Block 1524, lot 036
5655 Geary Blvd
- City’s use
- Commercial Retail
- Built
- 1977
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 10,660 sq ft
- Lot
- 5,331 sq ft
- Zoning
- NC3
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 30, 2026 | In progress filed Apr 2026, not yet issued | 5655 Geary Bl | no change in occupancy or use in this building. no additonal area or height is part of the scope. interior tenant improvement of existing retail bank and financial banking center at existing building including but not limited to new finishes, partitions, mechanical and electrical.Details
no change in occupancy or use in this building. no additonal area or height is part of the scope. interior tenant improvement of existing retail bank and financial banking center at existing building including but not limited to new finishes, partitions, mechanical and electrical. | $78,498 | |
| Mar 1, 2018 | Expired or cancelled cancelled Jan 2026 | 5655 Geary Bl | electrical only t-24 remove and replace lighting throughout.Details
electrical only t-24 remove and replace lighting throughout. | $9,000 | |
| Jan 26, 2017 | Never finaled filed Jan 2017, never issued | 5655 Geary Bl | streetspace | ||
| Jan 26, 2017 | Never finaled issued Jan 2017, no final | 5655 Geary Bl | street spaceDetails
street space | ||
| Jul 2, 2013 | Completed final sign-off Sep 2013 | 5655 Geary Bl | Orr Protection Systems Inc | install elevator recall and supervisory control panel, four smoke detectors, 2 recall relay modules and one fire hat module.Details
install elevator recall and supervisory control panel, four smoke detectors, 2 recall relay modules and one fire hat module. | $8,000 |
| May 21, 2013 | Never finaled issued May 2013, no final | 5655 Geary Bl | street spaceDetails
street space | ||
| Sep 21, 2012 | Completed final sign-off Dec 2013 | 5655 Geary Bl | Gidel & Kocal Construction Co Inc | interior 1st floor remodel of existing bank including new finishes, new ada teller and coupon booths, new elevator, new private offices on 2nd floor, new restrooms, new cubiclesDetails
interior 1st floor remodel of existing bank including new finishes, new ada teller and coupon booths, new elevator, new private offices on 2nd floor, new restrooms, new cubicles | $400,000 |
| Apr 12, 2010 | Never finaled issued Apr 2010, no final | 5655 Geary Bl | street space and sidewalk repair, mta parking alsoDetails
street space and sidewalk repair, mta parking also | ||
| Jun 23, 2009 | Completed final sign-off Sep 2009 | 5655 Geary Bl | Golden Gate Sign Company Inc. | to erect 1 electric wall signDetails
to erect 1 electric wall sign | $10,000 |
| Jun 23, 2009 | Completed final sign-off Sep 2009 | 5655 Geary Bl | Golden Gate Sign Company Inc. | to erect double faced projecting electric signDetails
to erect double faced projecting electric sign | $5,000 |
| Jun 9, 2009 | Never finaled issued Jun 2009, no final | 5655 Geary Bl | Reeve-Knight Construction Inc. | revision to appl #200905158484 - framing revision at bm office.Details
revision to appl #200905158484 - framing revision at bm office. | $500 |
| May 15, 2009 | Never finaled issued Jun 2009, no final | 5655 Geary Bl | Reeve-Knight Construction Inc. | t.i. for conversion rom washington mutual to chase, demolition of existing finishes, non-structural partitions & millwork, also includes install of new finishes, floor & ceiling, non-structural partitions, & minor electrical & mechanical, replacement of exterior atm surround.Details
t.i. for conversion rom washington mutual to chase, demolition of existing finishes, non-structural partitions & millwork, also includes install of new finishes, floor & ceiling, non-structural partitions, & minor electrical & mechanical, replacement of exterior atm surround. | $96,416 |
| Aug 25, 2005 | Completed final sign-off Nov 2005 | 5655 Geary Bl | branch remodel to include new coupon booth, break room (non-structural partitions) on groundfloorDetails
branch remodel to include new coupon booth, break room (non-structural partitions) on groundfloor | $300,000 | |
| Oct 23, 2002 | Completed final sign-off Nov 2002 | 5655 Geary Bl | Simon Says Roofing | reroofingDetails
reroofing | $17,680 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Golden Gate Sign Company Inc. (2), Reeve-Knight Construction Inc. (2), Gidel & Kocal Construction Co Inc, Orr Protection Systems Inc, Simon Says Roofing
- Architects
- Callison Architects, P.C., Jeffrey Schmierer, Ted Udhus
- Engineers
- Bryce R. Taylor, Melanie True, Raymond Swartz
- Designers
- Gensler
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.