Block 0261, lot 017
345 California St
183 permits filed for this property since 2000.
CompletedIn progressNever finaledExpired or cancelled
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 6, 2026 | In progress | 345 California St | Rab Com Limited | 10th fl - to program 2 way comm intercom stations for passenger and freight elevator lobbies limited to the 10 floor. intercom is being installed to provide communication abilities during times that elevator lobby doors are locked or stairswells blocked. conduit, back boxes, cabling and installation | $19,626 |
| Aug 6, 2026 | Completed | 345 California St | Rab Com Limited | 23rd fl - to program 2 way comm intercom stations for passenger and freight elevator lobbies limited to the 23rd floor. intercom is being installed to provide communication abilites during time the elvator lobby doors are locked or stairwells blocked. conduit, back boxes, calling and installation to | $16,127 |
| Jul 24, 2026 | Completed | 345 California St | Rab Com Limited | program 2-way communications intercom stations for passenger and freight elevator lobbies and stair #1 stair 2 aor limited to 5/f. program, test and commision system. | $20,500 |
| Jul 20, 2026 | Completed | 345 California St | Prima Acquire Inc Dba Lahue And Associat | evacuation plans on 5th floor. | $1,400 |
| Jul 13, 2026 | In progress | 345 California St | Kr Johnston Construction Inc | 20/f tenant improvement; demolition of non-structural partitions, doors, glazing, millwork, ceilings, light fixtures and electrical to warm shell condition. restroom upgrades and new lighting. | $750,000 |
| Jun 26, 2026 | In progress | 345 California St | Skyline Construction | 10th fl, ste 1000; mechanical, electrical and plumbing work for ti. ref pa 202606102955 | $300,000 |
| Jun 17, 2026 | Completed | 345 California St | Rab Com Limited | 27/f: to program 2-way communications intercom stations for passenger and freight elevator lobbies limited to the 27th floor. intercom is being installed to provide communications abilities during times that the elevator lobby doors are locked. conduit, back boxes, cabling and installation to be... | $4,794 |
| Jun 12, 2026 | In progress | 345 California St | Gci, Inc | to obtain final inspection for work approved under pa# 202503101898. all work is complete. | |
| Jun 10, 2026 | In progress | 345 California St | Skyline Construction | 10/fl- interior ti construction of non structrual partitions doors, light fixtuers, millwork and finishes. includes structural anchorage of phone booths, moveable pin and island countertop. mep and fire life safety to be deferred permit submittal | $2,000,000 |
| May 27, 2026 | In progress | 345 California St | Skyline Construction | 6/f & 7/f: installation office phone booth anchorage & structural details included. | $66,000 |
| Feb 12, 2026 | Completed | 345 California St | Johnson Controls Inc. | 32 flr breakdown, fire alarm ystem modification. add 6 strobes. 2 speaker/strobes. ref pa#: 202508273995. | $6,500 |
| Jan 14, 2026 | Completed | 345 California St | Johnson Controls Inc. | 30/f: modify (e) fire alarm system for t.i. under pa 202506279639. | $3,500 |
| Nov 25, 2025 | In progress | 345 California St | Gci, Inc | 25th fl: interior ti- conference room, pantry & restrooms. demo of non structural partitions, ceilings, finishes. new non structural partitions & glazing new doors & hardware, lighting and ceilings.new mep | $1,298,024 |
| Nov 20, 2025 | In progress | 345 California St | Gci, Inc | recommencement and completion of work approved under pa#: 202103086103, 202009234825, and 202305228281. | $430,000 |
| Oct 22, 2025 | Completed | 345 California St | Ayoob & Peery Plumbing Co Inc | 32/f: add (4) relocate (6) fire sprinkler per ti. job #25-683. ref pa# 202508273995. | $6,211 |
| Oct 16, 2025 | Completed | 345 California St | Ayoob & Peery Plumbing Co Inc | 283-035-8118th floor: add 27 relocate 146 fire sprinkler per t.i. job #25-661 ref pa #202507291801 | $102,482 |
| Sep 26, 2025 | Completed | 345 California St | Ayoob & Peery Plumbing Co Inc | 30th fl - add 2, relocate 12, change out 2 fire sprinkler per ti ref pa 202506279369 | $9,176 |
| Sep 25, 2025 | Completed | 345 California St | Johnson Controls Inc. | 31st floor: modify existing fire alarm system: add 13 new speakers, 9 new speaker/strobes, 42 strobes, 1 new smoke detector, 2 relay, 2 new duct detectors, 2 new relay for heat pump 31-1 and 31-2 | $7,500 |
| Sep 23, 2025 | Completed | 345 California St | Johnson Controls Inc. | 28th floor. suite 2875. modify existing fire alarm system, add 3 speaker strobes, 1 stobe. ref: 202507221349 | $1,500 |
| Sep 12, 2025 | In progress | 345 California St | Golden Gate Fire Protection Inc | 28th floor:relocate 8 pendent and relocate 10 uprights. ref pa #202403157957 | $4,500 |
| Aug 27, 2025 | Completed | 345 California St | Gci, Inc | 32nd flr. demo non-structural partitions, ceilings, finishes & hardware. interior t.i. non structural partitions and glazing, new doors and hardware. mechanical, electrical and plumbing. restroom renovations. | $961,000 |
| Jul 22, 2025 | Completed | 345 California St | Peacock Construction | 28th/f: office t.i. demo & construction of non load bearing partitions, e) modifications to ceiling grid & tile, new light fixtures, new office doors & frames & mech & electrical. no plumbing fixture change. | $320,000 |
| Jun 27, 2025 | Completed | 345 California St | Gci, Inc | 30/f: tenant improvement. | $400,000 |
| May 20, 2025 | In progress | 345 California St | Ayoob & Peery Plumbing Co Inc | 31/f: add (14) relocate (130) fire sprinkler per ti job# 25-635. ref# 202503101898 | $89,438 |
| May 7, 2025 | Completed | 345 California St | Dpr Construction A | 22nd fl- soft demo of non-load bearing partition, (n) partition to shift ~16" to match existing wall. new light (1) in existing act system. carpet/paint finishes throughout | $400,000 |
| Mar 27, 2025 | In progress | 345 California St | Johnson Controls Inc. | 2400: restroom renovation: add 9 new speaker/strobes. add 13 new strobes, add 4 new speakers. new speakers will be connected to the existing floor speaker circuit and strobes will be connected to out put n3 and n4 on existing strobes power supply. ref pa#202502261111 | $6,500 |
| Mar 10, 2025 | In progress | 345 California St | Gci, Inc | 31st fl - revision to pa 202312132454 updated floor plans door schedule added conference room, reconfigured team rooms/ofces in lieu of open office work stations, updated restroom sheets (34) vav boxes, (2) heat pumps added electrical work | |
| Feb 26, 2025 | Completed | 345 California St | Source Planning And Construction Inc | 24th floor/suite 2400: (e) t.i.: demo and construction of non-loading bearing partitions; (n) partitions (n) ceiling title and grid system; open ceiling condition, led light fixtures and switches, power and signal; (n) doors/frames/hardware, millwork and finishes. include mep. all other required | $891,675 |
| Aug 9, 2024 | Completed | 345 California St | Pribuss Engineering Inc | 11th floor: gc pa# 202405293214 fire sprinkler t.i. for restrooms. total 4 heads. | $2,400 |
| Jul 19, 2024 | Completed | 345 California St | Pribuss Engineering Inc | 29th floor: ref gc pa# 202406053743: fire sprinkler t.i. total 3 heads. | $1,800 |
| Jul 12, 2024 | Completed | 345 California St | Johnson Controls Inc. | (2) new spreaker/strobes are being provided. new speakers will be connected to the (e) floor spreaker circuit and strobes will be connected to output 4 on the (e) strobe power supply no changes to the (e) line circuit devices or the smoke control system | $28,000 |
| Jul 3, 2024 | In progress | 345 California St | Ayoob & Peery Plumbing Co Inc | record as for pa 202405152199 update to piping plan per inspection request. 28th fl - add (3) fire sprinkler pi ref pa 202403157957 | $1,863 |
| Jun 28, 2024 | Completed | 345 California St | Johnson Controls Inc. | 28th floor -fire only- 2(n) speakers, (3) new speaker strobes and 3 (n) strobes are being provided. no changes to (e) signaling line circuit device or the smoke controls system ref- 2024 0315 7957 | $36,000 |
| May 29, 2024 | Completed | 345 California St | Richlen Construction | 11th floor: demo and construction of toilet partitions, new plumbing, and new finishes salvage and reuse of existing selected materials. core restrooms 11th floor | $300,000 |
| May 15, 2024 | Completed | 345 California St | Ayoob & Peery Plumbing Co Inc | 28th floor: suite 2875- add 3 relocate, 31 fire sprinkler per t.i. job# 24-638 ref pa#202403157857 | $21,117 |
| Mar 15, 2024 | Completed | 345 California St | Gci, Inc | 28th fl, ste 2875 project involves modification of (e) ti to include selective demo & construction of non-load bearing partitions, existing modifications to ceiling grid & tile, new light fixtures, new office doors, frmaes, salvage & reuse of (e) selectied materials if practiceable, millwork and new | $593,000 |
| Dec 13, 2023 | In progress | 345 California St | Gci, Inc | 31/f: demo of no structural partitions, ceilings, finhses & hardware. new interior non structural partitions & glazing, new doors, lighting & ceilings. new 36 vav boxes 1-new heat pump, 2-new fsds in lobby, new power lighting, new plumbing. | $3,000,000 |
| Oct 26, 2023 | Completed | 345 California St | Johnson Controls Fire | 12/f: mofidy fire alarm, 2 new speaker strobes added to restrooms, 2(e) strobes to be relocated. 1 new strobe shall be provided. 1 (e) speaker shall be relocated. 1 new relay module and duct detector shall be provided to (e) signaling line circuit devices. | $3,000 |
| Oct 16, 2023 | In progress | 345 California St | Johnson Controls Inc. | 30/f: 21-new speakers and 2-new speaker strobes are being provided, 1-existing speaker to be reused. 36-new strobes are being provided, 1-existing strobe being reused, 1-new smoke detectors is to be provided, a relay module is being installed to interface. | $50,640 |
| Sep 5, 2023 | Completed | 345 California St | Gci, Inc | structural support and details for skyfold partition ceiling panel. ref 202305228283 and 202212218840. | $15,000 |
| Aug 14, 2023 | Completed | 345 California St | Peacock Construction | interior alteration of 488 sqft office space no mech, no lightng no structural no plumbing 18th fl. | $50,000 |
| Jul 14, 2023 | Completed | 345 California St | Source Planning And Construction Inc | 12/f-suite 1260: selective demo and construction of non load bearing partitions to ceiling grid. relocate and new light fixtures. new office doors. frames, millwork, finishes. | $498,500 |
| May 22, 2023 | In progress | 345 California St | Gci, Inc | rev pa202103086103: rev to design/details of stairs and removal of fire door at 31/32 flrs; interior improvements on the 30/31/32 flrs. 30/31/32 demo of (e) stairs from floors 31-32. new communicating stairs through floors 30-32. maher n/a. | |
| May 22, 2023 | Completed | 345 California St | Gci, Inc | rev pa202109077835.resized the conference room 3004 and removed the banquet.removel a phone room and changed another phone room to a print room.changed the furntiure layout. added floor are to all offices. changed finish specs in misc design. maher n/a. | |
| Mar 28, 2023 | Completed | 345 California St | Ayoob & Peery Plumbing Co Inc | 30/f: add 14 and relocate 110 fire sprinklers heads per t.i., ref pa# 202109077835 | $77,016 |
| Mar 22, 2023 | In progress | 345 California St | Johnson Controls Inc. | 10/f: elevator 16 modernization: 2 new relay modules and 1 monitor module are being provided and connected to (e) loop 6 for the fire fighter helmet, shunt trip and its monitoring. a new heat detector is being provided within 24" of the (e) smoke detector in the elevator machine room. | $35,000 |
| Feb 9, 2023 | Expired or cancelled | 345 California St | Clune Construction Company L P | 28/f: revision to bpa#202203250873, install new accessible stall @ men's restroom @ (e) location | |
| Dec 13, 2022 | Completed | 345 California St | Johnson Controls Inc. | 16/f: (8) new speakers connected to (e) floor speaker circuit, (12) new strobes connected to circuit 4 on the (e) fcps. new duct smoke detector for hp16-3 for automatic shutdown, connect to (e) node 3 loop 2. no changes to (e) smoke control system. ref bpa#202208039792 | $40,000 |
| Nov 8, 2022 | Completed | 345 California St | Peacock Construction | 28th & 29th fl - revision to pa 2022-0621-6751 minor finishes changes and demo scope changes. | |
| Oct 5, 2022 | Completed | 345 California St | Ayoob & Peery Plumbing Co Inc | add and relocate sprinklers as necessary in accordance with ti. install pipe hangers as needed for new sprinkler pipe. ref pa # 202208039792. | $15,000 |
| Aug 30, 2022 | Completed | 345 California St | Johnson Controls Inc. | 17 new speaker strobes added to e floor speaker circuit. 7 new strobes to be provided and connected to e fcps. 2 new smoke det provide dfor magnetic door holders and fire smoke dumper along with 1 duct smoke detetor for the new heat pump. ref 201906102935 | $35,000 |
| Aug 3, 2022 | Completed | 345 California St | Clune Construction Company L P | suite 1650: tenant improvement to include selective demo and construction of non load bearing partitoins. ceiling grid and tile, new light fixtures, new office doors, frams. salvage and r euse e selected materials if practicable. new millwork, new finishes, assoc mech,ele, plumb. | $578,370 |
| Jun 21, 2022 | Completed | 345 California St | Peacock Construction | 28th fl. t.i to consist of minor demo, new construction to include new demising wall re-installation of raised floor system. 29th fl: adding stand alone new hvac cooling, minor changes to existing office space. mep, fire life safety under sep permit. | $150,000 |
| Jun 15, 2022 | Completed | 345 California St | Pioneer Fire Inc. | 28th fl - relocate 5 pendent sprinkler heads; add 1 pendent sprnkler head. ref pa 2022-0325-0873 | $1,500 |
| May 3, 2022 | Completed | 345 California St | Gci, Inc | suite 1600: t.i.: demo of (e) t.i. and demising floor into 2 small suites. renovation of suite including new partitions, suspended, ceiling lighting, electrical & plumbing. maher n/a. | $1,300,000 |
| Apr 14, 2022 | Completed | 345 California St | Pioneer Fire Inc. | ste 1000: remove all drops & install upright sprinklers to turn floor to shell condition. | $27,750 |
| Apr 7, 2022 | Completed | 222 Sansome St | Cw Horton General Contractor | revision to pa# 201907186324. to document change in designated accessible mobility guestrooms. | |
| Oct 15, 2021 | Never finaled | 222 Sansome St | Cw Horton General Contractor | revision to app#201911187527. electrical scope only per inspector request. | $5,000 |
| Mar 8, 2021 | Never finaled | 345 California St | Gci, Inc | revision to pa# 202009234825. to increase scope to add communicating stair. 31st to 32nd floor structural support. | $50,000 |
| Sep 23, 2020 | Never finaled | 345 California St | Gci, Inc | 30-31/f: new communicating stair on 30-31st floor: new non-structurual partitions m, new doors & hardware. new structural support. | $350,000 |
| Jul 1, 2020 | Never finaled | 222 Sansome St | Cw Horton General Contractor | new livng wall structural at bldg exterior, scope includes new structural framing, plumbing, electrical and lighting. | $60,000 |
| May 13, 2020 | Completed | 345 California St | Golden Gate Fire Protection Inc | 11th floor: fire sprinkler; relocate (3) pendent sprinklers. t.i. ref #2020 006 3714 | $1,500 |
| Mar 5, 2020 | Completed | 345 California St | Gci, Inc | ti on 25th & 26th fl: new interior non-structural partition to enclose (e) communicating stair, new non-structural partial height wall at reception. | $12,000 |
| Feb 18, 2020 | Completed | 222 Sansome St | Thomas Swan Sign Co Inc | new banner sign on existing pole four seasons maher not req | $2,000 |
| Feb 18, 2020 | Completed | 222 Sansome St | Thomas Swan Sign Co Inc | change copy to existing canopy sign | $2,000 |
| Feb 18, 2020 | Completed | 222 Sansome St | Thomas Swan Sign Co Inc | non electric wall signs | $2,000 |
| Jan 10, 2020 | Never finaled | 222 Sansome St | street space | ||
| Nov 19, 2019 | Never finaled | 345 California St | Johnson Controls Inc. | ref pa# 201810264251 & 201801310073 (building permit number) remove 2 duct detectors and relay modules associated with them, add a relay module for new gate override n/a maher | |
| Nov 18, 2019 | Completed | 222 Sansome St | De Haro Ramirez Corp | accessible path of travel upgrades/barrier removal at exterior of the building. new curb ramp at passenger loading zone on city sidewalk | $35,000 |
| Nov 18, 2019 | Never finaled | 222 Sansome St | Cw Horton General Contractor | no change to building area or room count. accessible path of travel upgrades/barrier removal exterior & hotel entry. non-structural demo & repair of (e) materials.new lighting at select areas in elevator lobby & restaurant. 3rd floor corridor new finishes & decorative lighting. new entry at lobby. | $300,000 |
| Nov 14, 2019 | Completed | 345 California St | Dpr Construction | 15th and 20th floor: electrical av upgrades to 7 locations. paint and carpet upgrades in noted locations. restrooms to have ada partition upgrades. ada stall on 2oth floor. to recieve upgraded toilet. | $280,000 |
| Oct 17, 2019 | Completed | 345 California St | Gci, Inc | 18/f: rev to pa#201906102935: minor structural revisions. maher n/a. | |
| Oct 10, 2019 | Completed | 345 California St | Dpr Construction | interior connecton stairwell between 14th & 15th fl. to partition off non exit stairm no change to (e) or occupancy | $45,000 |
| Oct 4, 2019 | Completed | 222 Sansome St | Cw Horton General Contractor | 3rd fl - inteior remodel of health club and unisex restroom scope include new floor and wall finishes, fitness equipment. existing unisex restroom to be upgrade to comply with current codes with no change in fixture counts. work consist of finishes only and barrier removal. | $17,000 |
| Aug 22, 2019 | Completed | 345 California St | Skyline Construction | revision to 201903256119 remove anchor bolt special inspections need | |
| Aug 8, 2019 | Completed | 345 California St | Skyline Construction | 1/f - suite 140: rev to pa201903256119, remove exit sign from "break room." maher n/a. | |
| Jul 22, 2019 | Completed | 345 California St | Johnson Controls Inc. | install 12 new sprakers. 14 strobes and 10 speaker/strobes to (e) circuits. 1 new dual module to interface w/card access systen amd 1 relay module to unlock doors. 3 release buttons and 2 intercam for elevators 4 ducts and 5 relays modules for dampers & hp. ref 201906102935 | $29,000 |
| Jul 22, 2019 | Completed | 345 California St | R L H Fire Protection Inc | fire sprinkler - relocate 86 add 18th flr - 24 and delete 18 ref 201906102935 | $28,000 |
| Jul 18, 2019 | Completed | 222 Sansome St | Cw Horton General Contractor | 38th-48th flrs. renovation of guestrooms and corridors including (n) finishes, plumbing fixtures and flooring | $2,900,000 |
| Jul 15, 2019 | Completed | 345 California St | Gci, Inc | 17/f 1750: mechanical and electrical: ref app# 201906052544. demo vav and new vav. lighting and title 24. n/a for maher | $120,000 |
| Jul 2, 2019 | Completed | 345 California St | Ayoob & Peery Plumbing Co Inc | replace (e) low zone diesel, fire pump with new fire pump, like in-kind to (e) pump and motor. job 19-662. | $228,918 |
| Jun 10, 2019 | Completed | 345 California St | Gci, Inc | 18th flr commercial ti - demo non struct paritions, ceiling, lighting, finishes & millwork. construct - non struct partitions, glazing, ceiling, lighting, millwork finishes and plumbing maher na | $550,000 |
| May 24, 2019 | Completed | 345 California St | Golden Gate Fire Protection Inc | 1/f: fire sprinklers relocate 7 pendent sprinklers and 1 sidewall on the gr fl ti 201903256119. maher n/a. | $4,200 |
| May 17, 2019 | Completed | 345 California St | Gci, Inc | 17th flr - restroom upgrade. demo includes (e) plm fix & accessories, construction includes (re)installation of plm fixs & accessories & patching/repaining finishes to match | $20,889 |
| Apr 12, 2019 | Completed | 222 Sansome St | Nibbi Bros Assoc Inc. | 48th fl - renovation of guest rooms 4804 and 4805, including (n) finishes, plumbing fixtures and flooring | $20,037 |
| Mar 25, 2019 | Completed | 345 California St | Skyline Construction | commercial amentities space on the 1st fl. demo of non-structural partitions, casework, lighting, doors & finishes, construction includes non-structural partitions glazing, millwork lighting finishes, work includes mechanincal elec, and minor structural | $549,739 |
| Feb 14, 2019 | Never finaled | 345 California St | Integrated Sign Installations Inc | install 1 illuminated electric freestanding sign. maher n/a. | $15,000 |
| Jan 9, 2019 | Completed | 345 California St | Bcci Construction Company | 6 & 7 fl: structural drawings and calculations for curtain wall. n/a for maher. | |
| Oct 5, 2018 | Completed | 345 California St | Golden Gate Fire Protection Inc | 6-7th flrs. fire sprinklers only. relocate 146 heads for the 6th flr and 146 heads for the 7th flr. ref pa's 201807316020 and 201807316022 | $15,000 |
| Oct 4, 2018 | Completed | 345 California St | Richlen Construction | support and seismic anchorage of plaza signage, lighting, benches and elevator lobby lighting. new structural steel in (e) concrete wall at new exterior windows ref 201807245441 maher na | $75,000 |
| Jul 24, 2018 | Never finaled | 123 Battery St | Installation Services Inc. Dba Bay Area | install 1 illuminated wall sign, double-faced, "illy cafe" | $3,000 |
| Jul 24, 2018 | Never finaled | 123 Battery St | Installation Services Inc. Dba Bay Area | install 1 illuminated projecting sign, single-faced, "illy cafe" | $4,000 |
| Jul 24, 2018 | Never finaled | 123 Battery St | Installation Services Inc. Dba Bay Area | install 1 illuminated wall sign, single-faced, "illy cafe" | $4,000 |
| Jul 24, 2018 | Completed | 345 California St | Richlen Construction | lobby refresh: scope to include new ceilings, new elevator lobbies ceiling and at elevator cabs, new floor at pel and plaza and arcade lighting. maher n/a. | $1,100,000 |
| Jul 20, 2018 | Completed | 345 California St | Bcci Construction Company | removal of floor slab and new stair connecting 6th and 7thf fls. ref#201710181527 & 201802232072. n/a for maher | $400,000 |
| Apr 27, 2018 | Never finaled | 345 California St | Gci, Inc | electrical - lighting and control switch ref pa 2018-0326-4557 and 2018-0223-2072. n/a for maher. | $20,000 |
| Apr 16, 2018 | Completed | 222 Sansome St | Johnson Controls Inc. | 1st flr- relocate 3 strobes and add 4 new speaker/strobes to (e) n1. relocate 1 speaker, 4 strobes and 1 speaker.strobe an (e) n2 maher na | $6,500 |
| Apr 11, 2018 | Never finaled | 222 Sansome St | street space | ||
| Apr 4, 2018 | Completed | 345 California St | Golden Gate Fire Protection Inc | 4th floor: fire sprinklers: relocate 17 upright. relocate 28 pendent sprinklers. t.i. #201801310073. n/a for maher | $23,625 |
| Jan 31, 2018 | Completed | 345 California St | Gci, Inc | ti at basement addition of bicycle storage room and 4th floor fitness center with shower and locker rooms for tenant use | $1,100,000 |
| Jan 30, 2018 | Completed | 222 Sansome St | R L H Fire Protection Inc | 1/f: fire sprinkler t.i.: relocate 17 pendents, remove 3 pendents. ref t.i. pa#201602189863 | $8,500 |
| Jan 23, 2018 | Completed | 345 California St | Johnson Controls Inc. | 12th floor, ste 1225 - install 8 new speakers, 3 existing strobes reused and 4 new strobes installed to existing n1 circuit. ref ti 2017-0929-9926. | $12,000 |
| Dec 8, 2017 | Never finaled | 222 Sansome St | street space permit | ||
| Apr 14, 2017 | Never finaled | 222 Sansome St | Metropolitan Electrical Construction | 2nd level - provide new lighting & title -24 @ ballroom areas. maher 155-13 na | $30,515 |
| Mar 9, 2017 | Never finaled | 222 Sansome St | Hathaway Dinwiddie Co. | interior renovation @ hotel lobby, stair, elevator lobby. includes m.e.p. fire alarm separate permit. ** maher: n/a ** | $624,825 |
| Jun 27, 2016 | Completed | 345 California St | Golden Gate Fire Protection Inc | 12th flr: fire sprinkler only ref 201606149903,relocate 15 pendants for canater fitzgerald (ste #1265); maher n/a | $7,500 |
| Mar 29, 2016 | Completed | 345 California St | Gci, Inc | 18th & 19th floor - electrical - remove lighting, connect new lighting to existing circuit, new occupancy sensor. ref #201602230305. n/a maher ordinance | |
| Feb 18, 2016 | Never finaled | 222 Sansome St | Hathaway Dinwiddie Co. | interior renovation at restaurant and bar on level1, includes mep -sprinklers fire alarm sep. permitm c new occupoant load-n/c maher ordinance no133.13 | $850,000 |
| Nov 10, 2015 | Expired or cancelled | 222 Sansome St | Thomas Swan Sign Co Inc | install projecting illuminated double faced sign | $7,000 |
| Aug 24, 2015 | Never finaled | 222 Sansome St | R L H Fire Protection Inc | fire sprinkler elevator modernization, remove heads in top of elevator hoistway and in machine room on roof (ab2.01, add "d"), no plan required. n/a ordinance #155-13 | $2,500 |
| May 11, 2015 | Completed | 345 California St | Johnson Controls Inc. | 3rd flr: ti- add 2 new smoke detectors, 1 relay module, 9 speakers and 14 strobes. maher na | $12,934 |
| Mar 26, 2015 | Completed | 345 California St | Cosco Fire Protection Inc. | 30th flr: remove (e) pre-action valve & appurtenances, return system to wet in the space. remove pre action panel & 2 smoke detectors. server room retasked to office per owner. no record for existing preaction system.maher - not req'd | $12,557 |
| Dec 3, 2014 | Completed | 345 California St | Johnson Controls Inc. | 23rd and 24th floors: fire alarm permit on 23rd floor add 2 smokes, 19 speakers, and 22 strobes. 24th floor: add 16 new speakers and 18 new strobes. extg devices on both floors to remain. ref app#201409237002 and 201409237004. n/a for the maher. | $19,364 |
| Nov 18, 2014 | Expired or cancelled | 345 California St | Johnson Controls Inc. | fire alarm ti addition of notification devices. 20140292432 | $15,000 |
| Oct 30, 2014 | Never finaled | 345 California St | Johnson Controls Inc. | 22nd floor: fire ti addition of 26 strobes and 24 speakers, ref ti 2014-0627-9880 | $13,000 |
| Sep 23, 2014 | Completed | 345 California St | Principal Builders Inc. | tenant improvement on the 24th fl to construct new partitions, doors, ceilings, millwork, finishes and mep. life safety/sprinklers on separate permit. maher not required | $600,000 |
| Sep 23, 2014 | Completed | 345 California St | Principal Builders Inc. | tenant improvement on the 23rd fl to construct new partitions, doors, ceiling millwork, finishes and mep. life safety/sprinklers on separate permit. maher not required | $1,200,000 |
| Sep 19, 2014 | Completed | 345 California St | Mc Millan Electric | suite #170: electrical devices added, lights, switches, and plugs.n/a for the maher ordinance #155-13 refer to building permit #2014 0729 2432 | $10,000 |
| Aug 25, 2014 | Completed | 345 California St | Principal Builders Inc. | 23rd flr: demolition of partitions, doors millwork & finishes on 23rd flr, per abo17 floor will remain vacant until future t.i. permit; maher n/a | $20,000 |
| Aug 19, 2014 | Never finaled | 345 California St | Potter Fire Protection | 1st flr, ste 170: ref. permit 201407292432, relocate (10) fire sprinklers and install branch-line seismic braces.; maher n/a | $5,000 |
| Jul 29, 2014 | Completed | 345 California St | San Francisco Commercial Builders Inc | ste #170: expanding existing dental office into adjacent vacant space; maher n/a | $300,000 |
| Jun 26, 2014 | Never finaled | 345 California St | Johnson Controls Inc. | 21st floor: fire alarm add add 3 strobes relocate 6 strobe and 1 speakers. ref app#201405276769 | $11,444 |
| May 29, 2013 | Never finaled | 345 California St | Thomas Swan Sign Co Inc | erect an illuminate double faced projecting sign | $3,000 |
| May 24, 2013 | Completed | 345 California St | Hathaway Dinwiddie Co. | demo of small area of roof slab and replace with the same | $10,000 |
| Jul 24, 2012 | Never finaled | 345 California St | Golden Gate Fire Protection Inc | ground floor-fire sprinkler system upgrade-relocate 9 pendent sprinkler heads | $4,635 |
| Jul 5, 2012 | Never finaled | 222 Sansome St | R L H Fire Protection Inc | 38th floor fire sprinkler only - suite - oriental : 11 heads, all relo, 4 deletes. suite taipan: 14 heads , 8 relocate, 6 add, 4 delete, total 25 heads. | $10,500 |
| Jun 29, 2012 | Completed | 345 California St | Johnson Controls Inc. | 3rd floor - 2 new speakers to be installed & connected to the existing circuits, 5 existing speakers to be relocated, 7 existing strobes to be relocated, 15 new strobes on n1, 8 (e) strobes to be relocated & 8 new strobes on n2, 2 new door holders to be added. | $8,500 |
| May 24, 2012 | Never finaled | 345 California St | Golden Gate Fire Protection Inc | fire sprinkler system upgrade. relocate 64 pendent sprinkler heads on the 17th floor. relocate 138 pendent sprinler heads on the 20th fl | $104,030 |
| May 18, 2012 | Never finaled | 345 California St | Johnson Controls Inc. | 14th floor:remodel of fire alarm system. addition and relocation of speakers and strobes | $8,500 |
| May 18, 2012 | Completed | 345 California St | Johnson Controls Inc. | 15th floor:remodel of fire alarm system. addition and relocation of speakers and strobes | $8,500 |
| May 18, 2012 | Never finaled | 222 Sansome St | R L H Fire Protection Inc | 3rd floor-fire sprinkler only-relocate 120 heads, add 14 heads & remove 21 heads. 134 sprinklers | $68,876 |
| May 17, 2012 | Never finaled | 345 California St | Golden Gate Fire Protection Inc | 14th & 15th floors-fire sprinkler system upgrade-relocate 17 pendent sprinkler heads on 14 th fl & relocate 30 pendent heads on 15th fl | $24,205 |
| May 7, 2012 | Never finaled | 345 California St | Golden Gate Fire Protection Inc | 16th floor:fire sprinkler system upgrade, relocate 2 pendent sprinkler heads on the 16th floor. delete 1 head. | $1,030 |
| May 2, 2012 | Never finaled | 222 Sansome St | Acco Engineered Systems Inc. Dba Acco En | 4th. flr.: replace (e) chiller "like for like" change-out. | $350,000 |
| Apr 17, 2012 | Completed | 222 Sansome St | Hathaway Dinwiddie Co. | 38/f, 39/f, 40/f, 43/f -guestroom remodeling. revision to appl#201111098562. | $200,000 |
| Apr 11, 2012 | Completed | 222 Sansome St | Hathaway Dinwiddie Co. | perform all mechanical, electrical & plumbing work associated with relocation of fitness & hotel offices form 4th to 3rd floor. ref pa #2012.03.28.7008. | $300,000 |
| Apr 11, 2012 | Never finaled | 222 Sansome St | Johnson Controls Inc. | add fcps panels to florrs 38, 39, 40, 41. add strobes to ada rooms 3801,3809, 3818, 3908, 3916, 3918, 4001,4005,4006,4105, 4106, 4207, 4304,4316,4416,4517 2nd floor add 3 speakers, 3 strobes, sd-44 & increase strobe candela to 110 on speaker/strobe, add smoke detector above fcps on 44. | $20,000 |
| Apr 4, 2012 | Completed | 222 Sansome St | Johnson Controls Inc. | suite #4612 & 4702-add 2 strobes in ada rooms #4612 & 4702-add booster panel in 47th floor housekeeping closet & smoke detector above it | $5,000 |
| Mar 28, 2012 | Completed | 222 Sansome St | Hathaway Dinwiddie Co. | relocate fitness & hotel offices from level 4 to level 3. add spa area on level 3 - elevator lobbies, women restroom & common hallway. note: building fully sprinklered. m.e.p. under separate permit. | $1,000,000 |
| Mar 12, 2012 | Completed | 222 Sansome St | Johnson Controls Inc. | add 1 new speaker strobe 1 new duct detector. 1 control relay, 2 replacement speakers to speaker/strobes, 6 relocates speaker strobes | $8,000 |
| Jan 11, 2012 | Completed | 222 Sansome St | R L H Fire Protection Inc | 1st floor - fire sprinkler only - relocate 38 heads, add 9 heads, delete 13 heads. for the mandarin oriental. total 47 heads. | $23,500 |
| Jan 10, 2012 | Never finaled | 222 Sansome St | mta parking only | ||
| Nov 21, 2011 | Never finaled | 222 Sansome St | street space permit | ||
| Nov 10, 2011 | Never finaled | 222 Sansome St | Hathaway Dinwiddie Co. | storefront only "replacement" doors & windows. in kind, ref per 201111078433 for da checklist | $100,000 |
| Nov 9, 2011 | Completed | 222 Sansome St | Hathaway Dinwiddie Co. | guestroom remodeling levels 38-48; mostly cosmetic. extent of construction work is limited to relocation of some minor non-bearing walls, upgrade 5% of total guestrooms to accessible units. deletion/relocation of electrical outlets. | $1,900,000 |
| Nov 7, 2011 | Never finaled | 222 Sansome St | Hathaway Dinwiddie Co. | renovation of lobby, front desk & grand area-expand restaurant & bar, pantry of main lobby, remove (e) bar, clubroom & gift shop-2nd. level-remove (e) restaurant & convert to meeting space. | $3,037,673 |
| Oct 31, 2011 | Expired or cancelled | 222 Sansome St | remove & replace canopy at front of building @ sansome st. | $100,000 | |
| Oct 27, 2011 | Completed | 123 Battery St | J S J Electrical Display Corp | reface existing projecting blade non-structural sign. | $900 |
| Oct 27, 2011 | Completed | 123 Battery St | J S J Electrical Display Corp | erect an electric single faced under canopy internally illuminated cabinet sign inside courtyard, not visible from street. | $500 |
| Oct 27, 2011 | Completed | 123 Battery St | J S J Electrical Display Corp | erect an electric single faced under canopy internally illuminated cabinet sign. | $1,000 |
| Oct 4, 2011 | Completed | 123 Battery St | Pioneer Fire Inc. | remodel of all outlined areas, consisting of 1 relocated pendent and 2 existing pendent to be raised to new ceiling height. | $500 |
| Sep 16, 2011 | Never finaled | 222 Sansome St | Hathaway Dinwiddie Co. | canopy installation; replace (e) canopy @ entry with (n) design. | $20,000 |
| Sep 9, 2011 | Completed | 345 California St | Gci, Inc | revision to pa #2011 0715 0323 to reflect minimal changes to add one new partition and change elevation | $15,000 |
| Aug 8, 2011 | Completed | 123 Battery St | Gotham Bay Construction | tenant improvement to an existing space (cafe to cafe)installation of equipment, fixtures ,furnishings, new ceiling, new finishes- plumbing and electrical | $150,000 |
| Jul 25, 2011 | Completed | 222 Sansome St | Hathaway Dinwiddie Co. | model room review; modify 2-guestrm., unit 3803 & 3804 for ownership to evaluate 2-separate schemes. mostly cosmetic construction work is limited to deletion & relocation of 2-partial non-bearing walls & deletion relocation of elect. outlets. | $25,000 |
| Aug 19, 2009 | Never finaled | 123 Battery St | Thomas Swan Sign Co Inc | erect an electric illuminated double faced projecting sign. | $2,500 |
| Aug 17, 2009 | Completed | 345 California St | Novo Construction Inc | 22nd floor limited demolition & construction of a lorge conference room, war room, pantry & executive offices. new floor finishes & paint throughout. mep, fire sprinkler & life safety under separate permit. | $150,000 |
| Jun 25, 2009 | Completed | 345 California St | Sierra Electric Co | as builts fire alarm for 200610316471. per response from don fields, sffd. add ffop, add 4 smoke detectors, add 1 heat detector | $15,000 |
| Aug 20, 2008 | Completed | 345 California St | 31st floor revision to appl #200804038713 - revising pot shown on 31a.03 & revising (e) plan to show correct field conditions. | $200 | |
| Apr 18, 2008 | Completed | 222 Sansome St | Nationwide Construction Managers Inc. | replace millwork panels and stone top. cosmetic work to include re-facing cabinet doors with new hardware as per section 1134b.2.1 exception #4. | $50,000 |
| Apr 11, 2008 | Completed | 345 California St | Next Venture Inc Dba Sierra Group | renew appl#200610104465, 200611077109, 200610104468, 200706285392 for final inspection only. | |
| Feb 5, 2008 | Completed | 345 California St | demolition of existing partitions, raised floor, ceilings, lighting. no access drawings required per ab-17. future tenant under separate permit. | $98,105 | |
| Jul 30, 2007 | Expired or cancelled | 345 California St | Gci, Inc | relocation of one (1) high drinking fountain to other side of corridor per request of building insp. p. o'riordan. rev. to to (e) pa #2007/03/12/5958 | $5,500 |
| Apr 12, 2007 | Never finaled | 345 California St | Gci, Inc | cushman & wakefield: oti-3 4th floor sp | $4,500 |
| Mar 14, 2007 | Expired or cancelled | 345 California St | Gci, Inc | oti-2, 4th floor, el, me | $70,000 |
| Mar 12, 2007 | Expired or cancelled | 345 California St | Gci, Inc | oti-1, 4th floor, el, ls, sp. | $84,606 |
| Nov 7, 2006 | Completed | 345 California St | Aa/Acme Locksmiths | install card readers and magnetic locks on 28th and 29th floor elevator lobbies, emergency door release stations for emergency egress. 2 telephone systems for door entry. | $11,954 |
| Oct 12, 2006 | Never finaled | 222 Sansome St | Sabah International Incorporated | replace existing halon sphere cylinder w/ new fm200 cylinder in computer room. replace existing halon pipe w/ new piping for fm200. final and test. | $9,660 |
| Oct 12, 2006 | Completed | 345 California St | Skyline Construction | to renew pa#2005/12/06/9621 & 2005/12/16/0540 for final insp. | |
| Jun 15, 2006 | Completed | 345 California St | Peacock Construction Inc | oti-3 12/f sp. | $12,000 |
| Jun 1, 2006 | Completed | 345 California St | Peacock Construction Inc | oti-2, 12th floor, el, me. | $120,000 |
| May 16, 2006 | Completed | 345 California St | suite# 170. tenant improvement. non bearing load partition walls. handicap bathroom. cabinets & counter for reception area. elecrical hookup for equipment (x-ray machines etc. ) closets. | $92,500 | |
| May 1, 2006 | Completed | 345 California St | Matrix Hg Inc | remove subplement ac units (4) and reinstall original vav type system @ 6th floor only | $50,000 |
| Apr 3, 2006 | Expired or cancelled | 238 Sansome St | double faced electric projecting wall sign | ||
| Mar 24, 2006 | Completed | 345 California St | oti-1 12th/fl-el, me, ls ,sp. | $150,000 | |
| Mar 3, 2006 | Never finaled | 222 Sansome St | street space | ||
| Dec 9, 2005 | Completed | 222 Sansome St | Pwi Construction Inc | add 4 " metal stud wall to 3804 and 3814 -4814 units, floors 38 thru 48, 21 units total | $34,000 |
| Dec 6, 2005 | Expired or cancelled | 345 California St | Skyline Construction | fire sprinkler upgrade/17 relocations/4 to be renovated/no increase in office space 17th floor | $4,800 |
| Nov 21, 2005 | Never finaled | 222 Sansome St | street space | ||
| Oct 7, 2005 | Completed | 123 Battery St | remove counters,new casework,modify existing flooring,relocate or new plumbing,relocate or new equipment,path & paint.remove & install new display counter.no electrical added. | $40,000 | |
| Feb 24, 2000 | Expired or cancelled | 222 Sansome St | Wcp Svcs, Dba: Venture Builders | remodel work under app #9926001 | $12,000 |
| Feb 23, 2000 | Completed | 222 Sansome St | Wcp Svcs, Dba: Venture Builders | cut out restaurant dining rms/reconfigurate etc. | $440,000 |
| Jan 21, 2000 | Completed | 222 Sansome St | add and relocate fire sprinklers | $4,000 |