- Apr 2015 to Nov 2025
60 permits since 2000 (engineer on 59 permits, architect on 1 permit): 37 completed, 5 in progress, 13 never finaled, 5 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 21, 2025 | In progress filed Nov 2025, not yet issued | 775 Sutter St | construction of a new 26 story type i-a with 1 basement mixed use building with 36 dwelling units.Details
construction of a new 26 story type i-a with 1 basement mixed use building with 36 dwelling units. | $22,800,000 | |
| Jul 28, 2025 | In progress issued Aug 2025 | 1652 Sunnydale Av | Cahill Guzman Construction Group Jv | tower crane foundation and crane installation. tower crane for use during construction only. to be located within courtyard footprint. dismantling will be completed prior to turnover of building. reference to building pa# 202211146447s.Details
tower crane foundation and crane installation. tower crane for use during construction only. to be located within courtyard footprint. dismantling will be completed prior to turnover of building. reference to building pa# 202211146447s. | $50,000 |
| May 8, 2025 | Completed final sign-off Dec 2025 | 3900 03rd St | Singular Builders | priority: soft story upgrade per city of san francisco mandatory soft story program (mssp)-19 srosDetails
priority: soft story upgrade per city of san francisco mandatory soft story program (mssp)-19 sros | $90,000 |
| Feb 25, 2025 | Completed final sign-off Aug 2026 | 1075 California St | Build Singular Joint Venture | renovation of all (e) guest rooms including new finishes and furnishings,full (n) bath renovations,(n) lighting,conversion of select guest rooms at level 12 to presidential suite.refresh of finishes,furnishings,and lighting at spa and pool,main lobby,big 4 restaurant,select partition changes...Details
renovation of all (e) guest rooms including new finishes and furnishings,full (n) bath renovations,(n) lighting,conversion of select guest rooms at level 12 to presidential suite.refresh of finishes,furnishings,and lighting at spa and pool,main lobby,big 4 restaurant,select partition changes... | $15,000,000 |
| Feb 11, 2025 | In progress issued Nov 2025 | 1687 Market St | Build Group Inc. | mayors directive 13-01: construction of a 17-story type i-a, 94 units of 100% affordable housing. 17 total stories of occupancy including 2 basements providing both dwelling units and art community colaboration spaces.Details
mayors directive 13-01: construction of a 17-story type i-a, 94 units of 100% affordable housing. 17 total stories of occupancy including 2 basements providing both dwelling units and art community colaboration spaces. | $70,205,789 |
| Feb 4, 2025 | Completed final sign-off Jul 2025 | 365 Main St | Northshore Build Llc | revision to permit 202409191134. adding cmu block wall in basement.Details
revision to permit 202409191134. adding cmu block wall in basement. | $50,000 |
| Sep 19, 2024 | Completed final sign-off Jul 2025 | 365 Main St | Northshore Build Llc | install of emergency water riser to feed cooling towers on roof. riser will not be connected to any city water connections, only to be utilized in emergency situations via water truckDetails
install of emergency water riser to feed cooling towers on roof. riser will not be connected to any city water connections, only to be utilized in emergency situations via water truck | $40,000 |
| Aug 26, 2024 | Completed final sign-off Nov 2025 | 200 Folsom St | Swinerton Rubecon Joint Venture | 200 folsom street west: rev to 202208019628-s2, revise s2.01 and s2.01-0 to show extended mat foundation due to ground improvement obstructions found in the courtyard and at a portion of building foundation.Details
200 folsom street west: rev to 202208019628-s2, revise s2.01 and s2.01-0 to show extended mat foundation due to ground improvement obstructions found in the courtyard and at a portion of building foundation. | |
| Aug 22, 2024 | Expired or cancelled withdrawn Mar 2026 | 200 Folsom St | Swinerton Builders | 200 folsom st west: rev to 202208019628-s3 due to changes in the emergency generator location.Details
200 folsom st west: rev to 202208019628-s3 due to changes in the emergency generator location. | |
| Aug 16, 2024 | Completed final sign-off Apr 2026 | 200 Folsom St | Swinerton Builders | 100% affordable housing. revision to 2022-1118-6863-s3, structural permit due to unforseen obstructions encountered during ground improvement work & excavation.Details
100% affordable housing. revision to 2022-1118-6863-s3, structural permit due to unforseen obstructions encountered during ground improvement work & excavation. | $26,467 |
| Jul 22, 2024 | Completed final sign-off Apr 2026 | 200 Folsom St | Swinerton Rubecon Joint Venture | tower crane foundation for construction to be used for 200 folsom east in support of 2022-1118-6863. 100% affordable senior housing with apprpoved priority review.Details
tower crane foundation for construction to be used for 200 folsom east in support of 2022-1118-6863. 100% affordable senior housing with apprpoved priority review. | $84,467 |
| Jul 10, 2024 | In progress issued Jan 2025 | 1833 Page St | roof repair. exterior wall waterproof coating. exterior window repairs and painting. remove and replace existing roof access ladder in kind (ladder under a separate permit).Details
roof repair. exterior wall waterproof coating. exterior window repairs and painting. remove and replace existing roof access ladder in kind (ladder under a separate permit). | $500,000 | |
| Dec 4, 2023 | Completed final sign-off Jan 2025 | 77 Bruton St | Sun Light & Power | closed loopsolar domestic hot water system with (24)heliodynegobi 410 collectors & (1) 1500 gallon tank.Details
closed loopsolar domestic hot water system with (24)heliodynegobi 410 collectors & (1) 1500 gallon tank. | $265,605 |
| Apr 24, 2023 | Completed final sign-off Apr 2025 | 555 Bryant St | Swinerton Builders | tower crane erection & operation & foundation.Details
tower crane erection & operation & foundation. | $500,000 |
| Dec 14, 2022 | In progress issued Dec 2023 | 3270 18th St | Build Group Inc. | erect a new 4 story school(k-8) bldg, no dwellings,no basement.type 3-aDetails
erect a new 4 story school(k-8) bldg, no dwellings,no basement.type 3-a | $13,500,000 |
| Dec 2, 2022 | Completed final sign-off Dec 2024 | 77 Bruton St | James E Roberts-Obayashi Corporation | parcel c2.2 - tower crane erection; temporary use. potain mdt219 j10 tower crame with 164 ft long jib at 131.2ft in ht. ref site bpa# 201912169614. (mayor ed 17-02 priority)Details
parcel c2.2 - tower crane erection; temporary use. potain mdt219 j10 tower crame with 164 ft long jib at 131.2ft in ht. ref site bpa# 201912169614. (mayor ed 17-02 priority) | $70,000 |
| Nov 21, 2022 | Completed final sign-off Mar 2024 | 50 Colton St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | mayoral ed-17-02 for 'mazzola garden' public open space on bart parcel (3505/034) per the 1629 market dev. agreement. scope includes: 1) concrete masonry unit enclosure w/gate to surround (e) bart vent structure 2) tensile fabric canopy within enclosure 3) new paving 4) new planting areas 5) k4 rateDetails
mayoral ed-17-02 for 'mazzola garden' public open space on bart parcel (3505/034) per the 1629 market dev. agreement. scope includes: 1) concrete masonry unit enclosure w/gate to surround (e) bart vent structure 2) tensile fabric canopy within enclosure 3) new paving 4) new planting areas 5) k4 rate | $200,000 |
| Aug 1, 2022 | Completed final sign-off Jul 2026 | 200 Folsom St | Swinerton Rubecon Joint Venture, Swinerton Builders | erect a 9-story over zero basement type ib, 100% affordable residential building with 151 senior housing units. mayor ed 17-02.Details
erect a 9-story over zero basement type ib, 100% affordable residential building with 151 senior housing units. mayor ed 17-02. | $56,977,150 |
| Jan 28, 2022 | Completed final sign-off Apr 2022 | 588 Mission Bay Blvd North Bl | Nibbi Bros Assoc Inc. | repairs to (e) laundry room including structural repairs. replacement of damaged roofing & revisions to mechanical system.Details
repairs to (e) laundry room including structural repairs. replacement of damaged roofing & revisions to mechanical system. | $350,000 |
| May 26, 2021 | Completed final sign-off Oct 2021 | 830 Eddy St | Webcor Construction Lp | level 1 and 2 unit guardrails and roof level glass guardrails at roof parapet. shop drawings per approval under 201612285985Details
level 1 and 2 unit guardrails and roof level glass guardrails at roof parapet. shop drawings per approval under 201612285985 | |
| May 24, 2021 | Never finaled filed May 2021, never issued | 200 Kansas St | Bcci Construction Company | horizontal and vertical addition, and change of use -retains part of (e)perimeter wall, and major alteration (core and shell). separate t.i. permitDetails
horizontal and vertical addition, and change of use -retains part of (e)perimeter wall, and major alteration (core and shell). separate t.i. permit | $30,000,000 |
| May 11, 2021 | Never finaled issued Sep 2021, no final | 879 La Salle Av | Lennar Homes Of California Inc. | building j: revision to previously approved structural addendum pa@ 2016-0217-9818/s-1. work includes adjstments to pt and framing plan, updated wall schedules and other details.Details
building j: revision to previously approved structural addendum pa@ 2016-0217-9818/s-1. work includes adjstments to pt and framing plan, updated wall schedules and other details. | $15,000 |
| Oct 10, 2020 | Completed final sign-off Sep 2023 | 55 Mason St | D & H Construction | voluntary seismic upgrade of steel horizontal bracing system installed below (e) floor framing levels 2-6. 14 units will be converted to %100 accessible apts. remaining 120 housing units receive interior finish upgrades. 6 units to receive communication devices. common area and mep upgrades as well.Details
voluntary seismic upgrade of steel horizontal bracing system installed below (e) floor framing levels 2-6. 14 units will be converted to %100 accessible apts. remaining 120 housing units receive interior finish upgrades. 6 units to receive communication devices. common area and mep upgrades as well. | $12,000,000 |
| Aug 31, 2020 | Never finaled filed Aug 2020, never issued | 3260 26th St | to erect a type 1b, 7 story, 42 residential unit building with one commertial unit and one partial basement.Details
to erect a type 1b, 7 story, 42 residential unit building with one commertial unit and one partial basement. | $9,400,000 | |
| Mar 3, 2020 | Expired or cancelled withdrawn Apr 2023 | 345 04th St | Stoer Construction Inc | revision to bpa #201807194942. structural conversion of the fixed head pile assembly. design has changed to utilize deeper pile embedment into the pile. **maher n/a**Details
revision to bpa #201807194942. structural conversion of the fixed head pile assembly. design has changed to utilize deeper pile embedment into the pile. **maher n/a** | |
| Dec 16, 2019 | Completed final sign-off Dec 2024 | 1 Avenue Of The Palms | Webcor Construction Lp | mayor ed #17-02. priority processing. ab-004 attached. to erect 22 stories, type 1-a, 250 residential units with mixed-used building (b,a,r-2) parcel-c2.4Details
mayor ed #17-02. priority processing. ab-004 attached. to erect 22 stories, type 1-a, 250 residential units with mixed-used building (b,a,r-2) parcel-c2.4 | $130,240,000 |
| Jul 16, 2019 | Completed final sign-off Mar 2022 | 201 Macalla Rd | Cahill Contractors Llc. | tower crane for new construction. ref pa# 2018/08/13/7195-s.Details
tower crane for new construction. ref pa# 2018/08/13/7195-s. | $36,000 |
| May 14, 2019 | Never finaled issued Dec 2019, no final | 360 05th St | Thompson Builders Corp | excavation, shoring & tieback for new construction. (ref pa# 2018/05/31/0611-s) ** maher: n/a **Details
excavation, shoring & tieback for new construction. (ref pa# 2018/05/31/0611-s) ** maher: n/a ** | $409,611 |
| May 14, 2019 | Never finaled issued Dec 2019, no final | 214 Clara St | Thompson Builders Corp | shoring & tieback for new construction @ 360 - 05th street. (ref pa# 2018/05/31/0611-s) ** maher: n/a **Details
shoring & tieback for new construction @ 360 - 05th street. (ref pa# 2018/05/31/0611-s) ** maher: n/a ** | $93,603 |
| May 14, 2019 | Never finaled issued Dec 2019, no final | 225 Shipley St | Thompson Builders Corp | shoring & tieback for new construction @ 360 - 05th street. (ref pa# 2018/05/31/0611-s) ** maher: n/a **Details
shoring & tieback for new construction @ 360 - 05th street. (ref pa# 2018/05/31/0611-s) ** maher: n/a ** | $51,056 |
| May 1, 2019 | Completed final sign-off Feb 2024 | 1629 Market St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | mayor dir 17-02. to erect 9 stories, 1 basement, type i-a, 185 residential units, with retail & parking. (r-2, m, s-2)Details
mayor dir 17-02. to erect 9 stories, 1 basement, type i-a, 185 residential units, with retail & parking. (r-2, m, s-2) | $36,000,000 |
| Apr 11, 2019 | Completed final sign-off Dec 2022 | 72 Ellis St | Webcor Construction Lp | tower crane permit for new construction #201508033157.Details
tower crane permit for new construction #201508033157. | $1,100,000 |
| Jan 24, 2019 | Expired or cancelled withdrawn Dec 2019 | 49 South Van Ness Av | Charles Pankow Builders Ltd | revision to tower crane#2 tie-in for office bldg. (pa# 201804126232). maher n/a.Details
revision to tower crane#2 tie-in for office bldg. (pa# 201804126232). maher n/a. | |
| Jan 15, 2019 | Never finaled issued Mar 2019, no final | 2465 Van Ness Av | Webcor Construction Lp | revision to s-1 block out for tower crane. (ref pa# 2016/12/28/5989-s) ** maher: n/a **Details
revision to s-1 block out for tower crane. (ref pa# 2016/12/28/5989-s) ** maher: n/a ** | |
| Sep 11, 2018 | Completed final sign-off Mar 2020 | 1301 16th St | T B Penick & Sons Inc. | request for local equivalency alternate regarding the exterior frt rim boards. proposal 5 1/2" wide x full depth glulams. rev to pa# 2017/05/02/5455-s1. ** maher: n/a **Details
request for local equivalency alternate regarding the exterior frt rim boards. proposal 5 1/2" wide x full depth glulams. rev to pa# 2017/05/02/5455-s1. ** maher: n/a ** | $1,000 |
| Jul 19, 2018 | Completed final sign-off Jun 2023 | 345 04th St | Stoer Construction Inc | to erect 7 stories, no basement, type i-b, office building. ** disturbance of at least 50 cu.yd. of soil, route to dph **Details
to erect 7 stories, no basement, type i-b, office building. ** disturbance of at least 50 cu.yd. of soil, route to dph ** | $15,000,000 |
| Apr 12, 2018 | Completed final sign-off Dec 2021 | 1500 Mission St | Build Group Inc. | tower crane# 1. tie-in for residential bldg. ref pa# 2016/06/20/0387-s. ** maher: n/a ** tower crane #1 foundation permit under pa #201801269658Details
tower crane# 1. tie-in for residential bldg. ref pa# 2016/06/20/0387-s. ** maher: n/a ** tower crane #1 foundation permit under pa #201801269658 | $112,000 |
| Apr 12, 2018 | Completed final sign-off Apr 2021 | 49 South Van Ness Av | Charles Pankow Builders Ltd | tower crane# 2. tie-in for office bldg. ref pa# 2016/06/20/0387-s. ** maher: n/a ** tower crane #2 foundation permit under pa#201801269651Details
tower crane# 2. tie-in for office bldg. ref pa# 2016/06/20/0387-s. ** maher: n/a ** tower crane #2 foundation permit under pa#201801269651 | $85,000 |
| Jul 14, 2017 | Completed final sign-off Oct 2020 | 3130 Broderick St | G. A. Delly Deigner Contractor Ltd. | submittal for req'd soft story upgrade fema p-807- structural plans & calcs only.Details
submittal for req'd soft story upgrade fema p-807- structural plans & calcs only. | $39,000 |
| Mar 31, 2017 | Completed final sign-off Aug 2017 | 401 Eucalyptus Dr | Bevilacqua & Sons | voluntary structural strengthening of 2 (e) classroom bldgs., ada upgrade per information sheet da-02 city of sf including (e) girls & boys bathrooms, interior remodel in 2 classroom buildings.Details
voluntary structural strengthening of 2 (e) classroom bldgs., ada upgrade per information sheet da-02 city of sf including (e) girls & boys bathrooms, interior remodel in 2 classroom buildings. | $450,000 |
| Feb 10, 2017 | Completed final sign-off May 2017 | 199 Fremont St | Charles Pankow Builders Ltd | 4th & 5th floor - deferred submittal - structural connections of metal screen decorative. ref pa 2016-1121-3185. n/a maher ordinanceDetails
4th & 5th floor - deferred submittal - structural connections of metal screen decorative. ref pa 2016-1121-3185. n/a maher ordinance | |
| Dec 22, 2016 | Expired or cancelled withdrawn Aug 2018 | 973 Mission St | Ting Kun Chow | mechanical (hvac) permit, shell improvement pa#201605167545Details
mechanical (hvac) permit, shell improvement pa#201605167545 | $160,000 |
| Dec 7, 2016 | Completed final sign-off Jan 2017 | 181 03rd St | Plant Construction Co, Lp | 2nd flor: installation of full height tempered glass partition to maintain continous acoutic barrier. no mep/fire work to be doneDetails
2nd flor: installation of full height tempered glass partition to maintain continous acoutic barrier. no mep/fire work to be done | $40,000 |
| Nov 18, 2016 | Completed final sign-off Feb 2017 | 588 Mission Bay Blvd North Bl | Solarix Systems | install a solar hot water heating system. system consists of a solar thermal collectors, a roof mounted storage tank and heat exchanger, and all associated piping and insulation.Details
install a solar hot water heating system. system consists of a solar thermal collectors, a roof mounted storage tank and heat exchanger, and all associated piping and insulation. | $310,000 |
| Sep 27, 2016 | Completed final sign-off Dec 2017 | 425 North Point St | Lombardi Contracting Corpration | renovation of existing guestrooms, scope of work limited to: lighting placement, plumbing fixture replacement, finishes and reconfiguration of accessible guestrooms, mech. elec. & plumbing under seperate permit. n/a ordinance #155-13Details
renovation of existing guestrooms, scope of work limited to: lighting placement, plumbing fixture replacement, finishes and reconfiguration of accessible guestrooms, mech. elec. & plumbing under seperate permit. n/a ordinance #155-13 | $2,700,000 |
| Sep 14, 2016 | Completed final sign-off May 2023 | 2898 Sloat Bl | roof truss submittal with drawings & calculations for project, reference building permit application #201402047761s.Details
roof truss submittal with drawings & calculations for project, reference building permit application #201402047761s. | $50,000 | |
| Jun 16, 2016 | Never finaled issued Jun 2016, no final | 1000 Brannan St | Nibbi Bros Assoc Inc. | repair of existing rust damage at the 4 steel columns of the water tower platform. remove entire height of boiler flue duct from north side of building. compliance with maher ordinance no 155-13 not required.Details
repair of existing rust damage at the 4 steel columns of the water tower platform. remove entire height of boiler flue duct from north side of building. compliance with maher ordinance no 155-13 not required. | $42,000 |
| May 20, 2016 | Expired or cancelled expired Feb 2023 | 973 Mission St | demo (e) storefront & construct new one - glazing and doors. change of use and future ti to be performed under sep permit 0516 7545Details
demo (e) storefront & construct new one - glazing and doors. change of use and future ti to be performed under sep permit 0516 7545 | $10,000 | |
| Apr 14, 2016 | Never finaled issued Oct 2020, no final | 999 Oakdale Av | (bldg q) to erect 4 stories of 39 dwellings with parkingDetails
(bldg q) to erect 4 stories of 39 dwellings with parking | $12,800,000 | |
| Mar 14, 2016 | Never finaled issued May 2016, no final | 250 04th St | The Whiting-Turner Contracting Company | revision to pa# 2013/06/28/0802-s2. provid erevision to superstructure thats been issued.Details
revision to pa# 2013/06/28/0802-s2. provid erevision to superstructure thats been issued. | $5,000 |
| Jan 29, 2016 | Never finaled issued Feb 2016, no final | 1050 Van Ness Av | level 2 - roof volumtary seismic improvemnets. straps & blocks at re-entry corners, steel ledger and collector on south exterior wall.Details
level 2 - roof volumtary seismic improvemnets. straps & blocks at re-entry corners, steel ledger and collector on south exterior wall. | $20,000 | |
| Dec 2, 2015 | Completed final sign-off May 2016 | 1321 Mission St | Yerba Buena Builders Inc | ground fl: panoramic interests office building & unit mock up for sales purposes. modulab unit mock up in temporary sales office.Details
ground fl: panoramic interests office building & unit mock up for sales purposes. modulab unit mock up in temporary sales office. | $35,000 |
| Nov 5, 2015 | Completed final sign-off Mar 2017 | 923 Folsom St | Cahill Contractors Inc | tower crane foundation for construction of 9 story apartment building. ref pa#2013-11-20-2410/s). n/a for maher.Details
tower crane foundation for construction of 9 story apartment building. ref pa#2013-11-20-2410/s). n/a for maher. | $10,000 |
| Oct 30, 2015 | Never finaled issued Jan 2016, no final | 250 04th St | The Whiting-Turner Contracting Company | revision to 2013-06-28-0802-s1. providing revision to foundation, site permit, underground utilities.Details
revision to 2013-06-28-0802-s1. providing revision to foundation, site permit, underground utilities. | $5,000 |
| Jul 14, 2015 | Completed final sign-off Aug 2020 | 777 Tennessee St | Fisher Development Inc, Aquamatic Fire Protection, Redrock Security & Cabling Inc | to erect 5 stories, 2 basements, 59 units residential & parking.Details
to erect 5 stories, 2 basements, 59 units residential & parking. | $16,500,000 |
| Jul 10, 2015 | Completed final sign-off Aug 2016 | 580 Geary St | C C I Commercial Construction & Improv | interior remodel of level 1, restaurant & lobby. remodel of level 2 includes 2 new guest rooms with minor structural work. mep, fire alarm & sprinkler under separate permit. no exterior work.Details
interior remodel of level 1, restaurant & lobby. remodel of level 2 includes 2 new guest rooms with minor structural work. mep, fire alarm & sprinkler under separate permit. no exterior work. | $200,000 |
| Jun 29, 2015 | Completed final sign-off Aug 2016 | 580 Geary St | C C I Commercial Construction & Improv | scope of work consists of demolition of geary street facade & selective demolition of jones street facade. (n) stone clad facade will replace (e) facade. (e) sidewalk & structure on geary street will be demolished & replaced. no mep., fire alarm or sprinkler work. standpipe on separate submittal.Details
scope of work consists of demolition of geary street facade & selective demolition of jones street facade. (n) stone clad facade will replace (e) facade. (e) sidewalk & structure on geary street will be demolished & replaced. no mep., fire alarm or sprinkler work. standpipe on separate submittal. | $220,000 |
| Apr 16, 2015 | Completed final sign-off Jul 2016 | 545 Post St | Centric Construction Inc | scope of work consists of adding 4 new guestroom within (e) hotel space. floor extension on lower 1/f. renovate public space, restaurant and back of house demolition, no work visable from street. t.i. for restaurant kitchen under seperate permit.Details
scope of work consists of adding 4 new guestroom within (e) hotel space. floor extension on lower 1/f. renovate public space, restaurant and back of house demolition, no work visable from street. t.i. for restaurant kitchen under seperate permit. | $355,000 |
| Apr 8, 2015 | Completed final sign-off Nov 2016 | 340 Fremont St | Suffolk Constr Co. Inc. Dba Suffolk-Roel | permit revision to addenda 6 for pa#200509193271 to add a new flange wide flange beam spanning the columns at tie for tower crane points as indicated on plans.Details
permit revision to addenda 6 for pa#200509193271 to add a new flange wide flange beam spanning the columns at tie for tower crane points as indicated on plans. | |
| Apr 6, 2015 | Never finaled issued Jul 2015, no final | 545 Post St | Centric Construction Inc | installation of (n) wheelchair lift and new (4) stop elevator serving the public space. fire alarm & sprinklers under seperate permitDetails
installation of (n) wheelchair lift and new (4) stop elevator serving the public space. fire alarm & sprinklers under seperate permit | $150,000 |