Blake Dilsworth
- License
- 3829
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- Firm
- Kpff
- Based in
- San Francisco
- On San Francisco permits
- Apr 2005 to May 2024
9 permits since 2000 (engineer on 9 permits): 6 completed, 3 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Gci, Inc (3), Plant Construction Co, Lp (2), Skyline Construction (2), Bcci Construction Company
- Architects
- Barry Bourbon (2), Timothy Murphy (2), Benedict Tranel, Laurence Chambers, Tom Fitz
- Engineers
- Brendan Kolts, Caroline Fenlon-Harding, Jacob Nguyen, Shyam Kumar, Todd Frederick, Todd M. See, Wayne Gaw
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 9
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 6, 2024 | Completed final sign-off Apr 2025 | 680 Folsom St | Gci, Inc | the project proposes to establish a 2094 sf non-retail office amenity space to be used as an employee lounge and tenant amenity in the vacant suite at the property to establish the proposed use.Details
the project proposes to establish a 2094 sf non-retail office amenity space to be used as an employee lounge and tenant amenity in the vacant suite at the property to establish the proposed use. | $1,500,000 |
| Sep 5, 2023 | Completed final sign-off May 2024 | 345 California St | Gci, Inc | structural support and details for skyfold partition ceiling panel. ref 202305228283 and 202212218840.Details
structural support and details for skyfold partition ceiling panel. ref 202305228283 and 202212218840. | $15,000 |
| Jun 10, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | exterior scope of work: new windows on level 4 along stevenson. interior scope of work: new structural pedestrian bridge at level 2; non-structual partions; door updates; lighting upgrades; architectural finish refresh; accessibility upgrades; signage updates.Details
exterior scope of work: new windows on level 4 along stevenson. interior scope of work: new structural pedestrian bridge at level 2; non-structual partions; door updates; lighting upgrades; architectural finish refresh; accessibility upgrades; signage updates. | $10,600,000 |
| Mar 9, 2022 | Completed final sign-off Feb 2025 | 945 Market St | Skyline Construction | complete eval.& detailed design of the strengthening required for gravity & lateral framing members for levels b1,level 1 & level 2 for an increased live load of 100 psf. developing necessary member & connection strengthening to achieve the desired load. bldg currently unoccupied.Details
complete eval.& detailed design of the strengthening required for gravity & lateral framing members for levels b1,level 1 & level 2 for an increased live load of 100 psf. developing necessary member & connection strengthening to achieve the desired load. bldg currently unoccupied. | $485,000 |
| Nov 8, 2021 | Completed final sign-off Mar 2024 | 48 Stockton St | Plant Construction Co, Lp | change of use retail to office (37,402 sf). new office entrance and service entry. new elevators, elevator lobbies, and basement level bicycle commuter facility. replacement of existing mep systems, screening and new roof system. selective interior demolition to accomodate new use.Details
change of use retail to office (37,402 sf). new office entrance and service entry. new elevators, elevator lobbies, and basement level bicycle commuter facility. replacement of existing mep systems, screening and new roof system. selective interior demolition to accomodate new use. | $15,750,000 |
| Mar 8, 2021 | Expired or cancelled expired Oct 2026 | 345 California St | Gci, Inc | revision to pa# 202009234825. to increase scope to add communicating stair. 31st to 32nd floor structural support.Details
revision to pa# 202009234825. to increase scope to add communicating stair. 31st to 32nd floor structural support. | $50,000 |
| Nov 28, 2018 | Expired or cancelled expired Aug 2024 | 120 Stockton St | Plant Construction Co, Lp | rooftop and basement slab demo.Details
rooftop and basement slab demo. | $1,000 |
| Jul 12, 2017 | Completed final sign-off May 2019 | 345 Spear St | Bcci Construction Company | for kitchen remodel. ref to pa# 201705126510Details
for kitchen remodel. ref to pa# 201705126510 | |
| Apr 21, 2005 | Expired or cancelled withdrawn Apr 2005 | 750 Kearny St | remodel of interior lobbby, restaurant, bar, mtg rooms , ballrooms and associated w/the hotel. workDetails
remodel of interior lobbby, restaurant, bar, mtg rooms , ballrooms and associated w/the hotel. work | $8,000,000 |