Michael Orosco
- Listed as
- engineer
- Firm
- More Consulting, Inc
- Based in
- Mogran Hill
- On San Francisco permits
- Apr 2016 to Sep 2026
6 permits since 2000 (engineer on 6 permits): 2 completed, 2 in progress, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 16, 2026 | In progress filed Sep 2026, not yet issued | 201 Mission St | removal of existing building generator and installation of new building generator. expansion of existing concrete pad for generator. no new partitions, ceilings, etc.Details
removal of existing building generator and installation of new building generator. expansion of existing concrete pad for generator. no new partitions, ceilings, etc. | $286,644 | |
| Jun 2, 2025 | In progress filed Jun 2025, not yet issued | 200 Paul Av | live on line miggration of (e) critical distrib fr (e) 1500kw ups 2n distrb power to new 2n 1500kw ups. demo (e) ups and battery system & incoming & distrib switchboards. installation of 2 new switchboards & 4 new 750kw ups and lithium ion battery cabinets.Details
live on line miggration of (e) critical distrib fr (e) 1500kw ups 2n distrb power to new 2n 1500kw ups. demo (e) ups and battery system & incoming & distrib switchboards. installation of 2 new switchboards & 4 new 750kw ups and lithium ion battery cabinets. | $750,000 | |
| Jun 22, 2023 | Completed final sign-off Sep 2024 | 365 Main St | Northshore Build Llc | replace 3 existing cooling units with 3 new ones (interior)Details
replace 3 existing cooling units with 3 new ones (interior) | $300,000 |
| Jun 22, 2023 | Completed final sign-off Sep 2024 | 365 Main St | Northshore Build Llc | replace 12 existing cooling units with 12 new units (interior)Details
replace 12 existing cooling units with 12 new units (interior) | $900,000 |
| May 11, 2023 | Never finaled filed May 2023, never issued | 400 Howard St | Bass Electric | 2/f: removal of 4-extg lead acid battery ups systems and installation of 4-lithium battery ups systemsDetails
2/f: removal of 4-extg lead acid battery ups systems and installation of 4-lithium battery ups systems | $440,000 |
| Apr 6, 2016 | Expired or cancelled expired Nov 2020 | 200 Paul Av | Cupertino Electric Inc. | furnish and install (6) 225a panelboards and feeders; furnish and install (88) l6-30r receptacles. maher naDetails
furnish and install (6) 225a panelboards and feeders; furnish and install (88) l6-30r receptacles. maher na | $85,000 |