Block 3750, lot 087
611 Folsom St
- City’s use
- Commercial Office
- Zoning
- C3S
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
124 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 11, 2026 | In progress filed Aug 2026, not yet issued | 611 Folsom St | modification to (e) t-moble facility. remove 4 (e) antennas replace with (6) new antennas. remove (9) erros, (6) tmas, and (12) radios at cabinets. replace with 6 new rrus. remove (1) 6102 cabinet, relace with 2 smaller cainets within (e) lease space. final configuration:Details
modification to (e) t-moble facility. remove 4 (e) antennas replace with (6) new antennas. remove (9) erros, (6) tmas, and (12) radios at cabinets. replace with 6 new rrus. remove (1) 6102 cabinet, relace with 2 smaller cainets within (e) lease space. final configuration: | $25,000 | |
| Mar 14, 2025 | Completed final sign-off Sep 2025 | 611 Folsom St | Walschon Fire Protection Inc | basement level, relocate existing 2 1/2" main and branch line. add sprinlker coverage below ducts greater 49" 9in width. add 7 heads. ref 202405222684Details
basement level, relocate existing 2 1/2" main and branch line. add sprinlker coverage below ducts greater 49" 9in width. add 7 heads. ref 202405222684 | $23,000 |
| Nov 22, 2024 | Completed final sign-off Aug 2025 | 611 Folsom St | Orr Protection Systems Inc | 6/f:upgrade spot type detection to air sampling.other f/a sys features to remain same. remove the smoke (e) smoke detectors, conduit, & wire.provide/install 2(n) air sampling detectors & pipe.provide/install d sampling multi zone power supply.provide/install new monitor modules.rev f/a panel programDetails
6/f:upgrade spot type detection to air sampling.other f/a sys features to remain same. remove the smoke (e) smoke detectors, conduit, & wire.provide/install 2(n) air sampling detectors & pipe.provide/install d sampling multi zone power supply.provide/install new monitor modules.rev f/a panel program | $87,589 |
| Aug 8, 2024 | In progress issued Sep 2024 | 611 Folsom St | Roebbelen Contracting Inc | secure vertically oriented/long alumium panels across all elevations of the bldg. this is a preventive measure. a full facade study is also planned in august 2024 to observe and meet with city's facade inspection requirement.Details
secure vertically oriented/long alumium panels across all elevations of the bldg. this is a preventive measure. a full facade study is also planned in august 2024 to observe and meet with city's facade inspection requirement. | $845,000 |
| May 22, 2024 | In progress issued Feb 2025 | 611 Folsom St | Roebbelen Contracting Inc | relocate (e) standby elec equip to (n) room. install feeders to tile (e0 loads to new house service equip. provide/install new ducts to service relocate elec equip. anchorage for 2 components up to 9,200 lbs each.Details
relocate (e) standby elec equip to (n) room. install feeders to tile (e0 loads to new house service equip. provide/install new ducts to service relocate elec equip. anchorage for 2 components up to 9,200 lbs each. | $100,000 |
| Apr 24, 2024 | Completed final sign-off May 2024 | 611 Folsom St | Western States Fire Protection Company | remove one wall mounted fire department connection to new location outside of gated entry. install new fire department connection.Details
remove one wall mounted fire department connection to new location outside of gated entry. install new fire department connection. | $7,950 |
| Mar 20, 2023 | Completed final sign-off Oct 2023 | 611 Folsom St | Enterprise Roofing Service Inc | reroofingDetails
reroofing | $1,253,814 |
| Feb 14, 2023 | Completed final sign-off Jun 2024 | 611 Folsom St | Roebbelen Contracting Inc | install new security gatesDetails
install new security gates | $20,000 |
| Feb 14, 2023 | Completed final sign-off Nov 2025 | 611 Folsom St | Roebbelen Contracting Inc | install mechanical and electrical infrastructure to support telephone equipmentDetails
install mechanical and electrical infrastructure to support telephone equipment | $500,000 |
| Sep 14, 2022 | Completed final sign-off May 2023 | 611 Folsom St | H C I Systems Inc | 6/f: expand (e) bldg fas to accommodate addition of new crah unit 604 (new vecda detector/subfloor smoke detector), provide sufficient battery backup to systain 24 hrs standby & (10) minutes alarm operation. fas wiring shall be in accordance w/nfpa 70 to article 760Details
6/f: expand (e) bldg fas to accommodate addition of new crah unit 604 (new vecda detector/subfloor smoke detector), provide sufficient battery backup to systain 24 hrs standby & (10) minutes alarm operation. fas wiring shall be in accordance w/nfpa 70 to article 760 | $21,790 |
| Oct 15, 2021 | Completed final sign-off Sep 2022 | 611 Folsom St | Apex Site Solutions Inc | remove and install 4 antennas. remove install 4 rrus. remove 3 dc2. install 4 dc9. remove 1 dc6 @ gamma sector. install 4 dc power trunksDetails
remove and install 4 antennas. remove install 4 rrus. remove 3 dc2. install 4 dc9. remove 1 dc6 @ gamma sector. install 4 dc power trunks | $35,500 |
| Aug 13, 2021 | Never finaled issued Jul 2022, no final | 611 Folsom St | Roebbelen Contracting Inc | replace 1 water cooled ac unit on the 6th floor with 2 new chilled water ac units on 6th floor. remove 2 extg closed circuit cooling towers on the roof. remove all condenser water piping, supports, and electrical feeders on the roof for the removed cooling towers. we are not moving any extg wallsDetails
replace 1 water cooled ac unit on the 6th floor with 2 new chilled water ac units on 6th floor. remove 2 extg closed circuit cooling towers on the roof. remove all condenser water piping, supports, and electrical feeders on the roof for the removed cooling towers. we are not moving any extg walls | $250,000 |
| Oct 2, 2019 | Completed final sign-off Nov 2019 | 611 Folsom St | Sabah International Incorporated | t.i. 201812178497 provide a very early warnming detection system for 3rd floor air handling units. add 30 smoke det, 6 dual inout modules 2 speaker/strobes, 2 duct det, 2 control relays, 2 vesda air dampling snk detDetails
t.i. 201812178497 provide a very early warnming detection system for 3rd floor air handling units. add 30 smoke det, 6 dual inout modules 2 speaker/strobes, 2 duct det, 2 control relays, 2 vesda air dampling snk det | $37,955 |
| Dec 17, 2018 | Completed final sign-off Jan 2020 | 611 Folsom St | Bangar Construction Corp. | install 2 new computer room air handlers on the 3rd fl.Details
install 2 new computer room air handlers on the 3rd fl. | $200,000 |
| Nov 21, 2018 | Completed final sign-off Mar 2019 | 611 Folsom St | Sabah International Incorporated | ref pa 2018-0427-7611 - provide a very early warning detection system - provide 4 new ductsmoke detectors, 1 control relay, 1 1 vesda smoke detector, 1 vesda power supply, 3 monitor modulesDetails
ref pa 2018-0427-7611 - provide a very early warning detection system - provide 4 new ductsmoke detectors, 1 control relay, 1 1 vesda smoke detector, 1 vesda power supply, 3 monitor modules | $24,930 |
| Aug 8, 2018 | Completed final sign-off Nov 2018 | 611 Folsom St | Sabah International Incorporated | ref pa# 201802080801; provide early warning system for the 8th fl. air handling unit, add (1) new duct smoke detector (1) high power control relay, (1) vesda smoke detector, (1) vesda power supply, (3) monitor modules. maher n/aDetails
ref pa# 201802080801; provide early warning system for the 8th fl. air handling unit, add (1) new duct smoke detector (1) high power control relay, (1) vesda smoke detector, (1) vesda power supply, (3) monitor modules. maher n/a | $21,391 |
| Jun 28, 2018 | Completed final sign-off Jul 2020 | 611 Folsom St | Apex Site Solutions Inc | att modification: r&r (8)(e) antennas w/(8) (n) antennas; install (8) (n) rrus, remove unused equipment; no change to batteriesDetails
att modification: r&r (8)(e) antennas w/(8) (n) antennas; install (8) (n) rrus, remove unused equipment; no change to batteries | $46,000 |
| Apr 27, 2018 | Completed final sign-off May 2019 | 611 Folsom St | Bangar Construction Corp. | 9th floor: install a pair of crac units and replace a chiller in the basement. n/a for maherDetails
9th floor: install a pair of crac units and replace a chiller in the basement. n/a for maher | $500,000 |
| Mar 20, 2018 | Completed final sign-off Apr 2018 | 611 Folsom St | Sabah International Incorporated | as built for fire alarm ref permit 201710231923, removed 2 heat detectors and 1 smoke detector from elevator hoistway as not access was provided. elevator machine room contains existing detection devices and is directly above hoistway with grated floor separating the two, allowing passage of smokeDetails
as built for fire alarm ref permit 201710231923, removed 2 heat detectors and 1 smoke detector from elevator hoistway as not access was provided. elevator machine room contains existing detection devices and is directly above hoistway with grated floor separating the two, allowing passage of smoke | |
| Feb 26, 2018 | Never finaled issued Feb 2019, no final | 611 Folsom St | Apex Site Solutions Inc | replace 3 extg panel antennas, install 2 6-0' panel antennas on extg mast, install 1 8' panel antenna on new mast. install 2 frp screens, install 3 rrus, install 3 diplexers, replace 6 tmas. n/a for maher.Details
replace 3 extg panel antennas, install 2 6-0' panel antennas on extg mast, install 1 8' panel antenna on new mast. install 2 frp screens, install 3 rrus, install 3 diplexers, replace 6 tmas. n/a for maher. | $25,000 |
| Feb 8, 2018 | Completed final sign-off Nov 2018 | 611 Folsom St | American Incorporated | 8th/9th flr -provide and install a new crah unit to cool telco equip. hot tap new chilled water connection to serve new crah unit. new ele and controls for new crah unitDetails
8th/9th flr -provide and install a new crah unit to cool telco equip. hot tap new chilled water connection to serve new crah unit. new ele and controls for new crah unit | $100,000 |
| Oct 23, 2017 | Completed final sign-off Apr 2018 | 611 Folsom St | Sabah International Incorporated | freight elevator modernization. add devices to e system. add 4 control relays for primary recall, alternate recall, fireman hat shunt trip. add 1 monitor module for elv shunt power loss. add 2 heat det and 1 smoke det for elevator hoistway sprinkler heads maher not reqDetails
freight elevator modernization. add devices to e system. add 4 control relays for primary recall, alternate recall, fireman hat shunt trip. add 1 monitor module for elv shunt power loss. add 2 heat det and 1 smoke det for elevator hoistway sprinkler heads maher not req | $10,000 |
| Oct 18, 2017 | Completed final sign-off Nov 2018 | 611 Folsom St | American Incorporated | upinterrupted power supply (ups) replacementDetails
upinterrupted power supply (ups) replacement | $100,000 |
| Oct 6, 2017 | Completed final sign-off Mar 2019 | 611 Folsom St | Sabah International Incorporated | demo two (e)halon systems that are no longer in use two tanks, all associated halon devices, conduit and black pipe per system. systems located on 3rd & 6th fl. no changes to (e) bldg fire alarm systems, restore to maintain (e) fire-rated wall requirements. n/a for maherDetails
demo two (e)halon systems that are no longer in use two tanks, all associated halon devices, conduit and black pipe per system. systems located on 3rd & 6th fl. no changes to (e) bldg fire alarm systems, restore to maintain (e) fire-rated wall requirements. n/a for maher | $10,149 |
| Oct 3, 2017 | Completed final sign-off Jan 2018 | 611 Folsom St | Potter Fire Protection | 9/f:elevator penthouse sprinkler ti: demo and repipe 4 fire sprinklers. ref app#201704184181. n/a maherDetails
9/f:elevator penthouse sprinkler ti: demo and repipe 4 fire sprinklers. ref app#201704184181. n/a maher | $2,500 |
| Jul 17, 2017 | Completed final sign-off Dec 2017 | 611 Folsom St | Apex Site Solutions Inc | att modification r +r 8 e antennas install 4 n rrus, r/4 re rru with 4 n rrus, removse unsused equp, install other small equip maher not reqDetails
att modification r +r 8 e antennas install 4 n rrus, r/4 re rru with 4 n rrus, removse unsused equp, install other small equip maher not req | $45,000 |
| Apr 18, 2017 | Completed final sign-off May 2018 | 611 Folsom St | American Incorporated | freight elevator modernizationDetails
freight elevator modernization | $100,000 |
| Apr 12, 2017 | Completed final sign-off Sep 2017 | 611 Folsom St | North American Power & Controls Inc | basement- remove (e) threaded piping which provides fuel to the standby generator, install new welded piping in the same orientation and location as (e), paint & label all piping, relocate tank monitoring panel to outside of engine room. n/a ordinance #155-13Details
basement- remove (e) threaded piping which provides fuel to the standby generator, install new welded piping in the same orientation and location as (e), paint & label all piping, relocate tank monitoring panel to outside of engine room. n/a ordinance #155-13 | $70,000 |
| Sep 2, 2016 | Completed final sign-off Nov 2016 | 611 Folsom St | Potter Fire Protection | relocate fire hose cabinet and miscellaneous pipe. ref #201601257847Details
relocate fire hose cabinet and miscellaneous pipe. ref #201601257847 | $2,500 |
| Sep 2, 2016 | Completed final sign-off Jan 2017 | 611 Folsom St | American Incorporated | 5th floor: provide new distribution duct work. provide and install 2 new fire smoke dampers. installation of smoke detector under separate application.Details
5th floor: provide new distribution duct work. provide and install 2 new fire smoke dampers. installation of smoke detector under separate application. | $50,000 |
| Jan 25, 2016 | Completed final sign-off Nov 2016 | 611 Folsom St | American Incorporated | 2nd flr: at&t- install 2 in-row cooling units one is redundant; maher n/a separate permit deferred for 4" sprinkler pipe relocationDetails
2nd flr: at&t- install 2 in-row cooling units one is redundant; maher n/a separate permit deferred for 4" sprinkler pipe relocation | $200,000 |
| Mar 31, 2015 | Completed final sign-off Jul 2015 | 611 Folsom St | Sabah International Incorporated | 7th flr: relocation of (e) fire smoke damper in the (e) space. the fire smoke damper shall close when the (e) area smoke detector activate. no changes to the (e) fire alarm system. maher - not req'dDetails
7th flr: relocation of (e) fire smoke damper in the (e) space. the fire smoke damper shall close when the (e) area smoke detector activate. no changes to the (e) fire alarm system. maher - not req'd | $5,809 |
| Jan 6, 2015 | Completed final sign-off Dec 2015 | 611 Folsom St | Apex Site Solutions Inc | modification to an (e) unmanned att telecommunication facility consisting of adding (3)(n) rrus-12 units w/ (3)(n) a2 modules; remove & replace (1)(e) dvl unit w/ (2) (n) dus41 units inside on (e) 23" rack; paint (e) screening to match building.n/a for maherDetails
modification to an (e) unmanned att telecommunication facility consisting of adding (3)(n) rrus-12 units w/ (3)(n) a2 modules; remove & replace (1)(e) dvl unit w/ (2) (n) dus41 units inside on (e) 23" rack; paint (e) screening to match building.n/a for maher | $16,000 |
| Nov 12, 2014 | Completed final sign-off May 2015 | 611 Folsom St | American Incorporated | 7th floor: disconnect and remove one fire damper. install one new fire smoke damper. install 2 new cable holes. relocate one exhaust air duct. all electrical work required to support the above work. n/a for the maherDetails
7th floor: disconnect and remove one fire damper. install one new fire smoke damper. install 2 new cable holes. relocate one exhaust air duct. all electrical work required to support the above work. n/a for the maher | $25,000 |
| Apr 25, 2014 | Expired or cancelled withdrawn Sep 2016 | 611 Folsom St | provide new distribution ductwork on 5/f, provide and install 2 new fire smoke dampers. n/a ordinance #155-13.Details
provide new distribution ductwork on 5/f, provide and install 2 new fire smoke dampers. n/a ordinance #155-13. | $50,000 | |
| Aug 15, 2013 | Completed final sign-off Oct 2013 | 611 Folsom St | Roebbelen Contracting Inc | install new pdsc panels & minor duct work modifications. all work on 7/fDetails
install new pdsc panels & minor duct work modifications. all work on 7/f | $50,000 |
| Aug 6, 2013 | Completed final sign-off Dec 2013 | 611 Folsom St | Roebbelen Contracting Inc | revision to 201303041432. 12 att panel antenna to be mounted on e 3rd fl balconies- structural 3Details
revision to 201303041432. 12 att panel antenna to be mounted on e 3rd fl balconies- structural 3 | |
| Jul 26, 2013 | Completed final sign-off Oct 2013 | 611 Folsom St | Sabah International Incorporated | 3rd floor:upgrade extg fire detection system.add 3 new smoke detectors for area coverage. the air changes in this room are 1.4 air changes per minute. 4 new dual monitoring module are to be added to monitor the open and close of each new fsd.Details
3rd floor:upgrade extg fire detection system.add 3 new smoke detectors for area coverage. the air changes in this room are 1.4 air changes per minute. 4 new dual monitoring module are to be added to monitor the open and close of each new fsd. | $8,556 |
| Apr 23, 2013 | Completed final sign-off Oct 2013 | 611 Folsom St | Sabah International Incorporated | reconfigure fire alarm system for installation of new ahu-901. upgrade system shall include the following. add (1) sddc card to node 5, (39) smoke detectors, (1) duct detector, (1) relay module, (2) speaker strobes. relocate 1 existing smoke and 1 existing heat detector. replace 1 existing heatDetails
reconfigure fire alarm system for installation of new ahu-901. upgrade system shall include the following. add (1) sddc card to node 5, (39) smoke detectors, (1) duct detector, (1) relay module, (2) speaker strobes. relocate 1 existing smoke and 1 existing heat detector. replace 1 existing heat | $30,000 |
| Mar 12, 2013 | Completed final sign-off Jun 2013 | 611 Folsom St | Potter Fire Protection | 9th floor:relocate 1 fire sprinkler. ref. app#201207064244.Details
9th floor:relocate 1 fire sprinkler. ref. app#201207064244. | $1,120 |
| Mar 4, 2013 | Completed final sign-off Dec 2013 | 611 Folsom St | Roebbelen Contracting Inc | installation of 16 panel antennas & associated equipment within the (e) bldg.Details
installation of 16 panel antennas & associated equipment within the (e) bldg. | $130,000 |
| Feb 7, 2013 | Never finaled issued Feb 2013, no final | 611 Folsom St | street space permitDetails
street space permit | ||
| Jan 25, 2013 | Completed final sign-off Oct 2013 | 611 Folsom St | Roebbelen Contracting Inc | install new roof top air handler and duct work.Details
install new roof top air handler and duct work. | $750,000 |
| Aug 24, 2012 | Expired or cancelled cancelled Mar 2020 | 611 Folsom St | (e) t-mobile wireless site. replaced (4) (e) antennas w/ (4) (n) antennas at same locations.Details
(e) t-mobile wireless site. replaced (4) (e) antennas w/ (4) (n) antennas at same locations. | $19,010 | |
| Jul 25, 2012 | Completed final sign-off Sep 2012 | 611 Folsom St | Sabah International Incorporated | reconfigure fa devices due to hvac modification project on 6th fl. upgrade system shall include: remove 7 smoke detectors on ceiling, 1 vesda system under floor. add new 6 smoke detbelow floor and 3 control relay for cran's shutdown. ceiling removal and air handling systems under separate permitDetails
reconfigure fa devices due to hvac modification project on 6th fl. upgrade system shall include: remove 7 smoke detectors on ceiling, 1 vesda system under floor. add new 6 smoke detbelow floor and 3 control relay for cran's shutdown. ceiling removal and air handling systems under separate permit | $14,148 |
| Jul 9, 2012 | Completed final sign-off Mar 2019 | 611 Folsom St | Potter Fire Protection | 2nd floor-relocate fire hose cabonet on the 2nd floor to accomodate wall removalDetails
2nd floor-relocate fire hose cabonet on the 2nd floor to accomodate wall removal | $1,120 |
| Jul 6, 2012 | Completed final sign-off Mar 2013 | 611 Folsom St | Sabah International Incorporated | re-configured f.a.devices due to architect ti project on 5th &9th fl. re-located&new devices will be tied to existing circuit. the upgrade shall include: remove&cover (2)smk det. (2)heat det. (1)pull station, (2)speaker strobes. relocate(5)speaker strobes,(4)detectors;added (7)new smk detectorsDetails
re-configured f.a.devices due to architect ti project on 5th &9th fl. re-located&new devices will be tied to existing circuit. the upgrade shall include: remove&cover (2)smk det. (2)heat det. (1)pull station, (2)speaker strobes. relocate(5)speaker strobes,(4)detectors;added (7)new smk detectors | $28,259 |
| Jun 29, 2012 | Completed final sign-off Mar 2013 | 611 Folsom St | Potter Fire Protection | 5th & 9th floor - demolish pipe from 5th & 9th floor, relocate fire hose cabinet on the 5th floor.Details
5th & 9th floor - demolish pipe from 5th & 9th floor, relocate fire hose cabinet on the 5th floor. | $4,500 |
| Jun 19, 2012 | Completed final sign-off Oct 2012 | 611 Folsom St | Roebbelen Contracting Inc | 6th floor - install 2 new computer room air handler units. fire alarm and smoke detection separate permit.Details
6th floor - install 2 new computer room air handler units. fire alarm and smoke detection separate permit. | $100,000 |
| Jun 15, 2012 | Never finaled issued Jun 2012, no final | 611 Folsom St | streetspaceDetails
streetspace | ||
| May 25, 2012 | Completed final sign-off Aug 2012 | 611 Folsom St | Roebbelen Contracting Inc | 2nd floor - install ductwork for new telephone equipmentDetails
2nd floor - install ductwork for new telephone equipment | $10,000 |
| Apr 25, 2012 | Completed final sign-off Apr 2013 | 611 Folsom St | Roebbelen Contracting Inc | demolish and remove offices on the 5th and 9th floors and convert to telephone equipment spacesDetails
demolish and remove offices on the 5th and 9th floors and convert to telephone equipment spaces | $100,000 |
| Feb 24, 2012 | Never finaled issued Feb 2012, no final | 611 Folsom St | street space & sidewalkDetails
street space & sidewalk | ||
| Jan 27, 2012 | Completed final sign-off Apr 2012 | 611 Folsom St | American Incorporated | 8th floor - duct work modifications, removal of a condenser from the roof.Details
8th floor - duct work modifications, removal of a condenser from the roof. | $50,000 |
| Dec 21, 2011 | Completed final sign-off Mar 2012 | 611 Folsom St | American Incorporated | add supply ductwork, balancing dampers, air outlets to cool 2 new routers. add 3 new zone dampers and modify 6 supply grille assemblies.Details
add supply ductwork, balancing dampers, air outlets to cool 2 new routers. add 3 new zone dampers and modify 6 supply grille assemblies. | $75,000 |
| Aug 25, 2011 | Completed final sign-off Oct 2011 | 611 Folsom St | Sabah International Incorporated | 8th floor fire alarm system - install (n) siga-cr relay module next to (e) sdcp in elec rm. relay to shutdown control of fsd in floor to 9th flr ef 8.1 (by others) located in field area. verify location of relay 0383 & adress of (e) smoke detector in office.Details
8th floor fire alarm system - install (n) siga-cr relay module next to (e) sdcp in elec rm. relay to shutdown control of fsd in floor to 9th flr ef 8.1 (by others) located in field area. verify location of relay 0383 & adress of (e) smoke detector in office. | $9,958 |
| Jun 30, 2011 | Completed final sign-off Oct 2011 | 611 Folsom St | Roebbelen Contracting Inc | install new exhaust fan and new fsd and modify ductwork on 8 and 9 floors. sprinkler work and fire alarm work require seperate permit.Details
install new exhaust fan and new fsd and modify ductwork on 8 and 9 floors. sprinkler work and fire alarm work require seperate permit. | $50,000 |
| May 6, 2011 | Completed final sign-off May 2011 | 611 Folsom St | umbrella permit under s.f high rise building fire sprinkler retrofit ordinance #337-93Details
umbrella permit under s.f high rise building fire sprinkler retrofit ordinance #337-93 | ||
| Apr 25, 2011 | Completed final sign-off Aug 2011 | 611 Folsom St | Sabah International Incorporated | 8th floor-relocate one vesda sampling port drop on an extg vesda system. add one new fsd to the extg 8th floor smoke damper control panel. si job #7854Details
8th floor-relocate one vesda sampling port drop on an extg vesda system. add one new fsd to the extg 8th floor smoke damper control panel. si job #7854 | $11,236 |
| Mar 14, 2011 | Completed final sign-off May 2011 | 611 Folsom St | American Incorporated | 8th floor-install new ductwork, add 1 new fire smoke damper, 5 new air boots & 1 control damperDetails
8th floor-install new ductwork, add 1 new fire smoke damper, 5 new air boots & 1 control damper | $80,000 |
| Mar 8, 2011 | Completed final sign-off Apr 2011 | 611 Folsom St | Sabah International Incorporated | 2nd floor-install heat & smoke detectors in the punch down closet on 2nd fl thru 9th floor. the upgrade system include the floowing: add 8 new photo smoke detectors, 8 new heat detectors & 16 baseDetails
2nd floor-install heat & smoke detectors in the punch down closet on 2nd fl thru 9th floor. the upgrade system include the floowing: add 8 new photo smoke detectors, 8 new heat detectors & 16 base | $53,250 |
| Dec 17, 2010 | Completed final sign-off Mar 2012 | 611 Folsom St | Potter Fire Protection | 1st floor - add sprinkler in risen closet; 2nfd through 9th floors - add sprinkler at riser closet, add sprinkler at phone closet.Details
1st floor - add sprinkler in risen closet; 2nfd through 9th floors - add sprinkler at riser closet, add sprinkler at phone closet. | $6,000 |
| Apr 29, 2010 | Expired or cancelled cancelled Jan 2026 | 611 Folsom St | 8th floor - ductwork modificationDetails
8th floor - ductwork modification | $50,000 | |
| Jan 12, 2010 | Completed final sign-off Dec 2010 | 611 Folsom St | Sabah International Incorporated | furnish, final & test 3-control relay for elevator.Details
furnish, final & test 3-control relay for elevator. | $8,088 |
| Oct 1, 2009 | Completed final sign-off May 2010 | 611 Folsom St | Roebbelen Contracting Inc | replacement of a supply fan, sf-6, to the ninth. floor air handler.Details
replacement of a supply fan, sf-6, to the ninth. floor air handler. | $182,125 |
| Jul 14, 2009 | Completed final sign-off Oct 2009 | 611 Folsom St | Roebbelen Contracting Inc | relocate basement ahu system. modify ducting and electrical to serve relocated ac system. relocate existing fire smoke dampers and provide new. relocated ac unit is less than 400 pounds.Details
relocate basement ahu system. modify ducting and electrical to serve relocated ac system. relocate existing fire smoke dampers and provide new. relocated ac unit is less than 400 pounds. | $70,000 |
| Mar 30, 2009 | Completed final sign-off Feb 2011 | 611 Folsom St | Roebbelen Contracting Inc | modification to (e) t-mobile tele communications facility, including relocation of (1) bts equipment cabinet from inside (e) elevator penthouse to (e) t-mobile equipment area located outside of penthouse. equipment will not be visible from public view.Details
modification to (e) t-mobile tele communications facility, including relocation of (1) bts equipment cabinet from inside (e) elevator penthouse to (e) t-mobile equipment area located outside of penthouse. equipment will not be visible from public view. | $5,000 |
| Apr 9, 2008 | Completed final sign-off Nov 2008 | 611 Folsom St | Roebbelen Contracting Inc | renew for final inspection. misc electrical work to be performed. 200403030542, 200609132213 and 200612059227.Details
renew for final inspection. misc electrical work to be performed. 200403030542, 200609132213 and 200612059227. | |
| Apr 8, 2008 | Completed final sign-off Jul 2008 | 611 Folsom St | Paradiso Mechanical, Inc | replace manhole skirts and covers, spill buckets on 2 (e) underground diesel storage tanksDetails
replace manhole skirts and covers, spill buckets on 2 (e) underground diesel storage tanks | $20,000 |
| Nov 5, 2007 | Completed final sign-off May 2008 | 611 Folsom St | American Incorporated | repair/replace existing insulation in vertical air supply plenum on all floors of building/ encapsulate insulation w/ 22gauge sheet metal from basement to 9th floor, install new code compliant access doors for duct work on all floorsDetails
repair/replace existing insulation in vertical air supply plenum on all floors of building/ encapsulate insulation w/ 22gauge sheet metal from basement to 9th floor, install new code compliant access doors for duct work on all floors | $500,000 |
| Oct 9, 2007 | Completed final sign-off May 2008 | 611 Folsom St | Sabah International Incorporated | fire alarm final test on the 7th floor. install 1 superduct detector and 1 control module.Details
fire alarm final test on the 7th floor. install 1 superduct detector and 1 control module. | $6,000 |
| Aug 16, 2007 | Completed final sign-off Jan 2008 | 611 Folsom St | Sabah International Incorporated | renewal pa 200511188578Details
renewal pa 200511188578 | $25,100 |
| Aug 16, 2007 | Completed final sign-off May 2008 | 611 Folsom St | Sabah International Incorporated | renewal pa 200411229839Details
renewal pa 200411229839 | $25,100 |
| Apr 11, 2007 | Never finaled issued Apr 2007, no final | 611 Folsom St | streetspaceDetails
streetspace | ||
| Feb 27, 2007 | Never finaled issued Feb 2007, no final | 611 Folsom St | street space permit only.Details
street space permit only. | ||
| Feb 7, 2007 | Completed final sign-off Dec 2007 | 611 Folsom St | replace 3 water-cooled computer room air conditioning units, install a 4th (n) matching computer room air conditioning unit. provide all service connections to the (n) units including power, duct work, condenser water, city water, condensate drain, smoke detection and controls.Details
replace 3 water-cooled computer room air conditioning units, install a 4th (n) matching computer room air conditioning unit. provide all service connections to the (n) units including power, duct work, condenser water, city water, condensate drain, smoke detection and controls. | $100,000 | |
| Feb 6, 2007 | Expired or cancelled expired Oct 2010 | 611 Folsom St | Sabah International Incorporated | modify the existing fire alarm system based on architectual changes at the at 9th floor battery room. includes installation of 12 photoelectric smoke detectors and 5 sprakers/strobes.Details
modify the existing fire alarm system based on architectual changes at the at 9th floor battery room. includes installation of 12 photoelectric smoke detectors and 5 sprakers/strobes. | $34,321 |
| Jan 8, 2007 | Never finaled issued Jan 2007, no final | 611 Folsom St | street spaceDetails
street space | ||
| Dec 5, 2006 | Never finaled issued Mar 2007, no final | 611 Folsom St | Roebbelen Contracting Inc | modify wall location. rev. to issued pa#2004/08/03/0542 at exterior back up generator location. new radiator encosure. person who submitted, jeremy gomoljack at 510-457-0027. nov #200336691 & #200558201.Details
modify wall location. rev. to issued pa#2004/08/03/0542 at exterior back up generator location. new radiator encosure. person who submitted, jeremy gomoljack at 510-457-0027. nov #200336691 & #200558201. | $1,000 |
| Nov 13, 2006 | Expired or cancelled expired Oct 2010 | 611 Folsom St | Roebbelen Contracting Inc | battery room & restroom ada upgrade on 9th floor. hvac upgrade on 8th & 9th floor to accommodate (n) battery room and telco equipment. two exit ramps (raised floor) from battery room (9th)Details
battery room & restroom ada upgrade on 9th floor. hvac upgrade on 8th & 9th floor to accommodate (n) battery room and telco equipment. two exit ramps (raised floor) from battery room (9th) | $700,000 |
| Nov 1, 2006 | Completed final sign-off Dec 2006 | 611 Folsom St | Roebbelen Contracting Inc | demolition of portion of raised floor, suspended acoustical ceiling, light fixtures, some (e) walls & door-frames. remove mechanical electrical, lighting and fire suppression system that will not affect other areas of the bldg. interior non-structural demolition only under this permit.Details
demolition of portion of raised floor, suspended acoustical ceiling, light fixtures, some (e) walls & door-frames. remove mechanical electrical, lighting and fire suppression system that will not affect other areas of the bldg. interior non-structural demolition only under this permit. | $45,000 |
| Sep 13, 2006 | Expired or cancelled expired Nov 2008 | 611 Folsom St | revision pa# 200408030542, for approval of structural slab supporting generator. generator separate permit.Details
revision pa# 200408030542, for approval of structural slab supporting generator. generator separate permit. | $15,000 | |
| Sep 6, 2006 | Completed final sign-off Oct 2006 | 611 Folsom St | Coast Sign Incorporated | erect: wall, single faced direct replacement sign w/street spaceDetails
erect: wall, single faced direct replacement sign w/street space | $2,500 |
| Sep 6, 2006 | Completed final sign-off Oct 2006 | 611 Folsom St | Coast Sign Incorporated | erect: non electric , wall, single faced, non illuminated, replacement sign.Details
erect: non electric , wall, single faced, non illuminated, replacement sign. | $1,500 |
| Dec 6, 2005 | Expired or cancelled expired Feb 2007 | 611 Folsom St | Sabah International Incorporated | no new devices have been added, relocate (1) speaker/strobe and (1) control relayDetails
no new devices have been added, relocate (1) speaker/strobe and (1) control relay | $6,000 |
| Nov 18, 2005 | Expired or cancelled expired Feb 2007 | 611 Folsom St | Sabah International Incorporated | add new heat detectors to extg est-3 alarm system. 22 heat detectors. 2 modules.Details
add new heat detectors to extg est-3 alarm system. 22 heat detectors. 2 modules. | $18,000 |
| Nov 17, 2005 | Completed final sign-off Sep 2006 | 611 Folsom St | Transceive Communications Inc. | change out of 2 panel antennas like for like, replaceing assoicaed cabling attached grounding, upgradeing th bts. (unit no change in cabinets)Details
change out of 2 panel antennas like for like, replaceing assoicaed cabling attached grounding, upgradeing th bts. (unit no change in cabinets) | $16,010 |
| Oct 27, 2005 | Completed final sign-off Nov 2005 | 611 Folsom St | Roebbelen Contracting Inc | renew permit app 200108105800 for final inspectionDetails
renew permit app 200108105800 for final inspection | |
| Oct 26, 2005 | Completed final sign-off Jan 2008 | 611 Folsom St | Simplex Grinnell | retro fitting (e) bldg w/new fire protection systems. basement to roof w/new class ii stand pipe for hose stations. sprinkler per highrise ordinace phase ii-phase i separate permit.Details
retro fitting (e) bldg w/new fire protection systems. basement to roof w/new class ii stand pipe for hose stations. sprinkler per highrise ordinace phase ii-phase i separate permit. | $368,175 |
| Oct 14, 2005 | Completed final sign-off Oct 2005 | 611 Folsom St | Sabah International Incorporated | provide 3-duct dectors for existing air handlers (3) duct smoke detectors.Details
provide 3-duct dectors for existing air handlers (3) duct smoke detectors. | $7,000 |
| Sep 28, 2005 | Expired or cancelled expired Feb 2007 | 611 Folsom St | Turner Construction Co | interior demo for specified walls, mechanical, electrical. interior bearing plates with expansion boltsDetails
interior demo for specified walls, mechanical, electrical. interior bearing plates with expansion bolts | $125,000 |
| Sep 21, 2005 | Completed final sign-off Jan 2008 | 611 Folsom St | Roebbelen Contracting Inc | fire sprinkler retrofit phase 11 - upgrade or provide fire smoke dampers forDetails
fire sprinkler retrofit phase 11 - upgrade or provide fire smoke dampers for | $150,000 |
| Jun 30, 2005 | Completed final sign-off Oct 2005 | 611 Folsom St | Roebbelen Contracting Inc | to renew 200306116843Details
to renew 200306116843 | $37,000 |
| Apr 26, 2005 | Completed final sign-off May 2005 | 611 Folsom St | Johnston Sign Company | erect sign for elctrtic, wall, single faced.Details
erect sign for elctrtic, wall, single faced. | |
| Mar 4, 2005 | Completed final sign-off Mar 2005 | 611 Folsom St | Siemens Industry, Inc. | replace sam iv refrigerant monitor with new maloguard iii refrigerant monitor.remainder of (e)systemDetails
replace sam iv refrigerant monitor with new maloguard iii refrigerant monitor.remainder of (e)system | $7,931 |
| Nov 22, 2004 | Expired or cancelled expired May 2008 | 611 Folsom St | Sabah International Incorporated | provide new uv detecor and notification devices. in generator room, test & final.11 modules,Details
provide new uv detecor and notification devices. in generator room, test & final.11 modules, | $45,151 |
| Oct 4, 2004 | Completed final sign-off Apr 2005 | 611 Folsom St | Sabah International Incorporated | renew of permit#200206048146 .Details
renew of permit#200206048146 . | |
| Aug 4, 2004 | Completed final sign-off Sep 2004 | 611 Folsom St | Roebbelen Contracting Inc | as built to pa#2003/11/10/9873 sub mit plan per fire dept. requestDetails
as built to pa#2003/11/10/9873 sub mit plan per fire dept. request | |
| Aug 3, 2004 | Expired or cancelled expired Nov 2008 | 611 Folsom St | room prep. to accommodate additional one standby generator relocate walls, modify ventitation andDetails
room prep. to accommodate additional one standby generator relocate walls, modify ventitation and | $680,000 | |
| Feb 19, 2004 | Completed final sign-off Mar 2005 | 611 Folsom St | American Incorporated | replacement of chillers located in basement/rplmnt of 2 chilled water pumpsDetails
replacement of chillers located in basement/rplmnt of 2 chilled water pumps | $275,000 |
| Nov 10, 2003 | Completed final sign-off Sep 2004 | 611 Folsom St | Roebbelen Contracting Inc | add battery room area exhaust fan & duct workDetails
add battery room area exhaust fan & duct work | $25,000 |
| Nov 3, 2003 | Expired or cancelled expired Apr 2005 | 611 Folsom St | Signtech Electrical Advertising Inc. | sign permitDetails
sign permit | |
| Aug 8, 2003 | Expired or cancelled expired Apr 2005 | 611 Folsom St | Roebbelen Contracting Inc | to renew app#2002/03/28/2577 for final inspection.Details
to renew app#2002/03/28/2577 for final inspection. | |
| Jun 11, 2003 | Expired or cancelled expired Oct 2005 | 611 Folsom St | Air Systems Of Sacramento | install (n) 125 hp supply backup plan, replace (e) supply w/ a new one, revise (e)125 hp motorDetails
install (n) 125 hp supply backup plan, replace (e) supply w/ a new one, revise (e)125 hp motor | $75,000 |
| Apr 3, 2003 | Expired or cancelled expired Feb 2005 | 611 Folsom St | Aztec Constructors | add one cololing tower & piping, contols, location on roof new cooling tower w/provide back up for mDetails
add one cololing tower & piping, contols, location on roof new cooling tower w/provide back up for m | $150,000 |
| Feb 21, 2003 | Completed final sign-off Aug 2003 | 611 Folsom St | Aztec Constructors | installation of power for ups unit + liebert cooling unit & courtesy outlets. permit#e200302133971Details
installation of power for ups unit + liebert cooling unit & courtesy outlets. permit#e200302133971 | $70,000 |
| Nov 25, 2002 | Completed final sign-off Aug 2003 | 611 Folsom St | Sabah International Incorporated | install & test an additional est-3 fire alarm cabinet to (e) sys. @ 6th floorDetails
install & test an additional est-3 fire alarm cabinet to (e) sys. @ 6th floor | $36,909 |
| Jun 4, 2002 | Expired or cancelled expired May 2005 | 611 Folsom St | Sabah International Incorporated | furnish and test fire detection system for entire bldgDetails
furnish and test fire detection system for entire bldg | $521,250 |
| Mar 28, 2002 | Expired or cancelled expired Apr 2005 | 611 Folsom St | Kleeman Roebbelen Construction | wire partitions for interior work only (no increase office space)Details
wire partitions for interior work only (no increase office space) | $2,000 |
| Dec 27, 2001 | Expired or cancelled expired Aug 2003 | 611 Folsom St | Johnston Sign Company | sign permit - electric, wall, single faced.Details
sign permit - electric, wall, single faced. | |
| Dec 26, 2001 | Expired or cancelled expired Jun 2002 | 611 Folsom St | streetspaceDetails
streetspace | ||
| Oct 17, 2001 | Never finaled filed Oct 2001, never issued | 611 Folsom St | Kleeman Roebbelen Construction | install wire partitions for switching for equipment on 5/f no increase in office spaceDetails
install wire partitions for switching for equipment on 5/f no increase in office space | |
| Oct 17, 2001 | Completed final sign-off Feb 2002 | 611 Folsom St | Kleeman Roebbelen Construction | 5/f install wire partitions for interior work onlyDetails
5/f install wire partitions for interior work only | $2,000 |
| Aug 22, 2001 | Expired or cancelled expired Feb 2002 | 611 Folsom St | Details
| ||
| Aug 10, 2001 | Expired or cancelled expired Aug 2003 | 611 Folsom St | install new nominal15 ton fan coil unit, duct smoke detectos and smoke fire dampers, install chill wDetails
install new nominal15 ton fan coil unit, duct smoke detectos and smoke fire dampers, install chill w | $40,000 | |
| Jun 26, 2001 | Expired or cancelled expired Aug 2002 | 611 Folsom St | American Incorporated | replace exhaust fan motors w/new, install new return & static pressure control dampers on @floorDetails
replace exhaust fan motors w/new, install new return & static pressure control dampers on @floor | $110,000 |
| Jun 18, 2001 | Never finaled filed Jun 2001, never issued | 611 Folsom St | Kleeman Roebbelen Construction | replace exhaust fan motors -9th fl ,return/static pressurecontrol dampers 1-9 flr and pressure sensoDetails
replace exhaust fan motors -9th fl ,return/static pressurecontrol dampers 1-9 flr and pressure senso | $110,000 |
| Apr 6, 2001 | Completed final sign-off May 2001 | 611 Folsom St | American Incorporated | to renew permit#2001/02/07/1531 for final inspection.Details
to renew permit#2001/02/07/1531 for final inspection. | |
| Feb 7, 2001 | Completed final sign-off May 2001 | 611 Folsom St | American Incorporated | install hvac,chilled water piping & new power feeds (1st flr)Details
install hvac,chilled water piping & new power feeds (1st flr) | $159,000 |
| Feb 7, 2001 | Completed final sign-off Apr 2001 | 611 Folsom St | American Incorporated | repl of 2 condessor water pumps & new elec(work in basement)Details
repl of 2 condessor water pumps & new elec(work in basement) | $48,000 |
| May 4, 2000 | Completed final sign-off Jan 2001 | 611 Folsom St | Simplex Grinnell*** See 802591**** | smoke detector addition in a corridor next to new battery roomDetails
smoke detector addition in a corridor next to new battery room | $4,700 |
| Apr 20, 2000 | Expired or cancelled expired Oct 2003 | 611 Folsom St | one - stop, revision to pa 20000118257Details
one - stop, revision to pa 20000118257 | $30,000 | |
| Mar 16, 2000 | Completed final sign-off Dec 2000 | 611 Folsom St | battery room , and closing of battery rm @ 2nd floorDetails
battery room , and closing of battery rm @ 2nd floor | $375,000 | |
| Mar 14, 2000 | Expired or cancelled expired Jul 2000 | 611 Folsom St | Simplex Grinnell*** See 802591**** | renewal of 9725453Details
renewal of 9725453 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.