Aug 2010 to Nov 2024
Last 24 months
0 permits filed

27 permits since 2000: 20 completed, 7 never finaled.

Of the 7 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 4 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Nov 22, 2024Completed
final sign-off Aug 2025
611 Folsom St6/f:upgrade spot type detection to air sampling.other f/a sys features to remain same. remove the smoke (e) smoke detectors, conduit, & wire.provide/install 2(n) air sampling detectors & pipe.provide/install d sampling multi zone power supply.provide/install new monitor modules.rev f/a panel program
Details
Permit
202411064504
Permit issued
Apr 28, 2025
Final sign-off
Aug 6, 2025

6/f:upgrade spot type detection to air sampling.other f/a sys features to remain same. remove the smoke (e) smoke detectors, conduit, & wire.provide/install 2(n) air sampling detectors & pipe.provide/install d sampling multi zone power supply.provide/install new monitor modules.rev f/a panel program

Open the permit page

$87,589
Aug 15, 2023Completed
final sign-off Mar 2025
651 Brannan Streplac (e) pre-action detection controls & fire alarm system. replace (e) panel w/ (n) notifier nfs-320. all (e) initiating devices will be replaced one for one. reuse all (e) wire & conduit. all (e) notification devices will remain as is. orr to perform a full functional test prior to final inspect
Details
Permit
202308154494
Permit issued
Aug 8, 2024
Final sign-off
Mar 17, 2025

replac (e) pre-action detection controls & fire alarm system. replace (e) panel w/ (n) notifier nfs-320. all (e) initiating devices will be replaced one for one. reuse all (e) wire & conduit. all (e) notification devices will remain as is. orr to perform a full functional test prior to final inspect

Open the permit page

$83,218
Jan 20, 2023Never finaled
issued Nov 2023, no final
445 Sutter Stdue to emergency/panel replacement of (e) firelite ms9600udls with a new firelite es200x. all (e) field devices to remain, will perform functional tesst prior to schedule inspection.
Details
Permit
202301200464
Permit issued
Nov 2, 2023

due to emergency/panel replacement of (e) firelite ms9600udls with a new firelite es200x. all (e) field devices to remain, will perform functional tesst prior to schedule inspection.

Open the permit page

$20,040
Jan 5, 2022Completed
final sign-off Jun 2022
501 Tunnel Avnew sprinler riser into (e) fire control panel furnish and install (2) monitor modules for the new sprinkler riser water flow and tamper switches.
Details
Permit
202201055388
Permit issued
Jan 24, 2022
Final sign-off
Jun 6, 2022

new sprinler riser into (e) fire control panel furnish and install (2) monitor modules for the new sprinkler riser water flow and tamper switches.

Open the permit page

$5,000
Sep 28, 2020Completed
final sign-off Dec 2020
447 Sutter Stti 3rd fl fire alarm only.
Details
Permit
202009285307
Permit issued
Oct 20, 2020
Final sign-off
Dec 9, 2020

ti 3rd fl fire alarm only.

Open the permit page

$9,868
Jan 21, 2020Completed
final sign-off Apr 2020
185 Berry Stfire alarm tenant improvement: submit as builts for existing permit; garage, 1st, 2nd floors. revision to pa# 2015-10-09-3946.
Details
Permit
202001212318
Permit issued
Jan 21, 2020
Final sign-off
Apr 30, 2020

fire alarm tenant improvement: submit as builts for existing permit; garage, 1st, 2nd floors. revision to pa# 2015-10-09-3946.

Open the permit page

$19,315
Oct 9, 2019Completed
final sign-off Mar 2020
185 Berry St1st & 2nd fl - new fire alarm system ti. 1st fl - 6 devices; 2nd fl - 3 devices ref pa 2019-0821-9459
Details
Permit
201910093946
Permit issued
Oct 9, 2019
Final sign-off
Mar 18, 2020

1st & 2nd fl - new fire alarm system ti. 1st fl - 6 devices; 2nd fl - 3 devices ref pa 2019-0821-9459

Open the permit page

$19,315
Sep 26, 2019Completed
final sign-off Apr 2022
501 Tunnel Avfire alarm system ti - replace (e) fire alarm panel in bld ga/gc
Details
Permit
201909262764
Permit issued
Sep 26, 2019
Final sign-off
Apr 12, 2022

fire alarm system ti - replace (e) fire alarm panel in bld ga/gc

Open the permit page

$10,321
Sep 4, 2019Completed
final sign-off Sep 2019
185 Berry Stnew pre-action detection & controls system, tenant improvement on the 2nd floor. n/a maher
Details
Permit
201909040568
Permit issued
Sep 4, 2019
Final sign-off
Sep 27, 2019

new pre-action detection & controls system, tenant improvement on the 2nd floor. n/a maher

Open the permit page

$19,740
Aug 23, 2019Completed
final sign-off Mar 2020
501 Tunnel Avadd fire alarm panel to monitor (e) sprinkler system in (hhwcf) hazardous waste
Details
Permit
201908239649
Permit issued
Aug 23, 2019
Final sign-off
Mar 13, 2020

add fire alarm panel to monitor (e) sprinkler system in (hhwcf) hazardous waste

Open the permit page

$7,966
Nov 1, 2018Never finaled
issued Nov 2018, no final
445 Sutter Stfurnish and install (n) elevator recall functions. (n) - 19 smoke detects, 2 heat detects, 6 control relays, 2 monitor modules. n/a for maher.
Details
Permit
201811014723
Permit issued
Nov 30, 2018

furnish and install (n) elevator recall functions. (n) - 19 smoke detects, 2 heat detects, 6 control relays, 2 monitor modules. n/a for maher.

Open the permit page

$12,000
Sep 12, 2018Never finaled
issued Apr 2019, no final
55 02nd Stroom 2220. furnish & install fire proinert 2 clean agent suppression system. furnish & install fire shp pro suppression control panel to control clean agent system. provide & install smoke devices, manual release, abort station, monitoring & av devices. maher n/a.
Details
Permit
201809129842
Permit issued
Apr 3, 2019

room 2220. furnish & install fire proinert 2 clean agent suppression system. furnish & install fire shp pro suppression control panel to control clean agent system. provide & install smoke devices, manual release, abort station, monitoring & av devices. maher n/a.

Open the permit page

$18,000
Jun 13, 2018Completed
final sign-off Nov 2018
200 Paul Avreplace existing fire alarm panel with new fire alarm panel,replace existing (2) vesda smoke detectors with new smoke detectors.**n/a maher**
Details
Permit
201806131766
Permit issued
Aug 15, 2018
Final sign-off
Nov 2, 2018

replace existing fire alarm panel with new fire alarm panel,replace existing (2) vesda smoke detectors with new smoke detectors.**n/a maher**

Open the permit page

$20,770
Apr 26, 2016Completed
final sign-off May 2016
200 Paul Avinstall (2) new est-siga-ct1 monitor modules at pre-action risers with nitrogen generation system. maher na
Details
Permit
201604265716
Permit issued
Apr 26, 2016
Final sign-off
May 25, 2016

install (2) new est-siga-ct1 monitor modules at pre-action risers with nitrogen generation system. maher na

Open the permit page

$80,000
Aug 27, 2015Completed
final sign-off Sep 2015
360 Spear Strelocate (1) existing horn/strobe, t.i. pa# 201506169112. n/a ordinance #155-13
Details
Permit
201508275436
Permit issued
Aug 27, 2015
Final sign-off
Sep 30, 2015

relocate (1) existing horn/strobe, t.i. pa# 201506169112. n/a ordinance #155-13

Open the permit page

$2,000
Aug 21, 2015Completed
final sign-off Oct 2015
1600 Van Ness Avinstl new fike cheetah xi50 ctrl panel w/dact w/24-hr btry backup.instl esp uv/ir detector inside rm&vesda vlp-500 air sampling detector.altronix al1024ulm pwr supply for detector.instl monitor modules&dectors,marrioff hi-fog mau wtr sys.instl relay module to close rollupdr.instl solenoid disconnect
Details
Permit
201508214910
Permit issued
Sep 8, 2015
Final sign-off
Oct 30, 2015

instl new fike cheetah xi50 ctrl panel w/dact w/24-hr btry backup.instl esp uv/ir detector inside rm&vesda vlp-500 air sampling detector.altronix al1024ulm pwr supply for detector.instl monitor modules&dectors,marrioff hi-fog mau wtr sys.instl relay module to close rollupdr.instl solenoid disconnect

Open the permit page

$22,000
Mar 11, 2014Completed
final sign-off Aug 2014
200 Paul Av4th floor: add 5 input, add 5 relay modules to supervise and shutdown, 5 new hvac units installed under permit app#201402198861. work to be added to the extg fire alarm system.
Details
Permit
201403110446
Permit issued
Mar 11, 2014
Final sign-off
Aug 5, 2014

4th floor: add 5 input, add 5 relay modules to supervise and shutdown, 5 new hvac units installed under permit app#201402198861. work to be added to the extg fire alarm system.

Open the permit page

$1,000
Jan 30, 2014Completed
final sign-off Mar 2014
447 Sutter St1/f: install 2 duct detectors for new fire smoke detectrs, install 1 control relay module & 1 pam -1 aux relay module for relay module for releasing fire/smoke damper and shut down hvac. install 3 wall mount strobes, & 2 horn/strobes. ref app#201307020978. n/a for maher ordinance #155-13
Details
Permit
201401307429
Permit issued
Jan 30, 2014
Final sign-off
Mar 4, 2014

1/f: install 2 duct detectors for new fire smoke detectrs, install 1 control relay module & 1 pam -1 aux relay module for relay module for releasing fire/smoke damper and shut down hvac. install 3 wall mount strobes, & 2 horn/strobes. ref app#201307020978. n/a for maher ordinance #155-13

Open the permit page

$5,000
Jul 23, 2013Completed
final sign-off Aug 2013
1355 Market St2nd floor - install ecaro-25 clean agent fire suppression system, with associated detection and controls t protec 2nd floor t.i. storage room #208. ref ti app#201212176368- fire alarm separate permit
Details
Permit
201307232581
Permit issued
Aug 1, 2013
Final sign-off
Aug 29, 2013

2nd floor - install ecaro-25 clean agent fire suppression system, with associated detection and controls t protec 2nd floor t.i. storage room #208. ref ti app#201212176368- fire alarm separate permit

Open the permit page

$10,000
Jul 2, 2013Completed
final sign-off Sep 2013
5655 Geary Blinstall elevator recall and supervisory control panel, four smoke detectors, 2 recall relay modules and one fire hat module.
Details
Permit
201307021008
Permit issued
Jul 11, 2013
Final sign-off
Sep 16, 2013

install elevator recall and supervisory control panel, four smoke detectors, 2 recall relay modules and one fire hat module.

Open the permit page

$8,000
Apr 22, 2013Completed
final sign-off May 2013
650 Townsend Stas builts to correct drawings - original pa# 201303071715; remove preaction system detection and releasing devices sprinkler work to be performed by superior sprinkler (201302220743)
Details
Permit
201304225106
Permit issued
Apr 22, 2013
Final sign-off
May 6, 2013

as builts to correct drawings - original pa# 201303071715; remove preaction system detection and releasing devices sprinkler work to be performed by superior sprinkler (201302220743)

Open the permit page

$12,000
Mar 7, 2013Completed
final sign-off Apr 2013
650 Townsend Stthe existing pre-action system-zone 3 is to remain in place w/ the make up piping removed. a flow switch is to ge installed and the existing pre-action piping is to be filled making it wet. the riser will remain attached to the standpipe w/ new water flow swithch and tamper sprinkler pa#201302220743
Details
Permit
201303071715
Permit issued
Mar 8, 2013
Final sign-off
Apr 26, 2013

the existing pre-action system-zone 3 is to remain in place w/ the make up piping removed. a flow switch is to ge installed and the existing pre-action piping is to be filled making it wet. the riser will remain attached to the standpipe w/ new water flow swithch and tamper sprinkler pa#201302220743

Open the permit page

$12,000
Sep 6, 2012Never finaled
issued Aug 2013, no final
445 Sutter Stphase 1 of sffd approved plan of action. revision to pa# 2011/03/17/2252. relocate facp. replace 22 manual pull stations. provide & install monitor module enclosure of modules.
Details
Permit
201209069082
Permit issued
Aug 30, 2013

phase 1 of sffd approved plan of action. revision to pa# 2011/03/17/2252. relocate facp. replace 22 manual pull stations. provide & install monitor module enclosure of modules.

Open the permit page

$18,000
Sep 21, 2011Completed
final sign-off Feb 2012
200 Paul Av4th floor-change server room to office space. pre action above ceiling to stay. add 85 smoke detectors to drop ceilings. 15 horn strobes, 14 monitor modules & 14 relay modules for hvac & 3 duct detectors and a new module for new strobe panel.
Details
Permit
201109215144
Permit issued
Sep 21, 2011
Final sign-off
Feb 3, 2012

4th floor-change server room to office space. pre action above ceiling to stay. add 85 smoke detectors to drop ceilings. 15 horn strobes, 14 monitor modules & 14 relay modules for hvac & 3 duct detectors and a new module for new strobe panel.

Open the permit page

$78,000
Mar 17, 2011Never finaled
issued Apr 2011, no final
445 Sutter Stbasement & 1st floor - provide 1 new ld-10 annuciator, 1 smoke, 1 zu-35 module, 4 sprinkler mod, 1 ea 32 mod enclosure.
Details
Permit
201103172252
Permit issued
Apr 26, 2011

basement & 1st floor - provide 1 new ld-10 annuciator, 1 smoke, 1 zu-35 module, 4 sprinkler mod, 1 ea 32 mod enclosure.

Open the permit page

$18,000
Nov 5, 2010Never finaled
issued Nov 2010, no final
401 Tunnel Avrevision to pa# 2010.08.18.9055. removed annunciator
Details
Permit
201011054423
Permit issued
Nov 5, 2010

revision to pa# 2010.08.18.9055. removed annunciator

Open the permit page

Aug 18, 2010Never finaled
issued Sep 2010, no final
401 Tunnel Avinstallation of new sprinkler monitoring devices: install (1) notifier monitoring control panel with remote annunciator; install (1) smoke detector; install (1) manual pull station; install horn strobe; wire to new water flow and tamper switches
Details
Permit
201008189055
Permit issued
Sep 16, 2010

installation of new sprinkler monitoring devices: install (1) notifier monitoring control panel with remote annunciator; install (1) smoke detector; install (1) manual pull station; install horn strobe; wire to new water flow and tamper switches

Open the permit page

$7,500