Charles Kridler
- Listed as
- architect, engineer
- Firm
- Gensler
- Based in
- San Francisco
- On San Francisco permits
- Dec 2004 to Dec 2017
73 permits since 2000 (architect on 72 permits, engineer on 1 permit): 51 completed, 13 never finaled, 9 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 22, 2017 | Expired or cancelled withdrawn Apr 2018 | 44 Montgomery St | modification of (e) roof deck from floor tenant amenity to building amenity, including (n) ada lift & access, stair & rails, (n) 2nd exit stair (previously only one exit) & (n) finishesDetails
modification of (e) roof deck from floor tenant amenity to building amenity, including (n) ada lift & access, stair & rails, (n) 2nd exit stair (previously only one exit) & (n) finishes | $750,000 | |
| Nov 30, 2011 | Completed final sign-off May 2012 | 1 Market St | Turner Construction Co | 4th fl ti, nonload bearing partitions, ceilings, furnishings, modification to (e) mech elec plumb distr sys, fire alarms/life safety and sprinklers design build submitted separately communicating opening bet steuart tower & landmark bldg submit separate permitDetails
4th fl ti, nonload bearing partitions, ceilings, furnishings, modification to (e) mech elec plumb distr sys, fire alarms/life safety and sprinklers design build submitted separately communicating opening bet steuart tower & landmark bldg submit separate permit | $2,687,434 |
| Dec 28, 2010 | Completed final sign-off Jan 2013 | 345 Stockton St | ground floor tenant improvement:temporaty removal & re-installation of (e) storefront & guardrail for (n) escalator installation. basement tenant improvement; reconfiguration of meeting rooms & upgrade and renovation including millwork, restroom finishes, plumbing fixtures & lighting, etc.Details
ground floor tenant improvement:temporaty removal & re-installation of (e) storefront & guardrail for (n) escalator installation. basement tenant improvement; reconfiguration of meeting rooms & upgrade and renovation including millwork, restroom finishes, plumbing fixtures & lighting, etc. | $3,610,000 | |
| Dec 28, 2010 | Completed final sign-off Feb 2013 | 345 Stockton St | guestrms&bathrms: work to include but not limited to: installation of (n)finishes;widen interconnecting doors btw guestrooms,remove tub and replace bathroom finishes with (n)tubs/shower stalls and (n)finishes.(n)sliding doors &valences to be installed.replace (e)wall coverings with (n)in area ofDetails
guestrms&bathrms: work to include but not limited to: installation of (n)finishes;widen interconnecting doors btw guestrooms,remove tub and replace bathroom finishes with (n)tubs/shower stalls and (n)finishes.(n)sliding doors &valences to be installed.replace (e)wall coverings with (n)in area of | $2,980,000 | |
| Nov 8, 2010 | Completed final sign-off Mar 2017 | 935 Market St | Allied Fire Protection, Swinerton Builders, Plant Construction Co, Lp | to erect 5 stories, retail / parking / storage building.Details
to erect 5 stories, retail / parking / storage building. | $60,000,000 |
| Jul 6, 2010 | Completed final sign-off Mar 2011 | 2801 Leavenworth St | Plant Construction Company Lp | revision to pa# 2010.06.04.3882. to revise exterior door at north wall of mercantile- storage stock and shipping area to swing in into building.Details
revision to pa# 2010.06.04.3882. to revise exterior door at north wall of mercantile- storage stock and shipping area to swing in into building. | $800 |
| Jun 2, 2010 | Completed final sign-off Sep 2010 | 5 Embarcadero Center | Bcci Construction Company | replace entry doors to interior space, remove 1-14" (e) wall. minor lighting & electricalDetails
replace entry doors to interior space, remove 1-14" (e) wall. minor lighting & electrical | $83,000 |
| Apr 13, 2010 | Completed final sign-off Nov 2010 | 77 Ofarrell St | Malcolm Drilling Co Inc, The Weitz Company | basement renovation to abandon sub-sidewalk space (1428 sq.ft.) for new subway station. sprinkler and fire alarm uner seprarate permit. closure wall under separate permit.Details
basement renovation to abandon sub-sidewalk space (1428 sq.ft.) for new subway station. sprinkler and fire alarm uner seprarate permit. closure wall under separate permit. | $1,236,883 |
| Mar 29, 2010 | Completed final sign-off Aug 2010 | 1 Embarcadero Center | Hathaway Dinwiddie Co. | 22nd. flr.: select demolition & re-build of non-load bearing walls, ceilings and finishes. new mech, electrical, plumbing as required. fire sprinkler & life safety under separate permit.Details
22nd. flr.: select demolition & re-build of non-load bearing walls, ceilings and finishes. new mech, electrical, plumbing as required. fire sprinkler & life safety under separate permit. | $400,000 |
| May 12, 2009 | Completed final sign-off Dec 2009 | 760 Market St | revision to approved app 200903123992 to change door at conference room and add new private offices, relocate door in conference room.Details
revision to approved app 200903123992 to change door at conference room and add new private offices, relocate door in conference room. | $37,000 | |
| May 5, 2009 | Completed final sign-off Dec 2009 | 760 Market St | demo of non-bearing walls, ceilings, floors & wall finishes. upgrade (e) mens & womens restroom to ada compliance. m.e.p, sprinkler & fire alarm under seperate permitDetails
demo of non-bearing walls, ceilings, floors & wall finishes. upgrade (e) mens & womens restroom to ada compliance. m.e.p, sprinkler & fire alarm under seperate permit | $400,000 | |
| Mar 18, 2009 | Completed final sign-off Mar 2010 | 1 Stockton St | Dpr Construction Inc | barrier removal only for disability access upgrades. remove 3 theater seats and designate 2 companion seats on 2nd fl. install ada compliant handrails at ramp on 1st floor.Details
barrier removal only for disability access upgrades. remove 3 theater seats and designate 2 companion seats on 2nd fl. install ada compliant handrails at ramp on 1st floor. | $20,000 |
| Feb 13, 2009 | Completed final sign-off Sep 2010 | 123 Mission St | Richlen Construction | ground floor lobby improvement of an existing building. new non-load bearing partition, ceiling & finishes. new mechanical, electrical & plumbing as required. fire sprinkler & life safety under separate permit. new canopy at mission st.Details
ground floor lobby improvement of an existing building. new non-load bearing partition, ceiling & finishes. new mechanical, electrical & plumbing as required. fire sprinkler & life safety under separate permit. new canopy at mission st. | $1,650,000 |
| Jan 27, 2009 | Completed final sign-off Apr 2009 | 650 California St | Richlen Construction | 6th fl: tenant improvement including demolition, non-structural partitions, ceilings, finishes, millwork, mechanical, power & lighting modification.Details
6th fl: tenant improvement including demolition, non-structural partitions, ceilings, finishes, millwork, mechanical, power & lighting modification. | $90,000 |
| Dec 24, 2008 | Never finaled issued Mar 2009, no final | 480 Sutter St | Howard S. Wright Constructors Lp | new exterior composite metal panel cladding - submitted as a deferred to main bldg appl #200805162267.Details
new exterior composite metal panel cladding - submitted as a deferred to main bldg appl #200805162267. | $254,000 |
| Dec 12, 2008 | Never finaled issued Feb 2009, no final | 480 Sutter St | Howard S. Wright Constructors Lp | exterior glazing and store front systems, 1st and 2nd floors submitted for deffered approval. reference main building permit pa# 2008/05/16/2267.Details
exterior glazing and store front systems, 1st and 2nd floors submitted for deffered approval. reference main building permit pa# 2008/05/16/2267. | $269,000 |
| Dec 4, 2008 | Completed final sign-off Nov 2009 | 212 Stockton St | Plant Construction Company Lp | 2 foundation walls in sub sidewalk space. sfmta requires the space for union st . muni station.Details
2 foundation walls in sub sidewalk space. sfmta requires the space for union st . muni station. | $65,000 |
| Nov 26, 2008 | Completed final sign-off Mar 2009 | 1 Front St | Principal Builders Inc. | revision to pa 200810103887, life safety for 32nd fl: add 1 exist fsd/sd, 2 new fsds/dds, 1 sd@ 1df, 1 ceiling strobe, relocate: 2 strobes, 2 speakers, remove: 2 strobes, 2 speakers, 1 wall strobe.Details
revision to pa 200810103887, life safety for 32nd fl: add 1 exist fsd/sd, 2 new fsds/dds, 1 sd@ 1df, 1 ceiling strobe, relocate: 2 strobes, 2 speakers, remove: 2 strobes, 2 speakers, 1 wall strobe. | |
| Nov 20, 2008 | Completed final sign-off Jan 2009 | 333 Ofarrell St | Richlen Construction | luggage storage conversion: convert and enclose (e) open space to luggage storage. work will include new walls, electrical sep permit, and finishes. (e)xtg life safety to remain.Details
luggage storage conversion: convert and enclose (e) open space to luggage storage. work will include new walls, electrical sep permit, and finishes. (e)xtg life safety to remain. | $23,000 |
| Oct 15, 2008 | Never finaled issued Nov 2008, no final | 480 Sutter St | Howard S. Wright Constructors Lp | new architectural precast (gfrc cladding) at levels 1st & 2nd only. submitted for deffered approval, ref. to appl#200805162267.Details
new architectural precast (gfrc cladding) at levels 1st & 2nd only. submitted for deffered approval, ref. to appl#200805162267. | $135,000 |
| Sep 23, 2008 | Expired or cancelled expired Feb 2013 | 1596 Howard St | Timberwolff Construction Inc | interior office tenant improvement of a single tenant space, work includes addition of walls, shelving, lighting & a test storefront in a storage space. ref pa#200805192362.Details
interior office tenant improvement of a single tenant space, work includes addition of walls, shelving, lighting & a test storefront in a storage space. ref pa#200805192362. | $276,500 |
| Sep 11, 2008 | Completed final sign-off Sep 2008 | 1596 Howard St | Swinerton Builders | removal scope from appl#200805192362, 200806174595 walls & lighting & relocate ductwork & new hvac unit, add access control device. (n) smoke detectors to cover east side corridor, new full ht. partitions & doors to enclose laundry & break area per fire plan check.Details
removal scope from appl#200805192362, 200806174595 walls & lighting & relocate ductwork & new hvac unit, add access control device. (n) smoke detectors to cover east side corridor, new full ht. partitions & doors to enclose laundry & break area per fire plan check. | |
| Aug 11, 2008 | Never finaled issued Aug 2008, no final | 333 Ofarrell St | Marchetti Construction Inc. | revision to application 200706083444 r-2. garage level- upgrade existing wall to 2 hr rating. install add'l duct work w/applicable fso/sd. remove (e) pair of doors & stair enclosure/path exit wayDetails
revision to application 200706083444 r-2. garage level- upgrade existing wall to 2 hr rating. install add'l duct work w/applicable fso/sd. remove (e) pair of doors & stair enclosure/path exit way | |
| Jun 17, 2008 | Completed final sign-off Sep 2008 | 1596 Howard St | Swinerton Builders | 3rd floor-minor changes to (e) issued pa: add interior mock-up storefront. added clarifications to m.e.p. drawings, reference pa# 2008-0519-2362Details
3rd floor-minor changes to (e) issued pa: add interior mock-up storefront. added clarifications to m.e.p. drawings, reference pa# 2008-0519-2362 | $10,000 |
| May 19, 2008 | Completed final sign-off Sep 2008 | 1596 Howard St | Swinerton Builders | minor demolition of walls & tenant improvement @ 3rd floor. new partitions to create office & storage space. existing toilets & egress to remain. minor demolitions of walls.Details
minor demolition of walls & tenant improvement @ 3rd floor. new partitions to create office & storage space. existing toilets & egress to remain. minor demolitions of walls. | $1,300,000 |
| May 2, 2008 | Expired or cancelled expired Jul 2009 | 2 Embarcadero Center | Paganini Electric Corp(See Signatories) | 26th floor-life safety installation which includes: 40 strobes, 45 speakers, 7 detectors, 6 relay modules, 1 dual relay module, 3 detectors with air duct housing and relayDetails
26th floor-life safety installation which includes: 40 strobes, 45 speakers, 7 detectors, 6 relay modules, 1 dual relay module, 3 detectors with air duct housing and relay | $15,000 |
| May 2, 2008 | Expired or cancelled expired Jul 2009 | 2 Embarcadero Center | Paganini Electric Corp(See Signatories) | 27th floor-life safety installation which includes: 39 strobes, 44 spearkers, 9 detectors, 1 interface module, 2 tri-volt magnetic door holdersDetails
27th floor-life safety installation which includes: 39 strobes, 44 spearkers, 9 detectors, 1 interface module, 2 tri-volt magnetic door holders | $15,000 |
| Mar 6, 2008 | Never finaled issued Apr 2008, no final | 480 Sutter St | t.i. for hotel basement, including (n) partitions & offices, minor upgrades to storage & computer network rooms, addition of 1 hr. rated exit corridor. removal of (e) ada lift & installation of (n) ramp. removal of 1 stairway (n) lighting & mechanical. no exterior work.Details
t.i. for hotel basement, including (n) partitions & offices, minor upgrades to storage & computer network rooms, addition of 1 hr. rated exit corridor. removal of (e) ada lift & installation of (n) ramp. removal of 1 stairway (n) lighting & mechanical. no exterior work. | $186,500 | |
| Feb 21, 2008 | Never finaled issued Feb 2008, no final | 333 Ofarrell St | Marchetti Construction Inc. | revisions to p.a. 200706083444. changes to doors, door hardware, corridor construction, etc.Details
revisions to p.a. 200706083444. changes to doors, door hardware, corridor construction, etc. | |
| Feb 19, 2008 | Completed final sign-off Oct 2008 | 880 Market St | interior build-out of new shoe storage room at basement level. slight modification of ex. electrical, lighting and mechanical fixtures.fire sprinklers under separate permitDetails
interior build-out of new shoe storage room at basement level. slight modification of ex. electrical, lighting and mechanical fixtures.fire sprinklers under separate permit | $40,000 | |
| Jan 24, 2008 | Completed final sign-off Feb 2009 | 925 Market St | new security roll down grille at building entrance,revision to approved pa#200608311195(umb upgrade),Details
new security roll down grille at building entrance,revision to approved pa#200608311195(umb upgrade), | $20,000 | |
| Dec 12, 2007 | Never finaled issued May 2008, no final | 80 Powell St | add new entry doors in (e) storefront on ellis st. replace glass on powell st. at entry only on 1st floor.Details
add new entry doors in (e) storefront on ellis st. replace glass on powell st. at entry only on 1st floor. | $75,000 | |
| Dec 5, 2007 | Completed final sign-off May 2009 | 5 The Embarcadero | ev. to p/a #2007.08.24.0840. incr. scope of work: front entrance area of club lounge to include beverage counter & reach in referigerator, incr. buffet counter length and increase space betwem (e) backwall & allow low panels for banquett seating & install (n) furring walls. (changes as delta 8).Details
ev. to p/a #2007.08.24.0840. incr. scope of work: front entrance area of club lounge to include beverage counter & reach in referigerator, incr. buffet counter length and increase space betwem (e) backwall & allow low panels for banquett seating & install (n) furring walls. (changes as delta 8). | $400,000 | |
| Aug 30, 2007 | Completed final sign-off May 2009 | 5 The Embarcadero | tenant improv. to guest rms. on 16/f & 17/f & suite rms. on 2/f to 15/f (type s1, s2 & s3) fixture, furniture & finishes upgrades throughout.(n) floor @ entry vestibule. (n) toilet, (n) faucets @ lav. & tub (alternate condition: remove (e) tub & install (n) shower or (n) tub as per pln. total 135 rmDetails
tenant improv. to guest rms. on 16/f & 17/f & suite rms. on 2/f to 15/f (type s1, s2 & s3) fixture, furniture & finishes upgrades throughout.(n) floor @ entry vestibule. (n) toilet, (n) faucets @ lav. & tub (alternate condition: remove (e) tub & install (n) shower or (n) tub as per pln. total 135 rm | $2,500,000 | |
| Aug 24, 2007 | Completed final sign-off May 2009 | 5 The Embarcadero | 18/f- tenant improvement to elevator lobby & regency lounge club, electrical to be under seperate permit.Details
18/f- tenant improvement to elevator lobby & regency lounge club, electrical to be under seperate permit. | $200,000 | |
| Aug 8, 2007 | Never finaled issued Aug 2007, no final | 901 Market St | 'starbucks coffee' black vinyl lettersDetails
'starbucks coffee' black vinyl letters | ||
| Aug 8, 2007 | Never finaled issued Aug 2007, no final | 901 Market St | 'marshalls' black vinyl lettersDetails
'marshalls' black vinyl letters | ||
| Aug 8, 2007 | Never finaled issued Aug 2007, no final | 901 Market St | "marshalls" black vinyl letters.Details
"marshalls" black vinyl letters. | ||
| Aug 8, 2007 | Never finaled issued Aug 2007, no final | 901 Market St | "site for sore eyes" black vinyl lettersDetails
"site for sore eyes" black vinyl letters | ||
| Aug 1, 2007 | Completed final sign-off Aug 2008 | 1 Hilton Sq | vanilla box build out of former storage/pantry area into a gift shop consisting of (n) floor finishes, (n) susp. ceiling, (n) entry door. all areas were and remain accessory spaces to the hotel.Details
vanilla box build out of former storage/pantry area into a gift shop consisting of (n) floor finishes, (n) susp. ceiling, (n) entry door. all areas were and remain accessory spaces to the hotel. | $30,000 | |
| Jul 26, 2007 | Completed final sign-off Jul 2009 | 1455 Market St | City Building Inc. | fire life safety to appl#200611167923 delete panel 9th floor / add exit signs. cost of construciton for security portals additional $100,000 under this permit.Details
fire life safety to appl#200611167923 delete panel 9th floor / add exit signs. cost of construciton for security portals additional $100,000 under this permit. | $100,000 |
| Jun 15, 2007 | Completed final sign-off Jun 2008 | 980 Mission St | sidewalk in existing sub sidewalk basement & new driveway cut on jessie street.Details
sidewalk in existing sub sidewalk basement & new driveway cut on jessie street. | $24,000 | |
| Jun 15, 2007 | Expired or cancelled expired Jun 2009 | 980 Mission St | revision to apprvd pa3200604108636. build out of mezzanine level. new elevator smoke door on 2nd flr.Details
revision to apprvd pa3200604108636. build out of mezzanine level. new elevator smoke door on 2nd flr. | $110,000 | |
| Jun 5, 2007 | Never finaled issued Jun 2007, no final | 901 Market St | remove existing canopy, no other work under this permit. remove canopy only. no other work.Details
remove existing canopy, no other work under this permit. remove canopy only. no other work. | $69,500 | |
| May 16, 2007 | Completed final sign-off Aug 2007 | 1 Embarcadero Center | Ayoob & Peery Plumbing Co Inc | relocate fire sprinkler heads per tenant improvements. 27 relocates.Details
relocate fire sprinkler heads per tenant improvements. 27 relocates. | $5,400 |
| Mar 14, 2007 | Completed final sign-off Jul 2007 | 3491 California St | alterations to existing sales floor, demolition of partitions, fixtures & finishes, construction of partitions, fixtures & finishes. no mechanical for this permit ( electrical, lighting, hvac).Details
alterations to existing sales floor, demolition of partitions, fixtures & finishes, construction of partitions, fixtures & finishes. no mechanical for this permit ( electrical, lighting, hvac). | $565,000 | |
| Mar 8, 2007 | Completed final sign-off Dec 2007 | 77 Ofarrell St | revisions to app #200601192583. revised 1st floor and basement plans revised storefront work and revised roof plan as builtDetails
revisions to app #200601192583. revised 1st floor and basement plans revised storefront work and revised roof plan as built | $30,000 | |
| Mar 8, 2007 | Completed final sign-off Dec 2007 | 77 Ofarrell St | revision to approved app #200604280200 as built permit. minor changes to locations of walls and doors due to site conditions. as built.Details
revision to approved app #200604280200 as built permit. minor changes to locations of walls and doors due to site conditions. as built. | $72,000 | |
| Mar 8, 2007 | Expired or cancelled expired Dec 2007 | 77 Ofarrell St | Dpr Construction Inc | revision to approved app #200606063267. revised shape of extgerior canopy. as builtDetails
revision to approved app #200606063267. revised shape of extgerior canopy. as built | $1,000 |
| Mar 8, 2007 | Expired or cancelled expired Apr 2009 | 890 Market St | Westates Mechanical Corporation Inc | modify sprinkler system on levels one & two. disconenct level one & two spr. system from city supply. tie into fire pump pressurized system in basement. relcoate 252, add 4, plug 90.Details
modify sprinkler system on levels one & two. disconenct level one & two spr. system from city supply. tie into fire pump pressurized system in basement. relcoate 252, add 4, plug 90. | $82,000 |
| Feb 16, 2007 | Completed final sign-off Jan 2009 | 200 Powell St | new storefront and facade repair, new stairs and elevator for future retail tenant. fire alarm and sprinkler under seperate permit. demolish existing sidewalk slab, construct new concrete slab and beam over sub-sidewalk.Details
new storefront and facade repair, new stairs and elevator for future retail tenant. fire alarm and sprinkler under seperate permit. demolish existing sidewalk slab, construct new concrete slab and beam over sub-sidewalk. | $400,000 | |
| Jan 29, 2007 | Completed final sign-off Jul 2007 | 760 Market St | Gray West Construction Inc | interio tenant improvement of offices on 11th floor, (partial floor 9530) mechanical, electrical, plumbing, life safety under separate permitDetails
interio tenant improvement of offices on 11th floor, (partial floor 9530) mechanical, electrical, plumbing, life safety under separate permit | $300,000 |
| Oct 26, 2006 | Completed final sign-off Jun 2009 | 890 Market St | Swinerton Builders | interior non-structural remodel of existing retail store on 1st & 2nd floors.upgrade drinking fountain in basement. fire alarm and sprinkler on separate application.Details
interior non-structural remodel of existing retail store on 1st & 2nd floors.upgrade drinking fountain in basement. fire alarm and sprinkler on separate application. | $1,800,000 |
| Aug 31, 2006 | Completed final sign-off May 2009 | 925 Market St | t.i. of (e) single tenant retail building. new architectural/structural/mechanical and electrical work for future tenant (umb upgrade) no exterior work. general procedure.Details
t.i. of (e) single tenant retail building. new architectural/structural/mechanical and electrical work for future tenant (umb upgrade) no exterior work. general procedure. | $650,000 | |
| Jul 7, 2006 | Completed final sign-off Sep 2006 | 220 Post St | interkr non structural remodel of partial 4th flkiir arnabm vebdir area nedm sorubjkers ^ kufe safety under seperat permit.Details
interkr non structural remodel of partial 4th flkiir arnabm vebdir area nedm sorubjkers ^ kufe safety under seperat permit. | $150,000 | |
| Jun 6, 2006 | Completed final sign-off Dec 2007 | 77 Ofarrell St | Dpr Construction Inc | renovate (e) facade of building. exterior work only. sprinkler work under separate permit.Details
renovate (e) facade of building. exterior work only. sprinkler work under separate permit. | $325,000 |
| Jan 24, 2006 | Completed final sign-off Jan 2007 | 750 Kearny St | per building field inspector, modify existing corridor exhaust at floor 14-25. mechanical duct installation - exempt by sec 1134b.2.1 ex4.Details
per building field inspector, modify existing corridor exhaust at floor 14-25. mechanical duct installation - exempt by sec 1134b.2.1 ex4. | $110,000 | |
| Jan 24, 2006 | Completed final sign-off Mar 2006 | 750 Kearny St | install a 240 sq.ft. coffee kiosh in the lobby of an existing hotel lobbyDetails
install a 240 sq.ft. coffee kiosh in the lobby of an existing hotel lobby | $120,000 | |
| Jan 19, 2006 | Completed final sign-off Dec 2007 | 77 Ofarrell St | Dpr Construction Inc | interior demolition on all floors. removal of (e) escalators. new slab openings on all floors for new stairs. (2) no exterior work under this permit.Details
interior demolition on all floors. removal of (e) escalators. new slab openings on all floors for new stairs. (2) no exterior work under this permit. | $1,500,000 |
| Dec 20, 2005 | Completed final sign-off Mar 2006 | 750 Kearny St | revision to pa# 2005/06/15/5180. remove (e) tile finish, relocate (e) handsink, demo (e) electrical devices & plumbing connection. kitchen @ 1st & 2nd floor per pa# 2005/06/15/5180.Details
revision to pa# 2005/06/15/5180. remove (e) tile finish, relocate (e) handsink, demo (e) electrical devices & plumbing connection. kitchen @ 1st & 2nd floor per pa# 2005/06/15/5180. | $30,000 | |
| Dec 12, 2005 | Completed final sign-off Jun 2006 | 750 Kearny St | install fire feature with associated ventilation system.Details
install fire feature with associated ventilation system. | $75,000 | |
| Dec 12, 2005 | Completed final sign-off Mar 2006 | 750 Kearny St | modify (e) corridor exhaust.Details
modify (e) corridor exhaust. | $100,000 | |
| Nov 17, 2005 | Completed final sign-off Nov 2007 | 333 Ofarrell St | all interior work,no exterior alterations.remodel bathrooms,convert some bathtubs to showers,new lighting & switches,install new toilets in (e)locations.new bathroom doors.remove select connecting doors,furrout wall in some location.no ada renovations bldg.is in compliance.Details
all interior work,no exterior alterations.remodel bathrooms,convert some bathtubs to showers,new lighting & switches,install new toilets in (e)locations.new bathroom doors.remove select connecting doors,furrout wall in some location.no ada renovations bldg.is in compliance. | $940,000 | |
| Sep 23, 2005 | Never finaled issued Sep 2005, no final | 600 Stockton St | conver guestrms to ada compliant guestrms, hearing impaired, add doors, all inerior.Details
conver guestrms to ada compliant guestrms, hearing impaired, add doors, all inerior. | $400,000 | |
| Aug 12, 2005 | Expired or cancelled expired May 2007 | 1 Harrison St | City Building Inc. | addendum to permit #200410136681 contractor has chosen alternate routing for conduits no adjustmentDetails
addendum to permit #200410136681 contractor has chosen alternate routing for conduits no adjustment | |
| Jun 17, 2005 | Completed final sign-off Mar 2006 | 750 Kearny St | provide t.i. for fitness room at 5/f.work includes new door,mill work,partition wallDetails
provide t.i. for fitness room at 5/f.work includes new door,mill work,partition wall | $50,000 | |
| Jun 15, 2005 | Completed final sign-off Mar 2006 | 750 Kearny St | upgrade (e) kitchen equipment per plan.Details
upgrade (e) kitchen equipment per plan. | $350,000 | |
| Jun 13, 2005 | Completed final sign-off Mar 2006 | 750 Kearny St | provide tenant improvement per plan for 1st, 2nd and basement floor including partition walls,Details
provide tenant improvement per plan for 1st, 2nd and basement floor including partition walls, | $1,850,000 | |
| Apr 21, 2005 | Expired or cancelled withdrawn Apr 2005 | 750 Kearny St | remodel of interior lobbby, restaurant, bar, mtg rooms , ballrooms and associated w/the hotel. workDetails
remodel of interior lobbby, restaurant, bar, mtg rooms , ballrooms and associated w/the hotel. work | $8,000,000 | |
| Mar 9, 2005 | Completed final sign-off May 2005 | 188 South Park | addition of 3 interior non load bearing walls with glazing, enclosing kchn & dining areasDetails
addition of 3 interior non load bearing walls with glazing, enclosing kchn & dining areas | $30,000 | |
| Feb 4, 2005 | Completed final sign-off Jul 2007 | 750 Kearny St | Cahill Contractors Inc | remove/replace bathroom door on each room.minor sheetrock work.relocate (e)electrical outletsDetails
remove/replace bathroom door on each room.minor sheetrock work.relocate (e)electrical outlets | $3,500,000 |
| Jan 7, 2005 | Completed final sign-off Apr 2005 | 501 Geary St | revision #200409305609 s-1. foundation revsion per plan) for rear storage shed.Details
revision #200409305609 s-1. foundation revsion per plan) for rear storage shed. | ||
| Dec 21, 2004 | Completed final sign-off Jul 2005 | 333 Ofarrell St | fire proofing of new electrical receptaclesDetails
fire proofing of new electrical receptacles | $25,000 |