A Mc Carthy Engineering Inc
- Based in
- San Francisco
- On San Francisco permits
- Apr 2000 to Aug 2026
- Last 24 months
- 2 permits filed
9 permits since 2000: 5 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
2 stairs permits: 2 in progress. Typically 16 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 19, 2026 | In progress issued Aug 2026 | 48 Stockton St | an existing vacant 5th fl. is to be built out as an office floor. existing services and acess to the floor including restrooms, elevators and exit stairs, will all remain in place. a break area will be provided. an existing communcating stair to the sixth floor will remain in placeDetails
an existing vacant 5th fl. is to be built out as an office floor. existing services and acess to the floor including restrooms, elevators and exit stairs, will all remain in place. a break area will be provided. an existing communcating stair to the sixth floor will remain in place | $1,800,000 |
| Jul 31, 2026 | In progress issued Aug 2026 | 48 Stockton St | 6th floor: build out for offices. existing services and access for the floor, including restrooms, elevators, and exit stairs will all remain in place. 2 break areas will be provided in the space.Details
6th floor: build out for offices. existing services and access for the floor, including restrooms, elevators, and exit stairs will all remain in place. 2 break areas will be provided in the space. | $2,200,000 |