Northshore Build Llc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2023 to Feb 2025
- Last 24 months
- 1 permit filed
4 permits since 2000: 4 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 4, 2025 | Completed final sign-off Jul 2025 | 365 Main St | revision to permit 202409191134. adding cmu block wall in basement.Details
revision to permit 202409191134. adding cmu block wall in basement. | $50,000 |
| Sep 19, 2024 | Completed final sign-off Jul 2025 | 365 Main St | install of emergency water riser to feed cooling towers on roof. riser will not be connected to any city water connections, only to be utilized in emergency situations via water truckDetails
install of emergency water riser to feed cooling towers on roof. riser will not be connected to any city water connections, only to be utilized in emergency situations via water truck | $40,000 |
| Jun 22, 2023 | Completed final sign-off Sep 2024 | 365 Main St | replace 12 existing cooling units with 12 new units (interior)Details
replace 12 existing cooling units with 12 new units (interior) | $900,000 |
| Jun 22, 2023 | Completed final sign-off Sep 2024 | 365 Main St | replace 3 existing cooling units with 3 new ones (interior)Details
replace 3 existing cooling units with 3 new ones (interior) | $300,000 |