Benedict Tranel
- Listed as
- architect
- On San Francisco permits
- Nov 2021 to Jul 2024
5 permits since 2000 (architect on 5 permits): 4 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 11, 2024 | Completed final sign-off Mar 2025 | 600 Townsend St | Gci, Inc | 1st/f lobby t.i.: demo of non-structural partitions, ceilings, light fixtures, millwork & finishes. new construction of non-structural partitions, lighting, electrical & mech & finishes.Details
1st/f lobby t.i.: demo of non-structural partitions, ceilings, light fixtures, millwork & finishes. new construction of non-structural partitions, lighting, electrical & mech & finishes. | $650,000 |
| Aug 25, 2023 | In progress issued Feb 2026 | 2 Stockton St | Plant Construction Co, Lp | major alteration of (e) 4 story bldg. including replacement of all (e) structural elements u.o.n., (as shown in plans), with (n) 7 story type 1b structure, includes vertical addition of 3 stories of office space, replacement of market and stockton street facades at levels 1-4 and (n) street-scape.Details
major alteration of (e) 4 story bldg. including replacement of all (e) structural elements u.o.n., (as shown in plans), with (n) 7 story type 1b structure, includes vertical addition of 3 stories of office space, replacement of market and stockton street facades at levels 1-4 and (n) street-scape. | $60,000,000 |
| Nov 4, 2022 | Completed final sign-off Mar 2024 | 48 Stockton St | Plant Construction Co, Lp | 4/f: construction new non structural partitions, new operable partitions, new accoustical grid and tile and gyp bd ceilings, new finishes throughout. pantry millwork, equipment, and plumbing fixtures also included. mep and life safety deferred submittalsDetails
4/f: construction new non structural partitions, new operable partitions, new accoustical grid and tile and gyp bd ceilings, new finishes throughout. pantry millwork, equipment, and plumbing fixtures also included. mep and life safety deferred submittals | $2,000,000 |
| Feb 11, 2022 | Completed final sign-off Mar 2024 | 48 Stockton St | Plant Construction Co, Lp | selective interior non structural demolition per ab-017 ref pa #202202228420 sprinklers to uprightDetails
selective interior non structural demolition per ab-017 ref pa #202202228420 sprinklers to upright | $300,000 |
| Nov 8, 2021 | Completed final sign-off Mar 2024 | 48 Stockton St | Plant Construction Co, Lp | change of use retail to office (37,402 sf). new office entrance and service entry. new elevators, elevator lobbies, and basement level bicycle commuter facility. replacement of existing mep systems, screening and new roof system. selective interior demolition to accomodate new use.Details
change of use retail to office (37,402 sf). new office entrance and service entry. new elevators, elevator lobbies, and basement level bicycle commuter facility. replacement of existing mep systems, screening and new roof system. selective interior demolition to accomodate new use. | $15,750,000 |