178 permits since 2000 (architect on 176 permits, authorized agent-others on 5 permits, engineer on 1 permit): 81 completed, 23 in progress, 40 never finaled, 34 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
Showing the 100 most recent of 178.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 21, 2026 | In progress filed Sep 2026, not yet issued | 1215 Bay St | alteration of the space of one (e) parking space, storage room & partial laundry room for a new adu within (e) building envelope.Details
alteration of the space of one (e) parking space, storage room & partial laundry room for a new adu within (e) building envelope. | $70,000 | |
| Sep 15, 2026 | In progress issued Sep 2026 | 778 44th Av | revision to 202605131149, (e)2nd flr bathroom will be remodeled and the adajcent closet wll be demolished to accomodate the expanded bathroom.Details
revision to 202605131149, (e)2nd flr bathroom will be remodeled and the adajcent closet wll be demolished to accomodate the expanded bathroom. | $10,000 | |
| Jul 6, 2026 | In progress issued Jul 2026 | 128 Noe St | revision to bpa: 202606042545 - modify door opening to be larger + structural.Details
revision to bpa: 202606042545 - modify door opening to be larger + structural. | $500 | |
| Jun 4, 2026 | In progress issued Jun 2026 | 128 Noe St | kitchen remodel to move (e) cabinets, appliances, and countertops. (n) outlets . relocate (e) plumbing and mech. construction of new door opening and fill in of existing, non-structural. renovate (e) cabinets.Details
kitchen remodel to move (e) cabinets, appliances, and countertops. (n) outlets . relocate (e) plumbing and mech. construction of new door opening and fill in of existing, non-structural. renovate (e) cabinets. | $16,000 | |
| Jun 2, 2026 | In progress issued Oct 2026 | 125 Santa Paula Av | Damar Construction And Remodeling Inc | revision to 202211086074: add new detail a7.51 for a glass guardrail at 3rd/f west roof deck. per clients request. current detail 5/a7.51 will remain as detail for steel guardrail (no glass) at other decks/baloncies. @ roof deckDetails
revision to 202211086074: add new detail a7.51 for a glass guardrail at 3rd/f west roof deck. per clients request. current detail 5/a7.51 will remain as detail for steel guardrail (no glass) at other decks/baloncies. @ roof deck | |
| May 15, 2026 | In progress issued Jul 2026 | 505 Grand View Av | add (1) full bath room at level 1Details
add (1) full bath room at level 1 | $10,000 | |
| May 13, 2026 | In progress issued May 2026 | 778 44th Av | Dunros Construction | demo of (e) 1st fl slab on grade & footing, excavation of back area for lower slab. installation of (n) foundations & slab on grade @ a lower 1st fl.replacement of (e) exterior stairs in south lightwell of property. renovation of (e) kitchen & primary bath @ 2nd fl. no additional contitioned spaceDetails
demo of (e) 1st fl slab on grade & footing, excavation of back area for lower slab. installation of (n) foundations & slab on grade @ a lower 1st fl.replacement of (e) exterior stairs in south lightwell of property. renovation of (e) kitchen & primary bath @ 2nd fl. no additional contitioned space | $150,000 |
| Feb 28, 2026 | In progress filed Feb 2026, not yet issued | 8 Woodland Av | adding a stair and a small deck in the rear yard. enclosing part of the 1st floor patio and 2nd floor deck. remodeling the part of the 1st floor and 2nd floor. adding 2 more stories above the existing structure.Details
adding a stair and a small deck in the rear yard. enclosing part of the 1st floor patio and 2nd floor deck. remodeling the part of the 1st floor and 2nd floor. adding 2 more stories above the existing structure. | $500,000 | |
| Feb 20, 2026 | In progress filed Feb 2026, not yet issued | 6625 03rd St | commencement of work not started under previously approved permit application #201901311731.Details
commencement of work not started under previously approved permit application #201901311731. | ||
| Feb 2, 2026 | In progress filed Feb 2026, not yet issued | 711 Hampshire St | De Brus Construction Inc | (n) 1st flr conditioned areas inclusive of (n) bathrms & multipurpose rooms.(n) interior staircase connecting the 1st and 2nd floors. renovation of (e) 2nd flr kitchen & bathroom to accommodate the installation of new stairs.install new rear yard patio doors.Details
(n) 1st flr conditioned areas inclusive of (n) bathrms & multipurpose rooms.(n) interior staircase connecting the 1st and 2nd floors. renovation of (e) 2nd flr kitchen & bathroom to accommodate the installation of new stairs.install new rear yard patio doors. | $306,308 |
| Jan 12, 2026 | In progress filed Jan 2026, not yet issued | 1216 Fulton St | addition & alteration to an (e) 2-unit victorian building to a 4-unit building using the mandelman legislation- sfpc 207(c)(8)- on this rh-3 lot.Details
addition & alteration to an (e) 2-unit victorian building to a 4-unit building using the mandelman legislation- sfpc 207(c)(8)- on this rh-3 lot. | $2,000,000 | |
| Dec 23, 2025 | Completed final sign-off Feb 2026 | 660 Spruce St | add non load bearing partition to divide bedroom 2 into 2 bedrooms. add 2 new interior door openings and install relocated e doors for those bedrooms. add new light fixtures and new outlets in new partition only. 1st fl combine 2 e closets into powderDetails
add non load bearing partition to divide bedroom 2 into 2 bedrooms. add 2 new interior door openings and install relocated e doors for those bedrooms. add new light fixtures and new outlets in new partition only. 1st fl combine 2 e closets into powder | $60,000 | |
| Dec 1, 2025 | In progress issued Dec 2025 | 711 Hampshire St | De Brus Construction Inc | foundation replacement and seismic stregtheningDetails
foundation replacement and seismic stregthening | $108,000 |
| Oct 27, 2025 | Completed final sign-off Feb 2026 | 505 Grand View Av | Otto Miller Development Inc | revision for issued permit pa#:202307061528. renovation(e)6 units on level 2 & 3: (1)interior renovation w/ (n) mech system (2) new roof assembly (3)repair exterior stucco if needed(4) remove common laundry room; provide private laundry wash& dryer ea. unit 5) new front door & window 6)replace railDetails
revision for issued permit pa#:202307061528. renovation(e)6 units on level 2 & 3: (1)interior renovation w/ (n) mech system (2) new roof assembly (3)repair exterior stucco if needed(4) remove common laundry room; provide private laundry wash& dryer ea. unit 5) new front door & window 6)replace rail | |
| Oct 9, 2025 | In progress issued Jan 2026 | 319 Rutledge St | Wickman Development And Construction | remove & reconstruct (e) wood dramed entry staircase, structure & guards. installation of new slab on grade, site walls & structure to accomodate proposed entry stair design. addition of area to (e) garage. installation of new garage doors & entry features. (e) 1 vehicular parking space, (e)Details
remove & reconstruct (e) wood dramed entry staircase, structure & guards. installation of new slab on grade, site walls & structure to accomodate proposed entry stair design. addition of area to (e) garage. installation of new garage doors & entry features. (e) 1 vehicular parking space, (e) | $44,000 |
| Aug 15, 2025 | Completed final sign-off Jan 2026 | 125 Santa Paula Av | Damar Construction And Remodeling Inc | revision 202211086074-s1 to add tie in (n) slab with (e) footing. revise 1st floor framing to show pier footing at gl per (e) condition and show detiail call outs to (n) detail . and (e) detail and change the post at b/2.7 to land on an (e) footing instead of a (n) pier footing per (n) detail.Details
revision 202211086074-s1 to add tie in (n) slab with (e) footing. revise 1st floor framing to show pier footing at gl per (e) condition and show detiail call outs to (n) detail . and (e) detail and change the post at b/2.7 to land on an (e) footing instead of a (n) pier footing per (n) detail. | |
| Jul 31, 2025 | In progress issued Apr 2026 | 3251 Steiner St | revise p/a 2022-0712-8244 to remove the construction fire wall from the previously stated/approved scope of work and to document the installation of an ordinary temperature/quick response ws fire sprinkler system (under separate p/a) the existing, p/l, 3-story staircase and adjacent exit passageway.Details
revise p/a 2022-0712-8244 to remove the construction fire wall from the previously stated/approved scope of work and to document the installation of an ordinary temperature/quick response ws fire sprinkler system (under separate p/a) the existing, p/l, 3-story staircase and adjacent exit passageway. | $1,926 | |
| Jun 18, 2025 | Completed final sign-off Jun 2026 | 1224 Funston Av | Kohlmyer | revision to pa# 201812118001/s1: "to remove the wetted stand pipe requirements"Details
revision to pa# 201812118001/s1: "to remove the wetted stand pipe requirements" | |
| Jun 18, 2025 | Completed final sign-off Nov 2025 | 4149 26th St | Woods Const Co | add 2 bathrooms and wet bar to revision application#: 202505075942.Details
add 2 bathrooms and wet bar to revision application#: 202505075942. | $16,000 |
| May 16, 2025 | In progress issued Feb 2026 | 2839 24th St | Amador General Construction Inc | commencement of work not started pa# 202002285777.Details
commencement of work not started pa# 202002285777. | |
| Mar 27, 2025 | Completed final sign-off Aug 2026 | 2007 09th Av | Bailey General Contracting Co Inc | demo (e) bath at level 2 for (n) stairs to level 3. (n) bath at level 2. vertical addition at (e) roof level (level 3).Details
demo (e) bath at level 2 for (n) stairs to level 3. (n) bath at level 2. vertical addition at (e) roof level (level 3). | $250,000 |
| Feb 18, 2025 | Completed final sign-off Apr 2025 | 4033 25th St | Woods Const Co | repair, refinish/repaint parging at (e) front retaining wall to remian. remove (e) planting. provide new planter, planting, and compliant guardrails. remove (e) non structural cmu guard walls at exterior entry landing stairs. provide new guardrails and handrails. repaint front doors.Details
repair, refinish/repaint parging at (e) front retaining wall to remian. remove (e) planting. provide new planter, planting, and compliant guardrails. remove (e) non structural cmu guard walls at exterior entry landing stairs. provide new guardrails and handrails. repaint front doors. | $16,000 |
| Jan 9, 2025 | In progress issued Oct 2025 | 1478 Masonic Av | rev 202203160099 floor plan for (n) garage door at (e) brick wall,(n) drvwy & curb cut.infill 1/f below (e) 2/f pop-out for (n)kitchen & sitting area.remove (e) deck & bathroom on 2/f.mod prime bed & add strs to roof dk. (n) roof deck with roof hatch access.Details
rev 202203160099 floor plan for (n) garage door at (e) brick wall,(n) drvwy & curb cut.infill 1/f below (e) 2/f pop-out for (n)kitchen & sitting area.remove (e) deck & bathroom on 2/f.mod prime bed & add strs to roof dk. (n) roof deck with roof hatch access. | $150,000 | |
| Dec 31, 2024 | Completed final sign-off Jun 2026 | 3735 Buchanan St | Velox Construction Inc/Velox Des & Const | 4th flr. address on-site exploratory demo and comply wiht nov#: 202431789. renovate interior of 4th flr unit. modify and remove non structural partitions. remove drop ceilings, new non-structural partitions new doors and interior glazing. refinish floors and replace kitchen fixture &cabinets.Details
4th flr. address on-site exploratory demo and comply wiht nov#: 202431789. renovate interior of 4th flr unit. modify and remove non structural partitions. remove drop ceilings, new non-structural partitions new doors and interior glazing. refinish floors and replace kitchen fixture &cabinets. | $102,000 |
| Dec 30, 2024 | In progress issued Feb 2026 | 45 Mccoppin St | to comply w/nov# 202309140, document existing and unpermitted conditions; provide a rated fire wall and window sprinkler protection/ replacement to provide compliant roof exiting; provide rated parapets and roof fire protection features; construct interior framed walls and ceilings to atmoshpericallDetails
to comply w/nov# 202309140, document existing and unpermitted conditions; provide a rated fire wall and window sprinkler protection/ replacement to provide compliant roof exiting; provide rated parapets and roof fire protection features; construct interior framed walls and ceilings to atmoshpericall | $24,000 | |
| Nov 1, 2024 | Completed final sign-off May 2025 | 1415 Golden Gate Av | Hugo Tejada/Dba Alpha & Omega Renovation | revision to pa #202403298919. removed proposed 1 full bath. existing half bath to remain at level 2 and 3. reduced scope of wall reconfigurations. remove o f proposed voluntary plywood stiffenig walls and update 2 spread foundations supporting basement post.Details
revision to pa #202403298919. removed proposed 1 full bath. existing half bath to remain at level 2 and 3. reduced scope of wall reconfigurations. remove o f proposed voluntary plywood stiffenig walls and update 2 spread foundations supporting basement post. | |
| Oct 11, 2024 | In progress filed Oct 2024, not yet issued | 400 28th Av | interior renovation of unit 3 & 10 including renovation of kitchen, demo & adding interior partitions to add enclosed bedroom, updating wall & floor finishes and installing new plumbing, lighting fixtures and a closet with washer & dryer. existing units are not accessibleDetails
interior renovation of unit 3 & 10 including renovation of kitchen, demo & adding interior partitions to add enclosed bedroom, updating wall & floor finishes and installing new plumbing, lighting fixtures and a closet with washer & dryer. existing units are not accessible | $120,000 | |
| Sep 5, 2024 | Completed final sign-off Apr 2025 | 4033 25th St | Woods Const Co | 1 kitchen & 2 bathrooms renovation new applicances, interior finishes for both unit upper unit 4033 & lower unit 4035. move first fl window (4035 25th st) replace mech effeciency heat pumpDetails
1 kitchen & 2 bathrooms renovation new applicances, interior finishes for both unit upper unit 4033 & lower unit 4035. move first fl window (4035 25th st) replace mech effeciency heat pump | $35,000 |
| Aug 27, 2024 | In progress issued Sep 2024 | 834 Irving St | Modern Art Construction | entry accessible upgrade to comply with abe 201912029015Details
entry accessible upgrade to comply with abe 201912029015 | $2,000 |
| Aug 27, 2024 | In progress filed Aug 2024, not yet issued | 834 Irving St | Modern Art Construction | change occupant load from 99 to 198. no work done.Details
change occupant load from 99 to 198. no work done. | |
| Jul 24, 2024 | Completed final sign-off Oct 2025 | 970 Chestnut St | revision to 202306230743 changing the fire escape at the frontDetails
revision to 202306230743 changing the fire escape at the front | ||
| Jul 10, 2024 | Completed final sign-off Jul 2025 | 834 Irving St | Modern Art Construction | remodel existing restrooms to have 1 accessible stall for each gender restroom. address any dryrot issues located around toilets/sinks. install new electrical and plumbing.Details
remodel existing restrooms to have 1 accessible stall for each gender restroom. address any dryrot issues located around toilets/sinks. install new electrical and plumbing. | $32,500 |
| Jun 25, 2024 | Completed final sign-off Dec 2025 | 431 Lake St | Andrew Mark Construction Inc | interior remodeling on the 3rd floor of an (e) single family home at 431 lake st. remodeling the primary bedroom, primary bathroom, kids bedroom, and the bathroom within the kids bedroom. no exterior changes or expansions are involved.Details
interior remodeling on the 3rd floor of an (e) single family home at 431 lake st. remodeling the primary bedroom, primary bathroom, kids bedroom, and the bathroom within the kids bedroom. no exterior changes or expansions are involved. | $75,000 |
| May 3, 2024 | Completed final sign-off Jun 2024 | 1426 08th Av | the project involves a revision t0 the previously issued permit #202011209457. initially the plan included the demolition of an extg window facing the backyard on the 1st floor to be replaced with 2 new windows for a bedroom. the updated proposed retains the extg window with the space nowDetails
the project involves a revision t0 the previously issued permit #202011209457. initially the plan included the demolition of an extg window facing the backyard on the 1st floor to be replaced with 2 new windows for a bedroom. the updated proposed retains the extg window with the space now | ||
| Mar 29, 2024 | Completed final sign-off May 2025 | 1415 Golden Gate Av | Hugo Tejada/Dba Alpha & Omega Renovation | interior remodel of level 2 & 3 dwelling units (1415 & 1417). note that scope of work is identical in each unit. scope includes: kitchen remodel, addition of 2 full bathrooms, removal of 1 half bath & misc. vanity sinks, reconfiguration of interior wall, replace & add plmg & light fixtures,Details
interior remodel of level 2 & 3 dwelling units (1415 & 1417). note that scope of work is identical in each unit. scope includes: kitchen remodel, addition of 2 full bathrooms, removal of 1 half bath & misc. vanity sinks, reconfiguration of interior wall, replace & add plmg & light fixtures, | $75,000 |
| Dec 1, 2023 | In progress issued Dec 2023 | 6625 03rd St | Trim Fit Constr. - O'reilly Engineering | revision to issued permit# 201901311731: basement level to have garage door at building frontage, including (n) curb cut.Details
revision to issued permit# 201901311731: basement level to have garage door at building frontage, including (n) curb cut. | $1,500 |
| Jul 6, 2023 | Completed final sign-off Feb 2026 | 505 Grand View Av | work consists of renovation of (e) 5 units on level 2 & 3. interior renovation in units with (n) mechanical system, new roof assembly, repair exterior stucco if needed. no work in unit 203. convert crawl space at level 1 to storageDetails
work consists of renovation of (e) 5 units on level 2 & 3. interior renovation in units with (n) mechanical system, new roof assembly, repair exterior stucco if needed. no work in unit 203. convert crawl space at level 1 to storage | $400,000 | |
| Jun 23, 2023 | Expired or cancelled expired Oct 2025 | 970 Chestnut St | 3-story infill (approx 90 sq.ft) northeast utility lightwell; upgrade of (e) front escape ladder per pre-app dated 11/4/22Details
3-story infill (approx 90 sq.ft) northeast utility lightwell; upgrade of (e) front escape ladder per pre-app dated 11/4/22 | $20,000 | |
| Jun 9, 2023 | Completed final sign-off Jan 2026 | 335 27th St | comply w/nov#202182998.-rear structure-provide a space heating system for the proposed provide kitchen throught the additon of an oven, hood& vent.replace the studio alternating tread device w/ a compliant staircase. replace driveway(e)driveway of the main residence.ordinance #95-17(add 1 state adu)Details
comply w/nov#202182998.-rear structure-provide a space heating system for the proposed provide kitchen throught the additon of an oven, hood& vent.replace the studio alternating tread device w/ a compliant staircase. replace driveway(e)driveway of the main residence.ordinance #95-17(add 1 state adu) | $25,000 | |
| Jun 7, 2023 | Never finaled filed Jun 2023, never issued | 741 Capitol Av | (bldg a) erect 3-story over zero basement, type v-a, residential building with two dwellings and one adu per state program. lot split per sb-9. ref new construction bldg b pa# 202306079515/s, and demo pa# 202306029177.Details
(bldg a) erect 3-story over zero basement, type v-a, residential building with two dwellings and one adu per state program. lot split per sb-9. ref new construction bldg b pa# 202306079515/s, and demo pa# 202306029177. | $500,000 | |
| Jun 7, 2023 | Never finaled filed Jun 2023, never issued | 745 Capitol Av | (bldg b) erect 3-story over zero basement, type v-a, residential building with two dwellings and one adu per state program. lot split per sb-9. ref new construction bldg a pa# 202306079514/s, and demo pa# 202306029177.Details
(bldg b) erect 3-story over zero basement, type v-a, residential building with two dwellings and one adu per state program. lot split per sb-9. ref new construction bldg a pa# 202306079514/s, and demo pa# 202306029177. | $500,000 | |
| Jun 2, 2023 | Never finaled filed Jun 2023, never issued | 745 Capitol Av | demolition of 1-story, type v-b, single family dwelling. ref new construction under pa# 202306079514/s and 202306079515/s.Details
demolition of 1-story, type v-b, single family dwelling. ref new construction under pa# 202306079514/s and 202306079515/s. | $5,000 | |
| May 23, 2023 | Expired or cancelled withdrawn Oct 2025 | 1740 Lyon St | remove existing rear pop-out & stairs, and add new addition(with 15")and new stair at north property line,from 2nd floor to rear yard.project to be non-sprinkled.Details
remove existing rear pop-out & stairs, and add new addition(with 15")and new stair at north property line,from 2nd floor to rear yard.project to be non-sprinkled. | $80,000 | |
| Jan 6, 2023 | Completed final sign-off Dec 2023 | 970 Chestnut St | converting 4 existing interior lightwells into 4 new tenant storage spaces at each level, exterior fill-in wall at 2nd flr unit# 9, minor addition at 1st flr unit# 17.Details
converting 4 existing interior lightwells into 4 new tenant storage spaces at each level, exterior fill-in wall at 2nd flr unit# 9, minor addition at 1st flr unit# 17. | $40,000 | |
| Dec 12, 2022 | Completed final sign-off Jul 2023 | 17 Chattanooga St | Otto Miller Development Inc | the project consists of documenting as built conditions associated with approved and issued pa# 201703171687 and p#201902203304 of existing 3 flax minor changes to floor plan/internal wall layouts occured with the construction and this permit is to memorize thhis work, change to the exterior occurreDetails
the project consists of documenting as built conditions associated with approved and issued pa# 201703171687 and p#201902203304 of existing 3 flax minor changes to floor plan/internal wall layouts occured with the construction and this permit is to memorize thhis work, change to the exterior occurre | $10,000 |
| Nov 8, 2022 | In progress issued Jul 2024 | 125 Santa Paula Av | Damar Construction And Remodeling Inc | horizontal addition to 1st fl(86 gsf)to add additional living space,addition to the 2nd fl(221 gsf)to add 4th bedroom & 3rd bathroom,vertical addition(394 gsf)adding an attic level to rear of house.attic space will house a bonus room under a proposed sloping cathedral ceiling/gable roof.Details
horizontal addition to 1st fl(86 gsf)to add additional living space,addition to the 2nd fl(221 gsf)to add 4th bedroom & 3rd bathroom,vertical addition(394 gsf)adding an attic level to rear of house.attic space will house a bonus room under a proposed sloping cathedral ceiling/gable roof. | $350,000 |
| Jun 1, 2022 | Never finaled filed Jun 2022, never issued | 1515 York St | construct a small roof deck & bonus room @ the attic level & a roof dormer for head clearance. replace basement door & add new window facing york street to provide natural light to convert a portion of the (e) garage into a guest suite with bathroom.Details
construct a small roof deck & bonus room @ the attic level & a roof dormer for head clearance. replace basement door & add new window facing york street to provide natural light to convert a portion of the (e) garage into a guest suite with bathroom. | $150,000 | |
| Feb 17, 2022 | Expired or cancelled cancelled Jan 2026 | 6635 03rd St | new opening at 6635 3rd street to connect parking level to 2bd building on separate lots per as-010. interconnect opening has been approved under site permit pa: 201901311731 for 6625 3rd st (block/lot: 5016/019)Details
new opening at 6635 3rd street to connect parking level to 2bd building on separate lots per as-010. interconnect opening has been approved under site permit pa: 201901311731 for 6625 3rd st (block/lot: 5016/019) | $8,000 | |
| Sep 27, 2021 | Completed final sign-off Sep 2023 | 292 Eureka St | Occidental Express | comply w/nov 201996591 & planning enf case 2019-021966enf document add'l removal of bldg; demo calcs; (n) add'l unit @ ground fl; replace exterior windows size to size and inkind; (n) window to replace door @ ground fl; remodel of kitchen & bathrooms @ ground fl; new upper floor deckDetails
comply w/nov 201996591 & planning enf case 2019-021966enf document add'l removal of bldg; demo calcs; (n) add'l unit @ ground fl; replace exterior windows size to size and inkind; (n) window to replace door @ ground fl; remodel of kitchen & bathrooms @ ground fl; new upper floor deck | $300,000 |
| Aug 17, 2021 | Never finaled issued Jan 2022, no final | 1785 15th St | obtain an ilo permit for unit 2 and 9. building contains 9 dwelling unitsDetails
obtain an ilo permit for unit 2 and 9. building contains 9 dwelling units | ||
| Jul 30, 2021 | Completed final sign-off Dec 2022 | 49 Gold Mine Dr | Greenfield Construction Llc | accessibility improvements to site walkways, ramps, steps. alterations to interior spaces, including relocateion of non bearing partitions. removal and replacement of exterior windows and doors. cosmetic renvation includes finishes, fixtures, cabients, appliances, paint throughout. (included mep)Details
accessibility improvements to site walkways, ramps, steps. alterations to interior spaces, including relocateion of non bearing partitions. removal and replacement of exterior windows and doors. cosmetic renvation includes finishes, fixtures, cabients, appliances, paint throughout. (included mep) | $400,000 |
| Jul 20, 2021 | Completed final sign-off Jan 2022 | 135 El Camino Del Mar | Orchard Construction | rev to pa 201912048693: modify window documentation for window 006 on a1.2&a2.2 from fixted to double hung and resize window 049 from 3 fixed wdw to 1 casement at east elevation.Details
rev to pa 201912048693: modify window documentation for window 006 on a1.2&a2.2 from fixted to double hung and resize window 049 from 3 fixed wdw to 1 casement at east elevation. | |
| Jun 22, 2021 | Never finaled filed Jun 2021, never issued | 1229 45th Av | replacement of existing 1-story garage with 4-story, 3 bedroom adu at front of lot using local adu program. two existing units at rear to remain.Details
replacement of existing 1-story garage with 4-story, 3 bedroom adu at front of lot using local adu program. two existing units at rear to remain. | $300,000 | |
| May 18, 2021 | Completed final sign-off Dec 2022 | 2915 Baker St | construction of (n) elevator for homeowner access to 4 levels of existing home, installation of 1 skylight and 1 window for replacement light at (e) rooms.Details
construction of (n) elevator for homeowner access to 4 levels of existing home, installation of 1 skylight and 1 window for replacement light at (e) rooms. | $25,000 | |
| May 11, 2021 | Never finaled issued Feb 2023, no final | 3029 Laguna St | Fifth Arch Llp, Associated Builders | addition and alterations to an existing 2-unit, 2-sotry structure. add additional 2 stories on the top of the existing structure and preserve most of the existing facade.Details
addition and alterations to an existing 2-unit, 2-sotry structure. add additional 2 stories on the top of the existing structure and preserve most of the existing facade. | $1,200,000 |
| May 10, 2021 | In progress issued Jan 2026 | 2440 Van Ness Av | De Brus Construction Inc | the addition of an accessory dwelling unit (adu) within the (e) building envelope at the ground floor in a space currently occupied by resident laundry, facility toilet room, and facility storage. other maintanence upgrades to be done.Details
the addition of an accessory dwelling unit (adu) within the (e) building envelope at the ground floor in a space currently occupied by resident laundry, facility toilet room, and facility storage. other maintanence upgrades to be done. | $100,000 |
| Apr 8, 2021 | Completed final sign-off Dec 2024 | 1120 Shotwell St | to erect 3 stories, no basement, type v-a, 3 units residential building. sprinklers per nfpa 13 and sprinkler monitoring per nfpa 72 under separate permits.Details
to erect 3 stories, no basement, type v-a, 3 units residential building. sprinklers per nfpa 13 and sprinkler monitoring per nfpa 72 under separate permits. | $1,000,000 | |
| Apr 2, 2021 | Never finaled issued Nov 2021, no final | 26 Hill St | repair existing/historic windows (no new windows are proposed at existing window locations or all building elevations) and provide a minor alteration to the front yard landscaping.landscape rear yard incl fence, siding replacement @ front and side elevation. 2 (n) openings at rear pop-out. infillDetails
repair existing/historic windows (no new windows are proposed at existing window locations or all building elevations) and provide a minor alteration to the front yard landscaping.landscape rear yard incl fence, siding replacement @ front and side elevation. 2 (n) openings at rear pop-out. infill | $2,000 | |
| Mar 12, 2021 | Never finaled issued Sep 2022, no final | 575 Ivy St | alter (e) 3 units structure found to be a class "a" historic resource. convert an uninhabited basement to 3 bedrooms & 2 baths for 1st floor unit & new stair to 1st floor. demolish (e) rear stair & build new deck in (e) building footage. 3rd floor, new roof access stair & penthouse to new roof deck.Details
alter (e) 3 units structure found to be a class "a" historic resource. convert an uninhabited basement to 3 bedrooms & 2 baths for 1st floor unit & new stair to 1st floor. demolish (e) rear stair & build new deck in (e) building footage. 3rd floor, new roof access stair & penthouse to new roof deck. | $600,000 | |
| Jan 5, 2021 | Expired or cancelled cancelled Apr 2024 | 505 Grand View Av | Otto Miller Development Inc | proposed scope of work consists of the construction of 2 new adu (accessory dwelling units) and common amenities for tenant within the existing building envelope. no building expansion is proposed. new adu's are to be located on existing level 1Details
proposed scope of work consists of the construction of 2 new adu (accessory dwelling units) and common amenities for tenant within the existing building envelope. no building expansion is proposed. new adu's are to be located on existing level 1 | $300,000 |
| Dec 10, 2020 | Expired or cancelled withdrawn Mar 2025 | 379 Upper Tr | the scope of work of this project includes, but is not limited to: i. the addition of an accessory dwelling unit (adu) within the existing building envelope to a 4-unit multi-family building on the site. the adu is proposed on the 2nd floor (one floor below street level).Details
the scope of work of this project includes, but is not limited to: i. the addition of an accessory dwelling unit (adu) within the existing building envelope to a 4-unit multi-family building on the site. the adu is proposed on the 2nd floor (one floor below street level). | $35,000 | |
| Nov 20, 2020 | Completed final sign-off Jun 2024 | 1426 08th Av | enclose (e) light well, interior remodeling inlcuding 1/f: new conditioned space of family room, bedroom, den; remodel 2/f kitchen, 1/2 bathrooms and dining room.Details
enclose (e) light well, interior remodeling inlcuding 1/f: new conditioned space of family room, bedroom, den; remodel 2/f kitchen, 1/2 bathrooms and dining room. | $200,000 | |
| Aug 31, 2020 | Never finaled filed Aug 2020, never issued | 3260 26th St | to erect a type 1b, 7 story, 42 residential unit building with one commertial unit and one partial basement.Details
to erect a type 1b, 7 story, 42 residential unit building with one commertial unit and one partial basement. | $9,400,000 | |
| Aug 31, 2020 | Never finaled filed Aug 2020, never issued | 3260 26th St | demolish a 1-story, industrial structure(auto repair)Details
demolish a 1-story, industrial structure(auto repair) | $40,500 | |
| Jul 6, 2020 | Completed final sign-off Jul 2020 | 2104 Hayes St | Talbco Development Corp Dba Supreme Buil | administrative permit to revise pa 2018-0223-2088 to remove 3 ada restrooms from scope of work (now under pa 2020-0218-4642) and removal of 3 formally proposed fire rated windowsDetails
administrative permit to revise pa 2018-0223-2088 to remove 3 ada restrooms from scope of work (now under pa 2020-0218-4642) and removal of 3 formally proposed fire rated windows | |
| Feb 28, 2020 | Expired or cancelled expired Jan 2025 | 2839 24th St | comply w/ nov 201808142. legalization of (e) grd flr unit #2839 per ord# 43-14. sprinkler of unit to occur under separate permit.Details
comply w/ nov 201808142. legalization of (e) grd flr unit #2839 per ord# 43-14. sprinkler of unit to occur under separate permit. | $75,000 | |
| Jan 27, 2020 | Completed final sign-off Dec 2023 | 970 Chestnut St | mod & legalization of (e) non-conforming roof deck and life-safety improvements (extension of (e) stair penthouse, installation of (n) fire sprinkler heads at select locations,installation of (n) magnetic on-hold doors).improvements to (e) fire escape & installation of fire alarm system at all levelDetails
mod & legalization of (e) non-conforming roof deck and life-safety improvements (extension of (e) stair penthouse, installation of (n) fire sprinkler heads at select locations,installation of (n) magnetic on-hold doors).improvements to (e) fire escape & installation of fire alarm system at all level | $100,000 | |
| Dec 9, 2019 | Completed final sign-off Aug 2022 | 230 Laidley St | Bailey General Contracting Co Inc | remodel of entry stair, addition of door to ground floor study/den & addition of awning to enter area.Details
remodel of entry stair, addition of door to ground floor study/den & addition of awning to enter area. | $94,000 |
| Dec 5, 2019 | Never finaled filed Dec 2019, never issued | 240 Church St | to erect 6 stories, no basement, type iii-a over type i-a, 24-units residential building with retail space at street level.Details
to erect 6 stories, no basement, type iii-a over type i-a, 24-units residential building with retail space at street level. | $3,500,000 | |
| Dec 5, 2019 | Never finaled filed Dec 2019, never issued | 240 Church St | demolish 1-story, type 5b, bakery building.Details
demolish 1-story, type 5b, bakery building. | $20,000 | |
| Dec 4, 2019 | Completed final sign-off Jan 2022 | 135 El Camino Del Mar | Orchard Construction | comply with nov #200864297,#200865117 & #200989665.san francisco superior court cgc-13-530290.alteration to sfd to remove additon built without proper permits and planning renew.removal of portions of veranda, dining terrace, balconies at east wall.Details
comply with nov #200864297,#200865117 & #200989665.san francisco superior court cgc-13-530290.alteration to sfd to remove additon built without proper permits and planning renew.removal of portions of veranda, dining terrace, balconies at east wall. | $50,000 |
| Nov 8, 2019 | Expired or cancelled cancelled Jan 2024 | 1216 Fulton St | An Dun Construction | remodel of an (e) 2-story, 2-unit bldg. (n) work consists of remodeling 1st flr & converting partial of uninhabited basement flr to a master bedroom and a bedroom to be included in this unit. 2nd flr remodel unit includes adding 1-story as a master bedroom to the (e) bldg. add unit at lower level r2Details
remodel of an (e) 2-story, 2-unit bldg. (n) work consists of remodeling 1st flr & converting partial of uninhabited basement flr to a master bedroom and a bedroom to be included in this unit. 2nd flr remodel unit includes adding 1-story as a master bedroom to the (e) bldg. add unit at lower level r2 | $1,000,000 |
| Nov 1, 2019 | Never finaled issued Nov 2019, no final | 23 Prosper St | 3/f: conversion and remodel of (e) bonus room to full btahroom.Details
3/f: conversion and remodel of (e) bonus room to full btahroom. | $11,500 | |
| Sep 12, 2019 | Completed final sign-off Dec 2021 | 34 Steiner St | Achill Beg Construction Inc | (3) new accessory dwelling units (adu) in the (e) basement space for a total of (12) units per ord no. 162-16. (previous alteration of units w/ an additional (1) unit on each (e) floors 2 & 3 under separate bpa #2018-0912-9872.)Details
(3) new accessory dwelling units (adu) in the (e) basement space for a total of (12) units per ord no. 162-16. (previous alteration of units w/ an additional (1) unit on each (e) floors 2 & 3 under separate bpa #2018-0912-9872.) | $300,000 |
| Jul 19, 2019 | Never finaled filed Jul 2019, never issued | 535 Green St | preservation of a listed buon gusto historic resource w/ additions over buon gusto & on vacant parking lot. create (6) stories of housing of 34 dwelling units over street level commercial approx 74 ft tall bldg. buon gusto 1st fl & basement to remainDetails
preservation of a listed buon gusto historic resource w/ additions over buon gusto & on vacant parking lot. create (6) stories of housing of 34 dwelling units over street level commercial approx 74 ft tall bldg. buon gusto 1st fl & basement to remain | $8,000,000 | |
| Apr 30, 2019 | Never finaled issued May 2023, no final | 2455 Harrison St | Wickman Development And Construction | new 5-story (& penthouse) over basement, type 3 over 1 construction, with two stairwells, mixed use building with two levels of residential (5 units) over 4 levels of non-life science laboratory use.Details
new 5-story (& penthouse) over basement, type 3 over 1 construction, with two stairwells, mixed use building with two levels of residential (5 units) over 4 levels of non-life science laboratory use. | $1,500,000 |
| Apr 30, 2019 | Never finaled issued May 2023, no final | 2455 Harrison St | Wickman Development And Construction | demolish an existing auto repair (industrial) bldg.Details
demolish an existing auto repair (industrial) bldg. | $8,407 |
| Apr 26, 2019 | Never finaled issued Feb 2020, no final | 8 Phoenix Tr | Infinite Construction | interior remodel- new work consists of converting an uninhabited 1st fl to a workroom with storage and bathroom. 2nd fl remodel kithchen , half bath and new stairs to 1st fl, 3rd fl remodel bathroom, new master bath, laundry and closet, new stair to roof.Details
interior remodel- new work consists of converting an uninhabited 1st fl to a workroom with storage and bathroom. 2nd fl remodel kithchen , half bath and new stairs to 1st fl, 3rd fl remodel bathroom, new master bath, laundry and closet, new stair to roof. | $200,000 |
| Mar 20, 2019 | Expired or cancelled cancelled Dec 2024 | 379 Upper Tr | remodel @ (e) street level to add (n) stair @ carport to (n) roof deck & (n) pop-up in garage ceiling/roof assembly to accommodate a car lift. remodel of (e) lower unit to add stair to (n) unit @ (n) lower levels open space for 3 bedrms,3.5 bath unit. total increase to 4 unit bldg. ref 2016-002089.Details
remodel @ (e) street level to add (n) stair @ carport to (n) roof deck & (n) pop-up in garage ceiling/roof assembly to accommodate a car lift. remodel of (e) lower unit to add stair to (n) unit @ (n) lower levels open space for 3 bedrms,3.5 bath unit. total increase to 4 unit bldg. ref 2016-002089. | $709,200 | |
| Feb 20, 2019 | Completed final sign-off Jul 2023 | 17 Chattanooga St | Otto Miller Development Inc | internal remodel of existing 3 units - add bedrooms and bathroom. no increase in building envelope. voluntary structure upgrades. ref adu at ground floor pa 2017-0317-1687Details
internal remodel of existing 3 units - add bedrooms and bathroom. no increase in building envelope. voluntary structure upgrades. ref adu at ground floor pa 2017-0317-1687 | $80,000 |
| Jan 31, 2019 | Never finaled issued Jan 2022, no final | 6625 03rd St | Trim Fit Constr. - O'reilly Engineering | to erect a type v-a, 4-story, 3-dwelling unit with one basement.Details
to erect a type v-a, 4-story, 3-dwelling unit with one basement. | $1,800,000 |
| Dec 19, 2018 | Completed final sign-off Oct 2023 | 24 Amber Dr | North Star Plumbing & Development Inc, Habitat For Humanity >Sf(Exempt By Btrc | 100% affordable housing. building c. to erect a type v-a, 3-story 3-unit residential condos with one basement.Details
100% affordable housing. building c. to erect a type v-a, 3-story 3-unit residential condos with one basement. | $300,000 |
| Dec 19, 2018 | Completed final sign-off Oct 2023 | 36 Amber Dr | Habitat For Humanity >Sf(Exempt By Btrc | 100% affordable housing. building a. to erect a type v-a, 3-story 3-unit residential condos with one basement.Details
100% affordable housing. building a. to erect a type v-a, 3-story 3-unit residential condos with one basement. | $300,000 |
| Dec 19, 2018 | Completed final sign-off Oct 2023 | 30 Amber Dr | North Star Plumbing & Development Inc, Habitat For Humanity >Sf(Exempt By Btrc | 100% affordable housing. building b. to erect a type v-a, 3-story 2-unit residential condos with one basement.Details
100% affordable housing. building b. to erect a type v-a, 3-story 2-unit residential condos with one basement. | $300,000 |
| Dec 18, 2018 | Completed final sign-off Oct 2023 | 36 Amber Dr | Habitat For Humanity >Sf(Exempt By Btrc | to demolish a type v-b, 1-story single family dwelling.Details
to demolish a type v-b, 1-story single family dwelling. | $20,000 |
| Dec 18, 2018 | Expired or cancelled cancelled Nov 2024 | 4312 23rd St | Modern Art Construction | interior renovations and additions of a garage to an (e) sfh. (n) work consists of (n) interior partitions, (n) garage w/ interior staircase, remodeled 1st flr, remodeled interior staircase & exterior staircase. (n) addition under (e) deck is proposed.Details
interior renovations and additions of a garage to an (e) sfh. (n) work consists of (n) interior partitions, (n) garage w/ interior staircase, remodeled 1st flr, remodeled interior staircase & exterior staircase. (n) addition under (e) deck is proposed. | $250,000 |
| Oct 23, 2018 | Completed final sign-off Jul 2023 | 26 Hill St | Otto Miller Development Inc | to comply with dbi nov 201864947. develop and expand existing unconditioned ground floor space for third unit under existing second floor dwelling unit. interior remodel of second floor dwelling unit. rear facade modifications. legalize roof modification at rear.Details
to comply with dbi nov 201864947. develop and expand existing unconditioned ground floor space for third unit under existing second floor dwelling unit. interior remodel of second floor dwelling unit. rear facade modifications. legalize roof modification at rear. | $50,000 |
| Oct 18, 2018 | Completed final sign-off Dec 2019 | 72 Parker Av | Williams Construction | renovation of interior of (e) flat on 2/f. remodel of (e) kitchen & (e) master bath into master and powder room. new partitions and minor structural work (beam. new lighting and plumbing fixtures. remodel (e) laundry room.Details
renovation of interior of (e) flat on 2/f. remodel of (e) kitchen & (e) master bath into master and powder room. new partitions and minor structural work (beam. new lighting and plumbing fixtures. remodel (e) laundry room. | $100,000 |
| Sep 12, 2018 | Completed final sign-off Dec 2021 | 34 Steiner St | Achill Beg Construction Inc | internal renovation of 3 story residential structure to add 2 dwelling units within (e)envelope & allowable density(not adu's). new roof deck w/ no bldg expansion for open space for new dwelling units. remodel front facade & steps. remove(e)stair penthouse on roof. basemet to be excavate for storageDetails
internal renovation of 3 story residential structure to add 2 dwelling units within (e)envelope & allowable density(not adu's). new roof deck w/ no bldg expansion for open space for new dwelling units. remodel front facade & steps. remove(e)stair penthouse on roof. basemet to be excavate for storage | $1,600,000 |
| Jun 26, 2018 | Expired or cancelled withdrawn Apr 2021 | 1380 Filbert St | addition of 3 adu studio apartments under adu program located in existing basement. no work in existing units. ordinance #162-16Details
addition of 3 adu studio apartments under adu program located in existing basement. no work in existing units. ordinance #162-16 | $400,000 | |
| May 14, 2018 | Completed final sign-off Sep 2018 | 1352 Haight St | renovations with (e) building envelope. renovate kitchen, bath, laundry. convert rear office space to dwelling unitDetails
renovations with (e) building envelope. renovate kitchen, bath, laundry. convert rear office space to dwelling unit | $70,000 | |
| Mar 15, 2018 | Never finaled issued Mar 2018, no final | 26 Hill St | internal remodel (e) 1150sq ft on 2/f of 3-story structure. no exterior changes or structural work. no change to (e) exiting. work includes (n) non-bearing interior partitions, remodel kitchen & bathrm, new bathrm at (e) closet, new lighting & plumbing fixtures. (e) forced air heating &Details
internal remodel (e) 1150sq ft on 2/f of 3-story structure. no exterior changes or structural work. no change to (e) exiting. work includes (n) non-bearing interior partitions, remodel kitchen & bathrm, new bathrm at (e) closet, new lighting & plumbing fixtures. (e) forced air heating & | $75,000 | |
| Mar 13, 2018 | Never finaled filed Mar 2018, never issued | 301 Grove St | addition & alterations to (e) 2-story commercial bldg w/ office tenant & at-grade parking garage. reconfigure (e) commercial bldg to replace (e) parking w/ an "active-use" add (3)(n) stories of residential units over (e) structure, finished bldg will be (5) storiesDetails
addition & alterations to (e) 2-story commercial bldg w/ office tenant & at-grade parking garage. reconfigure (e) commercial bldg to replace (e) parking w/ an "active-use" add (3)(n) stories of residential units over (e) structure, finished bldg will be (5) stories | $4,111,010 | |
| Feb 23, 2018 | Completed final sign-off Oct 2020 | 2104 Hayes St | Talbco Development Corp Dba Supreme Buil | renovations to the ground flr commercial spaces of an (e) 3-story mixed use bldg in an nc-1 zoning district. the scope of work includes interior renovations, renovation of the facade w/ sprinkler system installed. there is no work on 2nd & 3rd flrs. mandatory ss retrofit under sep permit.Details
renovations to the ground flr commercial spaces of an (e) 3-story mixed use bldg in an nc-1 zoning district. the scope of work includes interior renovations, renovation of the facade w/ sprinkler system installed. there is no work on 2nd & 3rd flrs. mandatory ss retrofit under sep permit. | $185,000 |
| Dec 19, 2017 | Completed final sign-off Feb 2024 | 635 Fulton St | An Dun Construction | new foundation and mep to prepare site for two (e) moved buildings, two (e) moved buildings to comply w/ cbc 503.1.2 as one building.Details
new foundation and mep to prepare site for two (e) moved buildings, two (e) moved buildings to comply w/ cbc 503.1.2 as one building. | $3,900,000 |
| Dec 18, 2017 | Never finaled issued Dec 2018, no final | 807 Franklin St | erect 8 stories, one basement, type 1-a, 48 units residential (r-2)Details
erect 8 stories, one basement, type 1-a, 48 units residential (r-2) | $16,400,000 | |
| Dec 14, 2017 | Completed final sign-off Feb 2025 | 377 06th St | Js Sullivan Construction Inc | to erect 8 stories, no basement, type i-a, 90 units residential with commercial mixed use building and parking. (r-2, a-2, s)Details
to erect 8 stories, no basement, type i-a, 90 units residential with commercial mixed use building and parking. (r-2, a-2, s) | $26,068,060 |
| Oct 18, 2017 | Never finaled issued Dec 2017, no final | 1342 Haight St | renovations within existing building envelope. add laundry, kitchen/bath upgrade. convert one office space to dwelling unit.Details
renovations within existing building envelope. add laundry, kitchen/bath upgrade. convert one office space to dwelling unit. | $65,000 | |
| Sep 5, 2017 | Completed final sign-off Apr 2024 | 3359 26th St | North Star Plumbing & Fire Protection, O Donoghue Construction Inc. | vertical addition to an (e)structure over basement on a through lot. (3)(n)floors on top of (e)2-story over basement portion facing 26th street;& (4)(n)floors above (e)1-story over basement portion facing capp street. (7)new condominiums will be added to the (e)single dwelling unit over commercial.Details
vertical addition to an (e)structure over basement on a through lot. (3)(n)floors on top of (e)2-story over basement portion facing 26th street;& (4)(n)floors above (e)1-story over basement portion facing capp street. (7)new condominiums will be added to the (e)single dwelling unit over commercial. | $500,000 |
| Jul 27, 2017 | Never finaled issued Oct 2018, no final | 20 Belcher St | Modern Art Construction | rear bldg: remodel of the detached 1-unit cottage in the rear yard. add 1 bathroom. reconfigure & relocat kitchen to ground floor.Details
rear bldg: remodel of the detached 1-unit cottage in the rear yard. add 1 bathroom. reconfigure & relocat kitchen to ground floor. | $200,000 |