Joshua Larson
- Listed as
- architect, designer
- Firm
- Larson Shores Arch.
- Based in
- Oakland
- On San Francisco permits
- Oct 2011 to Aug 2026
66 permits since 2000 (architect on 65 permits, designer on 1 permit): 30 completed, 14 in progress, 14 never finaled, 8 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 18, 2026 | In progress filed Aug 2026, not yet issued | 2950 Pacific Av | Plath & Company Inc | revision to pa 202505297471 change of wall finish simplified landscaping, revised plans for walking between stairsDetails
revision to pa 202505297471 change of wall finish simplified landscaping, revised plans for walking between stairs | |
| Jul 31, 2026 | In progress issued Aug 2026 | 2950 Pacific Av | Plath & Company Inc | revision to pa 202505297474 for revised shoringDetails
revision to pa 202505297474 for revised shoring | |
| Jul 1, 2026 | In progress issued Jul 2026 | 2950 Pacific Av | Plath & Company Inc | revision to approved permit pa202505297471 in kind replacement of chimneys.Details
revision to approved permit pa202505297471 in kind replacement of chimneys. | |
| Jun 7, 2026 | In progress filed Jun 2026, not yet issued | 65 Loraine Ct | interior remodel w/ added roof deck set back 17'-10"from(e)facade.remodel includes a 2'-11" expansion on the 1st fl not extending beyond(e)floor above(n) elec,plum, structural,skylights,& interior finishes.maximum excavation 1'-6",total soil disturbance 12.8 cubic yards for foundation reinforcement.Details
interior remodel w/ added roof deck set back 17'-10"from(e)facade.remodel includes a 2'-11" expansion on the 1st fl not extending beyond(e)floor above(n) elec,plum, structural,skylights,& interior finishes.maximum excavation 1'-6",total soil disturbance 12.8 cubic yards for foundation reinforcement. | $300,000 | |
| Sep 26, 2025 | Completed final sign-off Nov 2025 | 1915 Sacramento St | revision to 202202258675. add 2 windows and 1 door to storage room in basement.Details
revision to 202202258675. add 2 windows and 1 door to storage room in basement. | $1,000 | |
| Sep 10, 2025 | In progress issued Sep 2025 | 276 Ellsworth St | structural revision to permit 202506138678. structural redesign and reduction of current permitted foundation design. ref permits 202302031353, 202503212737.Details
structural revision to permit 202506138678. structural redesign and reduction of current permitted foundation design. ref permits 202302031353, 202503212737. | ||
| Jun 13, 2025 | In progress issued May 2026 | 2950 Pacific Av | Plath & Company Inc | facade alt and addition of 2 basement levels to (e).windows replacement,addition of garage and landscaping elements.new ped and vehicular entrance from broadway.interior renovation and relocate of elevator. rev to pa201602028565.Details
facade alt and addition of 2 basement levels to (e).windows replacement,addition of garage and landscaping elements.new ped and vehicular entrance from broadway.interior renovation and relocate of elevator. rev to pa201602028565. | $1,200,000 |
| Mar 21, 2025 | In progress issued May 2025 | 276 Ellsworth St | revision to 202302031353. relocation to permitted kitchen and bath locations. add 1/2 bath. new finishes, revised mep per revised layout. remove ext. stair add deck less than 30" affDetails
revision to 202302031353. relocation to permitted kitchen and bath locations. add 1/2 bath. new finishes, revised mep per revised layout. remove ext. stair add deck less than 30" aff | ||
| Dec 12, 2024 | In progress issued Apr 2025 | 230 27th St | Adler Builders Inc | interior remodel to include 4' rear yard extension within required 30% rear yard setback. new excavation at finishe floor, new electrical and plumbing,new roof and new skylights. new work not visible from public right of way.Details
interior remodel to include 4' rear yard extension within required 30% rear yard setback. new excavation at finishe floor, new electrical and plumbing,new roof and new skylights. new work not visible from public right of way. | $650,000 |
| Sep 16, 2024 | In progress issued Sep 2024 | 1287 Alabama St | interior tenant improvement w/ cosmetic upgrade including new fixtures, cabinets, plumbing fixture and electrical.Details
interior tenant improvement w/ cosmetic upgrade including new fixtures, cabinets, plumbing fixture and electrical. | $23,000 | |
| Jul 17, 2024 | Completed final sign-off Aug 2026 | 266 Waller St | Adler Builders Inc | interior remodel to include new kitchen & bath layout, new plumbing & appliancesDetails
interior remodel to include new kitchen & bath layout, new plumbing & appliances | $125,000 |
| Apr 25, 2024 | In progress issued May 2024 | 2865 Green St | revision to 202402095605: new retaining wall at southwest side of rear yardDetails
revision to 202402095605: new retaining wall at southwest side of rear yard | $10,000 | |
| Apr 23, 2024 | In progress filed Apr 2024, not yet issued | 493 Molimo Dr | Ingenous General Construction | revision to pa# 2020-0812-1662 new shower curb at prime bath. proposed exterior finish to be stuccoDetails
revision to pa# 2020-0812-1662 new shower curb at prime bath. proposed exterior finish to be stucco | |
| Feb 9, 2024 | In progress issued Mar 2024 | 2865 Green St | add new terrace to rear yard. new retaining walls, landscaping and electrical work.Details
add new terrace to rear yard. new retaining walls, landscaping and electrical work. | $30,000 | |
| Nov 29, 2023 | In progress issued May 2026 | 1877 Broadway | interior remodel including fourth floor expansion within existing building footprint. new work not visible from public right of way.Details
interior remodel including fourth floor expansion within existing building footprint. new work not visible from public right of way. | $350,000 | |
| Apr 18, 2023 | Never finaled issued Apr 2023, no final | 78 Athens St | Ingenous General Construction | rev to pa# 2022-1013-4263; new 2 ft. x 4 ft. skylight to be installed above kitchen more than 5'-0" property lineDetails
rev to pa# 2022-1013-4263; new 2 ft. x 4 ft. skylight to be installed above kitchen more than 5'-0" property line | $4,000 |
| Apr 7, 2023 | In progress issued Oct 2025 | 81 Bradford St | D3 Construction | new vertical & horizontal addition on south side of existing structure with new kitchen on main floor and new bath on lower floor; new powder room & prime bath in existing structure; new deck at main floor new addition; new patio at lower floor addition; new exterior stairs connecting both levels ofDetails
new vertical & horizontal addition on south side of existing structure with new kitchen on main floor and new bath on lower floor; new powder room & prime bath in existing structure; new deck at main floor new addition; new patio at lower floor addition; new exterior stairs connecting both levels of | $350,000 |
| Dec 23, 2022 | Never finaled filed Dec 2022, never issued | 2865 Green St | int. remodel to incl addition of new 4th story set back from the public way 20' 7". rear yard extension of 7'8" on 3rd flr & 2'10" on 4th flr. new mech, elect & plump and new finishes throughout. existing flr framing to remain at same elevation. changes to ext finishes. rev to pa# 202104279406Details
int. remodel to incl addition of new 4th story set back from the public way 20' 7". rear yard extension of 7'8" on 3rd flr & 2'10" on 4th flr. new mech, elect & plump and new finishes throughout. existing flr framing to remain at same elevation. changes to ext finishes. rev to pa# 202104279406 | ||
| Oct 13, 2022 | Completed final sign-off Jul 2023 | 78 Athens St | Ingenous General Construction | kitchen remodel work to include removal of interior wall; new cabinets, counter top and appliances; existing window to interior courtyard to be replaced in-kind. bathroom remodel, no added fixtures, replacing extg fixtures with low fan fixtures and upgrading extg finishes lighting & exhaust fan.Details
kitchen remodel work to include removal of interior wall; new cabinets, counter top and appliances; existing window to interior courtyard to be replaced in-kind. bathroom remodel, no added fixtures, replacing extg fixtures with low fan fixtures and upgrading extg finishes lighting & exhaust fan. | $30,000 |
| Feb 25, 2022 | Expired or cancelled expired Nov 2025 | 1915 Sacramento St | Planart Construction Corp | excavate (e) crawlspace to replace (e) damaged foundations. add new staircase & elevator access from garage to main house. infill (e) lightwell. replace 1st fl rear bay wall. change interior layout. replace (e) windows w/ fullwood. add insulation at walls. re-frame damaged garage roof.Details
excavate (e) crawlspace to replace (e) damaged foundations. add new staircase & elevator access from garage to main house. infill (e) lightwell. replace 1st fl rear bay wall. change interior layout. replace (e) windows w/ fullwood. add insulation at walls. re-frame damaged garage roof. | $700,000 |
| May 27, 2021 | Never finaled filed May 2021, never issued | 2725 Jackson St | Upscale Construction Inc. | removal of (e) non-load bearing post from center of garage openingDetails
removal of (e) non-load bearing post from center of garage opening | $1,000 |
| Apr 27, 2021 | Never finaled issued Apr 2022, no final | 2865 Green St | Upscale Construction Inc. | interior remodel to include vertical addition of new 4th floor story set back from public right of way 17'-7".rear yard extenstion of 2'-0" on 3rd and 4th floors only. vertical addition. plumbing, mechanical, elec. & finishes throughout. removal of existing elevator. sprinkler 13r throughoutDetails
interior remodel to include vertical addition of new 4th floor story set back from public right of way 17'-7".rear yard extenstion of 2'-0" on 3rd and 4th floors only. vertical addition. plumbing, mechanical, elec. & finishes throughout. removal of existing elevator. sprinkler 13r throughout | $450 |
| Oct 15, 2020 | Completed final sign-off Aug 2022 | 26 Hill St | Quality Builders General Construction In | remove (e) stair & guardrail from 26 1/2 hill st to backyard on the rear side of bldg. add (n) stair & guardrail to comply bldg code. rear stairs serve as egress for middle & top unit. replacement staircase is larger than (e) req'd by code (n) deck in front of (e) sliding door on rear side, 5' awayDetails
remove (e) stair & guardrail from 26 1/2 hill st to backyard on the rear side of bldg. add (n) stair & guardrail to comply bldg code. rear stairs serve as egress for middle & top unit. replacement staircase is larger than (e) req'd by code (n) deck in front of (e) sliding door on rear side, 5' away | $12,000 |
| Oct 9, 2020 | Completed final sign-off Jul 2022 | 1911 30th Av | Lt Construction Inc | interior remodel of kitchen & bath, (n) paint, electrical, lighting. replace appliances & plumbing in kind. replace cabinets, counters, tile & floor. (n) heated floor in bathroom, replace (e) bathroom window in kind. no change to (e) layout, building footprint, or garage.Details
interior remodel of kitchen & bath, (n) paint, electrical, lighting. replace appliances & plumbing in kind. replace cabinets, counters, tile & floor. (n) heated floor in bathroom, replace (e) bathroom window in kind. no change to (e) layout, building footprint, or garage. | $50,000 |
| Sep 15, 2020 | Expired or cancelled cancelled Jan 2026 | 1310 Sanchez St | Planart Construction Corp | renovation to garage to include leveling floor throughout, addition of bath & laundry, added work space, renovated backyard access & addition of stairway from garage to floor through existing lightwell.Details
renovation to garage to include leveling floor throughout, addition of bath & laundry, added work space, renovated backyard access & addition of stairway from garage to floor through existing lightwell. | $100,000 |
| Sep 1, 2020 | Expired or cancelled cancelled Nov 2024 | 1310 Sanchez St | expansion of the third floor envelope to include addition of master bedroom and master bath, roof deck, added windows on north and south walls and added skylight. infill of lightwell & garage work under permit #202009154211.Details
expansion of the third floor envelope to include addition of master bedroom and master bath, roof deck, added windows on north and south walls and added skylight. infill of lightwell & garage work under permit #202009154211. | $150,000 | |
| Aug 12, 2020 | Never finaled issued Aug 2022, no final | 493 Molimo Dr | Ingenous General Construction | floor plan layout changes,(n) vertical additions over (e) balcony in front &(e) deck @ rear on second level,(n) elevator &(n) stair from garage level to roof,exterior changes on front & rear facade,(n) deck bridge to hill on first level,(n) skylights & guardrail along roof &(n) solar panels on roof.Details
floor plan layout changes,(n) vertical additions over (e) balcony in front &(e) deck @ rear on second level,(n) elevator &(n) stair from garage level to roof,exterior changes on front & rear facade,(n) deck bridge to hill on first level,(n) skylights & guardrail along roof &(n) solar panels on roof. | $500,000 |
| Aug 29, 2019 | Completed final sign-off Jul 2020 | 120 Brunswick St | interior remodel: upgrade kitchen finishes, upgrade extg bath finishes, add bathroom, divide garage in half for new family room with bath. elec and plmg upgrades, upgrade electrical panel to 200a.Details
interior remodel: upgrade kitchen finishes, upgrade extg bath finishes, add bathroom, divide garage in half for new family room with bath. elec and plmg upgrades, upgrade electrical panel to 200a. | $75,000 | |
| Jul 12, 2019 | Completed final sign-off Oct 2019 | 1737 Sutter St | True Line Construction | unit e. bathroom remodel in-kind. replacement of vanity and sink, shower tile, faucet, shower door and floor tile, all in-kind. (n) grab bars added at shower and toilet. all vent locations and (e) toilet to remain. no modifications to structuralDetails
unit e. bathroom remodel in-kind. replacement of vanity and sink, shower tile, faucet, shower door and floor tile, all in-kind. (n) grab bars added at shower and toilet. all vent locations and (e) toilet to remain. no modifications to structural | $20,000 |
| Sep 11, 2018 | Never finaled issued Sep 2018, no final | 2031 18th Av | Planart Construction Corp | 1st floor remodeling:master bathroom and bathroom #2. laundry and storage area.Details
1st floor remodeling:master bathroom and bathroom #2. laundry and storage area. | $60,000 |
| Aug 3, 2018 | Never finaled issued Aug 2018, no final | 746 Divisadero St | Planart Construction Corp, Timber-Rock Craftsmen | removing (e) sun room at rear, renovations of (e) kitchen and bathrooms, revised room layout, associated structural improvements to (e) framing *note; 2nd floorDetails
removing (e) sun room at rear, renovations of (e) kitchen and bathrooms, revised room layout, associated structural improvements to (e) framing *note; 2nd floor | $150,000 |
| Jun 14, 2018 | Never finaled issued Jul 2018, no final | 1329 Sanchez St | Planart Construction Corp | interior renovation to existing single family residence. new skylights. upgrades to electrical, mechanical and plumbing systems. new layout and interior finishes. windows to be aluminum wood clad.Details
interior renovation to existing single family residence. new skylights. upgrades to electrical, mechanical and plumbing systems. new layout and interior finishes. windows to be aluminum wood clad. | $325,000 |
| May 25, 2018 | Never finaled filed May 2018, never issued | 1737 Sutter St | enclose extg exterior balcony with glazing to create an enclosed sunroom.Details
enclose extg exterior balcony with glazing to create an enclosed sunroom. | $50,000 | |
| May 25, 2018 | Never finaled issued Apr 2019, no final | 2031 18th Av | Planart Construction Corp | enclose existing exterior patio/courtyard within bldg envelope on 2nd story. new infill not to exceed (e) height of bldg. new infill not visible from public right of way. new interior layout & finishes.new paint on bldg exterior. new room extension off master bed within bldg footprint.Details
enclose existing exterior patio/courtyard within bldg envelope on 2nd story. new infill not to exceed (e) height of bldg. new infill not visible from public right of way. new interior layout & finishes.new paint on bldg exterior. new room extension off master bed within bldg footprint. | $150,000 |
| Apr 19, 2018 | Completed final sign-off Oct 2019 | 238 Alma St | Chang Chao Ming Constr | front: interior upgrades to kitchen cabinets, appliances, new wood & tile floring, (n) washer/dryer, (n) appliances, (n) exhaust hood, (n) recessed led lighting, painting, upgrades to electrical & plumbing.Details
front: interior upgrades to kitchen cabinets, appliances, new wood & tile floring, (n) washer/dryer, (n) appliances, (n) exhaust hood, (n) recessed led lighting, painting, upgrades to electrical & plumbing. | $85,000 |
| Mar 20, 2018 | Completed final sign-off Aug 2022 | 26 Hill St | revision to #201711093552. install sliding patio door & change position/type of 1 window. remove 1 window. all changes on the rear exterior facade of the 3rd fl (unit 26 1/2).Details
revision to #201711093552. install sliding patio door & change position/type of 1 window. remove 1 window. all changes on the rear exterior facade of the 3rd fl (unit 26 1/2). | $5,000 | |
| Jan 30, 2018 | Completed final sign-off Aug 2018 | 242 Alma St | remove proposed sprinkler @ (e) backyard cottage to reduce scope of work, ref 201403191083. pa #201403181083, issued to comply with nov 201333903.Details
remove proposed sprinkler @ (e) backyard cottage to reduce scope of work, ref 201403191083. pa #201403181083, issued to comply with nov 201333903. | ||
| Dec 19, 2017 | Completed final sign-off Aug 2018 | 2980 California St | Durkin Inc. | convert (e) unconditioned attic space ot (n) conditioned as a game room. no bldg expansion. int renovation to (e) s. f. d. upgrade to electrical, plumbing & mechanical system. renovate ktichen & bathroom w/(n) fixture & finishes throughout.(n) skylights,(n) 8x8 dormer,(n) bathroom,(n) window.Details
convert (e) unconditioned attic space ot (n) conditioned as a game room. no bldg expansion. int renovation to (e) s. f. d. upgrade to electrical, plumbing & mechanical system. renovate ktichen & bathroom w/(n) fixture & finishes throughout.(n) skylights,(n) 8x8 dormer,(n) bathroom,(n) window. | $70,000 |
| Oct 7, 2016 | Completed final sign-off Apr 2017 | 617 Broderick St | Kieran O'carroll Construction | renovation of (e) unit - interior remodel of (e) kitchen, bathroom. add new bathroom, threee new dormers, and new finishes. new electrical and plumbing included under this permit. fire sprinklers/alarm under separate permit.Details
renovation of (e) unit - interior remodel of (e) kitchen, bathroom. add new bathroom, threee new dormers, and new finishes. new electrical and plumbing included under this permit. fire sprinklers/alarm under separate permit. | $80,000 |
| May 3, 2016 | Completed final sign-off Apr 2021 | 8 California St | renovation of existing lobby (main building lobby) to 1st fl. remove/replace existing wall and floor finishes, ceiling and ceiling fixtures, new lighting maher not reqDetails
renovation of existing lobby (main building lobby) to 1st fl. remove/replace existing wall and floor finishes, ceiling and ceiling fixtures, new lighting maher not req | $90,000 | |
| Jan 26, 2016 | Completed final sign-off Apr 2017 | 141 San Pablo Av | Dennis Webb Construction | change in layout of guest bath and utility room 1st fl and lower eleveation of floor. removal of e posts in living room. change master bath to sitting niche on 2nd fl, restore layout of e bath ond 2nd fl to e situation. remove built in closet at mezz, remove built in desks at bedroom 2nd flDetails
change in layout of guest bath and utility room 1st fl and lower eleveation of floor. removal of e posts in living room. change master bath to sitting niche on 2nd fl, restore layout of e bath ond 2nd fl to e situation. remove built in closet at mezz, remove built in desks at bedroom 2nd fl | $10,000 |
| Dec 23, 2015 | Completed final sign-off Feb 2016 | 2834 Polk St | Dragon Werks Inc | revision to pa#201411050795 & pa# 2015-0429-4961, relocate laundry room to 1st fl.Details
revision to pa#201411050795 & pa# 2015-0429-4961, relocate laundry room to 1st fl. | $1,500 |
| Sep 29, 2015 | Never finaled issued Oct 2015, no final | 134 05th Av | Planart Construction Corp | revision to 201312033166, move back wall of 1st fl/basement to be even with wall aboveDetails
revision to 201312033166, move back wall of 1st fl/basement to be even with wall above | |
| Sep 11, 2015 | Completed final sign-off Apr 2017 | 141 San Pablo Av | Dennis Webb Construction | interior renovation of extg single family home with new kitchen, bathrooms, and reconfiguration of extg mezzanine in great room. add patio door at rear of home.Details
interior renovation of extg single family home with new kitchen, bathrooms, and reconfiguration of extg mezzanine in great room. add patio door at rear of home. | $175,000 |
| Jun 25, 2015 | Expired or cancelled expired Apr 2021 | 1200 Gough St | Singha Construction Inc, Dennis Webb Construction | kitchen remodel (cabinets, plmg, elec) install washer/dryer, replace bedroom window(u-factor 0.30 or better)Details
kitchen remodel (cabinets, plmg, elec) install washer/dryer, replace bedroom window(u-factor 0.30 or better) | $20,000 |
| Jun 3, 2015 | Completed final sign-off Oct 2015 | 63 Pearl St | addition of second bathroom in extg 1st floor unit of 2 unit building. no exterior changes, upgrades to kitchen to include new cabinets, countertops, flooring, lighting, and appliances. remodel extg bathroom with new tile , fixtures, paint, and lighting. new flooring throughout the unit.Details
addition of second bathroom in extg 1st floor unit of 2 unit building. no exterior changes, upgrades to kitchen to include new cabinets, countertops, flooring, lighting, and appliances. remodel extg bathroom with new tile , fixtures, paint, and lighting. new flooring throughout the unit. | $35,000 | |
| Apr 3, 2015 | Completed final sign-off Feb 2016 | 2832 Polk St | revision to appl #2014.1105.0793: widen + lower rear yard windows, add 1'-0" juliette guardrail.Details
revision to appl #2014.1105.0793: widen + lower rear yard windows, add 1'-0" juliette guardrail. | $5,000 | |
| Apr 3, 2015 | Completed final sign-off Feb 2016 | 2834 Polk St | revision to appl #2014.1105.0795: widen + lower rear yard windows, add 1'-0" juliette guardrail.Details
revision to appl #2014.1105.0795: widen + lower rear yard windows, add 1'-0" juliette guardrail. | $5,000 | |
| Feb 6, 2015 | Completed final sign-off Oct 2017 | 711 20th Av | expand building horizontal on each level at rear. renovation to 1st,2nd & 3rd level of home. enclose (e) patio on 2nd flr, new interior staircase, remodel kitchen & bathrooms, new rear yard windows + doors, upgraded electrical & plumbing throughout, paint.Details
expand building horizontal on each level at rear. renovation to 1st,2nd & 3rd level of home. enclose (e) patio on 2nd flr, new interior staircase, remodel kitchen & bathrooms, new rear yard windows + doors, upgraded electrical & plumbing throughout, paint. | $150,000 | |
| Feb 6, 2015 | Completed final sign-off May 2017 | 46 Wilder St | interior renovation for 1st & 2nd flr. fill in (e) light well for new stair case, add master bath, renovate kitchen, change door to window on 1st flr, renovate bathroom 1st flr, new electrical, plumbing, paint.Details
interior renovation for 1st & 2nd flr. fill in (e) light well for new stair case, add master bath, renovate kitchen, change door to window on 1st flr, renovate bathroom 1st flr, new electrical, plumbing, paint. | $100,000 | |
| Nov 5, 2014 | Completed final sign-off Feb 2016 | 2834 Polk St | remodel existing kitchen and bath. addition of bath, in kind replacement of facade windows, update electrical and plumbing, lighting, new paint & flooring, structural upgrade on interior. wood window at front/same grid pattern.Details
remodel existing kitchen and bath. addition of bath, in kind replacement of facade windows, update electrical and plumbing, lighting, new paint & flooring, structural upgrade on interior. wood window at front/same grid pattern. | $60,000 | |
| Nov 5, 2014 | Completed final sign-off Feb 2016 | 2832 Polk St | remodel existing kitchen and bath. addition of bath, in kind replacement of facade windows, update electrical and plumbing, lighting, new paint & flooring, structural upgrade on interior. add roof deck 243 sf with railing. wood window at front w/ same grid pattern.Details
remodel existing kitchen and bath. addition of bath, in kind replacement of facade windows, update electrical and plumbing, lighting, new paint & flooring, structural upgrade on interior. add roof deck 243 sf with railing. wood window at front w/ same grid pattern. | $60,000 | |
| Sep 23, 2014 | Completed final sign-off Jul 2015 | 41 Wilder St | Planart Construction Corp | convert existing unconditioned space on 1st floor to master suite with (n) deck. (6" above grade).Details
convert existing unconditioned space on 1st floor to master suite with (n) deck. (6" above grade). | $48,000 |
| Jul 8, 2014 | Never finaled issued Jul 2014, no final | 1315 Laguna St | C R Remodeling & Construction | unit #5: interior upgrades to kitchen cabinets, appliances, new wood and tile flooring, new washer/dryer, dishwasher, new exhaust hood, recessed led lighting, painting, new folding patio door, enlarged bathroom, relocation of e interior doors, new electrical upgrades to meet code compliance,Details
unit #5: interior upgrades to kitchen cabinets, appliances, new wood and tile flooring, new washer/dryer, dishwasher, new exhaust hood, recessed led lighting, painting, new folding patio door, enlarged bathroom, relocation of e interior doors, new electrical upgrades to meet code compliance, | $22,000 |
| Mar 5, 2014 | Completed final sign-off Jul 2014 | 200 Genebern Wy | Planart Construction Corp | replace e living room windows in kind with double pane glasDetails
replace e living room windows in kind with double pane glas | $55,000 |
| Feb 21, 2014 | Completed final sign-off Jun 2015 | 1864 Greenwich St | M-Projects | to comply w/nov 201452052 - revision to pa #2012.10.262879: revised demo calculations.Details
to comply w/nov 201452052 - revision to pa #2012.10.262879: revised demo calculations. | |
| Dec 26, 2013 | Completed final sign-off Jan 2015 | 1995 Turk St | work @ unit# 2 only. addition of bedroom, family room, bathroom, electrical, lighting, structural framing upgrades & new egress. tdl all wood windows @ (e) 1st floor. addition of equipment platform over garage. ** maher: compliance with ordinance no# 155-13 not required **Details
work @ unit# 2 only. addition of bedroom, family room, bathroom, electrical, lighting, structural framing upgrades & new egress. tdl all wood windows @ (e) 1st floor. addition of equipment platform over garage. ** maher: compliance with ordinance no# 155-13 not required ** | $40,000 | |
| Dec 3, 2013 | Expired or cancelled cancelled Jan 2026 | 491 Gold Mine Dr | master bathroom remodel on 3rd floor. (n) property line windows in bathroom and dining room on 2nd floor.Details
master bathroom remodel on 3rd floor. (n) property line windows in bathroom and dining room on 2nd floor. | $30,000 | |
| Dec 3, 2013 | Never finaled issued Jul 2014, no final | 134 05th Av | Planart Construction Corp | addition to back of house on 2nd & 3rd fl includes renovated kitchen, (n) deck, (n) master bathroom on 3rd level, renovated master bedroom on 3rd level.Details
addition to back of house on 2nd & 3rd fl includes renovated kitchen, (n) deck, (n) master bathroom on 3rd level, renovated master bedroom on 3rd level. | $175,000 |
| Feb 26, 2013 | Completed final sign-off Jun 2013 | 744 Duncan St | interior remodel of three (e) bathrooms. new finishes only, (e) plumbing locations to remain. no structural removal of walls. finish work includes tile, tone, cabinets, new electrical & plumbing fixtures. no work in basement.Details
interior remodel of three (e) bathrooms. new finishes only, (e) plumbing locations to remain. no structural removal of walls. finish work includes tile, tone, cabinets, new electrical & plumbing fixtures. no work in basement. | $18,000 | |
| Dec 21, 2012 | Expired or cancelled expired Dec 2014 | 2725 Jackson St | Redhorse Constructors Inc. | increase garage door by 5". in kind in terms of materialDetails
increase garage door by 5". in kind in terms of material | $500 |
| Oct 31, 2012 | Expired or cancelled cancelled Jan 2026 | 341 Cornwall St | revision to pa# 2012-0830-8638-revised location of stairs off of back deckDetails
revision to pa# 2012-0830-8638-revised location of stairs off of back deck | $100 | |
| Oct 26, 2012 | Completed final sign-off Jun 2015 | 1864 Greenwich St | M-Projects | renovation/expansion of (e) single family residence. vertical and horizontal addition of 2 additional floors to remain single family residence. fire sprinklers under separate permit.Details
renovation/expansion of (e) single family residence. vertical and horizontal addition of 2 additional floors to remain single family residence. fire sprinklers under separate permit. | $200,000 |
| Feb 24, 2012 | Never finaled issued Mar 2012, no final | 2725 Jackson St | Redhorse Constructors Inc. | interior renovation of 5 bathrooms & kitchen. repl fireplace surround, hardwood flooring on 2nd/3rd fl. selective painting, demo & replacement of interior non load bearing pony walls. no exterior work, no replacement windows. (e) electrical work to remain, some additional lighting on covesDetails
interior renovation of 5 bathrooms & kitchen. repl fireplace surround, hardwood flooring on 2nd/3rd fl. selective painting, demo & replacement of interior non load bearing pony walls. no exterior work, no replacement windows. (e) electrical work to remain, some additional lighting on coves | $175,000 |
| Oct 24, 2011 | Completed final sign-off Oct 2011 | 1154 Stanyan St | Doran Construction & Design | revision to pa# 2011-0517-6177-per inspector's request to show drwgs-interior glass to be tempered, door at garage to have closer & smoke seal, new 4" concrete encased metal bollard, 20 sq ft of ventilationDetails
revision to pa# 2011-0517-6177-per inspector's request to show drwgs-interior glass to be tempered, door at garage to have closer & smoke seal, new 4" concrete encased metal bollard, 20 sq ft of ventilation | $15,000 |
| Oct 24, 2011 | Expired or cancelled cancelled Jan 2026 | 1154 Stanyan St | remove (e) deck & replace with juliette guardrailDetails
remove (e) deck & replace with juliette guardrail | $750 |