Stephen Li
- Listed as
- architect, authorized agent-others, designer
- Firm
- Sbl Design Group
- Based in
- San Francisco
- On San Francisco permits
- Sep 2007 to Feb 2026
25 permits since 2000 (architect on 21 permits, authorized agent-others on 2 permits, designer on 2 permits): 19 completed, 1 in progress, 3 never finaled, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 3, 2026 | In progress filed Feb 2026, not yet issued | 1660 Mission St | seismic upgrade and int ronovation all flrs into health and connection recovery center. demo (e) partitions for construction of new walls,ceilings and architectural finishes to house new building program.mep and l/s upgraded. install pv solar system on roof.Details
seismic upgrade and int ronovation all flrs into health and connection recovery center. demo (e) partitions for construction of new walls,ceilings and architectural finishes to house new building program.mep and l/s upgraded. install pv solar system on roof. | $36,500,000 | |
| Dec 7, 2020 | Completed final sign-off Sep 2022 | 414 Rivera St | B. Uniacke Construction | remove e gr fl living room and utility hall to provide new bedroom w full bath, office and 1/2 bath, laundry rm. replace roof deck at 2nd fl provide new retaining wall at side yard.Details
remove e gr fl living room and utility hall to provide new bedroom w full bath, office and 1/2 bath, laundry rm. replace roof deck at 2nd fl provide new retaining wall at side yard. | $90,000 |
| Sep 1, 2020 | Never finaled filed Sep 2020, never issued | 1939 41st Av | 324sf 2-story addition with deck and stair enclosure to rear yard of (e) 2-story sfh. - (n) conc found w/wd frame at addition- (n) stair- (2) (n) bedrms & baths-(n) patio & roof deck- replace (e) deteriorated windows on front facade - replace (e) deteriorated garage doorDetails
324sf 2-story addition with deck and stair enclosure to rear yard of (e) 2-story sfh. - (n) conc found w/wd frame at addition- (n) stair- (2) (n) bedrms & baths-(n) patio & roof deck- replace (e) deteriorated windows on front facade - replace (e) deteriorated garage door | $400,000 | |
| Aug 13, 2019 | Completed final sign-off Oct 2020 | 1057 Portola Dr | Zhizhao Liu Construction Co | remove and replace interior stairs, update kitchen and bathroom, add 1 bathroom at lower floor, replace select windows on side yardDetails
remove and replace interior stairs, update kitchen and bathroom, add 1 bathroom at lower floor, replace select windows on side yard | $50,000 |
| Sep 27, 2018 | Completed final sign-off Jul 2019 | 1452 Bush St | Axel8 Construction | unit 20. interior remodel of 3 bed, 3.5 bath unit. remove non-bearing walls for new closet and redesigned half bath. new finishes at kitchen and bathrooms. maher n/aDetails
unit 20. interior remodel of 3 bed, 3.5 bath unit. remove non-bearing walls for new closet and redesigned half bath. new finishes at kitchen and bathrooms. maher n/a | $50,000 |
| Jun 12, 2018 | Completed final sign-off Oct 2021 | 24 Ord St | Amherst Associates Const | rev to approved permit 201305177225,& comply to nov 201314301,201829041, 201833151,201833121,&201835431. at front, expand roof deck, modify stair, and adjust window style. at lower unit, remodel storage to study, at upper unit, remove side door,at rear yd new retaining wall,new fireplace&no fence.Details
rev to approved permit 201305177225,& comply to nov 201314301,201829041, 201833151,201833121,&201835431. at front, expand roof deck, modify stair, and adjust window style. at lower unit, remodel storage to study, at upper unit, remove side door,at rear yd new retaining wall,new fireplace&no fence. | $10,000 |
| Jun 7, 2018 | Completed final sign-off Oct 2019 | 255 Berry St | Axel8 Construction | interior remodel of existing dwelling unit. provide (n) non-bearing partition walls, with relocated outlets and lightings. replace (e) bathroom vanities. maher naDetails
interior remodel of existing dwelling unit. provide (n) non-bearing partition walls, with relocated outlets and lightings. replace (e) bathroom vanities. maher na | $15,000 |
| Jan 17, 2018 | Completed final sign-off May 2019 | 245 05th St | Premier Structures Inc | title 24 documentation for new power & lighting distribution for t.i. consiting of new offices, breakroom, conference room & shower restroom. refer to pa#201709087375.Details
title 24 documentation for new power & lighting distribution for t.i. consiting of new offices, breakroom, conference room & shower restroom. refer to pa#201709087375. | $40,000 |
| Jan 4, 2018 | Completed final sign-off Dec 2019 | 246 02nd St | unit #1: t.i. of ground floor office space, removal of non-bearing partition walls and providing new conference room and select finishes.Details
unit #1: t.i. of ground floor office space, removal of non-bearing partition walls and providing new conference room and select finishes. | $60,000 | |
| Nov 20, 2017 | Expired or cancelled cancelled Jan 2026 | 357 Kearny St | title 24 calcs for pa 2017-0817-5103Details
title 24 calcs for pa 2017-0817-5103 | ||
| Sep 8, 2017 | Completed final sign-off May 2019 | 245 05th St | Premier Structures Inc | interior ti of (e) office @ ground floor and 2nd floor; (n) non=rated partition walls for offices and conference rooms; (n) kitchenette and work room; (n) restroom with shower; (n) lighting. verify in field rated occupancy separation requirements between office and r-2.mep & sprinklers seprte prmt.Details
interior ti of (e) office @ ground floor and 2nd floor; (n) non=rated partition walls for offices and conference rooms; (n) kitchenette and work room; (n) restroom with shower; (n) lighting. verify in field rated occupancy separation requirements between office and r-2.mep & sprinklers seprte prmt. | $130,000 |
| Aug 17, 2017 | Completed final sign-off Mar 2018 | 357 Kearny St | Nick Valaris | minor improvements of (e) g/f and basement at (e) restaurant. (n) casework and kitchen equipment and lighting, flip (e) entry door swing to swing out. (e) hvac systems to remain.Details
minor improvements of (e) g/f and basement at (e) restaurant. (n) casework and kitchen equipment and lighting, flip (e) entry door swing to swing out. (e) hvac systems to remain. | $50,000 |
| Sep 22, 2016 | Completed final sign-off Apr 2017 | 675 Ofarrell St | Make Ready Maintenance Inc | grd fl: interior renovation of unit #3: removal of non-bearing partitions, update kitchen and bath finishes. add non bearing patitions for closet and bedroom; maher n/a. fire alarm deferred.Details
grd fl: interior renovation of unit #3: removal of non-bearing partitions, update kitchen and bath finishes. add non bearing patitions for closet and bedroom; maher n/a. fire alarm deferred. | $10,000 |
| Sep 8, 2016 | Expired or cancelled expired Apr 2017 | 675 Ofarrell St | Make Ready Maintenance Inc | #16 & #24- interior renovation of 2 seperate apartment units to remove of non-bearing partitions, update kitchen and bathrooms, add non-bearing partition walls for closet and bedroom. n/a ordinance #155-13. fire alarm deferred, if required.Details
#16 & #24- interior renovation of 2 seperate apartment units to remove of non-bearing partitions, update kitchen and bathrooms, add non-bearing partition walls for closet and bedroom. n/a ordinance #155-13. fire alarm deferred, if required. | $45,000 |
| Jul 28, 2016 | Completed final sign-off May 2017 | 665 Eddy St | Holland Brooks Builders Inc | interior unit renovations at 3, 44, 62. removal of non bearing partition walls, new walls for bedroom and closet. kitchen and bath remodel maher not reqDetails
interior unit renovations at 3, 44, 62. removal of non bearing partition walls, new walls for bedroom and closet. kitchen and bath remodel maher not req | $45,000 |
| May 12, 2016 | Completed final sign-off Aug 2016 | 2304 Washington St | Tritone Construction | #200- removal of non bearing partition walls for master bathroom, remodel & convert (e) study into bedroom, interior remodel of bathroom. n/a ordinance #155-13Details
#200- removal of non bearing partition walls for master bathroom, remodel & convert (e) study into bedroom, interior remodel of bathroom. n/a ordinance #155-13 | $20,000 |
| May 5, 2016 | Completed final sign-off Sep 2016 | 255 Berry St | Tritone Construction | unit #107: selective demo of non bearing partition walls and new partitions to create office space(media rm). maher naDetails
unit #107: selective demo of non bearing partition walls and new partitions to create office space(media rm). maher na | $10,000 |
| Dec 22, 2014 | Completed final sign-off Sep 2015 | 4675 18th St | Yao Hui Liang | interior remodel of lower unit. selective demo of structural bearing wall, kitchen and interior finishes. new structural posts beams and shear wall. new kitchen and bath finishesDetails
interior remodel of lower unit. selective demo of structural bearing wall, kitchen and interior finishes. new structural posts beams and shear wall. new kitchen and bath finishes | $35,000 |
| Sep 5, 2014 | Completed final sign-off Jun 2016 | 200 Brannan St | #237 - demolition of extg closets, non bearing partitions and metal guardrail panels. construction of new walls and door for new office. replace metal gurardrail panels with tempered glass. sprinklers under separate permit. n/a maher ordinanceDetails
#237 - demolition of extg closets, non bearing partitions and metal guardrail panels. construction of new walls and door for new office. replace metal gurardrail panels with tempered glass. sprinklers under separate permit. n/a maher ordinance | $15,000 | |
| Aug 29, 2014 | Never finaled issued Sep 2014, no final | 1527 Folsom St | Topline Builders Corp | modification to 201403059924. relocate bar #1 and seating area arrangement. maher not reqDetails
modification to 201403059924. relocate bar #1 and seating area arrangement. maher not req | $10,000 |
| Jul 28, 2014 | Never finaled issued Aug 2014, no final | 2140 Scott St | Joe Doerr Construction | interior renovation of bathroom, kitchen & living room in 1095 s.f. residential condo unit. work includes demolition, minor structural work, new doorway to kitchen, casework, kitchen appliances, plumbing fixtures & relocation/replacement of (e) light fixtures.Details
interior renovation of bathroom, kitchen & living room in 1095 s.f. residential condo unit. work includes demolition, minor structural work, new doorway to kitchen, casework, kitchen appliances, plumbing fixtures & relocation/replacement of (e) light fixtures. | $20,000 |
| Jun 24, 2014 | Completed final sign-off Feb 2015 | 220 Bush St | J M E Construction Services Inc | minor ti of e 1062 (b) restaurant on gr fl. includes demo of e non bearing walls and finishes. new casework, new partitons, relocation of sink and some new kitchen equipmentDetails
minor ti of e 1062 (b) restaurant on gr fl. includes demo of e non bearing walls and finishes. new casework, new partitons, relocation of sink and some new kitchen equipment | $52,000 |
| May 20, 2014 | Completed final sign-off Aug 2014 | 1190 Green St | Terry Mc Daniel Construction | the existing door and window will be removed & replaced with a marvin sliding door. not visable from street.Details
the existing door and window will be removed & replaced with a marvin sliding door. not visable from street. | $3,000 |
| Sep 27, 2013 | Completed final sign-off May 2014 | 1534 Fillmore St | Taico Builder Inc | t.i on (e) jazz club venue. remodel of (e) bar, new fixed seating arrangement. new bar & new seating on 2nd floor. partial floor remodel of (e) bathroomDetails
t.i on (e) jazz club venue. remodel of (e) bar, new fixed seating arrangement. new bar & new seating on 2nd floor. partial floor remodel of (e) bathroom | $85,000 |
| Sep 17, 2007 | Completed final sign-off Dec 2007 | 1565 Oak St | Ho's Contractors Co | unit #10 - (n) partition for closet, demolition of casework, flooring, relocation of (e) kitchen and build out w/ casework, electrical outlets and gas for stove and plumbing for sink.Details
unit #10 - (n) partition for closet, demolition of casework, flooring, relocation of (e) kitchen and build out w/ casework, electrical outlets and gas for stove and plumbing for sink. | $10,000 |