open area. removing gyp. bd. clg. & replacing w/ drop-inDetails
adding 3 walls to 2nd, 3rd, & 4th floor open area. removing gyp. bd. clg. & replacing w/ drop-in | $150,000 |