M-Projects
- Based in
- San Francisco
- On San Francisco permits
- Feb 2008 to Dec 2021
- Last 24 months
- 0 permits filed
35 permits since 2000: 31 completed, 4 never finaled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
CompletedIn progressNever finaledExpired or cancelled
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 22, 2021 | Completed final sign-off Feb 2022 | 7 Seymour St | revision to permit #201702229909 to document as built conditions including kitchen sink, peninsula, fridge, dishwasher. in basement. master bedroom closet door inside bathroom hallway in second floor. | |
| Feb 4, 2020 | Completed final sign-off Jul 2020 | 353 Kearny St | revision to pa #2018-1126-6646: document as-built installation of electrical system. (e) electrical switcher is being utilized to serve the project. | $10,000 |
| Nov 5, 2019 | Completed final sign-off Feb 2022 | 7 Seymour St | revision to pa# 2017-0222-9909: reduce window at basement, side elevation, add new lightwell at rear year @ basement level | $3,000 |
| Oct 28, 2019 | Never finaled issued Mar 2020, no final | 353 Kearny St | install 1 single faced electric wall sign "canopy" | $1,500 |
| Oct 28, 2019 | Never finaled issued Mar 2020, no final | 353 Kearny St | install 1 electric double faced projecting sign "canopy" | $1,000 |
| Jun 24, 2019 | Completed final sign-off Jul 2020 | 595 Pacific Av | ref pa# 201905302023 and 201906123199: t.i for office building, electrical lighting and power. electrical only. | $10,000 |
| Jun 11, 2019 | Completed final sign-off Jul 2020 | 595 Pacific Av | mechanical work only for pa 201905302023. demo of (e) vav terminal units. ductwork and flue piping. installation of (n) vav terminal units. installation of (n) hvac controls tied to (e) system | $10,000 |
| May 30, 2019 | Completed final sign-off Aug 2020 | 595 Pacific Av | installation of new cabinetry, non-bearing partitions; interior window partitions, break room, new flooring & new ceiling @ 5th floor. ti @ 5th fl - mep deferred | $300,000 |
| Jan 29, 2019 | Completed final sign-off Jun 2020 | 353 Kearny St | all floors: revision to bpa #201807184828 mechanical only. installation of restroom exhaust system. installation of outside air system for all floors. installation of central vrv system for all floor. | |
| Nov 26, 2018 | Completed final sign-off Jun 2020 | 353 Kearny St | title 24, electrical work in conjunction w/ pa 201807184828 and 201809069273 | $60,000 |
| Sep 6, 2018 | Completed final sign-off Jun 2020 | 353 Kearny St | revision to pa 2018-0718-4828 revised restroom & mech chase location & minor modifications. installation of non-load bearing walls. partitions break room & kitchenette | $55,000 |
| Aug 31, 2018 | Completed final sign-off Jun 2020 | 353 Kearny St | rooftop mech equipment | $1,000 |
| Jul 18, 2018 | Completed final sign-off Jun 2020 | 353 Kearny St | interior stairs - level extg stairs, modify handrails to be 36" and guard rails t obe 42". level elevator landing on upper floors, addition of ada unisex restroom on every floor. all exterior work to be under separate permit | $165,000 |
| Jun 11, 2018 | Completed final sign-off Jun 2018 | 343 Kearny St | to comply with complaint #201853793, document and receive inspection on non-structural demo. no historic or original materials were removed based on photos, construction materials and extant historic fabric. per ab-017 | $3,000 |
| Apr 11, 2018 | Completed final sign-off Jun 2018 | 595 Pacific Av | 4th floor: revision to app#201711103710 for sf health department. | |
| Dec 14, 2017 | Never finaled issued Jul 2018, no final | 595 Pacific Av | new non-structural exterior wall sign | $3,000 |
| Nov 10, 2017 | Completed final sign-off Jun 2018 | 595 Pacific Av | 4th fl: ti of office - installation of new cabinets, non-bearing partition walls, remodel restrooms, breakrooms. mep under seperate permit. demo under permit #201710201791. fully sprinklered building. | $350,000 |
| Oct 20, 2017 | Completed final sign-off Nov 2017 | 595 Pacific Av | interio demo only. remove all non bearing partitions, e cabinetry, remove and salavage 1 closet door. remove all e restroom partitions, sinks, faucets, countertop. remove and salvage all restroom accessories. ti under sep permit incl ele,mech,fire | $5,000 |
| Feb 22, 2017 | Completed final sign-off Feb 2022 | 7 Seymour St | respond to notice of enforcement 13269-enf, memorialize demo work performed without permits, full interior remodel @ all floors, adjust (e) floor heights to accommodate (n) 3rd floor, (n) dormers & enlarged window @ (n) 3rd floor level, no other facade changes. | $200,000 |
| Feb 8, 2016 | Completed final sign-off Jul 2018 | 2193 Fillmore St | t.i. to extg 2nd floor office. appox 2900 sq ft. demo extg office walls, reframe with new post and beam, construct new office partitions, replace extg bathroom with new. replace extg lighting. | $95,000 |
| Jan 29, 2016 | Completed final sign-off Nov 2016 | 20 Hawthorne St | interior renovation of (e) office space into an art gallery space. work will consist of demo of interior partitions and new partitions and finishes. no changes to existing or ada access. no change of use. fire sprinkler and alarm on separate permit | $80,000 |
| Feb 21, 2014 | Completed final sign-off Apr 2014 | 1864 Greenwich St | shoring permit | $3,000 |
| Feb 21, 2014 | Completed final sign-off Jun 2015 | 1864 Greenwich St | to comply w/nov 201452052 - revision to pa #2012.10.262879: revised demo calculations. | |
| Jan 29, 2014 | Completed final sign-off Jun 2015 | 1864 Greenwich St | revision to pa#2012-1026-2879. retaining wall back of property. | |
| Aug 21, 2013 | Completed final sign-off Nov 2013 | 486 Ellis St | interior remodel of 486-488 ellis st for art gallery use m to a occup. work to include: (2) ada bathrooms, minor partition walls, new lighitng, bldg is fully sprinklered. full seismic upgrade done under ref pa# 200811076130. all ada to space under pa# 201306179736. sep hvac, sprinkler, life safety | $120,000 |
| Oct 26, 2012 | Completed final sign-off Jun 2015 | 1864 Greenwich St | renovation/expansion of (e) single family residence. vertical and horizontal addition of 2 additional floors to remain single family residence. fire sprinklers under separate permit. | $200,000 |
| May 2, 2012 | Completed final sign-off Jan 2013 | 12 Geary St | erect non-electric, wall, projecting, double-faced new sign. | $150 |
| Sep 27, 2010 | Completed final sign-off Jul 2012 | 3020 Laguna St | to demolish 2 stories, single family residence. | $10,000 |
| Sep 27, 2010 | Never finaled issued Mar 2012, no final | 3020 Laguna St | to erect 4 stories, 2 units residential building. | $400,000 |
| Jun 1, 2010 | Completed final sign-off Apr 2011 | 3043 Clay St | pending issuance of ti | |
| May 19, 2010 | Completed final sign-off Apr 2011 | 3043 Clay St | revision to permit #2006/0403/8097-under construction. addition of sprinkler heads, fire shutters. documentation of revised windows & doors; including changes in size, operation & removal from scope. | $10,000 |
| May 5, 2009 | Completed final sign-off Jul 2010 | 1155 Vallejo St | revision to 200802043939, add rooftop access through main staircase to a rooftop deck (270 sf). additonal 94 sf enclosure for new stair to access roof deck. | $10,000 |
| Mar 16, 2009 | Completed final sign-off Dec 2009 | 3051 Clay St | convert closet to full bathroom, add a door. | $10,000 |
| Feb 23, 2009 | Completed final sign-off Nov 2009 | 1155 Vallejo St | changed foundation details, removed exterior staircase, added hallway into garage, revision to pa# 200802043939-s1 | |
| Feb 4, 2008 | Completed final sign-off Nov 2009 | 1155 Vallejo St | new third floor vertical addition for 2 bedrooms, 2 bathrooms to (e) 2-story building; 1st floor: new bedroom, bath, stair and laundry; 2nd floor: fill (e) deck for new bedroom and remove part of kitchen for a new deck; 2 bath & mew roof decks on 2nd and 3rd floors. | $185,000 |