Gregory Mantz
- Listed as
- architect
- Firm
- Carter Burgess Inc.
- Based in
- Oakland
- On San Francisco permits
- Aug 2004 to Oct 2019
19 permits since 2000 (architect on 19 permits): 18 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Oct 10, 2019 | Completed final sign-off Aug 2020 | 345 California St | Dpr Construction | interior connecton stairwell between 14th & 15th fl. to partition off non exit stairm no change to (e) or occupancyDetails
interior connecton stairwell between 14th & 15th fl. to partition off non exit stairm no change to (e) or occupancy | $45,000 |
| Mar 13, 2014 | Completed final sign-off May 2014 | 595 Buckingham Wy | Dpr Construction | suite #454: t.i. for medical office bldg, modification on non-structural partitions, doors, cabinets, and finishes. n/a for the maher ordinance #155-13.Details
suite #454: t.i. for medical office bldg, modification on non-structural partitions, doors, cabinets, and finishes. n/a for the maher ordinance #155-13. | $49,950 |
| Dec 10, 2013 | Completed final sign-off Aug 2014 | 945 Front St | Dpr Construction | demolition of interior walls, ceilings & finishes. all walls to be demolished are non-structural. (per ab- 017)Details
demolition of interior walls, ceilings & finishes. all walls to be demolished are non-structural. (per ab- 017) | $25,000 |
| Aug 4, 2009 | Completed final sign-off Jan 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: canopy bus stop id sign f1 thru f79. (see drawings attached to pa no. 200908044093)Details
tjpa sign: canopy bus stop id sign f1 thru f79. (see drawings attached to pa no. 200908044093) | |
| Aug 4, 2009 | Completed final sign-off Jan 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: primary directional/kiosk signs d-1 thru d-13. (see drawings attached to pa no. 200908044093)Details
tjpa sign: primary directional/kiosk signs d-1 thru d-13. (see drawings attached to pa no. 200908044093) | |
| Aug 4, 2009 | Completed final sign-off Jan 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: transit information display signs i.1-5 thru i.1-9, i.2-1 thru i.2-37 and i.3-1. (see drawings attached to pa no. 200908044093)Details
tjpa sign: transit information display signs i.1-5 thru i.1-9, i.2-1 thru i.2-37 and i.3-1. (see drawings attached to pa no. 200908044093) | |
| Aug 4, 2009 | Completed final sign-off Jun 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: street bus stop id signs g1 thru g11. (see drawings attached to pa no. 200908044093)Details
tjpa sign: street bus stop id signs g1 thru g11. (see drawings attached to pa no. 200908044093) | |
| Aug 4, 2009 | Completed final sign-off Jun 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: primary site id sign a1 thru a3. (see attached drawings)Details
tjpa sign: primary site id sign a1 thru a3. (see attached drawings) | $297,500 |
| Aug 4, 2009 | Completed final sign-off Jun 2011 | 200 Folsom St | Mc Guire And Hester | tjpa sign: relocated l.e.d. display signs h-1 thru h-37. (see drawings attached to pa no. 200908044093)Details
tjpa sign: relocated l.e.d. display signs h-1 thru h-37. (see drawings attached to pa no. 200908044093) | |
| Nov 4, 2008 | Completed final sign-off Jun 2010 | 200 Folsom St | erect a one story recycling enclosureDetails
erect a one story recycling enclosure | $20,000 | |
| Nov 4, 2008 | Completed final sign-off Jun 2010 | 200 Folsom St | erect a one story baggage enclosureDetails
erect a one story baggage enclosure | $8,000 | |
| Feb 19, 2008 | Completed final sign-off Aug 2008 | 236 King St | unit #236, ground floor : remodel existing space to include 2 new restrooms, non-structural partition walls, new flooring, lighting & electrical.Details
unit #236, ground floor : remodel existing space to include 2 new restrooms, non-structural partition walls, new flooring, lighting & electrical. | $150,000 | |
| Dec 21, 2007 | Completed final sign-off Jun 2011 | 200 Folsom St | grading. site improvements including site civil/mechanical, utilities, site electrical utilities; site work for modular bldg., canopies & landscaping and attendant improvements beneath east loop.Details
grading. site improvements including site civil/mechanical, utilities, site electrical utilities; site work for modular bldg., canopies & landscaping and attendant improvements beneath east loop. | $1,600,000 | |
| Dec 21, 2007 | Completed final sign-off Jun 2010 | 200 Main St | new one story security office at temporary transbay terminal.Details
new one story security office at temporary transbay terminal. | $90,000 | |
| Dec 21, 2007 | Completed final sign-off Jun 2010 | 250 Main St | erect 1 story ac transit building office at transbay terminalDetails
erect 1 story ac transit building office at transbay terminal | $188,000 | |
| Dec 21, 2007 | Completed final sign-off Jun 2010 | 200 Folsom St | new 1 story greyhound terminal at temporary trans-bay terminal including site work & canopies. (assembly, bussiness / office).Details
new 1 story greyhound terminal at temporary trans-bay terminal including site work & canopies. (assembly, bussiness / office). | $5,800,000 | |
| Aug 17, 2007 | Completed final sign-off Mar 2008 | 2410 Mission St | Cb Bovenkamp Inc. | a/m/e/p - change of use b/m to m, full floor ti - ground floorDetails
a/m/e/p - change of use b/m to m, full floor ti - ground floor | $280,000 |
| Mar 3, 2006 | Completed final sign-off Mar 2007 | 200 Jennings St | erect 1 story warehouseDetails
erect 1 story warehouse | $400,000 | |
| Aug 3, 2004 | Expired or cancelled expired Nov 2008 | 611 Folsom St | room prep. to accommodate additional one standby generator relocate walls, modify ventitation andDetails
room prep. to accommodate additional one standby generator relocate walls, modify ventitation and | $680,000 |