A Mc Carthy Engineering Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Aug 2026
- Last 24 months
- 2 permits filed
9 permits since 2000: 5 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2026 | In progress issued Aug 2026 | 48 Stockton St | an existing vacant 5th fl. is to be built out as an office floor. existing services and acess to the floor including restrooms, elevators and exit stairs, will all remain in place. a break area will be provided. an existing communcating stair to the sixth floor will remain in placeDetails
an existing vacant 5th fl. is to be built out as an office floor. existing services and acess to the floor including restrooms, elevators and exit stairs, will all remain in place. a break area will be provided. an existing communcating stair to the sixth floor will remain in place | $1,800,000 |
| Jul 31, 2026 | In progress issued Aug 2026 | 48 Stockton St | 6th floor: build out for offices. existing services and access for the floor, including restrooms, elevators, and exit stairs will all remain in place. 2 break areas will be provided in the space.Details
6th floor: build out for offices. existing services and access for the floor, including restrooms, elevators, and exit stairs will all remain in place. 2 break areas will be provided in the space. | $2,200,000 |
| May 17, 2011 | Never finaled issued Nov 2011, no final | 313 Noe St | underpinning to accomodate excavation ( 60 feet approx.) for proposed construction at adjacent property at 2299 market st 200910068389Details
underpinning to accomodate excavation ( 60 feet approx.) for proposed construction at adjacent property at 2299 market st 200910068389 | $25,000 |
| May 17, 2011 | Completed final sign-off Nov 2013 | 2299 Market St | shoring system to accomodate excavation for proposed basement in approved new construction 200910068389sDetails
shoring system to accomodate excavation for proposed basement in approved new construction 200910068389s | $60,000 |
| Feb 8, 2011 | Expired or cancelled withdrawn Mar 2019 | 246 01st St | window infill at west wall property line due to new adjacent construction at 19 tehama st. original opening to be covered by this new construction. 2 window openings at 2nd, 3rd & 4th floor to be infilled.2 windows openings at 5th floor. partial infill new smaller window.Details
window infill at west wall property line due to new adjacent construction at 19 tehama st. original opening to be covered by this new construction. 2 window openings at 2nd, 3rd & 4th floor to be infilled.2 windows openings at 5th floor. partial infill new smaller window. | $39,000 |
| Nov 23, 2010 | Completed final sign-off Feb 2011 | 174 Stanyan St | two foot high retaining wall to be constructed in the rear yard.Details
two foot high retaining wall to be constructed in the rear yard. | $18,000 |
| Sep 13, 2010 | Completed final sign-off Dec 2010 | 531 18th Av | remodel existing half bath bathroom, retile shower, replace toilet & lavatory. no structural work.Details
remodel existing half bath bathroom, retile shower, replace toilet & lavatory. no structural work. | $3,000 |
| Sep 24, 2009 | Completed final sign-off Dec 2010 | 735 Taylor St | correct nov 200903182. provide ventilation for bathroomsDetails
correct nov 200903182. provide ventilation for bathrooms | $3,500 |
| Apr 14, 2000 | Completed final sign-off Jan 2001 | 45 Chilton Av | dry rot repair, exploratory onlyDetails
dry rot repair, exploratory only | $3,000 |