Peter Suen
- License
- C37738
- Architect
- About the California Architects Board
- Look the license up with the state (Architects Board)
- Listed as
- architect
- Firm
- Fifth Arch
- On San Francisco permits
- Jun 2019 to May 2021
7 permits since 2000 (architect on 7 permits): 5 completed, 1 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Associated Builders (5), Electric Current Construction Inc. (2), Fifth Arch Llp
- Architects
- Edward Morris
- Engineers
- Kathyrn Briggs, Michael Hom
Where they worked
- Single-family 3
- Multi-family (2-family, apartments) 4
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 11, 2021 | Never finaled issued Feb 2023, no final | 3029 Laguna St | Fifth Arch Llp, Associated Builders | addition and alterations to an existing 2-unit, 2-sotry structure. add additional 2 stories on the top of the existing structure and preserve most of the existing facade.Details
addition and alterations to an existing 2-unit, 2-sotry structure. add additional 2 stories on the top of the existing structure and preserve most of the existing facade. | $1,200,000 |
| Oct 26, 2020 | Completed final sign-off Dec 2021 | 2363 25th Av | Electric Current Construction Inc. | new exterior deck.Details
new exterior deck. | $5,000 |
| Jun 8, 2020 | Expired or cancelled expired Jan 2025 | 2912 Hawes St | Associated Builders | conversion of (e) first floor to add accessory dwelling unit with (1) bath and kitchenette per ordinance no. 95-17 under bpa#2020-0608-8221. new unit - 370 sq ft studio. reference bpa#2019-0702-4993 for vertical addition.Details
conversion of (e) first floor to add accessory dwelling unit with (1) bath and kitchenette per ordinance no. 95-17 under bpa#2020-0608-8221. new unit - 370 sq ft studio. reference bpa#2019-0702-4993 for vertical addition. | $35,000 |
| Mar 4, 2020 | Completed final sign-off Aug 2021 | 2363 25th Av | Electric Current Construction Inc. | the renovation and expansion of an existing single family house with horizontal expansion. ref adu permit# 2017-1208-5863.Details
the renovation and expansion of an existing single family house with horizontal expansion. ref adu permit# 2017-1208-5863. | $25,000 |
| Jul 23, 2019 | Completed final sign-off Jul 2024 | 1390 Oakdale Av | Associated Builders | erect 2-story, type 5b, no basement, single family dwelling unit building w/ one adu unit per ord# 162-16. total will be 2 residential dwelling units.Details
erect 2-story, type 5b, no basement, single family dwelling unit building w/ one adu unit per ord# 162-16. total will be 2 residential dwelling units. | $250,000 |
| Jul 2, 2019 | Completed final sign-off Jan 2025 | 2912 Hawes St | Associated Builders | remodel of (e) house. 1 story vertical addition w/ 2 (n) bedrooms & 1 (n) bath. convertion of (e) crawl space to (n) garage & habitable space including 1 (n) bedrooms and 1 (n) bath. convert proposed office to adu at ground floor under separate bpa 2912 hawesDetails
remodel of (e) house. 1 story vertical addition w/ 2 (n) bedrooms & 1 (n) bath. convertion of (e) crawl space to (n) garage & habitable space including 1 (n) bedrooms and 1 (n) bath. convert proposed office to adu at ground floor under separate bpa 2912 hawes | $200,000 |
| Jun 19, 2019 | Completed final sign-off Jul 2020 | 807 Vienna St | Associated Builders | remodel of (e) upper level, conversion of (e) unfinished ground level to add 1 (n) living room, 1 (n) bedroom & 2 (n) bathrooms, replace (e) windowsDetails
remodel of (e) upper level, conversion of (e) unfinished ground level to add 1 (n) living room, 1 (n) bedroom & 2 (n) bathrooms, replace (e) windows | $225,000 |