Block 3617, lot 054
26 Hill St
- City’s use
- Multi-Family Residential
- Built
- 1900
- Stories
- 3
- Units
- 3
- Rooms
- 6 bathrooms
- Building
- 3,331 sq ft
- Lot
- 2,848 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
20 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 6, 2023 | Completed final sign-off Jul 2023 | 26 Hill St | to obtain final inspection for work approved under pa#202104027812, pa#201807315966,pa#201804307694Details
to obtain final inspection for work approved under pa#202104027812, pa#201807315966,pa#201804307694 | ||
| Jul 6, 2023 | Completed final sign-off Jul 2023 | 26 Hill St | to obtain inspection for work approved dunder pa#201803204108, pa#201803153720, pa#201707263026Details
to obtain inspection for work approved dunder pa#201803204108, pa#201803153720, pa#201707263026 | ||
| Apr 2, 2021 | Never finaled issued Nov 2021, no final | 26 Hill St | repair existing/historic windows (no new windows are proposed at existing window locations or all building elevations) and provide a minor alteration to the front yard landscaping.landscape rear yard incl fence, siding replacement @ front and side elevation. 2 (n) openings at rear pop-out. infillDetails
repair existing/historic windows (no new windows are proposed at existing window locations or all building elevations) and provide a minor alteration to the front yard landscaping.landscape rear yard incl fence, siding replacement @ front and side elevation. 2 (n) openings at rear pop-out. infill | $2,000 | |
| Oct 15, 2020 | Completed final sign-off Aug 2022 | 26 Hill St | Quality Builders General Construction In | remove (e) stair & guardrail from 26 1/2 hill st to backyard on the rear side of bldg. add (n) stair & guardrail to comply bldg code. rear stairs serve as egress for middle & top unit. replacement staircase is larger than (e) req'd by code (n) deck in front of (e) sliding door on rear side, 5' awayDetails
remove (e) stair & guardrail from 26 1/2 hill st to backyard on the rear side of bldg. add (n) stair & guardrail to comply bldg code. rear stairs serve as egress for middle & top unit. replacement staircase is larger than (e) req'd by code (n) deck in front of (e) sliding door on rear side, 5' away | $12,000 |
| Apr 4, 2019 | Expired or cancelled withdrawn Jul 2023 | 26 Hill St | new high efficient furnace. less than 40' ductworkDetails
new high efficient furnace. less than 40' ductwork | $3,000 | |
| Mar 25, 2019 | Never finaled issued Mar 2019, no final | 26 Hill St | street spaceDetails
street space | ||
| Oct 23, 2018 | Completed final sign-off Jul 2023 | 26 Hill St | Otto Miller Development Inc | to comply with dbi nov 201864947. develop and expand existing unconditioned ground floor space for third unit under existing second floor dwelling unit. interior remodel of second floor dwelling unit. rear facade modifications. legalize roof modification at rear.Details
to comply with dbi nov 201864947. develop and expand existing unconditioned ground floor space for third unit under existing second floor dwelling unit. interior remodel of second floor dwelling unit. rear facade modifications. legalize roof modification at rear. | $50,000 |
| Jul 31, 2018 | Expired or cancelled expired Jul 2023 | 26 Hill St | in response to nov 201864947 stregthen the (e) walls and roof in the rear portion of the bldDetails
in response to nov 201864947 stregthen the (e) walls and roof in the rear portion of the bld | $25,000 | |
| Apr 30, 2018 | Never finaled issued Apr 2018, no final | 26 Hill St | revision to 201803153720, relocate kitchen to rearDetails
revision to 201803153720, relocate kitchen to rear | ||
| Mar 27, 2018 | Completed final sign-off Aug 2022 | 26 Hill St | Peninsula Mechanical | on top level, replace (e) furnace with new higher efficiency furnace and ductwork. provide access per cmc 304.4 , less than 40' of new duct.Details
on top level, replace (e) furnace with new higher efficiency furnace and ductwork. provide access per cmc 304.4 , less than 40' of new duct. | $10,000 |
| Mar 21, 2018 | Expired or cancelled expired Mar 2026 | 26 Hill St | field changes to structural. ref. pa# 2017-1109-3552.Details
field changes to structural. ref. pa# 2017-1109-3552. | $28,000 | |
| Mar 20, 2018 | Completed final sign-off Aug 2022 | 26 Hill St | structural revision to app#201711093552. field changes to structural.Details
structural revision to app#201711093552. field changes to structural. | ||
| Mar 20, 2018 | Never finaled issued Mar 2018, no final | 26 Hill St | street spaceDetails
street space | ||
| Mar 20, 2018 | Completed final sign-off Aug 2022 | 26 Hill St | revision to #201711093552. install sliding patio door & change position/type of 1 window. remove 1 window. all changes on the rear exterior facade of the 3rd fl (unit 26 1/2).Details
revision to #201711093552. install sliding patio door & change position/type of 1 window. remove 1 window. all changes on the rear exterior facade of the 3rd fl (unit 26 1/2). | $5,000 | |
| Mar 15, 2018 | Never finaled issued Mar 2018, no final | 26 Hill St | internal remodel (e) 1150sq ft on 2/f of 3-story structure. no exterior changes or structural work. no change to (e) exiting. work includes (n) non-bearing interior partitions, remodel kitchen & bathrm, new bathrm at (e) closet, new lighting & plumbing fixtures. (e) forced air heating &Details
internal remodel (e) 1150sq ft on 2/f of 3-story structure. no exterior changes or structural work. no change to (e) exiting. work includes (n) non-bearing interior partitions, remodel kitchen & bathrm, new bathrm at (e) closet, new lighting & plumbing fixtures. (e) forced air heating & | $75,000 | |
| Nov 9, 2017 | Completed final sign-off Aug 2022 | 26 Hill St | 3rd fl unit 26 1/2 in 3 unit tic: interior upgrades to kitchen cabinets, appliances, wood and tile flooring, new washer/dryer, new dishwasher, new exhaust hood, new recessed led lighting, new bath, elec upgrades to meet code compliance. no exterior workDetails
3rd fl unit 26 1/2 in 3 unit tic: interior upgrades to kitchen cabinets, appliances, wood and tile flooring, new washer/dryer, new dishwasher, new exhaust hood, new recessed led lighting, new bath, elec upgrades to meet code compliance. no exterior work | $40,000 | |
| Jul 26, 2017 | Never finaled issued Aug 2017, no final | 26 Hill St | unit #26a: unit is to be expanded into existing unconditioned ground fl space under the 2nd fl dwelling unit. new non-bearing partitions, lighting, and plumbing fixtures are being proposed. no structural work nor change to building envelope. expanding bathroom.Details
unit #26a: unit is to be expanded into existing unconditioned ground fl space under the 2nd fl dwelling unit. new non-bearing partitions, lighting, and plumbing fixtures are being proposed. no structural work nor change to building envelope. expanding bathroom. | $20,000 | |
| Jun 22, 2017 | Completed final sign-off Aug 2018 | 26 Hill St | Reed Roofers Co | reroofingDetails
reroofing | $8,500 |
| Oct 12, 2010 | Never finaled issued Oct 2010, no final | 26 Hill St | Imr Contractor Corp. | replace damaged treads and risers. hanorail post. add additonal stringer at rear stairway less than 50% repair. to comply with his nov 201067989. repair in kind.Details
replace damaged treads and risers. hanorail post. add additonal stringer at rear stairway less than 50% repair. to comply with his nov 201067989. repair in kind. | $220 |
| Oct 14, 2004 | Completed final sign-off Feb 2005 | 26 Hill St | repair 2 rear exterior stairs/deteriorated strings treads and risers/need bracing to comply withDetails
repair 2 rear exterior stairs/deteriorated strings treads and risers/need bracing to comply with | $1,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Imr Contractor Corp., Otto Miller Development Inc, Peninsula Mechanical, Quality Builders General Construction In, Reed Roofers Co
- Architects
- Edward Toby Morris (4), Joshua Larson (2)
- Engineers
- Rodrigo Santos (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.