Block 5431A, lot 001F
200 Paul Av
- City’s use
- Industrial
- Built
- 1955
- Stories
- 1
- Rooms
- 4 bathrooms
- Building
- 54,000 sq ft
- Lot
- 72,523 sq ft
- Zoning
- PDR2
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
The 200 most recent permits filed for this property.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 18, 2025 | In progress issued Apr 2026 | 200 Paul Av | Bass Electric | demo (e) pdu's and install (n) pdu's and remote power panel with smart monitoringDetails
demo (e) pdu's and install (n) pdu's and remote power panel with smart monitoring | $500,000 |
| Jun 2, 2025 | In progress filed Jun 2025, not yet issued | 200 Paul Av | live on line miggration of (e) critical distrib fr (e) 1500kw ups 2n distrb power to new 2n 1500kw ups. demo (e) ups and battery system & incoming & distrib switchboards. installation of 2 new switchboards & 4 new 750kw ups and lithium ion battery cabinets.Details
live on line miggration of (e) critical distrib fr (e) 1500kw ups 2n distrb power to new 2n 1500kw ups. demo (e) ups and battery system & incoming & distrib switchboards. installation of 2 new switchboards & 4 new 750kw ups and lithium ion battery cabinets. | $750,000 | |
| Sep 12, 2024 | Completed final sign-off Aug 2025 | 200 Paul Av | Mayco Commercial Construction Inc | various locations along the wood bowstring trusses are to be strengthened or repaired. (all interior work)Details
various locations along the wood bowstring trusses are to be strengthened or repaired. (all interior work) | $675,000 |
| Oct 19, 2023 | Completed final sign-off Feb 2024 | 200 Paul Av | B N Builders Inc | addition of new cable trays in pods 2-4, 2-5 & 3-1Details
addition of new cable trays in pods 2-4, 2-5 & 3-1 | $346,500 |
| Apr 27, 2023 | Completed final sign-off Sep 2023 | 200 Paul Av | Siemens Industry, Inc. | 2nd fl - fire only work for the data room remodel; additions are 15 modules, 2 horn/strobes, as well the relocation of 3 horn/strobes. ref pa 2022-0610-6089Details
2nd fl - fire only work for the data room remodel; additions are 15 modules, 2 horn/strobes, as well the relocation of 3 horn/strobes. ref pa 2022-0610-6089 | $10,588 |
| Apr 12, 2023 | Completed final sign-off Jun 2023 | 200 Paul Av | Golden Gate Fire Protection Inc | fire sprinkers relocate 7 pendant sprinklers add 2 pendants and add 7 upright for new room ref t.i. 2022-0610-6089Details
fire sprinkers relocate 7 pendant sprinklers add 2 pendants and add 7 upright for new room ref t.i. 2022-0610-6089 | $9,350 |
| Feb 9, 2023 | Never finaled issued Feb 2023, no final | 200 Paul Av | Intelligent Technologies & Services Inc | replace extg obsolete panel with new addressable panel. this is a like for like replacement of detection and controls with in 3rd floor suite 303 and 305 & 303Details
replace extg obsolete panel with new addressable panel. this is a like for like replacement of detection and controls with in 3rd floor suite 303 and 305 & 303 | $86,740 |
| Oct 11, 2022 | Never finaled issued Mar 2023, no final | 200 Paul Av | Mayco Commercial Construction Inc | building a/b, shoring and jacking five (5) bowstring trusses to repair cracked outer ply wood splice plates at trussesDetails
building a/b, shoring and jacking five (5) bowstring trusses to repair cracked outer ply wood splice plates at trusses | $70,000 |
| Aug 8, 2022 | Completed final sign-off Jan 2023 | 200 Paul Av | Cupertino Electric Inc. | combine (2) existing permtted data hall numbers 200 & 201 into (1) new server racks for suite 200.Details
combine (2) existing permtted data hall numbers 200 & 201 into (1) new server racks for suite 200. | $800,000 |
| Jun 27, 2022 | Never finaled issued Jun 2022, no final | 200 Paul Av | Intelligent Technologies & Services Inc | 1st fl: supply & install new addressable pre-action detecton & control system. replacing the obsolete detection & controls panel.Details
1st fl: supply & install new addressable pre-action detecton & control system. replacing the obsolete detection & controls panel. | $74,938 |
| Oct 21, 2021 | Never finaled issued Oct 2021, no final | 200 Paul Av | Intelligent Technologies & Services Inc | bldg f: 402/403.modifty (e) pre-action detector system due to demo of corridor between colo 402 & colo 403, combine into common detection zone and relocate some (e) / install some new detection devices. ref 201910225221.Details
bldg f: 402/403.modifty (e) pre-action detector system due to demo of corridor between colo 402 & colo 403, combine into common detection zone and relocate some (e) / install some new detection devices. ref 201910225221. | $30,000 |
| Aug 26, 2021 | Never finaled issued Aug 2021, no final | 200 Paul Av | Intelligent Technologies & Services Inc | combine 2 extg zones of pre-action detectional into 1 common panel/zone and add 8 smole for coverage. building permit reference is 2019-1022-5221. original pre action building system permit is 2010-0413-0124.Details
combine 2 extg zones of pre-action detectional into 1 common panel/zone and add 8 smole for coverage. building permit reference is 2019-1022-5221. original pre action building system permit is 2010-0413-0124. | $12,596 |
| Jun 22, 2021 | Never finaled issued Aug 2021, no final | 200 Paul Av | Allied Fire Protection | add 10 fire sprinklers total (5 under floor, 5 ceiling).Details
add 10 fire sprinklers total (5 under floor, 5 ceiling). | $18,000 |
| Dec 9, 2020 | Never finaled issued Dec 2020, no final | 200 Paul Av | Siemens Industry, Inc. | fire alarm work for the phase 3 remodel of suite f200 on floor 2; additions are 38 smoke detectors, 2 modules, 2 dut detectors, 4 horn/strobes, and 12 strobes. ref permit app# 201910225221Details
fire alarm work for the phase 3 remodel of suite f200 on floor 2; additions are 38 smoke detectors, 2 modules, 2 dut detectors, 4 horn/strobes, and 12 strobes. ref permit app# 201910225221 | $34,250 |
| Dec 9, 2020 | Completed final sign-off Aug 2021 | 200 Paul Av | Siemens Industry, Inc. | fire alarm work for the phase 2 at suite f200 on floor 2; additions are 7 smoke detectors, 6 flame detectors, 1 horn/strobe power supply, and 13 horn/strobes. ref permit app # 2019 1002 3339Details
fire alarm work for the phase 2 at suite f200 on floor 2; additions are 7 smoke detectors, 6 flame detectors, 1 horn/strobe power supply, and 13 horn/strobes. ref permit app # 2019 1002 3339 | $18,000 |
| Sep 19, 2020 | Never finaled issued Feb 2021, no final | 200 Paul Av | Hitt Contracting Inc. | 4/f suite f402 & f403: mech & electrical design for additional cooling requested to backup the (e) system on 4/f.Details
4/f suite f402 & f403: mech & electrical design for additional cooling requested to backup the (e) system on 4/f. | $3,000,000 |
| Sep 17, 2020 | Completed final sign-off Dec 2020 | 200 Paul Av | Eco Fire Sprinklers Inc | demo portion of (e) wet system and install new wet system in office ti area. ref t.i. pa201908078160Details
demo portion of (e) wet system and install new wet system in office ti area. ref t.i. pa201908078160 | $30,000 |
| Aug 5, 2020 | Completed final sign-off Jul 2021 | 200 Paul Av | Greenberry Industrial Llc, C Stone Construction | seismic upgrade to (e) data center for electric components.Details
seismic upgrade to (e) data center for electric components. | $500,000 |
| Jul 15, 2020 | Completed final sign-off Jan 2021 | 200 Paul Av | Dpr Construction | suite f250: rev to pa201910023339: add a card reader, change fire rated wall to non-fire rated.Details
suite f250: rev to pa201910023339: add a card reader, change fire rated wall to non-fire rated. | |
| May 26, 2020 | Never finaled issued Mar 2021, no final | 200 Paul Av | Intelligent Technologies & Services Inc | suite f200: provide pre-action detector for phase 2 of data hall 2 on the 2/f. ref t.i. pa 201908078160.Details
suite f200: provide pre-action detector for phase 2 of data hall 2 on the 2/f. ref t.i. pa 201908078160. | $25,860 |
| Mar 13, 2020 | Expired or cancelled cancelled Jan 2026 | 200 Paul Av | revision to pa #2019-0807-8160: show new fsds and fire barriers required by mechanical only.Details
revision to pa #2019-0807-8160: show new fsds and fire barriers required by mechanical only. | $20,000 | |
| Mar 11, 2020 | Completed final sign-off Aug 2020 | 200 Paul Av | Siemens Industry, Inc. | fire alarm work for the "ste f200" remodel on floor 2; additions are 20 smoke detectors, 2 duct detectors, 8 flame detectors, 12 modules, 1 horn/strobe power supply, and 38 horn/strobes, ref pa 2019-0807-8160Details
fire alarm work for the "ste f200" remodel on floor 2; additions are 20 smoke detectors, 2 duct detectors, 8 flame detectors, 12 modules, 1 horn/strobe power supply, and 38 horn/strobes, ref pa 2019-0807-8160 | $60,200 |
| Feb 24, 2020 | Completed final sign-off Aug 2020 | 200 Paul Av | Intelligent Technologies & Services Inc | provide pre-action detection & controls for 2nd flr suite 200 data center & critical area.Details
provide pre-action detection & controls for 2nd flr suite 200 data center & critical area. | $25,408 |
| Feb 18, 2020 | Never finaled filed Feb 2020, never issued | 200 Paul Av | contractor will furnish and install laterial (vertical, longitudinal, transverese) braceing to support existing cable baskets and trays, provide new supports for a 3rd tier of 18x6 basket tray.contractor will install 4 4" od conduites between rm 402 and 403 fire caulkDetails
contractor will furnish and install laterial (vertical, longitudinal, transverese) braceing to support existing cable baskets and trays, provide new supports for a 3rd tier of 18x6 basket tray.contractor will install 4 4" od conduites between rm 402 and 403 fire caulk | $650,000 | |
| Oct 22, 2019 | Completed final sign-off Aug 2021 | 200 Paul Av | Dpr Construction | supporting equipment rooms & electrical rooms. improvements to consist of new walls, doors, finishes & new mechanical, electrical & plumbing work, exterior improvements of new chillers air handling units on the roof top. new generator pads. **maher n/a**Details
supporting equipment rooms & electrical rooms. improvements to consist of new walls, doors, finishes & new mechanical, electrical & plumbing work, exterior improvements of new chillers air handling units on the roof top. new generator pads. **maher n/a** | $2,000,000 |
| Oct 22, 2019 | Completed final sign-off Aug 2021 | 200 Paul Av | Dpr Construction | new generators on pads 13, 14, and 30 serving suite f200 **maher n/a**Details
new generators on pads 13, 14, and 30 serving suite f200 **maher n/a** | $1,500,000 |
| Oct 18, 2019 | Never finaled issued Dec 2019, no final | 200 Paul Av | Dpr Construction Inc | ste f200: demo of e partition wall, installation of security cage and installation of new servers with connections to e building systems in an (e) data rm.Details
ste f200: demo of e partition wall, installation of security cage and installation of new servers with connections to e building systems in an (e) data rm. | $500,000 |
| Oct 15, 2019 | Completed final sign-off Dec 2020 | 200 Paul Av | Dpr Construction Inc | #f200: installation of new security cage and servers with connections to extg bldg systems in an (e) data room. n/a for maherDetails
#f200: installation of new security cage and servers with connections to extg bldg systems in an (e) data room. n/a for maher | $500,000 |
| Oct 2, 2019 | Completed final sign-off Jan 2021 | 200 Paul Av | Dpr Construction | new office on 2nd fl, restrooms, converence rooms, walls, doors, finishes, mep included. duct connections. expansion of data center on separate permitDetails
new office on 2nd fl, restrooms, converence rooms, walls, doors, finishes, mep included. duct connections. expansion of data center on separate permit | $750,000 |
| Aug 7, 2019 | Completed final sign-off Dec 2020 | 200 Paul Av | Dpr Construction Inc | 2nd fl, building f - new data center. supporting equipment rooms & electrical rooms. new walls, door, finishes, mep work, new chiller/ahu on rooftops. generator pods for future generators and transformersDetails
2nd fl, building f - new data center. supporting equipment rooms & electrical rooms. new walls, door, finishes, mep work, new chiller/ahu on rooftops. generator pods for future generators and transformers | $22,750,000 |
| Aug 7, 2019 | Completed final sign-off Dec 2020 | 200 Paul Av | Dpr Construction | (4) new generators w/ 4000 gallon belly tanks. on pads 31, 32, 33 & 34 within the generator yard.**maher n/a**Details
(4) new generators w/ 4000 gallon belly tanks. on pads 31, 32, 33 & 34 within the generator yard.**maher n/a** | $2,500,000 |
| Mar 5, 2019 | Never finaled issued Mar 2019, no final | 200 Paul Av | Intelligent Technologies & Services Inc | submit as built drawings for approval and final sign off pre action system ref 201902041974Details
submit as built drawings for approval and final sign off pre action system ref 201902041974 | |
| Feb 19, 2019 | Completed final sign-off Mar 2019 | 200 Paul Av | Siemens Industry, Inc. | ref pa# 201807174756; fire alarm work for the "suite 360d" remodel on floor 3 of building d; additions are 16 smoke detectors, 1 duct detector, 2 flame detectors,2 modules, 1 horn/strobe power supply, 14 speaker/strobes, and 2 strobes. n/a for maher.Details
ref pa# 201807174756; fire alarm work for the "suite 360d" remodel on floor 3 of building d; additions are 16 smoke detectors, 1 duct detector, 2 flame detectors,2 modules, 1 horn/strobe power supply, 14 speaker/strobes, and 2 strobes. n/a for maher. | $27,480 |
| Feb 4, 2019 | Completed final sign-off Mar 2019 | 200 Paul Av | Intelligent Technologies & Services Inc | provide parts & design for new pre-action detection & controls system within 3rd floor date suite 360, crac gallery, ups rm a & b and ucb2 room. ** maher: n/a **Details
provide parts & design for new pre-action detection & controls system within 3rd floor date suite 360, crac gallery, ups rm a & b and ucb2 room. ** maher: n/a ** | $25,000 |
| Jun 13, 2018 | Completed final sign-off Nov 2018 | 200 Paul Av | Orr Protection Systems Inc | replace existing fire alarm panel with new fire alarm panel,replace existing (2) vesda smoke detectors with new smoke detectors.**n/a maher**Details
replace existing fire alarm panel with new fire alarm panel,replace existing (2) vesda smoke detectors with new smoke detectors.**n/a maher** | $20,770 |
| May 21, 2018 | Expired or cancelled expired Nov 2020 | 200 Paul Av | Burr Computer Environments Inc. | addition of 2 opticol systems in (e) switch room for equipment cooling. addition of 1 crac unit & 1 dry cooler for cooling redundancyDetails
addition of 2 opticol systems in (e) switch room for equipment cooling. addition of 1 crac unit & 1 dry cooler for cooling redundancy | $10,000 |
| Apr 13, 2018 | Expired or cancelled cancelled Jan 2026 | 200 Paul Av | Cupertino Electric Inc. | t.i. project. furnish and install 435 receptacles, 32 rpp switchboards, and basket tray to extg space. n/a for maherDetails
t.i. project. furnish and install 435 receptacles, 32 rpp switchboards, and basket tray to extg space. n/a for maher | $1,635,000 |
| Feb 13, 2018 | Completed final sign-off May 2018 | 200 Paul Av | Intelligent Technologies & Services Inc | provide pre-action detection & controls for 3rd flr suite# 350 data center & elect rms.Details
provide pre-action detection & controls for 3rd flr suite# 350 data center & elect rms. | $22,280 |
| Jan 23, 2018 | Completed final sign-off Aug 2018 | 200 Paul Av | Data Processing Air Corp. | replace extg 7 crac units and 3 drycooler with like per like equipment. ref #201708306380Details
replace extg 7 crac units and 3 drycooler with like per like equipment. ref #201708306380 | $700,000 |
| Jan 16, 2018 | Completed final sign-off May 2018 | 200 Paul Av | Siemens Industry, Inc. | fire alarm work for the "suite d350" on floor 3; additions are 2 smoke detectors, 2 duct detectors, 2 flame detectors, 1 horn/strobe power supply and 25 horn/storbes. the flame detectors are installed at the genetor 28 pad. ref pa 2017-0707-1280. maher naDetails
fire alarm work for the "suite d350" on floor 3; additions are 2 smoke detectors, 2 duct detectors, 2 flame detectors, 1 horn/strobe power supply and 25 horn/storbes. the flame detectors are installed at the genetor 28 pad. ref pa 2017-0707-1280. maher na | $25,260 |
| Dec 20, 2017 | Completed final sign-off May 2018 | 200 Paul Av | Eco Fire Sprinklers Inc | add 279 sprinklers in area of work for tenant improvement. new overhead and underfloor preaction system to service data room (296 sprinklers). permit ref #2017-0707-1280.Details
add 279 sprinklers in area of work for tenant improvement. new overhead and underfloor preaction system to service data room (296 sprinklers). permit ref #2017-0707-1280. | $190,000 |
| Sep 22, 2017 | Completed final sign-off Aug 2018 | 200 Paul Av | Dpr Construction | bldg. d, #350- install new 2000 kw generator and 4000 gal fuel tank under pa#201707071280 and pa#201801108282. pad 28 n/a ordinance #155-13Details
bldg. d, #350- install new 2000 kw generator and 4000 gal fuel tank under pa#201707071280 and pa#201801108282. pad 28 n/a ordinance #155-13 | $250,000 |
| Aug 30, 2017 | Completed final sign-off Aug 2018 | 200 Paul Av | Data Processing Air Corp. | t-mobile switch station: provide a new 22 ton norminal liebert crac unit in the hvac and fire rm to serve the existing equipment rm. provide upgrade to bms system. provide new electrical connection for new crac.Details
t-mobile switch station: provide a new 22 ton norminal liebert crac unit in the hvac and fire rm to serve the existing equipment rm. provide upgrade to bms system. provide new electrical connection for new crac. | $120,000 |
| Mar 23, 2017 | Never finaled issued Apr 2017, no final | 200 Paul Av | Siemens Industry, Inc. | fire alarm work to add a fire alarm system at building a & b. ** maher: n/a **Details
fire alarm work to add a fire alarm system at building a & b. ** maher: n/a ** | $38,000 |
| Mar 2, 2017 | Completed final sign-off Jul 2017 | 200 Paul Av | Eco Fire Sprinklers Inc | add 46 sprinklers in arear of work for ti ref 201612144877Details
add 46 sprinklers in arear of work for ti ref 201612144877 | $23,000 |
| Dec 15, 2016 | Completed final sign-off Aug 2017 | 200 Paul Av | Hathaway Dinwiddie Co. | 1st floor: site improvement incudes site security fencing and associated gate to seperate the 2 parcels for 2 different users. n/a for maherDetails
1st floor: site improvement incudes site security fencing and associated gate to seperate the 2 parcels for 2 different users. n/a for maher | $85,890 |
| Dec 14, 2016 | Completed final sign-off Aug 2017 | 200 Paul Av | Hathaway Dinwiddie Co. | 1st flr: ti includes demo of non structural partitions & build back of non structural partitions; mep/ls under sep permit maher naDetails
1st flr: ti includes demo of non structural partitions & build back of non structural partitions; mep/ls under sep permit maher na | $4,400,000 |
| Sep 13, 2016 | Completed final sign-off Nov 2016 | 200 Paul Av | Intelligent Technologies & Services Inc | section of the ceiling is being raised 2 feet. 2 smoke detectors and 1 sampling port are to be raised, 21 additional lbs of hfc-227 are to be added to cover the additional cubic feet. also replace four nozzles. maher naDetails
section of the ceiling is being raised 2 feet. 2 smoke detectors and 1 sampling port are to be raised, 21 additional lbs of hfc-227 are to be added to cover the additional cubic feet. also replace four nozzles. maher na | $1,000 |
| Aug 26, 2016 | Completed final sign-off Sep 2016 | 200 Paul Av | Eco Fire Sprinklers Inc | ste. 260: as built, add 2 single interlock preaction systems at the north east corner of 2nd level of building at 200 paul. reference 2016.06.29.1169. n/a maher ord. 155-13Details
ste. 260: as built, add 2 single interlock preaction systems at the north east corner of 2nd level of building at 200 paul. reference 2016.06.29.1169. n/a maher ord. 155-13 | $200,000 |
| Jul 8, 2016 | Completed final sign-off Aug 2016 | 200 Paul Av | Intelligent Technologies & Services Inc | 1st flr, ste 251: provide pre-action detection and controls in data center, crac gallery and ups rooms as shown on plans; maher n/aDetails
1st flr, ste 251: provide pre-action detection and controls in data center, crac gallery and ups rooms as shown on plans; maher n/a | $17,955 |
| Jun 24, 2016 | Completed final sign-off Aug 2016 | 200 Paul Av | Siemens Industry, Inc. | 2nd flr; fire alarm - add 1 smoke detector, 1 module, 1 horn/strobe power supply., and 14 horn/strobes. reference ti 2016.02.19.0117 maher naDetails
2nd flr; fire alarm - add 1 smoke detector, 1 module, 1 horn/strobe power supply., and 14 horn/strobes. reference ti 2016.02.19.0117 maher na | $9,840 |
| Apr 6, 2016 | Expired or cancelled expired Nov 2020 | 200 Paul Av | Cupertino Electric Inc. | furnish and install (6) 225a panelboards and feeders; furnish and install (88) l6-30r receptacles. maher naDetails
furnish and install (6) 225a panelboards and feeders; furnish and install (88) l6-30r receptacles. maher na | $85,000 |
| Jan 8, 2016 | Completed final sign-off Mar 2016 | 200 Paul Av | Siemens Industry, Inc. | 2nd floor - fire alarm work to add notification devices into the demo area on floor 2 which is now unoccupied; additions are 13 horn/strobes, 3 modules and a horn/strobe power supply. maher naDetails
2nd floor - fire alarm work to add notification devices into the demo area on floor 2 which is now unoccupied; additions are 13 horn/strobes, 3 modules and a horn/strobe power supply. maher na | $10,300 |
| Dec 10, 2015 | Never finaled issued Dec 2015, no final | 200 Paul Av | R L H Fire Protection Inc | fire sprinkler demo permit. pipe demo on 2nd fl, 2 pre-action demo. turn to wet system. n/a for maher.Details
fire sprinkler demo permit. pipe demo on 2nd fl, 2 pre-action demo. turn to wet system. n/a for maher. | $87,629 |
| Apr 13, 2015 | Completed final sign-off Feb 2017 | 200 Paul Av | Burr Computer Environments Inc. | installation of 2 (1000 kw optional standby) diesel generator sets with 3,000 gallon belly tanks each. new structural pads located outside of building-d.Details
installation of 2 (1000 kw optional standby) diesel generator sets with 3,000 gallon belly tanks each. new structural pads located outside of building-d. | $94,000 |
| Mar 30, 2015 | Expired or cancelled cancelled Jan 2026 | 200 Paul Av | 4th floor at bldg f: installatio of new hollow metal door and frame in existing wall and installation o fnew security cage in existig data center. maher n/a.Details
4th floor at bldg f: installatio of new hollow metal door and frame in existing wall and installation o fnew security cage in existig data center. maher n/a. | $12,000 | |
| Jan 27, 2015 | Never finaled issued Feb 2015, no final | 200 Paul Av | Walschon Fire Protection Inc | 4th flr: instll nw pre-engineered nitrogen generation system & 2 vic series 757 air maint. device. install 2 atuo air releases. provide & instll 2 nw 4" butterfly valve @ preaction system. rmve & replace of selective fire sprk main & branchline piping an install aux drains. #201108162530. n/a mhrDetails
4th flr: instll nw pre-engineered nitrogen generation system & 2 vic series 757 air maint. device. install 2 atuo air releases. provide & instll 2 nw 4" butterfly valve @ preaction system. rmve & replace of selective fire sprk main & branchline piping an install aux drains. #201108162530. n/a mhr | $61,883 |
| Sep 17, 2014 | Completed final sign-off Oct 2014 | 200 Paul Av | Intelligent Technologies & Services Inc | 2nd floor:provide detection and controls for suite d 250. pre-action system. n/a for the maher ordinance #155-13. ref app#201409035253Details
2nd floor:provide detection and controls for suite d 250. pre-action system. n/a for the maher ordinance #155-13. ref app#201409035253 | $14,332 |
| Sep 3, 2014 | Never finaled issued Sep 2014, no final | 200 Paul Av | Superior Automatic Sprinkler | install 2 new single interlock preaction systems in suite 210 and main electrical room - using 230 sprinklers and modify/demo portions of 2 existing wet systems 13 heads. 201404173555Details
install 2 new single interlock preaction systems in suite 210 and main electrical room - using 230 sprinklers and modify/demo portions of 2 existing wet systems 13 heads. 201404173555 | $192,000 |
| Aug 12, 2014 | Never finaled issued Aug 2014, no final | 200 Paul Av | street space permitDetails
street space permit | ||
| Jun 27, 2014 | Completed final sign-off Jan 2015 | 200 Paul Av | Skyline Construction | ref pa# 2014/04/17/3555; design of mechanical roof top units on building d, condensing one air unit. upgrade to (e) roof screen b. ** maher: compliance with ordinance no# 155-13 not required **Details
ref pa# 2014/04/17/3555; design of mechanical roof top units on building d, condensing one air unit. upgrade to (e) roof screen b. ** maher: compliance with ordinance no# 155-13 not required ** | $150,000 |
| May 19, 2014 | Completed final sign-off Jun 2014 | 200 Paul Av | Terra Visual Inc | install 2 new evacuation maps for 1st floor to comply with current sffd evacution map guidelines. maher n/a.Details
install 2 new evacuation maps for 1st floor to comply with current sffd evacution map guidelines. maher n/a. | $750 |
| Apr 17, 2014 | Completed final sign-off Jan 2015 | 200 Paul Av | Skyline Construction | 1st and 2nd floor:t.i. for electrical rooms. new data center area, common area, electrical support area, new concrete pads for generators, installtion of 2 new generators.n/a for the maher ordinance #155-13Details
1st and 2nd floor:t.i. for electrical rooms. new data center area, common area, electrical support area, new concrete pads for generators, installtion of 2 new generators.n/a for the maher ordinance #155-13 | $5,300,000 |
| Feb 19, 2014 | Expired or cancelled expired Nov 2020 | 200 Paul Av | Il Mechanical, Inc. | installation of (5) new computer room air conditoiners.Details
installation of (5) new computer room air conditoiners. | $150,000 |
| Nov 20, 2013 | Completed final sign-off Mar 2014 | 200 Paul Av | Ayoob & Peery Plumbing Co Inc | 1st floor. add, relocate & remove fire sprinkler heads per ti. 2 add, 11 relocate & 1 remove. pa#2013-0808-3798.Details
1st floor. add, relocate & remove fire sprinkler heads per ti. 2 add, 11 relocate & 1 remove. pa#2013-0808-3798. | $6,168 |
| Nov 4, 2013 | Expired or cancelled cancelled Jan 2026 | 200 Paul Av | add (1) one smoke detector to existing data center for pre-action releasing detector added due to lack of coverageDetails
add (1) one smoke detector to existing data center for pre-action releasing detector added due to lack of coverage | $1,000 | |
| Oct 28, 2013 | Completed final sign-off May 2014 | 200 Paul Av | Siemens Industry, Inc. | addition of 1 relay module, 1 horn/strobe, 4 strobes for security office remodel floor 1. all new devices connect onto fire alarm system. ref. permit app#201308083798.Details
addition of 1 relay module, 1 horn/strobe, 4 strobes for security office remodel floor 1. all new devices connect onto fire alarm system. ref. permit app#201308083798. | $3,000 |
| Oct 24, 2013 | Never finaled issued Dec 2013, no final | 200 Paul Av | Siemens Industry, Inc. | replacement of the entire fire alarm system for the building on a like-for-like basis per the csfm code interpretation 12-001. the replacement system does not meet correct codes.Details
replacement of the entire fire alarm system for the building on a like-for-like basis per the csfm code interpretation 12-001. the replacement system does not meet correct codes. | $195,000 |
| Oct 22, 2013 | Completed final sign-off Sep 2015 | 200 Paul Av | Skyline Construction | site demolition & partial building b. demolition regrading site for new vehicular road. new wood shear wall with cement plaster finish as in fill at the end of truncated building b. new 26' high acoustic wall around west end of future generator group & landscaping. compliance with ordiance noDetails
site demolition & partial building b. demolition regrading site for new vehicular road. new wood shear wall with cement plaster finish as in fill at the end of truncated building b. new 26' high acoustic wall around west end of future generator group & landscaping. compliance with ordiance no | $800,000 |
| Aug 9, 2013 | Expired or cancelled expired Feb 2017 | 200 Paul Av | Skyline Construction | revision to 201306109049: number and size of generator anchors shown on previous permit dwgsDetails
revision to 201306109049: number and size of generator anchors shown on previous permit dwgs | |
| Aug 2, 2013 | Never finaled issued Aug 2013, no final | 200 Paul Av | Siemens Industry, Inc. | bldg. d - flr 1:addition of 3 modules for monitoring of new generator at building d. new devicesconnect onto fire alarm system. (pa ref#201307151840)Details
bldg. d - flr 1:addition of 3 modules for monitoring of new generator at building d. new devicesconnect onto fire alarm system. (pa ref#201307151840) | $1,500 |
| Jul 15, 2013 | Completed final sign-off Jun 2014 | 200 Paul Av | Skyline Construction | installation of new generator. generator pad under permit #2013-0610-9049.Details
installation of new generator. generator pad under permit #2013-0610-9049. | $850,000 |
| Jun 10, 2013 | Completed final sign-off Jun 2014 | 200 Paul Av | Skyline Construction | new generator pad at exterior of 200 paul ave.Details
new generator pad at exterior of 200 paul ave. | $12,000 |
| Jun 6, 2013 | Never finaled issued Jun 2013, no final | 200 Paul Av | Preston Pipelines Inc | install new 10"pvc c900 privtae main fire underground tie in all existing appurtenances and abandon existing 10" fire main in place- include 1 hydarnt and 6 sprinkler underground.Details
install new 10"pvc c900 privtae main fire underground tie in all existing appurtenances and abandon existing 10" fire main in place- include 1 hydarnt and 6 sprinkler underground. | $200,000 |
| Jan 11, 2013 | Completed final sign-off Aug 2013 | 200 Paul Av | ste d160: revision to pa# 2012-0217-4415 to fill in shear wall including structural plans.Details
ste d160: revision to pa# 2012-0217-4415 to fill in shear wall including structural plans. | $1,500 | |
| Jan 7, 2013 | Completed final sign-off May 2017 | 200 Paul Av | Skyline Construction | revision to consist of reconfiguration of the new entrance into the data center and relocation of one crac unit. ref app#201202174415Details
revision to consist of reconfiguration of the new entrance into the data center and relocation of one crac unit. ref app#201202174415 | |
| Dec 14, 2012 | Completed final sign-off Feb 2013 | 200 Paul Av | Siemens Industry, Inc. | addition of 1 smoke detector, 1 monitor module, 1 central modul for 2nd fire alarm permit on the mmr retrofit project on floors 2 and 3. initial work under 201211053475Details
addition of 1 smoke detector, 1 monitor module, 1 central modul for 2nd fire alarm permit on the mmr retrofit project on floors 2 and 3. initial work under 201211053475 | $1,500 |
| Nov 19, 2012 | Expired or cancelled cancelled May 2015 | 200 Paul Av | Allied Fire Protection | combining preaction systems fro rooms #colo 402 & #colo 403 into (1) preaction system @ lev 4 t.i. @ subfloor & overhead piping. revision to appln #201210041298.Details
combining preaction systems fro rooms #colo 402 & #colo 403 into (1) preaction system @ lev 4 t.i. @ subfloor & overhead piping. revision to appln #201210041298. | |
| Nov 5, 2012 | Completed final sign-off Feb 2013 | 200 Paul Av | Siemens Industry, Inc. | addition of 1 smoke detector, 2 duct detectors, 3 monitor modules, 1 relay mdule, 3 strobes for mmr remodels on floor 2 and 3. all new devices connect onto fire alarm systemDetails
addition of 1 smoke detector, 2 duct detectors, 3 monitor modules, 1 relay mdule, 3 strobes for mmr remodels on floor 2 and 3. all new devices connect onto fire alarm system | $5,000 |
| Oct 4, 2012 | Expired or cancelled cancelled May 2015 | 200 Paul Av | Allied Fire Protection | ref pa# 2012-06-18-2762 issued 6-22-12. combining pre-action systems for room 402 & 403 into (1) preaction system-lev 4 for t.i. @ subfloor & overhead piping.Details
ref pa# 2012-06-18-2762 issued 6-22-12. combining pre-action systems for room 402 & 403 into (1) preaction system-lev 4 for t.i. @ subfloor & overhead piping. | $9,000 |
| Aug 15, 2012 | Completed final sign-off Apr 2013 | 200 Paul Av | Allied Fire Protection | fire sprinkler tenant improvement. add 4 upright sprinkler heads at room 207a 2nd fl. add 5 upgright sprinkler heads at room 312a 3rd flDetails
fire sprinkler tenant improvement. add 4 upright sprinkler heads at room 207a 2nd fl. add 5 upgright sprinkler heads at room 312a 3rd fl | $4,500 |
| Aug 3, 2012 | Never finaled issued Aug 2012, no final | 200 Paul Av | Siemens Industry, Inc. | addition on 1 heat detector (on floor 2) and 1 relay module for "firefighter's hat signal under the "south elevator machine room. upgrade on the roof level. all devices connect onto the fire alarm system.Details
addition on 1 heat detector (on floor 2) and 1 relay module for "firefighter's hat signal under the "south elevator machine room. upgrade on the roof level. all devices connect onto the fire alarm system. | $1,000 |
| Jun 7, 2012 | Completed final sign-off Jan 2013 | 200 Paul Av | Intelligent Technologies & Services Inc | 4/f #402 & #403- relocate 2 devices & re-program (e) pre-action detection systemDetails
4/f #402 & #403- relocate 2 devices & re-program (e) pre-action detection system | $5,000 |
| Feb 17, 2012 | Completed final sign-off Aug 2013 | 200 Paul Av | Skyline Construction | install new door & associated framing, install 2 new computer room, air conditioning, relocate 1 9e) crac, install supplemental steel platform to accomodate the footprint of the condenser, seismic anchorage. relocate vfd's.Details
install new door & associated framing, install 2 new computer room, air conditioning, relocate 1 9e) crac, install supplemental steel platform to accomodate the footprint of the condenser, seismic anchorage. relocate vfd's. | $108,000 |
| Dec 27, 2011 | Completed final sign-off Feb 2012 | 200 Paul Av | Dpr Construction | install server racks on the 4th floor data room. ti approved under pa #201108162518.Details
install server racks on the 4th floor data room. ti approved under pa #201108162518. | $15,000 |
| Dec 9, 2011 | Completed final sign-off Feb 2012 | 200 Paul Av | Dpr Construction | revision to 201108162518. install 5 new 45 minute fire rated window systems along existing 1 hr rated fire partition which separates the existing office space from data center spaceDetails
revision to 201108162518. install 5 new 45 minute fire rated window systems along existing 1 hr rated fire partition which separates the existing office space from data center space | $35,000 |
| Nov 14, 2011 | Completed final sign-off Feb 2012 | 200 Paul Av | Allied Fire Protection | add 93 fire sprinklers and new 4"main to extg sprinkler system on the 4th floor fed from an existing fire pump. pre action systemDetails
add 93 fire sprinklers and new 4"main to extg sprinkler system on the 4th floor fed from an existing fire pump. pre action system | $46,500 |
| Sep 21, 2011 | Completed final sign-off Feb 2012 | 200 Paul Av | Orr Protection Systems Inc | 4th floor-change server room to office space. pre action above ceiling to stay. add 85 smoke detectors to drop ceilings. 15 horn strobes, 14 monitor modules & 14 relay modules for hvac & 3 duct detectors and a new module for new strobe panel.Details
4th floor-change server room to office space. pre action above ceiling to stay. add 85 smoke detectors to drop ceilings. 15 horn strobes, 14 monitor modules & 14 relay modules for hvac & 3 duct detectors and a new module for new strobe panel. | $78,000 |
| Sep 8, 2011 | Expired or cancelled cancelled Jan 2026 | 200 Paul Av | Southland Industries | provide hvac for ups & pdu room.Details
provide hvac for ups & pdu room. | $180,000 |
| Aug 18, 2011 | Completed final sign-off Jan 2012 | 200 Paul Av | Alliance Roofing Co Inc | reroofingDetails
reroofing | $430,648 |
| Aug 16, 2011 | Completed final sign-off Feb 2012 | 200 Paul Av | Dpr Construction | work occurs on partial (e) 4th flr, interior improvement includes non bearing partitions, raised access floor, ceilings, mechanical, electrical, plumbing and fire protection.Details
work occurs on partial (e) 4th flr, interior improvement includes non bearing partitions, raised access floor, ceilings, mechanical, electrical, plumbing and fire protection. | $3,968,336 |
| Aug 16, 2011 | Completed final sign-off Nov 2011 | 200 Paul Av | Dpr Construction | 4th floor: demo (e) non structural walls, doors. remove & store (e) fences & gates. remove & store (e) mechanical equipment. remove electrical, plumbing, duct work, associated with equipmentDetails
4th floor: demo (e) non structural walls, doors. remove & store (e) fences & gates. remove & store (e) mechanical equipment. remove electrical, plumbing, duct work, associated with equipment | $66,000 |
| Aug 12, 2011 | Completed final sign-off Jan 2014 | 200 Paul Av | Cupertino Electric Inc. | new battery room within existing mechanical room, new electrical room, modification to metal canopy d.a. upgrades. note: separate battery system, operation permit required from sffdDetails
new battery room within existing mechanical room, new electrical room, modification to metal canopy d.a. upgrades. note: separate battery system, operation permit required from sffd | $2,500,000 |
| Jul 22, 2011 | Expired or cancelled expired Nov 2020 | 200 Paul Av | 3rd floor:revision to 200911181597: reduce scope of work.no chillers,no pumps, no structural platformDetails
3rd floor:revision to 200911181597: reduce scope of work.no chillers,no pumps, no structural platform | ||
| Feb 22, 2011 | Completed final sign-off Jun 2011 | 200 Paul Av | Bear Power Product Inc | install support stand over exisitng generator to hold generator test equipment.Details
install support stand over exisitng generator to hold generator test equipment. | $30,000 |
| Feb 7, 2011 | Expired or cancelled expired Nov 2020 | 200 Paul Av | astound revision to supply pump location. supply pump to be relocated from generator enclusure to staionary fuel tank. install electrical and low voltage conduits and wires per drawings. revision to app#201007066004Details
astound revision to supply pump location. supply pump to be relocated from generator enclusure to staionary fuel tank. install electrical and low voltage conduits and wires per drawings. revision to app#201007066004 | $3,000 | |
| Nov 9, 2010 | Expired or cancelled expired Nov 2020 | 200 Paul Av | Siemens Industry, Inc. | addition of a relay module in the north elevator machine rm, to activate a flashing firefighter's hat led in the north elev car. the raly will send a signal to the car upon an alarm condition from the existing smoke detrctors in the e.m.rDetails
addition of a relay module in the north elevator machine rm, to activate a flashing firefighter's hat led in the north elev car. the raly will send a signal to the car upon an alarm condition from the existing smoke detrctors in the e.m.r | $900 |
| Aug 20, 2010 | Expired or cancelled expired Nov 2020 | 200 Paul Av | Stort's Electric | to obtain final inspection for work approved under pa # 200712200962. all work completed.Details
to obtain final inspection for work approved under pa # 200712200962. all work completed. | |
| Jul 19, 2010 | Completed final sign-off Sep 2010 | 200 Paul Av | Siemens Industry, Inc. | 4th floor-addition of 1 smoke detector & 1 relay module for the corridor door holders installed at an entrance doorDetails
4th floor-addition of 1 smoke detector & 1 relay module for the corridor door holders installed at an entrance door | $1,100 |
| Jul 15, 2010 | Completed final sign-off Sep 2010 | 200 Paul Av | Rosendin Electric, Inc. | added generator details as per fire permit inspector reference # pa 2009.07.23.3307Details
added generator details as per fire permit inspector reference # pa 2009.07.23.3307 | |
| Jul 6, 2010 | Expired or cancelled expired Nov 2020 | 200 Paul Av | Benson & Son Electric | astound generator upgrade at 200 paul ave.Details
astound generator upgrade at 200 paul ave. | $50,000 |
| May 11, 2010 | Expired or cancelled withdrawn Oct 2011 | 200 Paul Av | Rosendin Electric, Inc. | install above ground storage tank permitDetails
install above ground storage tank permit | $20,000 |
| May 6, 2010 | Completed final sign-off Jul 2011 | 200 Paul Av | Rosendin Electric, Inc. | install 1-225a, 208/120v panel fed from (e) service. install (8)l21-30 receptacles & (24)l6-20 receptacles.Details
install 1-225a, 208/120v panel fed from (e) service. install (8)l21-30 receptacles & (24)l6-20 receptacles. | $35,000 |
| Apr 29, 2010 | Completed final sign-off Sep 2010 | 200 Paul Av | Siemens Industry, Inc. | 4th floor - addition of 3 monitor modules and relocate 2 monitor modules, 1 control relay module for "drt" suites 402 & 403 on 4th fl. monitor modules will be used to interface 2 new pre-action systems and sprinkler waterflow/tampes switches into (e) fire alarm system.Details
4th floor - addition of 3 monitor modules and relocate 2 monitor modules, 1 control relay module for "drt" suites 402 & 403 on 4th fl. monitor modules will be used to interface 2 new pre-action systems and sprinkler waterflow/tampes switches into (e) fire alarm system. | $1,900 |
| Apr 13, 2010 | Completed final sign-off Sep 2010 | 200 Paul Av | Intelligent Technologies & Services Inc | 4th floor-design & install 2 pre-action dectection & control systems within suites #402 & 403Details
4th floor-design & install 2 pre-action dectection & control systems within suites #402 & 403 | $24,500 |
| Mar 12, 2010 | Completed final sign-off Sep 2010 | 200 Paul Av | Allied Fire Protection | 4th floor. revise (e) sprinkler system (overhead)-add 2 new sprinkler systems to subfloor. all systems are to be preaction, 4 & wet system in corridor. 3 new pre-action sys. 1 exist preaction sys valve (connect new pipe). 1 wet pipe riser (386 sprinkler); demo exist pipe in area.Details
4th floor. revise (e) sprinkler system (overhead)-add 2 new sprinkler systems to subfloor. all systems are to be preaction, 4 & wet system in corridor. 3 new pre-action sys. 1 exist preaction sys valve (connect new pipe). 1 wet pipe riser (386 sprinkler); demo exist pipe in area. | $105,800 |
| Feb 23, 2010 | Completed final sign-off Sep 2010 | 200 Paul Av | Dpr Construction Inc | rev. to pa# 2009.07.23.3307. revise structural steel lay out for roof top equipmentDetails
rev. to pa# 2009.07.23.3307. revise structural steel lay out for roof top equipment | |
| Feb 8, 2010 | Completed final sign-off Sep 2010 | 200 Paul Av | Dpr Construction Inc | revision to pa# 2009-0723-3307-per field conditions, revise 2 hour rated construction to match (e) 1 hour rated constructionDetails
revision to pa# 2009-0723-3307-per field conditions, revise 2 hour rated construction to match (e) 1 hour rated construction | $17,500 |
| Jan 14, 2010 | Completed final sign-off Jan 2010 | 200 Paul Av | Rusciano Construction Inc. | construct steel support rack for new battery installation. 3rd floor utility roomDetails
construct steel support rack for new battery installation. 3rd floor utility room | $7,500 |
| Nov 18, 2009 | Expired or cancelled expired Nov 2020 | 200 Paul Av | data center upgrade phase ii - new chiller w/struct roof platform, no change to exist bldg.Details
data center upgrade phase ii - new chiller w/struct roof platform, no change to exist bldg. | $500,000 | |
| Jul 23, 2009 | Completed final sign-off Sep 2010 | 200 Paul Av | Dpr Construction Inc | alteration of data and electric rooms on 4th fl of bldg "f". replace partial roof/top mechanical/electrical equipment with new structural supports, replace (1) generator in existing generator yard. fire alarm & sprinklers under separate permit.Details
alteration of data and electric rooms on 4th fl of bldg "f". replace partial roof/top mechanical/electrical equipment with new structural supports, replace (1) generator in existing generator yard. fire alarm & sprinklers under separate permit. | $10,000,000 |
| May 28, 2009 | Completed final sign-off Jun 2010 | 200 Paul Av | 3rd floor & roof data center upgrade - new (hvac) chillers & ups/struct roof platform, new work is tenant upgrade/improvement no change to existing bldg.Details
3rd floor & roof data center upgrade - new (hvac) chillers & ups/struct roof platform, new work is tenant upgrade/improvement no change to existing bldg. | $500,000 | |
| Jan 7, 2009 | Expired or cancelled expired Nov 2020 | 200 Paul Av | Geo M Robinson & Co | alteration to existing fire sprinkler system. add 11 ssp heads under ducts in co-locate room 80108. relocate 6 ssu heads to obtain ordinary hazard occupancy with 130 sf max spacing in room 80101Details
alteration to existing fire sprinkler system. add 11 ssp heads under ducts in co-locate room 80108. relocate 6 ssu heads to obtain ordinary hazard occupancy with 130 sf max spacing in room 80101 | $6,250 |
| Oct 16, 2008 | Expired or cancelled expired Nov 2020 | 200 Paul Av | Geo M Robinson & Co | alteration to existing fire sprinkler system, add 10 ssp heads under new 7'-6" wide 18" deep duct.Details
alteration to existing fire sprinkler system, add 10 ssp heads under new 7'-6" wide 18" deep duct. | $2,700 |
| Jul 1, 2008 | Completed final sign-off Feb 2009 | 200 Paul Av | Xantis Group Inc | bldg d - install new condenser unit on the roof and connect toex. chillea water system. install unit struct cover over ex. chillea water pumps. connect new condenser to ex. electrical disconnect.Details
bldg d - install new condenser unit on the roof and connect toex. chillea water system. install unit struct cover over ex. chillea water pumps. connect new condenser to ex. electrical disconnect. | $32,000 |
| May 28, 2008 | Expired or cancelled expired Nov 2020 | 200 Paul Av | Intelligent Technologies & Services Inc | ti for fire sprinkler detection on the 2nd floor. modify the ex. pre-action detection in new ups room for correct coverageDetails
ti for fire sprinkler detection on the 2nd floor. modify the ex. pre-action detection in new ups room for correct coverage | $1,000 |
| Apr 30, 2008 | Completed final sign-off Jun 2008 | 200 Paul Av | Data Processing Air Corp. | 1) furnish and install 20 ton glycol liebert unit on 3rd floor 2) tap into (e) glycol lines 3) rework supply and drain lines as needed, liebert model #dh267w with seismic floor stand.Details
1) furnish and install 20 ton glycol liebert unit on 3rd floor 2) tap into (e) glycol lines 3) rework supply and drain lines as needed, liebert model #dh267w with seismic floor stand. | $25,000 |
| Apr 28, 2008 | Completed final sign-off May 2009 | 200 Paul Av | Carlson Design Construct | addition of 1-2000 kw generator and belly tank. concrete pad for generator, add breaker (e) switch gear for generator. conduit and bus duct from generator to gearDetails
addition of 1-2000 kw generator and belly tank. concrete pad for generator, add breaker (e) switch gear for generator. conduit and bus duct from generator to gear | $680,000 |
| Mar 19, 2008 | Completed final sign-off Jul 2008 | 200 Paul Av | Silicon Valley Construction | revision to appl #200709102184 to existing 1.25 mega watt generator to be replaced with new 2.0 mega watt generator #9.Details
revision to appl #200709102184 to existing 1.25 mega watt generator to be replaced with new 2.0 mega watt generator #9. | |
| Feb 25, 2008 | Completed final sign-off Mar 2008 | 200 Paul Av | Skyline Construction | ti for the 5th floor. remove (e) work stations and build 5 offices. lighting, mechanical and electrical work will be under separate permits.Details
ti for the 5th floor. remove (e) work stations and build 5 offices. lighting, mechanical and electrical work will be under separate permits. | $78,000 |
| Jan 9, 2008 | Completed final sign-off Apr 2008 | 200 Paul Av | Thomas Swan Sign Co Inc | erect a non-electric wall single faced non-illluminated new signDetails
erect a non-electric wall single faced non-illluminated new sign | |
| Dec 20, 2007 | Expired or cancelled expired Aug 2010 | 200 Paul Av | Stort's Electric | installation of support for electrical equipment on concrete slab 3rd floor (all equipment under seperate permit)Details
installation of support for electrical equipment on concrete slab 3rd floor (all equipment under seperate permit) | $50,000 |
| Sep 10, 2007 | Completed final sign-off Dec 2008 | 200 Paul Av | Silicon Valley Construction | construct new interior walls for new data center.installation of ac units mounted to the floor. installation of one new diesel generator and one diesel fuel storage tank for the generator outside of the building.Details
construct new interior walls for new data center.installation of ac units mounted to the floor. installation of one new diesel generator and one diesel fuel storage tank for the generator outside of the building. | $125,000 |
| Jun 29, 2007 | Completed final sign-off Mar 2008 | 200 Paul Av | Allied Fire Protection | suite #106 - modification to existing sprinkler system and over head. add sub-floor fire protection. overhead ssu=115. sub floor ssu=79. separate permit - fire alarm connection.Details
suite #106 - modification to existing sprinkler system and over head. add sub-floor fire protection. overhead ssu=115. sub floor ssu=79. separate permit - fire alarm connection. | $122,000 |
| Jun 27, 2007 | Completed final sign-off Mar 2008 | 200 Paul Av | new generator (diesel) in service yard. no other work with this permit.Details
new generator (diesel) in service yard. no other work with this permit. | $50,000 | |
| Jun 27, 2007 | Never finaled issued Jun 2007, no final | 200 Paul Av | Siemens Industry, Inc. | install 2 monitor modules in suite 106 for pre action sprinkler systemDetails
install 2 monitor modules in suite 106 for pre action sprinkler system | $1,400 |
| Jun 14, 2007 | Completed final sign-off Mar 2008 | 200 Paul Av | Intelligent Technologies & Services Inc | install preaction detection and control system for suite 106 and electrical roomDetails
install preaction detection and control system for suite 106 and electrical room | $17,100 |
| Dec 13, 2006 | Never finaled issued Dec 2006, no final | 200 Paul Av | sidewalk repairDetails
sidewalk repair | ||
| Nov 29, 2006 | Completed final sign-off Jan 2007 | 200 Paul Av | Dpr Construction Inc | 1 new diesel generator in service yard. no other work under this permit.Details
1 new diesel generator in service yard. no other work under this permit. | $87,000 |
| Nov 7, 2006 | Completed final sign-off Jan 2007 | 200 Paul Av | Intelligent Technologies & Services Inc | install pre-action detection in computer room and electrical room on 1st floor. and audibles in computer room on 1st floor.Details
install pre-action detection in computer room and electrical room on 1st floor. and audibles in computer room on 1st floor. | $15,000 |
| Nov 7, 2006 | Completed final sign-off Jan 2007 | 200 Paul Av | Siemens Industry, Inc. | addition of monitor modules for interface into a new pre-action systrem (by others) for the building "d" suite 160.Details
addition of monitor modules for interface into a new pre-action systrem (by others) for the building "d" suite 160. | $2,100 |
| Oct 12, 2006 | Completed final sign-off Dec 2006 | 200 Paul Av | Allied Fire Protection | modification to existing sprinkler system, 4 add ssu. add new system under floor = 83 ssu. change to a preaction system.Details
modification to existing sprinkler system, 4 add ssu. add new system under floor = 83 ssu. change to a preaction system. | $76,000 |
| Sep 1, 2006 | Completed final sign-off Sep 2006 | 200 Paul Av | Carlson Design Construct | alter raised floor design from pedestals w/ 4" base plates anchored to concrete to 6" bases using adhesive w/ max stress ratio of 32.74%, change live load to 150 psf, resubmit design for equipment platform (steel) on roof, rev. to approved building pa#2005/12/15/0462Details
alter raised floor design from pedestals w/ 4" base plates anchored to concrete to 6" bases using adhesive w/ max stress ratio of 32.74%, change live load to 150 psf, resubmit design for equipment platform (steel) on roof, rev. to approved building pa#2005/12/15/0462 | |
| Aug 17, 2006 | Completed final sign-off Dec 2006 | 200 Paul Av | Dpr Construction Inc | 1st floor - tenant improvement on 1/f, new data center and electrical room.Details
1st floor - tenant improvement on 1/f, new data center and electrical room. | $4,000,000 |
| May 2, 2006 | Completed final sign-off Jun 2006 | 200 Paul Av | Siemens Industry, Inc. | add 2 monitor modules for interface into pre-action system for suite #103. the pre-action system is provided by others under a seperate permit. a relay module is also being added for fsd closure. these fsds are being installed with the pre-action project.Details
add 2 monitor modules for interface into pre-action system for suite #103. the pre-action system is provided by others under a seperate permit. a relay module is also being added for fsd closure. these fsds are being installed with the pre-action project. | $1,800 |
| Feb 23, 2006 | Completed final sign-off Sep 2006 | 200 Paul Av | Ayoob & Peery Plumbing Co Inc | expansion to (e) pre action system. relocate valve assembly. underfloor protection. 88 new sprinklers. no increase in size.Details
expansion to (e) pre action system. relocate valve assembly. underfloor protection. 88 new sprinklers. no increase in size. | $17,600 |
| Feb 21, 2006 | Expired or cancelled expired Mar 2007 | 200 Paul Av | Diversified Protection Systems Inc | add 4 vesda smoke sampling detyector unit in an existing server/electricalroomand the each unit to the suites preaction detection systemDetails
add 4 vesda smoke sampling detyector unit in an existing server/electricalroomand the each unit to the suites preaction detection system | $30,000 |
| Dec 15, 2005 | Completed final sign-off Sep 2006 | 200 Paul Av | Carlson Design Construct | build out of data storage suite with raised floor,libert floor cooling units,electrical room and roof coolers mounted on (e)steel platform.sprinkler system previous & fire alarm revision under seperate applications.Details
build out of data storage suite with raised floor,libert floor cooling units,electrical room and roof coolers mounted on (e)steel platform.sprinkler system previous & fire alarm revision under seperate applications. | $500,000 |
| Jul 13, 2005 | Expired or cancelled expired Dec 2005 | 200 Paul Av | California Suppresion Dba Calif. Protect | provide/submit as built drawings for appl#200412030655 bldg.is 5 stories not 3 stories on originalDetails
provide/submit as built drawings for appl#200412030655 bldg.is 5 stories not 3 stories on original | |
| Dec 3, 2004 | Expired or cancelled expired Dec 2005 | 200 Paul Av | California Suppresion Dba Calif. Protect | furnish and installl 1 new remote stobe panel, 2, new fire/life safety device, tie existisng strobesDetails
furnish and installl 1 new remote stobe panel, 2, new fire/life safety device, tie existisng strobes | $15,975 |
| May 13, 2003 | Completed final sign-off Feb 2004 | 200 Paul Av | rev. appl#200301286157 for verify demolish (e)roll up door, infill opening, match w/(e) mechanical,Details
rev. appl#200301286157 for verify demolish (e)roll up door, infill opening, match w/(e) mechanical, | $5,000 | |
| Apr 25, 2003 | Expired or cancelled cancelled Dec 2003 | 200 Paul Av | vessda system equipment fire alarm system 1st floorDetails
vessda system equipment fire alarm system 1st floor | $20,000 | |
| Apr 25, 2003 | Completed final sign-off Feb 2004 | 200 Paul Av | fire alarm system first floorDetails
fire alarm system first floor | $30,000 | |
| Apr 11, 2003 | Completed final sign-off Feb 2004 | 200 Paul Av | Siemens Industry, Inc. | addition of horn/strobe notification devices throughout tenant space. installation of vesda system tDetails
addition of horn/strobe notification devices throughout tenant space. installation of vesda system t | $3,000 |
| Jan 28, 2003 | Completed final sign-off Feb 2004 | 200 Paul Av | interior tenant improvement in an e underground fl of building, includes infilling 2 existing roll-uDetails
interior tenant improvement in an e underground fl of building, includes infilling 2 existing roll-u | $2,500,000 | |
| Jan 14, 2003 | Completed final sign-off Jul 2003 | 200 Paul Av | construct 2 hour rated demising wall/relocate 1 door on the ground floorDetails
construct 2 hour rated demising wall/relocate 1 door on the ground floor | $10,000 | |
| Jun 6, 2002 | Completed final sign-off Aug 2003 | 200 Paul Av | Team Commercial Construction Inc. | rev. appl#200203111018 provide generator & tap box pad @ outside of bldg.Details
rev. appl#200203111018 provide generator & tap box pad @ outside of bldg. | $17,000 |
| Apr 19, 2002 | Completed final sign-off May 2002 | 200 Paul Av | fabrication and installation of hilti uni-strut equipmt stands to support telecom equipment racksDetails
fabrication and installation of hilti uni-strut equipmt stands to support telecom equipment racks | $15,000 | |
| Apr 15, 2002 | Completed final sign-off Apr 2002 | 200 Paul Av | Swinerton Builders | rev. appl#200204043089 & 200003154418 w/as built drawingDetails
rev. appl#200204043089 & 200003154418 w/as built drawing | $100 |
| Apr 10, 2002 | Completed final sign-off Apr 2002 | 200 Paul Av | Jaytel Technologies Inc. | 1/fl- install & secure unistrut to concrete floor, attach solid core ladder rack to unistrutDetails
1/fl- install & secure unistrut to concrete floor, attach solid core ladder rack to unistrut | $10,000 |
| Apr 4, 2002 | Completed final sign-off Apr 2002 | 200 Paul Av | Swinerton Builders | renew appl#200003154418 for final inspectionDetails
renew appl#200003154418 for final inspection | |
| Mar 19, 2002 | Completed final sign-off Mar 2002 | 200 Paul Av | revised drawing for purpose of resubmit per app #200005109600/200010243974Details
revised drawing for purpose of resubmit per app #200005109600/200010243974 | ||
| Mar 14, 2002 | Completed final sign-off Aug 2003 | 200 Paul Av | provide fire sprinklers per planDetails
provide fire sprinklers per plan | $50,000 | |
| Mar 14, 2002 | Completed final sign-off Aug 2003 | 200 Paul Av | provide detection and controls for the hfc 227 ea. clean agent, preaction vesda air sampling & fireDetails
provide detection and controls for the hfc 227 ea. clean agent, preaction vesda air sampling & fire | $150,000 | |
| Feb 27, 2002 | Completed final sign-off Apr 2002 | 200 Paul Av | Siemens Industry, Inc. | install:3-smoke detectors, pull stations, 3 horn/strobes, 4-strobes for new corridors @1st fl.Details
install:3-smoke detectors, pull stations, 3 horn/strobes, 4-strobes for new corridors @1st fl. | $3,100 |
| Feb 20, 2002 | Completed final sign-off Apr 2002 | 200 Paul Av | City Building Inc. | new corridor (1-hr rated);tenant demising wall on grnd flr & electrical, fire sprinkler,fire alarmDetails
new corridor (1-hr rated);tenant demising wall on grnd flr & electrical, fire sprinkler,fire alarm | $45,000 |
| Nov 26, 2001 | Completed final sign-off Mar 2002 | 200 Paul Av | to renew app#2000/10/24/3974 for final inspection.Details
to renew app#2000/10/24/3974 for final inspection. | ||
| Sep 21, 2001 | Expired or cancelled expired Oct 2002 | 200 Paul Av | Intelligent Technologies & Services Inc | replace (e) strobes & horn/strobes w/new amber lens strobes & hon/strobes rev. to appl#200002276304Details
replace (e) strobes & horn/strobes w/new amber lens strobes & hon/strobes rev. to appl#200002276304 | $2,600 |
| Aug 15, 2001 | Expired or cancelled expired Dec 2001 | 200 Paul Av | Anderson, Rowe & Buckley, Inc. | rev. to pa# 2001/01/23/0371- provide t/i fire protection work grndfloor (system becoming split)Details
rev. to pa# 2001/01/23/0371- provide t/i fire protection work grndfloor (system becoming split) | |
| Aug 8, 2001 | Expired or cancelled expired Oct 2002 | 200 Paul Av | Kinetic Systems Inc | all hvac mechanical work for all 3 fls:elevators, mech. run, exhaust & electrical run exhuastDetails
all hvac mechanical work for all 3 fls:elevators, mech. run, exhaust & electrical run exhuast | $50,000 |
| Aug 7, 2001 | Expired or cancelled expired Oct 2002 | 200 Paul Av | sprinkler underground- in conjunction w/overhead appn. 200101230371Details
sprinkler underground- in conjunction w/overhead appn. 200101230371 | $21,000 | |
| Aug 4, 2001 | Expired or cancelled expired Oct 2002 | 200 Paul Av | install new pipe line bridge per plansDetails
install new pipe line bridge per plans | $75,000 | |
| Jul 31, 2001 | Completed final sign-off Apr 2002 | 200 Paul Av | revision to 2000/03/15/4418. as built.Details
revision to 2000/03/15/4418. as built. | $1,000 | |
| Jun 27, 2001 | Completed final sign-off Feb 2002 | 200 Paul Av | to renew permit#2000/05/10/9523 for final inspection.Details
to renew permit#2000/05/10/9523 for final inspection. | ||
| Mar 21, 2001 | Completed final sign-off May 2001 | 200 Paul Av | Siemens Industry, Inc. | addition of smoke detector at 5th floorDetails
addition of smoke detector at 5th floor | $2,300 |
| Mar 9, 2001 | Expired or cancelled expired Oct 2002 | 200 Paul Av | Siemens Industry, Inc. | this job is an addition to the existing fire alarm system. the adds are locted in attached bldg. d aDetails
this job is an addition to the existing fire alarm system. the adds are locted in attached bldg. d a | $27,000 |
| Feb 20, 2001 | Expired or cancelled expired Oct 2002 | 200 Paul Av | revise to app #200006172938s regarding fire rated of communication openings betwn (e) bld f & bld dDetails
revise to app #200006172938s regarding fire rated of communication openings betwn (e) bld f & bld d | ||
| Feb 15, 2001 | Expired or cancelled expired Oct 2002 | 200 Paul Av | provide fire service per plansDetails
provide fire service per plans | $25,000 | |
| Jan 23, 2001 | Expired or cancelled expired May 2002 | 200 Paul Av | Anderson, Rowe & Buckley, Inc. | provide tenant fire protection work groundfloorDetails
provide tenant fire protection work groundfloor | $185,000 |
| Dec 29, 2000 | Completed final sign-off May 2001 | 200 Paul Av | Intelligent Technologies & Services Inc | expand ex fike cheetah fm200/preaction systm ex/new devices from same mfg for device cmptblty 5th flDetails
expand ex fike cheetah fm200/preaction systm ex/new devices from same mfg for device cmptblty 5th fl | $27,000 |
| Oct 30, 2000 | Completed final sign-off May 2001 | 200 Paul Av | Anderson, Rowe & Buckley, Inc. | provide tenant fire protection work 5th floor, work includes new pre action system (2 sets of hydrDetails
provide tenant fire protection work 5th floor, work includes new pre action system (2 sets of hydr | $59,000 |
| Oct 24, 2000 | Completed final sign-off Mar 2002 | 200 Paul Av | partion walls offices permit 990599 referenceDetails
partion walls offices permit 990599 reference | $50,000 | |
| Sep 27, 2000 | Completed final sign-off Mar 2001 | 200 Paul Av | correct detalil of 9911833 and eliminate cement detail , provide as built detailDetails
correct detalil of 9911833 and eliminate cement detail , provide as built detail | ||
| Sep 27, 2000 | Completed final sign-off Feb 2001 | 200 Paul Av | Anderson, Rowe & Buckley, Inc. | provide tenant fire protection work 5th flr phase iDetails
provide tenant fire protection work 5th flr phase i | $4,290 |
| Sep 18, 2000 | Expired or cancelled expired Jan 2001 | 200 Paul Av | street spaceDetails
street space | ||
| Sep 16, 2000 | Completed final sign-off May 2001 | 200 Paul Av | provide tenant improvement on 5/f bldg 1 shipping & receiving rm 500c & 2 dc batteryDetails
provide tenant improvement on 5/f bldg 1 shipping & receiving rm 500c & 2 dc battery | $200,000 | |
| Aug 23, 2000 | Expired or cancelled expired May 2002 | 200 Paul Av | Siemens Industry, Inc. | fire alm hrns,strobes, pull station install to nettel 1st fl ten sp as on pla fa-01 will connect toDetails
fire alm hrns,strobes, pull station install to nettel 1st fl ten sp as on pla fa-01 will connect to | $15,000 |
| Aug 19, 2000 | Completed final sign-off May 2001 | 200 Paul Av | battery rm ti under ap #200005089318 mech under #200008188195 5/fDetails
battery rm ti under ap #200005089318 mech under #200008188195 5/f | ||
| Aug 18, 2000 | Completed final sign-off Jan 2001 | 200 Paul Av | provide mechanical per planDetails
provide mechanical per plan | ||
| Aug 4, 2000 | Completed final sign-off Jun 2001 | 200 Paul Av | Cic Associates, Inc | renewal of pa 9910269Details
renewal of pa 9910269 | $1,000 |
| Aug 2, 2000 | Expired or cancelled withdrawn Jan 2001 | 200 Paul Av | t/i include battery rm interior and exterior emergency genrator with fuel roomDetails
t/i include battery rm interior and exterior emergency genrator with fuel room | $50,000 | |
| Jul 28, 2000 | Completed final sign-off Jan 2001 | 200 Paul Av | Siemens Industry, Inc. | 5th flr -tenant remodel on the (e)fire alarm systemDetails
5th flr -tenant remodel on the (e)fire alarm system | $15,500 |
| Jul 27, 2000 | Completed final sign-off Jan 2001 | 200 Paul Av | Intelligent Technologies & Services Inc | install new fm200 fire supression system 5th floor locationDetails
install new fm200 fire supression system 5th floor location | $12,000 |
| Jul 27, 2000 | Expired or cancelled expired May 2002 | 200 Paul Av | Intelligent Technologies & Services Inc | install new fike fire detection system 3rd floorDetails
install new fike fire detection system 3rd floor | $34,000 |
| Jul 15, 2000 | Expired or cancelled expired May 2002 | 200 Paul Av | t/i vct floor metal stud partitions computer rm air condition units ups power preaction fire protectDetails
t/i vct floor metal stud partitions computer rm air condition units ups power preaction fire protect | $600,000 | |
| Jul 13, 2000 | Completed final sign-off Mar 2002 | 200 Paul Av | construct dad for fule tank and generator.Details
construct dad for fule tank and generator. | $14,000 | |
| Jun 30, 2000 | Expired or cancelled expired May 2002 | 200 Paul Av | Geo M Robinson & Co | install pre-action system thru-outDetails
install pre-action system thru-out | $20,500 |
| Jun 27, 2000 | Expired or cancelled expired May 2002 | 200 Paul Av | Ayoob & Peery Plumbing Co Inc | install new pre-action systems)Details
install new pre-action systems) | $70,000 |
| May 25, 2000 | Completed final sign-off Feb 2002 | 200 Paul Av | grd floor-to install one door to be a revision to 9915406Details
grd floor-to install one door to be a revision to 9915406 | $5,000 | |
| May 24, 2000 | Completed final sign-off Feb 2001 | 200 Paul Av | Anderson, Rowe & Buckley, Inc. | provide fire protection work @ 5th fl.Details
provide fire protection work @ 5th fl. | $85,000 |
| May 18, 2000 | Expired or cancelled expired Jun 2001 | 200 Paul Av | Ayoob & Peery Plumbing Co Inc | install new preaction system per tenant improvements and partial wet sprinkler system.Details
install new preaction system per tenant improvements and partial wet sprinkler system. | $140,000 |
| May 15, 2000 | Expired or cancelled expired Oct 2002 | 200 Paul Av | Intelligent Technologies & Services Inc | install fike fire protection /suppression systemDetails
install fike fire protection /suppression system | $365,000 |
| May 13, 2000 | Expired or cancelled expired Feb 2003 | 200 Paul Av | 18,000 sq ft of space as a telecommunication transport equipment rm install mech air conditionDetails
18,000 sq ft of space as a telecommunication transport equipment rm install mech air condition | $2,000,000 | |
| May 10, 2000 | Expired or cancelled expired May 2002 | 200 Paul Av | to install one additional fuel tank & generatorDetails
to install one additional fuel tank & generator | $200,000 | |
| May 10, 2000 | Completed final sign-off Mar 2002 | 200 Paul Av | meet elect tenant improvements only.Details
meet elect tenant improvements only. | $120,000 | |
| May 8, 2000 | Completed final sign-off Nov 2000 | 200 Paul Av | tenant iprovements 5th floorDetails
tenant iprovements 5th floor | $900,000 | |
| Apr 29, 2000 | Expired or cancelled expired Feb 2003 | 200 Paul Av | install wall door mech sym and lighting for a switch gear phone equip battery installation under sepDetails
install wall door mech sym and lighting for a switch gear phone equip battery installation under sep | $2,200,000 | |
| Apr 20, 2000 | Expired or cancelled expired May 2002 | 200 Paul Av | modify work approved under 200003134115Details
modify work approved under 200003134115 | $1,000 | |
| Apr 18, 2000 | Completed final sign-off Mar 2002 | 200 Paul Av | to fill construction voids in (e) groundflr slab- rev. to pa#2000/01/28/484Details
to fill construction voids in (e) groundflr slab- rev. to pa#2000/01/28/484 | $8,500 | |
| Apr 10, 2000 | Expired or cancelled cancelled Apr 2001 | 200 Paul Av | t.i. 7300 sq.ft telecomm. switching facility/hvac systemDetails
t.i. 7300 sq.ft telecomm. switching facility/hvac system | $350,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.