Block 0270, lot 001
353 Kearny St
- City’s use
- Commercial Office
- Built
- 1907
- Stories
- 5
- Units
- 3
- Rooms
- 11 bathrooms
- Building
- 15,942 sq ft
- Lot
- 1,998 sq ft
- Zoning
- C3O
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
50 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Nov 3, 2026 | In progress filed Nov 2026, not yet issued | 353 Kearny St | demoliton and recontruction of the sub-sidewalak basement roof slab.Details
demoliton and recontruction of the sub-sidewalak basement roof slab. | $400,000 | |
| May 6, 2026 | In progress issued May 2026 | 353 Kearny St | Rescom Realty And Development Llc | remove non-historic green tile from storefront, including around side door and expose original brick. exterior work only.Details
remove non-historic green tile from storefront, including around side door and expose original brick. exterior work only. | $6,500 |
| Oct 20, 2025 | Completed final sign-off Dec 2025 | 359 Kearny St | Cal Sign Inc | 1st/f & basement t.i. - new non structural partition wall, remove e) handsink & serve counter, cosmetic work & replacement of water heaterDetails
1st/f & basement t.i. - new non structural partition wall, remove e) handsink & serve counter, cosmetic work & replacement of water heater | $8,000 |
| Nov 20, 2023 | In progress issued Nov 2023 | 357 Kearny St | Specialized Graphics Inc | install one single faced, non illuminated wall mounted sign at front entrance "ar har ya"Details
install one single faced, non illuminated wall mounted sign at front entrance "ar har ya" | $2,500 |
| Nov 20, 2023 | In progress issued Nov 2023 | 357 Kearny St | Specialized Graphics Inc | install of 1, non-illuminated, dimensional letterset onto (e) building wall. wall is stucco over brick. no (e) signage to remove/no wasteDetails
install of 1, non-illuminated, dimensional letterset onto (e) building wall. wall is stucco over brick. no (e) signage to remove/no waste | $1,250 |
| Feb 4, 2020 | Completed final sign-off Jul 2020 | 353 Kearny St | M-Projects | revision to pa #2018-1126-6646: document as-built installation of electrical system. (e) electrical switcher is being utilized to serve the project.Details
revision to pa #2018-1126-6646: document as-built installation of electrical system. (e) electrical switcher is being utilized to serve the project. | $10,000 |
| Oct 28, 2019 | Never finaled issued Mar 2020, no final | 353 Kearny St | M-Projects | install 1 electric double faced projecting sign "canopy"Details
install 1 electric double faced projecting sign "canopy" | $1,000 |
| Oct 28, 2019 | Never finaled issued Mar 2020, no final | 353 Kearny St | M-Projects | install 1 single faced electric wall sign "canopy"Details
install 1 single faced electric wall sign "canopy" | $1,500 |
| Aug 9, 2019 | Never finaled issued Aug 2019, no final | 353 Kearny St | street space | ||
| Jun 3, 2019 | Completed final sign-off Jun 2020 | 353 Kearny St | Abe Fire Protection | install underground and new sprinkler supply. ref #201901291497.Details
install underground and new sprinkler supply. ref #201901291497. | $20,000 |
| Mar 1, 2019 | Never finaled issued Mar 2019, no final | 353 Kearny St | street space | ||
| Jan 29, 2019 | Completed final sign-off Jun 2020 | 353 Kearny St | M-Projects | all floors: revision to bpa #201807184828 mechanical only. installation of restroom exhaust system. installation of outside air system for all floors. installation of central vrv system for all floor.Details
all floors: revision to bpa #201807184828 mechanical only. installation of restroom exhaust system. installation of outside air system for all floors. installation of central vrv system for all floor. | |
| Nov 26, 2018 | Completed final sign-off Jun 2020 | 353 Kearny St | M-Projects | title 24, electrical work in conjunction w/ pa 201807184828 and 201809069273Details
title 24, electrical work in conjunction w/ pa 201807184828 and 201809069273 | $60,000 |
| Nov 26, 2018 | Completed final sign-off Jun 2020 | 353 Kearny St | removal of non-original marble cladding & non-original terrazzo steps at southernmost bay. repair & paint existing brick behind cladding. new storefront windows and entrance. new wood transom to match original.Details
removal of non-original marble cladding & non-original terrazzo steps at southernmost bay. repair & paint existing brick behind cladding. new storefront windows and entrance. new wood transom to match original. | $17,500 | |
| Nov 9, 2018 | Completed final sign-off Jun 2020 | 353 Kearny St | Professional Fire Safety Inc | new fire sprinkler installation as required per npfa 13 & 14/ 2016. ref pa ti 201809069273.Details
new fire sprinkler installation as required per npfa 13 & 14/ 2016. ref pa ti 201809069273. | $35,000 |
| Oct 17, 2018 | Completed final sign-off Jun 2020 | 353 Kearny St | Security Engineers Inc | fire sprinkler alarm monitoring. ref app#201809069273Details
fire sprinkler alarm monitoring. ref app#201809069273 | $10,000 |
| Sep 17, 2018 | Never finaled issued Sep 2018, no final | 353 Kearny St | street space | ||
| Sep 6, 2018 | Completed final sign-off Jun 2020 | 353 Kearny St | M-Projects | revision to pa 2018-0718-4828 revised restroom & mech chase location & minor modifications. installation of non-load bearing walls. partitions break room & kitchenetteDetails
revision to pa 2018-0718-4828 revised restroom & mech chase location & minor modifications. installation of non-load bearing walls. partitions break room & kitchenette | $55,000 |
| Aug 31, 2018 | Completed final sign-off Jun 2020 | 353 Kearny St | M-Projects | rooftop mech equipmentDetails
rooftop mech equipment | $1,000 |
| Jul 18, 2018 | Completed final sign-off Jun 2020 | 353 Kearny St | M-Projects | interior stairs - level extg stairs, modify handrails to be 36" and guard rails t obe 42". level elevator landing on upper floors, addition of ada unisex restroom on every floor. all exterior work to be under separate permitDetails
interior stairs - level extg stairs, modify handrails to be 36" and guard rails t obe 42". level elevator landing on upper floors, addition of ada unisex restroom on every floor. all exterior work to be under separate permit | $165,000 |
| Jun 11, 2018 | Completed final sign-off Jun 2018 | 343 Kearny St | M-Projects | to comply with complaint #201853793, document and receive inspection on non-structural demo. no historic or original materials were removed based on photos, construction materials and extant historic fabric. per ab-017Details
to comply with complaint #201853793, document and receive inspection on non-structural demo. no historic or original materials were removed based on photos, construction materials and extant historic fabric. per ab-017 | $3,000 |
| Apr 19, 2018 | Never finaled issued Feb 2019, no final | 353 Kearny St | L 7 Principal Development | repair of (e) windows on kearny & pine street, floors 2-5. replacement of windows previously removed with new wood windows on st. george alley frontageDetails
repair of (e) windows on kearny & pine street, floors 2-5. replacement of windows previously removed with new wood windows on st. george alley frontage | $100,000 |
| Jan 8, 2018 | Never finaled issued Jan 2018, no final | 357 Kearny St | renewal of permit # 201708175103 | ||
| Nov 20, 2017 | Expired or cancelled cancelled Jan 2026 | 357 Kearny St | title 24 calcs for pa 2017-0817-5103 | ||
| Nov 20, 2017 | Never finaled issued Nov 2017, no final | 357 Kearny St | street space permit | ||
| Aug 17, 2017 | Completed final sign-off Mar 2018 | 357 Kearny St | Nick Valaris | minor improvements of (e) g/f and basement at (e) restaurant. (n) casework and kitchen equipment and lighting, flip (e) entry door swing to swing out. (e) hvac systems to remain.Details
minor improvements of (e) g/f and basement at (e) restaurant. (n) casework and kitchen equipment and lighting, flip (e) entry door swing to swing out. (e) hvac systems to remain. | $50,000 |
| Jan 12, 2017 | Never finaled issued Jan 2017, no final | 353 Kearny St | Delvin Garcia Construction | removal of non-bearing partition walls on each floor, approx 580 lf each floor.Details
removal of non-bearing partition walls on each floor, approx 580 lf each floor. | $5,000 |
| Aug 7, 2014 | Expired or cancelled cancelled Mar 2017 | 353 Kearny St | Don Meyers | to erect non-electric, wall, single faced sign. | $2,100 |
| Jul 2, 2013 | Expired or cancelled cancelled Sep 2023 | 353 Kearny St | Superior Plumbing | new residential sprinkler system for dwellings & partial basement, reference appn. 201206072119Details
new residential sprinkler system for dwellings & partial basement, reference appn. 201206072119 | $10,000 |
| Jul 13, 2012 | Never finaled issued Jul 2012, no final | 353 Kearny St | streetspace | ||
| Jun 7, 2012 | Never finaled issued Jun 2012, no final | 353 Kearny St | reinforce existing joists, install ts columns, w-beams and spreaders. rearrange interior walls and upgrade 2 hr rated hallway.Details
reinforce existing joists, install ts columns, w-beams and spreaders. rearrange interior walls and upgrade 2 hr rated hallway. | $50,000 | |
| May 25, 2012 | Never finaled issued May 2012, no final | 353 Kearny St | street space permit | ||
| Mar 8, 2012 | Never finaled issued Mar 2012, no final | 353 Kearny St | exploratory demolition sheetrock removal for engineer inspection of framing non structural workDetails
exploratory demolition sheetrock removal for engineer inspection of framing non structural work | $2,500 | |
| Mar 6, 2012 | Never finaled issued Mar 2012, no final | 357 Kearny St | San Francisco Fire Protection | automatic fire suppression system installation over new ktichen hoodDetails
automatic fire suppression system installation over new ktichen hood | $3,000 |
| Jan 25, 2012 | Never finaled issued Jan 2012, no final | 357 Kearny St | to obtain final inspection for work approved under pa#9518766 all work is complete.Details
to obtain final inspection for work approved under pa#9518766 all work is complete. | ||
| Jan 25, 2012 | Never finaled issued Feb 2012, no final | 357 Kearny St | Aries Building & Construction | tenant improvement-remodel of (e) restaurant. new hood, counter, cooking equipment, squaring off 1 corner of wall & interior signageDetails
tenant improvement-remodel of (e) restaurant. new hood, counter, cooking equipment, squaring off 1 corner of wall & interior signage | $158,484 |
| Jan 25, 2012 | Never finaled issued Jan 2012, no final | 357 Kearny St | to obtain final inspection for work approved under pa#9517135 all work is complete.Details
to obtain final inspection for work approved under pa#9517135 all work is complete. | ||
| Dec 28, 2009 | Never finaled issued Dec 2009, no final | 343 Kearny St | streetspace | ||
| Apr 22, 2008 | Completed final sign-off Aug 2008 | 359 Kearny St | Tenx Enterprises Inc | erect a electric, wall, single faced sign.Details
erect a electric, wall, single faced sign. | |
| Jan 7, 2008 | Expired or cancelled expired Jun 2009 | 359 Kearny St | renew app#200705211846 for final inspectionDetails
renew app#200705211846 for final inspection | ||
| Nov 6, 2007 | Completed final sign-off Nov 2007 | 353 Kearny St | Don Meyers | renew pa# 2002/03/07/0852 for final inspection only.Details
renew pa# 2002/03/07/0852 for final inspection only. | |
| May 21, 2007 | Expired or cancelled expired Oct 2007 | 359 Kearny St | Tom's Construction | to erect electric wall single faced sign.Details
to erect electric wall single faced sign. | $1,500 |
| May 21, 2007 | Completed final sign-off Jul 2007 | 359 Kearny St | install new door. alternate entry details from approved plan.Details
install new door. alternate entry details from approved plan. | $5,000 | |
| Apr 30, 2007 | Never finaled issued Apr 2007, no final | 359 Kearny St | street space | ||
| Mar 12, 2007 | Completed final sign-off Jul 2007 | 359 Kearny St | t.i. at the store front and add a garage to unit. addition of a accessible front counter. mics. finishes, inside & outside.Details
t.i. at the store front and add a garage to unit. addition of a accessible front counter. mics. finishes, inside & outside. | $20,000 | |
| Oct 7, 2004 | Never finaled issued Oct 2004, no final | 353 Kearny St | Matrix Seismic Corp | change of ada work part of "umb" work on plan appl# 2003/05/09/4153. compliance for sanitaryDetails
change of ada work part of "umb" work on plan appl# 2003/05/09/4153. compliance for sanitary | |
| Mar 4, 2004 | Never finaled issued Mar 2004, no final | 353 Kearny St | street space | ||
| May 9, 2003 | Completed final sign-off Nov 2004 | 353 Kearny St | Matrix Seismic Corp | "umb" special procedure. no increase in office space.Details
"umb" special procedure. no increase in office space. | $62,000 |
| Mar 7, 2002 | Expired or cancelled expired Dec 2002 | 353 Kearny St | Don Meyers | erect a single faced, non-electric, wall signDetails
erect a single faced, non-electric, wall sign | |
| Feb 14, 2002 | Expired or cancelled cancelled May 2008 | 353 Kearny St | umb seismic retrofit works, general procedure | $92,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- M-Projects (9), Don Meyers (3), Matrix Seismic Corp (2), Specialized Graphics Inc (2), Abe Fire Protection, Aries Building & Construction, Cal Sign Inc, Delvin Garcia Construction, L 7 Principal Development, Nick Valaris, Professional Fire Safety Inc, Rescom Realty And Development Llc, San Francisco Fire Protection, Security Engineers Inc, Superior Plumbing, Tenx Enterprises Inc, Tom's Construction
- Architects
- Carolyn Kiernat (2), Stephen Li (2), A. Gordon Atkinson
- Engineers
- Alfonso Aguilera, Meng Hsio Chen
- Authorized agents
- Matt Quintero
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.