Block 0328, lot 004
48 Stockton St
- City’s use
- Commercial Retail
- Built
- 1909
- Stories
- 6
- Building
- 68,472 sq ft
- Lot
- 7,218 sq ft
- Zoning
- C3R
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
33 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 19, 2026 | In progress issued Aug 2026 | 48 Stockton St | A Mc Carthy Engineering Inc | an existing vacant 5th fl. is to be built out as an office floor. existing services and acess to the floor including restrooms, elevators and exit stairs, will all remain in place. a break area will be provided. an existing communcating stair to the sixth floor will remain in placeDetails
an existing vacant 5th fl. is to be built out as an office floor. existing services and acess to the floor including restrooms, elevators and exit stairs, will all remain in place. a break area will be provided. an existing communcating stair to the sixth floor will remain in place | $1,800,000 |
| Aug 7, 2026 | In progress filed Aug 2026, not yet issued | 48 Stockton St | 3rd floor: an existing vacant 3rd floor to be built-out as a multi-tenant office floor. existing serving and access for the floor including restrooms, elevators and exit stairs will all remain in place, break areas will be provided in each tenant space.Details
3rd floor: an existing vacant 3rd floor to be built-out as a multi-tenant office floor. existing serving and access for the floor including restrooms, elevators and exit stairs will all remain in place, break areas will be provided in each tenant space. | $2,000,000 | |
| Jul 31, 2026 | In progress issued Aug 2026 | 48 Stockton St | A Mc Carthy Engineering Inc | 6th floor: build out for offices. existing services and access for the floor, including restrooms, elevators, and exit stairs will all remain in place. 2 break areas will be provided in the space.Details
6th floor: build out for offices. existing services and access for the floor, including restrooms, elevators, and exit stairs will all remain in place. 2 break areas will be provided in the space. | $2,200,000 |
| Jun 20, 2023 | Never finaled issued Jun 2023, no final | 48 Stockton St | Sabah International Incorporated | modify the (e) fire alarm system on the 4th fl. to match the architectural changes made under the fourth fl. t.i. ref pa# 202111082012Details
modify the (e) fire alarm system on the 4th fl. to match the architectural changes made under the fourth fl. t.i. ref pa# 202111082012 | $24,976 |
| Jun 1, 2023 | Never finaled issued Jun 2023, no final | 48 Stockton St | Plant Construction Co, Lp | revision pa# 202212198688, revision changes for the fire alarm updates includes adding duct smoke detectors to every fan coil unit on both the mechanical floor plan and mechanical.Details
revision pa# 202212198688, revision changes for the fire alarm updates includes adding duct smoke detectors to every fan coil unit on both the mechanical floor plan and mechanical. | $5,000 |
| Feb 17, 2023 | Never finaled issued Mar 2023, no final | 48 Stockton St | Pribuss Engineering Inc | fire sprinkler t.i. : modify sprinkler heads to accommodate new walls and ceiling for level 4 spec. suite. total sprinklers 93Details
fire sprinkler t.i. : modify sprinkler heads to accommodate new walls and ceiling for level 4 spec. suite. total sprinklers 93 | $47,802 |
| Dec 19, 2022 | Completed final sign-off Mar 2024 | 48 Stockton St | Plant Construction Co, Lp | 4th/f: mep permit for 202211045949. new fcu's, lighting, and plumbing.Details
4th/f: mep permit for 202211045949. new fcu's, lighting, and plumbing. | |
| Nov 4, 2022 | Completed final sign-off Mar 2024 | 48 Stockton St | Plant Construction Co, Lp | 4/f: construction new non structural partitions, new operable partitions, new accoustical grid and tile and gyp bd ceilings, new finishes throughout. pantry millwork, equipment, and plumbing fixtures also included. mep and life safety deferred submittalsDetails
4/f: construction new non structural partitions, new operable partitions, new accoustical grid and tile and gyp bd ceilings, new finishes throughout. pantry millwork, equipment, and plumbing fixtures also included. mep and life safety deferred submittals | $2,000,000 |
| Oct 18, 2022 | Completed final sign-off Jul 2023 | 48 Stockton St | Errc Systems Inc (Former Dishnet Direct) | design & install an emergency radio responder coverage system in accordance with sffd ab#2.01-2019 addendum g. ref pa# 202111082012Details
design & install an emergency radio responder coverage system in accordance with sffd ab#2.01-2019 addendum g. ref pa# 202111082012 | $70,000 |
| Oct 12, 2022 | Completed final sign-off Mar 2024 | 48 Stockton St | Plant Construction Co, Lp | revision to pa# 202111082012. this revision includes the engineering & design of exterior metal stud framing system at storefront area facing o'farrell street.Details
revision to pa# 202111082012. this revision includes the engineering & design of exterior metal stud framing system at storefront area facing o'farrell street. | |
| Sep 26, 2022 | Completed final sign-off Jul 2023 | 48 Stockton St | Sabah International Incorporated | provide a new fire alarm system and a new 2-way communication system. ref t.i. pa# 202111082012.Details
provide a new fire alarm system and a new 2-way communication system. ref t.i. pa# 202111082012. | $73,850 |
| Sep 14, 2022 | Never finaled issued Nov 2022, no final | 48 Stockton St | Pribuss Engineering Inc | provide upright sprinkler protection for core & shell conditions @ demolished walls & ceilings. provide pendent sprinklers @ (n) ceilings @ (n) restrooms & elevator vestibules. total sprinklers in project: 403. extend (e) fdc on o'farrell st for (n) stucco wall finish.Details
provide upright sprinkler protection for core & shell conditions @ demolished walls & ceilings. provide pendent sprinklers @ (n) ceilings @ (n) restrooms & elevator vestibules. total sprinklers in project: 403. extend (e) fdc on o'farrell st for (n) stucco wall finish. | $207,142 |
| Sep 12, 2022 | Completed final sign-off Mar 2024 | 48 Stockton St | Plant Construction Co, Lp | revision 202111082012 add an additional elevator stop for the retail elevator on level 3. remove e communicating stair from level 4 to 05 and instill the floor openingDetails
revision 202111082012 add an additional elevator stop for the retail elevator on level 3. remove e communicating stair from level 4 to 05 and instill the floor opening | $25,000 |
| Feb 22, 2022 | Never finaled issued Feb 2022, no final | 48 Stockton St | Pribuss Engineering Inc | fire sprinkler permit" provide upright sprinkler protection on lower level 6 for demolition of existing partition and ceilings plug off remove existing sprinkler drops..Details
fire sprinkler permit" provide upright sprinkler protection on lower level 6 for demolition of existing partition and ceilings plug off remove existing sprinkler drops.. | $100,000 |
| Feb 11, 2022 | Completed final sign-off Mar 2024 | 48 Stockton St | Plant Construction Co, Lp | selective interior non structural demolition per ab-017 ref pa #202202228420 sprinklers to uprightDetails
selective interior non structural demolition per ab-017 ref pa #202202228420 sprinklers to upright | $300,000 |
| Nov 8, 2021 | Completed final sign-off Mar 2024 | 48 Stockton St | Plant Construction Co, Lp | change of use retail to office (37,402 sf). new office entrance and service entry. new elevators, elevator lobbies, and basement level bicycle commuter facility. replacement of existing mep systems, screening and new roof system. selective interior demolition to accomodate new use.Details
change of use retail to office (37,402 sf). new office entrance and service entry. new elevators, elevator lobbies, and basement level bicycle commuter facility. replacement of existing mep systems, screening and new roof system. selective interior demolition to accomodate new use. | $15,750,000 |
| Oct 18, 2019 | Never finaled issued Oct 2019, no final | 48 Stockton St | street spaceDetails
street space | ||
| Sep 13, 2019 | Never finaled issued Sep 2019, no final | 48 Stockton St | street spaceDetails
street space | ||
| Jul 15, 2019 | Never finaled issued Jul 2019, no final | 48 Stockton St | street spaceDetails
street space | ||
| Jun 7, 2018 | Never finaled issued Jun 2018, no final | 48 Stockton St | Lewis M Merlo Inc, International Waterproofing | elevator door infill at sidewalkDetails
elevator door infill at sidewalk | $32,000 |
| Apr 16, 2018 | Completed final sign-off Aug 2018 | 77 Ofarrell St | Shawmut Woodworking & Supply Inc | deferred steeke storage racks for 6th flr ref 201607182600Details
deferred steeke storage racks for 6th flr ref 201607182600 | $20,000 |
| Aug 20, 2010 | Never finaled issued Aug 2010, no final | 77 Ofarrell St | Anderson, Rowe & Buckley, Inc. | revision, relocate bfp apn 201008048071Details
revision, relocate bfp apn 201008048071 | |
| Jul 28, 2010 | Never finaled issued Jul 2010, no final | 77 Ofarrell St | street spaceDetails
street space | ||
| Jun 3, 2010 | Never finaled issued Jun 2010, no final | 77 Ofarrell St | street space permitDetails
street space permit | ||
| Jul 26, 2007 | Never finaled issued Jul 2007, no final | 77 Ofarrell St | street spaceDetails
street space | ||
| Jun 29, 2007 | Completed final sign-off Sep 2007 | 77 Ofarrell St | Golden Gate Sign Company Inc. | erect: electric, projecting, double faced, new sign w/ street space.Details
erect: electric, projecting, double faced, new sign w/ street space. | $50,000 |
| Jun 4, 2007 | Never finaled issued Jun 2007, no final | 77 Ofarrell St | street space permitDetails
street space permit | ||
| Mar 8, 2007 | Completed final sign-off Dec 2007 | 77 Ofarrell St | revision to approved app #200604280200 as built permit. minor changes to locations of walls and doors due to site conditions. as built.Details
revision to approved app #200604280200 as built permit. minor changes to locations of walls and doors due to site conditions. as built. | $72,000 | |
| Jan 18, 2007 | Completed final sign-off Sep 2007 | 77 Ofarrell St | Anderson, Rowe & Buckley, Inc. | fire sprinkler system build back 165 sprkrDetails
fire sprinkler system build back 165 sprkr | $24,750 |
| May 17, 2006 | Never finaled issued May 2006, no final | 79 Ofarrell St | street spaceDetails
street space | ||
| Mar 8, 2001 | Expired or cancelled expired Jul 2001 | 79 Ofarrell St | Dpw Inc. | modify and relocate sprinkler system per/plansDetails
modify and relocate sprinkler system per/plans | $4,000 |
| Mar 7, 2001 | Expired or cancelled expired Sep 2001 | 79 Ofarrell St | Allied Heating & Air Conditioning | relocate 2 existing fancoil units and provide new distrubution ductworkDetails
relocate 2 existing fancoil units and provide new distrubution ductwork | $18,000 |
| Feb 22, 2001 | Completed final sign-off Mar 2001 | 79 Ofarrell St | Qualcon Construction Inc | oti-1 2nd fl: el, me, ls & spDetails
oti-1 2nd fl: el, me, ls & sp | $20,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Plant Construction Co, Lp (7), Pribuss Engineering Inc (3), A Mc Carthy Engineering Inc (2), Anderson, Rowe & Buckley, Inc. (2), Sabah International Incorporated (2), Allied Heating & Air Conditioning, Dpw Inc., Errc Systems Inc (Former Dishnet Direct), Golden Gate Sign Company Inc., International Waterproofing, Lewis M Merlo Inc, Qualcon Construction Inc, Shawmut Woodworking & Supply Inc
- Architects
- Benedict Tranel (3), Mark Horton (3), Charles Kridler
- Engineers
- Carlo Biscocho (2), Alexander Joseph Pacheco, Blake Dilsworth, Blake Dilsworth, Brendan Kolts, Jacob Nguyen, Thomas Castle, Wayne Gaw
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.