Block 3745, lot 008
365 Main St
- City’s use
- Industrial
- Stories
- 6
- Building
- 190,000 sq ft
- Lot
- 41,250 sq ft
- Zoning
- P
- Construction type
- S
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
81 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 19, 2025 | Completed final sign-off Jan 2026 | 365 Main St | Csi Electrical Contractors Inc | demo of some rpp panels. reusing (e) rpp panels & upsizing them from 225a. reusing pdu's and submitting single line diagrams, power and demo plans re-using majority of (e) single line diagramDetails
demo of some rpp panels. reusing (e) rpp panels & upsizing them from 225a. reusing pdu's and submitting single line diagrams, power and demo plans re-using majority of (e) single line diagram | $270,000 |
| Mar 19, 2025 | Completed final sign-off Jan 2026 | 365 Main St | Csi Electrical Contractors Inc | demo of pdu/sts. adding (n) cupsized pdu & sts. addition of rpp panels. demo of single line diagram with exception of (e) rpp panels and switch boards c1 and cr1Details
demo of pdu/sts. adding (n) cupsized pdu & sts. addition of rpp panels. demo of single line diagram with exception of (e) rpp panels and switch boards c1 and cr1 | $680,000 |
| Feb 4, 2025 | Completed final sign-off Jul 2025 | 365 Main St | Northshore Build Llc | revision to permit 202409191134. adding cmu block wall in basement.Details
revision to permit 202409191134. adding cmu block wall in basement. | $50,000 |
| Sep 30, 2024 | In progress filed Sep 2024, not yet issued | 365 Main St | electric sign replacement: digital realty s.002Details
electric sign replacement: digital realty s.002 | ||
| Sep 30, 2024 | In progress issued Oct 2024 | 365 Main St | Discount Signs & Neon Inc | electric sign replacement: digital realtyDetails
electric sign replacement: digital realty | $16,585 |
| Sep 30, 2024 | In progress issued Oct 2024 | 365 Main St | Discount Signs & Neon Inc | to erect new replacement sign: digital realtyDetails
to erect new replacement sign: digital realty | $16,585 |
| Sep 19, 2024 | Completed final sign-off Jul 2025 | 365 Main St | Northshore Build Llc | install of emergency water riser to feed cooling towers on roof. riser will not be connected to any city water connections, only to be utilized in emergency situations via water truckDetails
install of emergency water riser to feed cooling towers on roof. riser will not be connected to any city water connections, only to be utilized in emergency situations via water truck | $40,000 |
| Jun 11, 2024 | Completed final sign-off Jul 2024 | 365 Main St | Everon Llc | 1/f: fire alarm as built for permit 202308114240. add vesda pipping connect to existing vesda unit and monitor built-in duct detectors for 3 additional crac units per sffd field inspector directive.Details
1/f: fire alarm as built for permit 202308114240. add vesda pipping connect to existing vesda unit and monitor built-in duct detectors for 3 additional crac units per sffd field inspector directive. | $6,000 |
| Aug 11, 2023 | Completed final sign-off Dec 2023 | 365 Main St | Everon Llc | 4th floor: modify extg vesda unit piping layout for mdf crac units replacement. ref app#202306220660Details
4th floor: modify extg vesda unit piping layout for mdf crac units replacement. ref app#202306220660 | $1,400 |
| Aug 11, 2023 | Completed final sign-off Jul 2024 | 365 Main St | Everon Llc | 1st fl - modify existing vesda units piping layout for c0l02 crac units replacement. ref pa 2023-0622-0656Details
1st fl - modify existing vesda units piping layout for c0l02 crac units replacement. ref pa 2023-0622-0656 | $3,200 |
| Jun 22, 2023 | Completed final sign-off Sep 2024 | 365 Main St | Northshore Build Llc | replace 12 existing cooling units with 12 new units (interior)Details
replace 12 existing cooling units with 12 new units (interior) | $900,000 |
| Jun 22, 2023 | Completed final sign-off Sep 2024 | 365 Main St | Northshore Build Llc | replace 3 existing cooling units with 3 new ones (interior)Details
replace 3 existing cooling units with 3 new ones (interior) | $300,000 |
| Oct 29, 2021 | Never finaled issued Nov 2021, no final | 365 Main St | Accutite Technology Engineering | installation of solenoid, check valve, flow sensor, sight glass & manual by pass line in each existing manifold supply lines in fuel filtration room, betw usts & day tanks ** maher: n/a **Details
installation of solenoid, check valve, flow sensor, sight glass & manual by pass line in each existing manifold supply lines in fuel filtration room, betw usts & day tanks ** maher: n/a ** | $40,000 |
| Mar 16, 2021 | Completed final sign-off Jun 2021 | 365 Main St | Rosendin Electric, Inc. | decommission global epo system by disconnecting dc power to epo panel, removing epo connections to the io diesel rotary ups's, remarry epo connection to the main 35kv utility circuit breaker, removing all interconnection wiring epo panel and remote devices as well as conduit. this is a life safety iDetails
decommission global epo system by disconnecting dc power to epo panel, removing epo connections to the io diesel rotary ups's, remarry epo connection to the main 35kv utility circuit breaker, removing all interconnection wiring epo panel and remote devices as well as conduit. this is a life safety i | $45,000 |
| Jun 18, 2020 | Never finaled filed Jun 2020, never issued | 365 Main St | Rosendin Electric, Inc. | refurbish hitec dynamic rotary uninterruptible power system [drups]. replace (e) hitec induction coupling [ic] module with (n) hitec kinetic energy module [kem]. replace (e) avk alternator with (n) avk alternator. reconnect (e) 3000a feeder to (n) alternator. install (n) hitec usp panel with bus tapDetails
refurbish hitec dynamic rotary uninterruptible power system [drups]. replace (e) hitec induction coupling [ic] module with (n) hitec kinetic energy module [kem]. replace (e) avk alternator with (n) avk alternator. reconnect (e) 3000a feeder to (n) alternator. install (n) hitec usp panel with bus tap | $4,500,000 |
| Jun 6, 2018 | Completed final sign-off Dec 2018 | 365 Main St | Dpr Construction | construct temporary noise barriers at the side of rooftop mechanical mezzanine walkway in order to reduce e mechanical equipment noise and comply with sfpc noise limit requirementsDetails
construct temporary noise barriers at the side of rooftop mechanical mezzanine walkway in order to reduce e mechanical equipment noise and comply with sfpc noise limit requirements | $100,000 |
| Jan 19, 2017 | Completed final sign-off Feb 2017 | 365 Main St | Red Hawk Fire & Security Ca Llc | 4/f: fire alarm t.i.: add 3 horns/strobes, 1 control relay for security door. ref. #2016-12-27-5940Details
4/f: fire alarm t.i.: add 3 horns/strobes, 1 control relay for security door. ref. #2016-12-27-5940 | $2,100 |
| Jan 11, 2017 | Completed final sign-off Jan 2017 | 365 Main St | R L H Fire Protection Inc | fire sprinkler ti add 2 sprinklers ref 201612275940Details
fire sprinkler ti add 2 sprinklers ref 201612275940 | $5,686 |
| Jan 5, 2017 | Completed final sign-off Mar 2017 | 365 Main St | Hathaway Dinwiddie Co. | approved permit 201612275940 revision 1 adding electrical and mechanical drawings. n/a for maher.Details
approved permit 201612275940 revision 1 adding electrical and mechanical drawings. n/a for maher. | |
| Dec 27, 2016 | Completed final sign-off Mar 2017 | 365 Main St | Hathaway Dinwiddie Co. | full demolition of 4th fl suite interior space. ti includes but not limited to: new walls, carpet, paint, ceiling grid and tilesDetails
full demolition of 4th fl suite interior space. ti includes but not limited to: new walls, carpet, paint, ceiling grid and tiles | $500,000 |
| Jan 27, 2014 | Completed final sign-off Feb 2014 | 365 Main St | Potter Fire Protection | 2nd floor: relocate 2 fire sprinklers. ref app#201401236900. n/a for maher ordinance no 155-13Details
2nd floor: relocate 2 fire sprinklers. ref app#201401236900. n/a for maher ordinance no 155-13 | $1,120 |
| Jan 23, 2014 | Completed final sign-off Apr 2014 | 365 Main St | Tcg Builders Inc Dba The Core Group | 26 lf of new drywall partitons, lighting. relocate carpet and paintDetails
26 lf of new drywall partitons, lighting. relocate carpet and paint | $25,000 |
| Oct 16, 2013 | Completed final sign-off Oct 2013 | 365 Main St | Red Hawk Fire & Security Ca Llc | fire alarm t.i. adding monitoring for new tamper switches, (7) monitor modules.Details
fire alarm t.i. adding monitoring for new tamper switches, (7) monitor modules. | $5,000 |
| Aug 12, 2013 | Never finaled issued Aug 2013, no final | 365 Main St | Ad Art Inc. | erect (2) two illuminated single faced wall signs.Details
erect (2) two illuminated single faced wall signs. | $10,000 |
| Jul 2, 2013 | Completed final sign-off Jul 2013 | 365 Main St | Anderson, Rowe & Buckley, Inc. | as built fire sprinkler system. old sprinler system pa#201304033695 arb-spkrs t.i. pa#201206072090 gcDetails
as built fire sprinkler system. old sprinler system pa#201304033695 arb-spkrs t.i. pa#201206072090 gc | $5,000 |
| May 13, 2013 | Never finaled issued May 2013, no final | 365 Main St | Truebeck Construction | revision to existing permit #201206072090, rearrange fixtures and doors to comply with 2010 ada and emergency regulations of 2010 cbc effective 08/01/2012.Details
revision to existing permit #201206072090, rearrange fixtures and doors to comply with 2010 ada and emergency regulations of 2010 cbc effective 08/01/2012. | |
| Apr 16, 2013 | Completed final sign-off Apr 2013 | 160 Harrison St | Truebeck Construction | to obtain final inspection for work approved under pa#200005028860. all work is complete.Details
to obtain final inspection for work approved under pa#200005028860. all work is complete. | |
| Apr 3, 2013 | Completed final sign-off Jul 2013 | 365 Main St | Anderson, Rowe & Buckley, Inc. | 1st, 2nd, 3rd floor: fire sprinkler system extg t.i. relocate and add 43 sprinklers - 1 thru 4 corridors & lobbies. relocate 28 sprinklers - 3rd fl mgmt office. lobby app#201206072090. app for for office #201206082234Details
1st, 2nd, 3rd floor: fire sprinkler system extg t.i. relocate and add 43 sprinklers - 1 thru 4 corridors & lobbies. relocate 28 sprinklers - 3rd fl mgmt office. lobby app#201206072090. app for for office #201206082234 | $35,000 |
| Mar 26, 2013 | Completed final sign-off Jul 2013 | 365 Main St | Red Hawk Fire & Security Ca Llc | fire alarm ti on 1st & 3rd flrs: 17 smoke detectors, 2 duct detectors, 4 horn/strobes, 4 strobes; reference 201302150300Details
fire alarm ti on 1st & 3rd flrs: 17 smoke detectors, 2 duct detectors, 4 horn/strobes, 4 strobes; reference 201302150300 | $7,000 |
| Mar 21, 2013 | Completed final sign-off Oct 2013 | 365 Main St | Potter Fire Protection | install 2 bypass fire department connection loops to allow backflush w/o having to drain building. approved by fpe fred stumpp.Details
install 2 bypass fire department connection loops to allow backflush w/o having to drain building. approved by fpe fred stumpp. | $5,480 |
| Feb 15, 2013 | Never finaled issued Feb 2013, no final | 365 Main St | Truebeck Construction | - -` 1st/3rd flrs reference 201206072090 and 201206082234; demo only of non load bearing partitions ceiling etc, mech, elec and plmbg eqpt in lobby and 3rd flr, mgt offices, areas are vacant space as per ab-017 interior work onlyDetails
- -` 1st/3rd flrs reference 201206072090 and 201206082234; demo only of non load bearing partitions ceiling etc, mech, elec and plmbg eqpt in lobby and 3rd flr, mgt offices, areas are vacant space as per ab-017 interior work only | $1,000 |
| Oct 25, 2012 | Completed final sign-off Dec 2012 | 365 Main St | Viking Sign Installations | installation of 1-illuminated electrical wall sign.Details
installation of 1-illuminated electrical wall sign. | $5,000 |
| Aug 14, 2012 | Completed final sign-off Oct 2012 | 365 Main St | Skyline Construction | revision to 201201101962. modification to remove 1 non required drinking fountainDetails
revision to 201201101962. modification to remove 1 non required drinking fountain | |
| Jul 26, 2012 | Completed final sign-off Feb 2013 | 365 Main St | Red Hawk Fire & Security Ca Llc | 2nd/3rd/4th floors-disconnect vesda detectors & duct detectors from crac units & re-connect to replacement units. all equipment supplies by others.Details
2nd/3rd/4th floors-disconnect vesda detectors & duct detectors from crac units & re-connect to replacement units. all equipment supplies by others. | $4,000 |
| Jun 8, 2012 | Completed final sign-off Jul 2013 | 365 Main St | Truebeck Construction | tenant improvements: non load bearing partitions, ceilings, furnishings and modifications to (e) doors, modifications to (e) mechanical, electrical & plumbing distribution systems with design build.Details
tenant improvements: non load bearing partitions, ceilings, furnishings and modifications to (e) doors, modifications to (e) mechanical, electrical & plumbing distribution systems with design build. | $850,000 |
| Jun 7, 2012 | Completed final sign-off Jul 2013 | 365 Main St | Truebeck Construction | tenant improvement: non-load bearing partitions, ceilings, furnishings & modifications to (e) doos, modifications to (e) mechanical, electrical & plumbing distribution systems.Details
tenant improvement: non-load bearing partitions, ceilings, furnishings & modifications to (e) doos, modifications to (e) mechanical, electrical & plumbing distribution systems. | $1,300,000 |
| May 25, 2012 | Completed final sign-off Sep 2012 | 365 Main St | Tcg Builders Inc Dba The Core Group | @ 2nd., 3rd. & 4th. flrs: air handling units,expand backup electrical systems.Details
@ 2nd., 3rd. & 4th. flrs: air handling units,expand backup electrical systems. | $350,000 |
| May 25, 2012 | Completed final sign-off Sep 2012 | 365 Main St | Tcg Builders Inc Dba The Core Group | replace hvac equipment @ 2nd., 3rd. & 4th. flr.install humidifyer at 1st,2nd,3rd, and 4thf floor.Details
replace hvac equipment @ 2nd., 3rd. & 4th. flr.install humidifyer at 1st,2nd,3rd, and 4thf floor. | $1,350,000 |
| May 18, 2012 | Completed final sign-off Jun 2012 | 365 Main St | Red Hawk Fire & Security Ca Llc | 1st floor:revision to app#200912042671. added 1 epo switch. changed heat pump operation on fa matrix.Details
1st floor:revision to app#200912042671. added 1 epo switch. changed heat pump operation on fa matrix. | $1,500 |
| May 15, 2012 | Completed final sign-off Oct 2012 | 365 Main St | Skyline Construction | revision to appl #2012.01.10.1962 - modification to remvoe 1 non-required exit door.Details
revision to appl #2012.01.10.1962 - modification to remvoe 1 non-required exit door. | |
| Mar 22, 2012 | Completed final sign-off Sep 2013 | 365 Main St | Red Hawk Fire & Security Ca Llc | fire alarm ti. colo 9 addition. 3 vesda detector, 13 sign - uio., 13 mctz modules, 62 smoke detectors, 2 horn/strobes.Details
fire alarm ti. colo 9 addition. 3 vesda detector, 13 sign - uio., 13 mctz modules, 62 smoke detectors, 2 horn/strobes. | $30,000 |
| Mar 14, 2012 | Never finaled issued Mar 2012, no final | 365 Main St | Potter Fire Protection | 1st floor:convert extg wet pipe fire sprinkler system to pre-action. add 13 fire sprinklers to remodeled area.Details
1st floor:convert extg wet pipe fire sprinkler system to pre-action. add 13 fire sprinklers to remodeled area. | $9,500 |
| Feb 21, 2012 | Never finaled issued Feb 2012, no final | 365 Main St | street space and mta parkingDetails
street space and mta parking | ||
| Jan 10, 2012 | Completed final sign-off Sep 2012 | 365 Main St | Skyline Construction | tenant improvement in an extg data center. improvements consist of new walls, doors, finishes new mechanical, electrical and plumbing work.Details
tenant improvement in an extg data center. improvements consist of new walls, doors, finishes new mechanical, electrical and plumbing work. | $400,000 |
| Oct 5, 2011 | Completed final sign-off Nov 2011 | 365 Main St | Red Hawk Fire & Security Ca Llc | tenant improvement with new fie alarm devices and relocation of existing (monitor mods) devices for sutie 304 data room at 365 main st. adding a new vesda vlp detector with 4 zones. relocate existing monitor modules.also add 2 zones to existing vesda system.Details
tenant improvement with new fie alarm devices and relocation of existing (monitor mods) devices for sutie 304 data room at 365 main st. adding a new vesda vlp detector with 4 zones. relocate existing monitor modules.also add 2 zones to existing vesda system. | $10,000 |
| Jul 19, 2011 | Completed final sign-off Oct 2011 | 365 Main St | Skyline Construction | floor 3, ste 304 -interior improvements to existing data center. new paint, base mouldings, new mechanical and electricalDetails
floor 3, ste 304 -interior improvements to existing data center. new paint, base mouldings, new mechanical and electrical | $50,000 |
| Dec 4, 2009 | Never finaled issued Dec 2009, no final | 365 Main St | Cupertino Electric Inc. | provide new fire alarm devices and relocate the existing devices for the colo (1) project @ 365 main street, 1st and 2nd flDetails
provide new fire alarm devices and relocate the existing devices for the colo (1) project @ 365 main street, 1st and 2nd fl | $500,000 |
| Nov 10, 2009 | Never finaled issued Nov 2009, no final | 365 Main St | Teutonic Construction Inc | this is a structural revision to (e) pa# 2008-0905-0920-we added a wide flange steel beam for added support. steel was inspected by tam chu, who requested we submit changesDetails
this is a structural revision to (e) pa# 2008-0905-0920-we added a wide flange steel beam for added support. steel was inspected by tam chu, who requested we submit changes | |
| Sep 5, 2008 | Completed final sign-off Jul 2013 | 365 Main St | conversion of an (e) conference room to an hvac/mechanical room includes mechanical & electrical for addition cooling capacity to (e) cool location space. nov 200344481-bid. replace (e) windows at 2nd floor along main sreet with (n) louvers for outside ventilation.Details
conversion of an (e) conference room to an hvac/mechanical room includes mechanical & electrical for addition cooling capacity to (e) cool location space. nov 200344481-bid. replace (e) windows at 2nd floor along main sreet with (n) louvers for outside ventilation. | $500,000 | |
| Jul 25, 2006 | Expired or cancelled expired Aug 2008 | 365 Main St | Diversified Fire Products | fire alarm t/i - addition of smoke detectors, monitor modules, and notification devices; modification of vesda system 1st floorDetails
fire alarm t/i - addition of smoke detectors, monitor modules, and notification devices; modification of vesda system 1st floor | $26,960 |
| Jun 7, 2006 | Expired or cancelled expired Sep 2007 | 365 Main St | Diversified Fire Products | record drawings submitted for approved per field inspector ealmy for appl#200604259755 8 (n) smokes 3 rd floor colo 5Details
record drawings submitted for approved per field inspector ealmy for appl#200604259755 8 (n) smokes 3 rd floor colo 5 | $2,000 |
| Apr 25, 2006 | Expired or cancelled expired Sep 2007 | 365 Main St | Diversified Fire Products | fire alarm ti, addition of smoke detectors, monitor modules, and av devices. modification of vesda system 3rd floorDetails
fire alarm ti, addition of smoke detectors, monitor modules, and av devices. modification of vesda system 3rd floor | $39,135 |
| Jan 13, 2006 | Expired or cancelled expired Sep 2007 | 365 Main St | Diversified Fire Products | bring data center on line,new smoke detectors and vesda systems.horn/strobes are existing and operational.Details
bring data center on line,new smoke detectors and vesda systems.horn/strobes are existing and operational. | $41,000 |
| Nov 8, 2005 | Never finaled issued Dec 2005, no final | 365 Main St | Diversified Fire Products | add smoke detectors (120) bring vesda systems on line (7)Details
add smoke detectors (120) bring vesda systems on line (7) | $28,000 |
| Aug 24, 2005 | Never finaled issued Aug 2005, no final | 365 Main St | street spaceDetails
street space | ||
| Jun 14, 2005 | Expired or cancelled expired Sep 2007 | 365 Main St | Cupertino Electric Inc. | fire alarm t.i. adding smoke detectors & vesda systems in colo 4 on 2/fDetails
fire alarm t.i. adding smoke detectors & vesda systems in colo 4 on 2/f | $45,000 |
| May 20, 2005 | Completed final sign-off Jan 2007 | 160 Harrison St | provide soil nails, tie back per plan.Details
provide soil nails, tie back per plan. | $25,000 | |
| Jun 21, 2001 | Expired or cancelled expired Oct 2001 | 365 Main St | R L H Fire Protection Inc | revise sprinkler supply to sprinklers over parking garage entry ramp room preaction to wet systemDetails
revise sprinkler supply to sprinklers over parking garage entry ramp room preaction to wet system | $750 |
| Jun 19, 2001 | Expired or cancelled expired Dec 2001 | 365 Main St | R L H Fire Protection Inc | remodel of existing automatic fire sprikler system on ground floor, for tenant improvement of paix iDetails
remodel of existing automatic fire sprikler system on ground floor, for tenant improvement of paix i | $11,300 |
| Jun 1, 2001 | Expired or cancelled expired Dec 2001 | 160 Harrison St | Cupertino Electric Inc. | expansion of (e) addressable fire alarm system on g/floorDetails
expansion of (e) addressable fire alarm system on g/floor | $20,000 |
| May 16, 2001 | Expired or cancelled expired Oct 2003 | 365 Main St | one-stop:m.tjoe:partial tenant improvementDetails
one-stop:m.tjoe:partial tenant improvement | $300,000 | |
| May 4, 2001 | Expired or cancelled cancelled Aug 2006 | 365 Main St | Details
| $700,000 | |
| Feb 28, 2001 | Expired or cancelled expired Jun 2001 | 160 Harrison St | R L H Fire Protection Inc | revise 2000/10/25/4005. converts part of penthouse to a wet sprinkler system.Details
revise 2000/10/25/4005. converts part of penthouse to a wet sprinkler system. | |
| Feb 6, 2001 | Expired or cancelled expired Jun 2001 | 160 Harrison St | Hathaway Dinwiddie Co. | revision to app#200005180355 fuel on diagram detail sheet #p.4:03 onlyDetails
revision to app#200005180355 fuel on diagram detail sheet #p.4:03 only | |
| Jan 24, 2001 | Expired or cancelled expired May 2001 | 160 Harrison St | erect a non-electric single faced wall signDetails
erect a non-electric single faced wall sign | $500 | |
| Dec 6, 2000 | Expired or cancelled expired May 2001 | 160 Harrison St | electricalk heat permit per app #200005180355Details
electricalk heat permit per app #200005180355 | ||
| Dec 1, 2000 | Expired or cancelled expired Jan 2002 | 160 Harrison St | R L H Fire Protection Inc | fire sprinklers -phase 4-bsement locationDetails
fire sprinklers -phase 4-bsement location | $120,000 |
| Nov 18, 2000 | Expired or cancelled expired Jul 2001 | 160 Harrison St | Thomas Swan Sign Co Inc | single-faced electrial sign on wallDetails
single-faced electrial sign on wall | $20,000 |
| Oct 25, 2000 | Expired or cancelled expired Nov 2001 | 160 Harrison St | R L H Fire Protection Inc | fire sprinklers-phase 3-level 1 & penthouseDetails
fire sprinklers-phase 3-level 1 & penthouse | $240,000 |
| Oct 25, 2000 | Expired or cancelled expired Nov 2001 | 160 Harrison St | R L H Fire Protection Inc | fire sprinklers-phase 2-level 4-4th floorDetails
fire sprinklers-phase 2-level 4-4th floor | $120,000 |
| Sep 20, 2000 | Expired or cancelled expired Jan 2002 | 160 Harrison St | fire alarm system for entire bldgDetails
fire alarm system for entire bldg | $250,000 | |
| Aug 29, 2000 | Expired or cancelled expired Aug 2002 | 160 Harrison St | R L H Fire Protection Inc | phase i fire sprinklers per plans levels 2 & 3Details
phase i fire sprinklers per plans levels 2 & 3 | $400,000 |
| Aug 7, 2000 | Expired or cancelled expired Dec 2000 | 160 Harrison St | partial interior seismic upgradeDetails
partial interior seismic upgrade | ||
| Aug 3, 2000 | Expired or cancelled expired Dec 2000 | 160 Harrison St | shoring permit -20000528860 for task 3 in public right of wayDetails
shoring permit -20000528860 for task 3 in public right of way | ||
| Aug 1, 2000 | Expired or cancelled expired Dec 2000 | 160 Harrison St | seismic upgrade to existing 4 story bldgDetails
seismic upgrade to existing 4 story bldg | ||
| Jul 21, 2000 | Expired or cancelled expired Nov 2000 | 160 Harrison St | reinforce existing concrete roof structure - 4th floorDetails
reinforce existing concrete roof structure - 4th floor | ||
| Jun 22, 2000 | Expired or cancelled expired Jun 2001 | 160 Harrison St | street spaceDetails
street space | ||
| Jun 5, 2000 | Expired or cancelled expired Jun 2002 | 160 Harrison St | Hathaway Dinwiddie Co. | structural demo breakout of the demo cover in app #200005028860Details
structural demo breakout of the demo cover in app #200005028860 | $400,000 |
| May 18, 2000 | Never finaled issued Oct 2000, no final | 160 Harrison St | remodel existing bldg new mechanical penthouse new exterior facade work new exiting new mechanicalDetails
remodel existing bldg new mechanical penthouse new exterior facade work new exiting new mechanical | $27,000,000 | |
| May 12, 2000 | Expired or cancelled expired May 2001 | 160 Harrison St | interior soft demolitionDetails
interior soft demolition | $95,000 | |
| May 2, 2000 | Expired or cancelled expired Apr 2013 | 160 Harrison St | seismic upgrade to all floors and exterior openings at 1st flr levelDetails
seismic upgrade to all floors and exterior openings at 1st flr level | $2,100,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.