Block 3769, lot 002A
1 Harrison St
115 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 14, 2026 | In progress | 1 Harrison St | Johnson Controls Fire | provide and install a new elevator lobby emergency communication system (2-way comm. system) ref pa#202511109279 and fire-26-20. | $2,000 |
| May 27, 2026 | In progress | 1 Harrison St | Truebeck Construction | 6/fl- revisoin 202410173107 to include adding guardrail to 6th floor roof deck plan north parapet. in response to as built discovery that the parapet is less than 42" at roof deck | |
| Apr 7, 2026 | In progress | 1 Harrison St | Truebeck Construction | revision to 202410082583 and 202507020012. update 5 columns at level 1 from frp strengthening to steel tube strengthening. | |
| Mar 11, 2026 | In progress | 1 Harrison St | Truebeck Construction | defferred green living wall submission associated with approved pa #202410173107 | $10,000 |
| Mar 5, 2026 | In progress | 1 Harrison St | Corporate Sign Systems | fabricate and install (1) internally face illuminated canopy sign. connecting to power source w/ dedicated 20amp circuit, and astronomical timer | $12,000 |
| Mar 5, 2026 | In progress | 1 Harrison St | Corporate Sign Systems | fabricate and install (1) non-illuminated wall mounted sign. | $2,000 |
| Mar 5, 2026 | In progress | 1 Harrison St | Corporate Sign Systems | install (40) evacuation maps on all levels | $6,000 |
| Feb 6, 2026 | In progress | 1 Harrison St | Truebeck Construction | deferred fire alarm submission associated with approved pa#2024-1017-3107 | |
| Dec 12, 2025 | Completed | 1 Harrison St | Golden Bear Fire Protect. | phase 3 - 1/f & 6/f and core: fire sprinkler for t.i. 202410173107. | $129,000 |
| Dec 12, 2025 | Completed | 1 Harrison St | Golden Bear Fire Protect. | 4/f: fire sprinkler for t.i. 202506239258. | $39,000 |
| Dec 8, 2025 | In progress | 1 Harrison St | Truebeck Construction | defferred exterior metal framing assocated with approved pa 202410173107. | $10,000 |
| Nov 10, 2025 | In progress | 1 Harrison St | Johnson Controls Fire | fire alarm system replacement, at owners request due to obsolecence. new 4100 es fire alarm control panel and devices. ref pa #2024911081130. | $160,000 |
| Nov 3, 2025 | In progress | 1 Harrison St | Truebeck Construction | windscreen structural only submission associated with 202410173107 | |
| Nov 2, 2025 | In progress | 1 Harrison St | Bobcomm Llc Dba Pacific Das Llc. | installation of new errc sytem.fire only.reference bpa#202410173107. | $120,082 |
| Aug 29, 2025 | In progress | 1 Harrison St | Truebeck Construction | defferred curtainwall: structural only submission assocated with approved pa 202410173107 | |
| Aug 15, 2025 | In progress | 1 Harrison St | Truebeck Construction | mech and electrial upgrades install (n) ashp heating , hot water chiler and new panel hr | $100,000 |
| Jul 18, 2025 | In progress | 1 Harrison St | Apex Site Solutions Inc | to obtain final inspection for work approved under pa#201804206958. all work is complete. | $15,000 |
| Jul 10, 2025 | In progress | 1 Harrison St | Truebeck Construction | deferred frp structural only submission associated with approved pa 202410082583. | $20,000 |
| Jun 23, 2025 | In progress | 1 Harrison St | Truebeck Construction | 4th floor: tenant improvements includes new non-load bearing partitions, doors, ceiling, and finishes. mep included. | $2,693,481 |
| May 29, 2025 | In progress | 1 Harrison St | Truebeck Construction | revision to pa# 202410082583: misc structural updates. | |
| Nov 14, 2024 | In progress | 1 Harrison St | Truebeck Construction | horizontal infill of (e) terraces at levels 2-5, (n) marquee. architectural and mep core and shell updates at all floors, and (n) interior & exterior assembly amenity spaces at level 6. soft demo, interior tenant improvements, and voluntary seismic upgrade to be done under separate permits. | $13,300,000 |
| Oct 8, 2024 | In progress | 1 Harrison St | Truebeck Construction | phase 2: voluntary structural seismic upgrade on all floors: soft demo and architecture under separate permit. see 202410173107. | $6,545,000 |
| Sep 27, 2024 | In progress | 1 Harrison St | Golden Bear Fire Protect. | demolition of ceiling fire sprinklers. ceiling being removed. system restored to shell condition. ref soft demo permit: 202409120580 | $144,660 |
| Sep 12, 2024 | Completed | 1 Harrison St | Truebeck Construction | demo of interior partitions, ceilings, finishes on all floors. structural and architectural upgrades under sep permit | $609,000 |
| Jul 13, 2022 | Completed | 1 Harrison St | Electric Tech Construction Inc | att: remove (6) (e) antennas ; install (3) (e) rrus, install (6) (n) antennas, (3) (n) rrus; install (4) (n) batteries. | $42,000 |
| Oct 17, 2019 | Never finaled | 1 Harrison St | Acco Engineered Systems Inc. Dba Acco En | replace existing chillers | $494,772 |
| Apr 20, 2018 | Never finaled | 1 Harrison St | Electric Tech Construction Inc | swap 6 antennas, swap 3 rrus. install: 3 rrus, 1 5216, 1xmu n v2 chasis. swap - 1 gps antenna, remove 1 strinf m12155ft battery string maher n/a | $15,000 |
| Nov 29, 2017 | Expired or cancelled | 1 Harrison St | Bcci Construction Company | 4th fl interior non structural demo life safety systems to remain | $100,000 |
| Sep 27, 2017 | Never finaled | 1 Harrison St | street space | ||
| Jul 27, 2017 | Completed | 1 Harrison St | Johnson Controls Fire | 1/f: fire alarm ; addition of duct detectors for fan coil unit locatin in the first floor. ref pa#201706159500. | $1,000 |
| Jun 15, 2017 | Completed | 1 Harrison St | Acco Engineered Systems Inc. Dba Acco En | install supplemental fan coil & heat pump. maher na | $95,000 |
| Mar 28, 2017 | Completed | 1 Harrison St | Metropolitan Electrical Construction | at&t modification: remove 6(e) rrus, 6(e) tmas, 6(e) equip cabinets; r&r 3(e) rrus-11 w/3(n) rrus-32 b2; install 6(n) diplexes, 3 new rrus-11. 3 new rrus-e2; r&r other small equip in (e) racks maher na | $26,000 |
| Feb 1, 2017 | Completed | 1 Harrison St | Acco Engineered Systems Inc. Dba Acco En | 1st flr: install commercial dryer with associated exhaust duct to terminate at (e) exterior discharge louver. install new dryer exhaust booster fan interlocked to dryer activate upon dryer operation maher na | $20,000 |
| Jan 6, 2016 | Completed | 1 Harrison St | Electric Tech Construction Inc | modificiation to an e att facility including removal and replace 6 antennas, install 3 new rrus, install 1 new xmu inside existing rack in equip area maher not req | $25,000 |
| Sep 30, 2015 | Completed | 1 Harrison St | Triton Tower Inc, Broken Arrow Communications Inc | modification to (e) at&t facility including: removing/replacing 3 antennas, installing 3 new rru's and installing other small ancillary equipment including surge supressors, 2 dus41 units and a new 2" innerduct for fiber/power cables. also removing all (e) tma's and diplexors. maher na | $28,000 |
| Nov 20, 2014 | Completed | 1 Harrison St | Johnson Controls Fire | replace existing fire alarm annunicator panel, remove fan damoer/override panel. install (12) relays & (24) interposing relays to shutdown the fans & close the shaft supply & exhaust fire/smoke dampers on floor of alarm. n/a maher ordinance | $40,000 |
| Mar 14, 2014 | Completed | 1 Harrison St | Johnson Controls Fire | fire alarm t.i. on 4th & 5th floors. provide new (79) horn/strobes, (30) strobes, and (4) weatherproof horn/strobes. (2) nac panels. reference pa# 2013 1218 4472. | $40,000 |
| Feb 26, 2014 | Completed | 1 Harrison St | Triton Tower Inc | modifications to an (e) at&t facility including removing 9 (e) antennas & replacing them with 9 (n) antennas of similar dimensions. also adding 3 (n) rrus near the antennas on roof. n/a compliance with ordinance #155-13 | $16,000 |
| Feb 18, 2014 | Never finaled | 1 Harrison St | Johnson Controls Fire | provide new (43) horn/strobes, (10) strobes & (2) weatherproof horn/strobes. compliance with ordinance #155-13 not required. | $22,000 |
| Jan 9, 2014 | Completed | 1 Harrison St | Johnson Controls Fire | provide (2) new nac panel & devices, remove & replace existing devices w/ new & demo devices as shown on drawings. t.i.#2013-12-18-4472. includes (37) horn/strobes and (3) strobes. | $20,000 |
| Dec 23, 2013 | Never finaled | 1 Harrison St | Bcci Construction Company | mechanical work associated appr #201312184472 including relocation existing grilles & vav boxes. | $34,500 |
| Dec 18, 2013 | Completed | 1 Harrison St | Bcci Construction Company | modifications to (e) pantries & workrooms & (n) millwork & finishes. minor demo at some office walls to enlarge. mech, elec, sprinklers & life safety under separate permit. | $135,000 |
| Nov 15, 2013 | Completed | 1 Harrison St | Triton Tower Inc | to complete work and to obtian final inspection for work approved under pa# 201012146679 | $25,000 |
| Nov 13, 2013 | Completed | 1 Harrison St | Triton Tower Inc | renew for final 201009231534. all work is complete | |
| May 18, 2012 | Never finaled | 1 Harrison St | Rainbow Waterproofing & Restor | construct a temporary sign on the front exterior of the building for 30 days, per attached plans. all wall penatrations will be repaired once sign comes down. | $5,000 |
| Dec 9, 2011 | Completed | 1 Harrison St | Bcci Construction Company | ada barrier removal,interior tenant improvement at ground floor shower/locker rooms. design build , seperate application will be submitted for plmg, electrical and sprinklers if required per field conditions. | $105,000 |
| Aug 12, 2011 | Never finaled | 1 Harrison St | street space | ||
| Jul 6, 2011 | Never finaled | 1 Harrison St | street space permit | ||
| Feb 23, 2011 | Never finaled | 1 Harrison St | Potter Fire Protection | 1st floor-relocate 9 and plug 1 fire sprinkler | $4,000 |
| Feb 18, 2011 | Completed | 1 Harrison St | Simplex Grinnell | fire alarm ti on 1st and 6th floor. provide and install 1 nac, 1 smoke detectotm 5 strobes, remove n replace 3 hoprn strobes.remove n replace 16 horn/strobes, 5 strobes w/ new on 1st fl. provide n install 1 new strobe on the 6th fl conf .rm only | $14,000 |
| Jan 28, 2011 | Completed | 1 Harrison St | City Building Inc. | interior tenant improvement on floors 1,2,3 currently permitted under 201101148376 (permit #1229974). additional work consist of 130 sf file rm. & conference rm. alteration & file rm. alteration. | $20,000 |
| Jan 14, 2011 | Completed | 1 Harrison St | City Building Inc. | interior tenant improvement on floors 1,2,3. ada upgrade to floor 1 shower, locker rooms, selectrive demo, paritions, ceilings, finishes. work on floors 2 and 3 luimited to new and existing closets in existing offices. 2 locations per plans | $75,000 |
| Jan 7, 2011 | Completed | 1 Harrison St | City Building Inc. | 6th floor-interior tenant improvement-selective demo & finishes for conversion of 2 adjacent offices into 1 conference room | $25,000 |
| Dec 14, 2010 | Expired or cancelled | 1 Harrison St | Pinnacle Wireless Usa Inc. | remove & replace 3 antennas, relocate 2 antennas, add gps antenna, add 6 rru's to be mounted near antennas, 3 surge suppressors, 3 new innerducts & a new splice box. add new 6601 rbs cabinet in an (e) 19" equipment rack | $45,000 |
| Dec 8, 2010 | Completed | 1 Harrison St | Pribuss Engineering Inc | 6th floor fire sprinkler t.i. - 2 relocates | $629 |
| Dec 3, 2010 | Never finaled | 1 Harrison St | Simplex Grinnell | install (n) nac panel, 3-horn/strobes, 4-strobes & 2-ceiling mounte horn/strobes in the scope of work. remove & replace 13-horn/strobes w/ new in the out of scope are for syncronization. | $8,000 |
| Nov 16, 2010 | Expired or cancelled | 1 Harrison St | Davaco Inc. | minor interior tenant improvement including drywall, new doors, finishes | $138,000 |
| Nov 9, 2010 | Completed | 1 Harrison St | City Building Inc. | interior tenant improvement: selective demolition, partitions, ceilings, finishes, lighting, power on 6th floor. ada upgrades: signage, mens rr stall door, ramp, handrails. | $105,000 |
| Sep 23, 2010 | Never finaled | 1 Harrison St | Triton Tower Inc, Broken Arrow Communications Inc, Sac Wireless Of Ca Lp | modification of (e) at&t site, relocate 3 antennas, add 3 equipemnt racks without batteries, add 9 rru's and add 2 two-inch inner ducts. | $5,000 |
| May 25, 2010 | Expired or cancelled | 1 Harrison St | Cba Site Services Inc. | a mod. to an (e) unmanned telecomunication facility consisting of adding a (n) 3206 cabinet to a (e) equioment rm. also adding 3-(n) dtma's & 6-(n) runs of coax & removing & replacing 3-(e) antenna's w/(n) antenna's w/ret's(remote electronic tilt) ret powered by low voltage signals thru (e) coax cab | $33,000 |
| Dec 23, 2008 | Completed | 1 Harrison St | Transceive Communications Inc. | remove extg 3206 cabinet and install 3814 cabinet for units 850 and 1900. add rru's for units 850 and 1900 below umts antennas. add ret's umts 850 antennas | $5,000 |
| Jan 30, 2008 | Completed | 1 Harrison St | City Building Inc. | renew app #200604128934/200610235711/200707237492 for final inspection | |
| Nov 8, 2007 | Never finaled | 1 Harrison St | Simplex Grinnell | provide elevator recall consisting of (2) smoke detectors and (2) relay iam's to tie into the existing fire alarm system as notes on 1st and 7th floor | $1,000 |
| Jul 23, 2007 | Expired or cancelled | 1 Harrison St | City Building Inc. | revision to appl#200610233711 & 200604138934 spacing of volunatory frame support to accomodate existing conditions. changes to finished restore to original look. | $2,000 |
| May 23, 2007 | Never finaled | 1 Harrison St | City Building Inc. | renew pa# 200506235877 for final inspection | |
| Apr 27, 2007 | Completed | 1 Harrison St | City Building Inc. | renew permits for final 200508099760, 200510054802 | |
| Apr 23, 2007 | Completed | 1 Harrison St | City Building Inc. | renewal pa 200508120207 for final inspection | |
| Apr 23, 2007 | Never finaled | 1 Harrison St | City Building Inc. | renewal pa 200512079729, 200508120207, & 200601172224 for final inspection. | |
| Oct 23, 2006 | Expired or cancelled | 1 Harrison St | new rofing, demolition of plaster walls & replacement of these wall by new metal louvers walls. mechanical penthouse screen replacement seismic bracing retrofit, eectrical update. revision to permit application #200604138934 | $70,000 | |
| Apr 13, 2006 | Expired or cancelled | 1 Harrison St | mechanical screen replacment @ roof. | $70,000 | |
| Jan 17, 2006 | Expired or cancelled | 1 Harrison St | City Building Inc. | added door to fuel tank room, previously, approved under permit app no 200410136681- per direction of inspector manuel regueros, added details of sidewalk fill port & spill basin on generator | $1,500 |
| Jan 11, 2006 | Expired or cancelled | 1 Harrison St | Fuel Oil System | revision to pa# 2005/10/05/4802 & procedural revision to plans, as marked 4. | |
| Dec 7, 2005 | Expired or cancelled | 1 Harrison St | City Building Inc. | revised support of generator (filed under app no 200410136681) from concrete to steel, based on unforseen conditions on roof. change of scope, no additional cost | |
| Oct 5, 2005 | Expired or cancelled | 1 Harrison St | Fuel Oil System | install main diesel tank / piping to rooftop generator. | $30,000 |
| Sep 22, 2005 | Expired or cancelled | 1 Harrison St | R L H Fire Protection Inc | fire protection upgrade (t/i) for gap generater at basement level. 2 uprt spkr hd (total). 3 heads. | $2,700 |
| Aug 12, 2005 | Expired or cancelled | 1 Harrison St | City Building Inc. | addendum to permit #200410136681 contractor has chosen alternate routing for conduits no adjustment | |
| Aug 9, 2005 | Expired or cancelled | 1 Harrison St | Simplex Grinnell | install (3) duct detectors on basement only. | $3,500 |
| Jul 25, 2005 | Completed | 1 Harrison St | remodel of (e) toilet rooms on floors 1-6 for compliance with disabled access code requirements. | $60,000 | |
| Jul 5, 2005 | Completed | 1 Harrison St | renew:200407219399-for final inspection | ||
| Jun 23, 2005 | Expired or cancelled | 1 Harrison St | split (e)office on 2/f into 2 offices.minor improvements to 2/f toilet rooms for disabled access | $25,000 | |
| Apr 13, 2005 | Completed | 1 Harrison St | Simplex Grinnell | install (1) strobe, install (2) horn/strobes work at 2nd, 3rd and 4th floor only under this permit | $500 |
| Apr 4, 2005 | Completed | 1 Harrison St | R L H Fire Protection Inc | fire sprnkler remodel of 2nd/3rd 7 4th floor lobbies total 36 heads/total 1600 sq ft/floor | $5,000 |
| Dec 20, 2004 | Expired or cancelled | 1 Harrison St | adding 3 walls to 2nd, 3rd, & 4th floor open area. removing gyp. bd. clg. & replacing w/ drop-in | $150,000 | |
| Oct 22, 2004 | Never finaled | 1 Harrison St | street space | ||
| Oct 13, 2004 | Completed | 1 Harrison St | install new bldg. diesel generator @ roof top with basement fuel tank room. | $1,100,000 | |
| Aug 11, 2004 | Expired or cancelled | 1 Harrison St | R L H Fire Protection Inc | fire spsrinkler tenant improvements to ground floor finance office/3 relocates/3 deletes | $500 |
| Jul 21, 2004 | Expired or cancelled | 1 Harrison St | Simplex Grinnell | one new smoke detector to be apprd in each mech room floors 2-6. s' from dampers. work on 2nd to 6th | $5,200 |
| Jun 10, 2004 | Completed | 1 Harrison St | City Building Inc. | oti-2, 1st floor-el,me, sp, ls | $30,000 |
| Jun 10, 2004 | Completed | 1 Harrison St | City Building Inc. | oti-1, 1st floor-el, ls, sp, me | $20,000 |
| Apr 14, 2004 | Never finaled | 1 Harrison St | street space | ||
| Mar 15, 2004 | Never finaled | 1 Harrison St | street space | ||
| Feb 10, 2004 | Completed | 1 Harrison St | City Building Inc. | mechanical upgrade to building's cooling system -replace existing cooling towers w/new celings | $1,100,000 |
| Jan 8, 2004 | Never finaled | 1 Harrison St | street space | ||
| Jan 8, 2004 | Expired or cancelled | 1 Harrison St | City Building Inc. | oti-2 1st fl, el-me | $20,000 |
| Dec 24, 2003 | Completed | 1 Harrison St | minor remodel of 300 sq ft of interior office area on 4th floor | $3,000 | |
| Nov 24, 2003 | Completed | 1 Harrison St | remodel of 800 sq. ft of interior office area on the 5th floor | $15,000 | |
| Nov 24, 2003 | Completed | 1 Harrison St | remodel of 800 sq. ft of interior office area on the 2nd floor | $15,000 | |
| Nov 24, 2003 | Completed | 1 Harrison St | City Building Inc. | oti-1, 1st floor, el, me, sp | $20,000 |
| Oct 27, 2003 | In progress | 1 Harrison St | Simplex Grinnell | added physical bridge to modules to 4120(facp)located 1 harrison st. facf network connection. | $4,850 |
| Jan 9, 2003 | Expired or cancelled | 1 Harrison St | oti-2, 1st fl. el,me | $40,000 | |
| Jan 9, 2003 | Expired or cancelled | 1 Harrison St | oti-1 1st flr. el, me, ls, sp | $35,000 | |
| Oct 17, 2002 | Expired or cancelled | 1 Harrison St | Allan Automatic Sprinkler | relocate 8 sprinkler heads and remove 1 head on 5th floor | $2,675 |
| Sep 30, 2002 | Completed | 1 Harrison St | demo existing walls to create a larger office minor interior remodel on 5/f | $15,000 | |
| Jul 22, 2002 | Expired or cancelled | 1 Harrison St | Allan Automatic Sprinkler | 4th flr tenant improvement no new heads verification of sprinkler spacing with walls being removed. | $2,470 |
| Jun 26, 2002 | Expired or cancelled | 1 Harrison St | create/construct partition to subdivide one large office into; two small offices incl. all assoc mec | $10,500 | |
| Jun 26, 2002 | Expired or cancelled | 1 Harrison St | demolish 3 offices & create open office; plan incld all associated mech/elec upgrades (5th flr) | $15,000 | |
| Feb 26, 2002 | Completed | 1 Harrison St | Fisher Development Inc | revise:200107093178 & 200107103278 pahse ii redrawn to reflect changes | |
| Aug 31, 2001 | Completed | 1 Harrison St | Dpw Inc. | t.i. work on 5/floor | $12,000 |
| Aug 24, 2001 | Expired or cancelled | 1 Harrison St | Dpw Inc. | replace all recall sprinkler heads on all floors, replace in kind | $45,000 |
| Jul 10, 2001 | Completed | 1 Harrison St | Fisher Development Inc | oti-2 5th floor, el,me | $125,000 |
| Jul 9, 2001 | Completed | 1 Harrison St | Fisher Development Inc | oti-1, 5th floor, el, me, ls, sp. | $125,000 |
| Jul 2, 2001 | Completed | 1 Harrison St | Dpw Inc. | sprinkler work only under this permit | $5,000 |
| May 25, 2001 | Completed | 1 Harrison St | construct dry wall partitions in offices to add closets, add electrical outlets for new systems furn | $70,000 | |
| May 2, 2000 | Completed | 1 Harrison St | repl of three cellular antennas | $3,000 | |
| Feb 18, 2000 | Completed | 1 Harrison St | Fisher Development Inc | oti 1 5th floor, sp | $10,000 |