B. Uniacke Construction
- Based in
- South San Francisco
- On San Francisco permits
- Mar 2003 to Jun 2026
- Last 24 months
- 4 permits filed
60 permits since 2000: 51 completed, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2026 | Completed final sign-off Aug 2026 | 2687 California St | unit 2687- add washer and dryer in kitchen .Details
unit 2687- add washer and dryer in kitchen . | $7,500 |
| May 30, 2025 | Completed final sign-off Jun 2026 | 2344 Cecilia Av | shoring of foundation. refer to #202505196781Details
shoring of foundation. refer to #202505196781 | $12,500 |
| May 19, 2025 | Completed final sign-off Jun 2026 | 2344 Cecilia Av | (n) conditioned living space at the back of (e) garage the work will include plumbing for bathroom, sauna, and electrical work.Details
(n) conditioned living space at the back of (e) garage the work will include plumbing for bathroom, sauna, and electrical work. | $130,000 |
| Jan 6, 2025 | Completed final sign-off Jan 2025 | 1754 Greenwich St | work performed under this application to comply with nov 202431975. refinish (e) wallboard at oppening between kitchen and hall infill upper portion of pony wall between kitchen and dining area and install wall baord and paintDetails
work performed under this application to comply with nov 202431975. refinish (e) wallboard at oppening between kitchen and hall infill upper portion of pony wall between kitchen and dining area and install wall baord and paint | |
| May 22, 2024 | Completed final sign-off Jan 2025 | 2311 Cecilia Av | remodel existing basement living room space. remodel bathroom. change window to sliding door. window faces the back. new lighting. add a partion wall for bedroom.Details
remodel existing basement living room space. remodel bathroom. change window to sliding door. window faces the back. new lighting. add a partion wall for bedroom. | $45,000 |
| Apr 22, 2024 | Completed final sign-off Jan 2025 | 2311 Cecilia Av | remodel 1 bathroom (new plumbing, new electrical , tile and shower.) remodel in-kind.Details
remodel 1 bathroom (new plumbing, new electrical , tile and shower.) remodel in-kind. | $25,000 |
| Oct 6, 2022 | Completed final sign-off Jan 2023 | 2344 Cecilia Av | remodel kitchen and one and one half bathrooms, in kind. repair damaged dry rot at lightwell to match existing siding.Details
remodel kitchen and one and one half bathrooms, in kind. repair damaged dry rot at lightwell to match existing siding. | $35,000 |
| Jul 8, 2022 | Completed final sign-off Sep 2022 | 414 Rivera St | to comply with bid nov#202292153: repair stucco and framing as a result of a car crash. in front of building.Details
to comply with bid nov#202292153: repair stucco and framing as a result of a car crash. in front of building. | $7,500 |
| Nov 18, 2021 | Completed final sign-off Jan 2023 | 342 Miramar Av | remodel kitchen & (e) master bathroom in-kind. remodel guest bathroom and add shower (relocate non-structural wall between closet)Details
remodel kitchen & (e) master bathroom in-kind. remodel guest bathroom and add shower (relocate non-structural wall between closet) | $55,000 |
| May 4, 2021 | Completed final sign-off Oct 2021 | 1825 Turk St | unit 203: remodel kitchen and 2 baths, new lightingDetails
unit 203: remodel kitchen and 2 baths, new lighting | $55,000 |
| Apr 16, 2021 | Never finaled issued Apr 2022, no final | 2700 43rd Av | 11/4/21: reduced scope: interior remodel of (e) kitchen and hall bath; raise kitchen ceiling by 12"; remove (e) chainlink fence at front yardDetails
11/4/21: reduced scope: interior remodel of (e) kitchen and hall bath; raise kitchen ceiling by 12"; remove (e) chainlink fence at front yard | $50,000 |
| Mar 9, 2021 | Completed final sign-off Aug 2021 | 333 Ulloa St | demo existing stucco from entire house. repair rotten wood. install new lath & stucco. approx 2500 sq ft. no structural work.Details
demo existing stucco from entire house. repair rotten wood. install new lath & stucco. approx 2500 sq ft. no structural work. | $35,000 |
| Dec 7, 2020 | Completed final sign-off Sep 2022 | 414 Rivera St | remove e gr fl living room and utility hall to provide new bedroom w full bath, office and 1/2 bath, laundry rm. replace roof deck at 2nd fl provide new retaining wall at side yard.Details
remove e gr fl living room and utility hall to provide new bedroom w full bath, office and 1/2 bath, laundry rm. replace roof deck at 2nd fl provide new retaining wall at side yard. | $90,000 |
| Nov 30, 2020 | Completed final sign-off Jan 2021 | 3515 25th St | unit#101: replace kitchen cabinets, counter tops. replace bathroom tile. replace carpet, paint apartment.Details
unit#101: replace kitchen cabinets, counter tops. replace bathroom tile. replace carpet, paint apartment. | $15,000 |
| Apr 16, 2019 | Never finaled issued Jul 2019, no final | 1340 Sloat Bl | (74 sf) horizontal additon @ kitchen with wood deck to rear yard. new sliding glass door @ 1st fl media. new window @ 2nd fl bedroom. new powder room.Details
(74 sf) horizontal additon @ kitchen with wood deck to rear yard. new sliding glass door @ 1st fl media. new window @ 2nd fl bedroom. new powder room. | $55,000 |
| Jan 14, 2019 | Expired or cancelled cancelled Oct 2022 | 342 Miramar Av | to demolish a type-v, 1-story detached shed.Details
to demolish a type-v, 1-story detached shed. | $10,000 |
| Dec 19, 2018 | Completed final sign-off May 2019 | 1621 18th St | replace kitchen cabinets. replace bathroom tiles in (2) bathrooms. replace flooring. change lighting in kitchen. no structural work. no framing changes.Details
replace kitchen cabinets. replace bathroom tiles in (2) bathrooms. replace flooring. change lighting in kitchen. no structural work. no framing changes. | $45,500 |
| Dec 8, 2017 | Completed final sign-off Aug 2020 | 339 Ulloa St | main floor: 10' extension at rear. remodel bedrooms/bath proposed 2nd floor. add (2) bedrooms, (1) bath, partial top floor vertical add. rebuild deck @ rear.Details
main floor: 10' extension at rear. remodel bedrooms/bath proposed 2nd floor. add (2) bedrooms, (1) bath, partial top floor vertical add. rebuild deck @ rear. | $325,000 |
| Dec 28, 2016 | Never finaled issued Dec 2016, no final | 3626 20th St | kitchen remodel, laundry room and pantry, replace window at rear of unit, new plumbing and electrical.Details
kitchen remodel, laundry room and pantry, replace window at rear of unit, new plumbing and electrical. | $45,000 |
| Nov 3, 2015 | Completed final sign-off Jul 2016 | 727 Duboce Av | project proposes 90 sq ft extg family room into extg storage scope includes new closet, new doors, and new bar sink. mep shall be design-build under separate permit.Details
project proposes 90 sq ft extg family room into extg storage scope includes new closet, new doors, and new bar sink. mep shall be design-build under separate permit. | $9,300 |
| Jun 25, 2015 | Completed final sign-off Nov 2017 | 2510 Diamond St | revision to appln #201312124060. reduce size of horizontal addition to 9' @ levels 1 & 2. (n) 3rd story convert to 3-bedroom, 3-bathroom w/ family room @ ground floor.Details
revision to appln #201312124060. reduce size of horizontal addition to 9' @ levels 1 & 2. (n) 3rd story convert to 3-bedroom, 3-bathroom w/ family room @ ground floor. | |
| Jun 9, 2015 | Completed final sign-off Feb 2016 | 1441 Jones St | unit # 403: remodel kitchen, 2 bathrooms, master bed closet.full new lighting. n/a for maher.Details
unit # 403: remodel kitchen, 2 bathrooms, master bed closet.full new lighting. n/a for maher. | $55,000 |
| Mar 4, 2015 | Expired or cancelled expired Jan 2019 | 1347 Green St | remodel (e) bathroom -add a wall for additional bathroom with shower, toilet & sink. replace (e) window with vinyl same size & style.Details
remodel (e) bathroom -add a wall for additional bathroom with shower, toilet & sink. replace (e) window with vinyl same size & style. | $21,500 |
| May 5, 2014 | Completed final sign-off Sep 2014 | 26 Conrad St | excavate for new family room. install 1/2 bath. relocate laundry.Details
excavate for new family room. install 1/2 bath. relocate laundry. | $68,250 |
| Apr 15, 2014 | Completed final sign-off Jun 2016 | 26 Conrad St | remodel main floor, relocate kitchen/bath, addition to main floor, construct new second story, change from 1 bedroom 1 bath to 4 bedrooms and 2 bathrooms. mechanical is under separate permit.Details
remodel main floor, relocate kitchen/bath, addition to main floor, construct new second story, change from 1 bedroom 1 bath to 4 bedrooms and 2 bathrooms. mechanical is under separate permit. | $166,625 |
| Jul 25, 2013 | Completed final sign-off Oct 2013 | 2970 Pine St | bathroom remodel - new plumbing - electrical - drywall - tile - shower pan. no change on walls.Details
bathroom remodel - new plumbing - electrical - drywall - tile - shower pan. no change on walls. | $15,000 |
| Apr 16, 2013 | Completed final sign-off Aug 2013 | 248 Ocean Av | install security bars over 3 windows and 1 door on ground floor commercial space, work done on rear windows, of building & lightwell door, disable acces work was done under app# 200711289148.Details
install security bars over 3 windows and 1 door on ground floor commercial space, work done on rear windows, of building & lightwell door, disable acces work was done under app# 200711289148. | $1,200 |
| Sep 6, 2012 | Completed final sign-off Sep 2013 | 531 Grove St | repair damaged one post due to dryrot supporting bathroom at rear of bldg (in the exterior).Details
repair damaged one post due to dryrot supporting bathroom at rear of bldg (in the exterior). | $3,000 |
| Apr 30, 2012 | Never finaled issued Jul 2012, no final | 360 09th Av | remodel e 650 sf storage room located in basement, below preschool, new storage room includes 5 closets, new countertops, new cabinets with a sink, installation of washer/dryer, elec wall heaters, new lighting, finish floorDetails
remodel e 650 sf storage room located in basement, below preschool, new storage room includes 5 closets, new countertops, new cabinets with a sink, installation of washer/dryer, elec wall heaters, new lighting, finish floor | $40,000 |
| Sep 27, 2011 | Expired or cancelled expired Oct 2012 | 371 11th St | repair in kind siding in lightwell water proof. not visible from street. all work inkind. no change walls, windows, and doors.Details
repair in kind siding in lightwell water proof. not visible from street. all work inkind. no change walls, windows, and doors. | $700 |
| Apr 14, 2011 | Completed final sign-off Aug 2011 | 1351 Green St | revision to pa#2011-0411-3830-replace kitchen windows & door, add cabinets & hood in kitchen, widen dining room doorways, increase in lightwell windows from 1 to 3 windows.Details
revision to pa#2011-0411-3830-replace kitchen windows & door, add cabinets & hood in kitchen, widen dining room doorways, increase in lightwell windows from 1 to 3 windows. | $8,000 |
| Apr 11, 2011 | Completed final sign-off Aug 2011 | 1351 Green St | replace cabinets, counters & floors in 1 ktichen. lighting to comply cec 150(k). no change to windows, walls doors work in 1351.Details
replace cabinets, counters & floors in 1 ktichen. lighting to comply cec 150(k). no change to windows, walls doors work in 1351. | $20,000 |
| Jan 10, 2011 | Completed final sign-off Mar 2011 | 2626 Kirkham St | replace cabinets - new electrical - drywall and paintDetails
replace cabinets - new electrical - drywall and paint | $15,000 |
| May 14, 2010 | Completed final sign-off Sep 2010 | 235 Broderick St | remodel entry, entry stair from sidewalk, rear yard deck. solar thermal panels. revised t24, leed, gbr. to correct t24 from app#200904085875.Details
remodel entry, entry stair from sidewalk, rear yard deck. solar thermal panels. revised t24, leed, gbr. to correct t24 from app#200904085875. | $15,000 |
| Feb 10, 2010 | Completed final sign-off Sep 2010 | 235 Broderick St | revision to application # 200904085875. substitute wood deck for metal deck above mechanical vault.Details
revision to application # 200904085875. substitute wood deck for metal deck above mechanical vault. | |
| Nov 23, 2009 | Completed final sign-off Dec 2009 | 344 06th St | to obtain final inspection for work approved under 200604219540. all work is complete.Details
to obtain final inspection for work approved under 200604219540. all work is complete. | |
| Nov 23, 2009 | Completed final sign-off Dec 2009 | 344 06th St | to obtain final inspection for work approved under 200603035953. all work is complete.Details
to obtain final inspection for work approved under 200603035953. all work is complete. | |
| Nov 23, 2009 | Completed final sign-off Dec 2009 | 344 06th St | to obtain final inspection for work approved under 200607106123. all work is complete.Details
to obtain final inspection for work approved under 200607106123. all work is complete. | |
| Nov 20, 2009 | Completed final sign-off Dec 2009 | 348 06th St | revision to pa# 2009.05.29.9374. deletion/removal of construction of steel and glass partition walls from scope of work. construction of partial height gyp board walls in their placeDetails
revision to pa# 2009.05.29.9374. deletion/removal of construction of steel and glass partition walls from scope of work. construction of partial height gyp board walls in their place | |
| Nov 17, 2009 | Completed final sign-off Dec 2009 | 348 06th St | revision to pa# 2007-0814-9654-conference room added on 3rd floor only. no change to mechanical or electrical. eliminate 2nd floor workDetails
revision to pa# 2007-0814-9654-conference room added on 3rd floor only. no change to mechanical or electrical. eliminate 2nd floor work | $1,000 |
| Nov 17, 2009 | Completed final sign-off Dec 2009 | 348 06th St | renew for final 200708149654Details
renew for final 200708149654 | $1,000 |
| Nov 10, 2009 | Completed final sign-off Dec 2009 | 348 06th St | revisions to (e) permits 200809222270 and (e) permit # 200905299374 due to revisions by permit 200905299374 to permit 200809222270. deletion of ramp from scope of work special inspection are no longer necessary and need to be removed from permitDetails
revisions to (e) permits 200809222270 and (e) permit # 200905299374 due to revisions by permit 200905299374 to permit 200809222270. deletion of ramp from scope of work special inspection are no longer necessary and need to be removed from permit | |
| Nov 4, 2009 | Completed final sign-off Nov 2009 | 348 06th St | level 3. new duct work tying into (e) mech units. mech work only under this permitDetails
level 3. new duct work tying into (e) mech units. mech work only under this permit | $7,000 |
| Nov 4, 2009 | Completed final sign-off Dec 2009 | 348 06th St | level1 1 and 2. new duct work tying into existing mech. units. mech work only to be performed under this pewrmitDetails
level1 1 and 2. new duct work tying into existing mech. units. mech work only to be performed under this pewrmit | $10,000 |
| May 29, 2009 | Completed final sign-off Dec 2009 | 348 06th St | rev. to 200809222270. all work on 1st. fl. work involves demo of (e) stairs, handicap lift,flooring on upper level, tile (e) accessible bath. install 2 new lifts, 2 new stairs, 1 non-accessible delivery ramp. new guard rails, 2 new steel glass partitions. new tile in bathroom.Details
rev. to 200809222270. all work on 1st. fl. work involves demo of (e) stairs, handicap lift,flooring on upper level, tile (e) accessible bath. install 2 new lifts, 2 new stairs, 1 non-accessible delivery ramp. new guard rails, 2 new steel glass partitions. new tile in bathroom. | $20,000 |
| Apr 8, 2009 | Completed final sign-off Sep 2010 | 235 Broderick St | revision to appl #200807096275 - replace entry stair, garage siding, add mech vault radiant heat, moment frame @1st/2nd floor, remodel bath, remove fire escapes,rear dormer, part of roof for new green roof, relocate 3rd floor bath, bedroom, add skylights.Details
revision to appl #200807096275 - replace entry stair, garage siding, add mech vault radiant heat, moment frame @1st/2nd floor, remodel bath, remove fire escapes,rear dormer, part of roof for new green roof, relocate 3rd floor bath, bedroom, add skylights. | $35,000 |
| Mar 25, 2009 | Completed final sign-off Sep 2010 | 235 Broderick St | new rear deck at 3rd floor with a new skylight.Details
new rear deck at 3rd floor with a new skylight. | $60,000 |
| Nov 19, 2008 | Completed final sign-off Jan 2009 | 2920 Polk St | revision to 200810204643. replace sheathing on front wall. install insulation repair damaged framing at front corners in kind. this additional work was discovered when stucco was removed. replace beams.Details
revision to 200810204643. replace sheathing on front wall. install insulation repair damaged framing at front corners in kind. this additional work was discovered when stucco was removed. replace beams. | $10,000 |
| Oct 20, 2008 | Completed final sign-off Jan 2009 | 2920 Polk St | replace (e) windows (24) with new vinyl double glazed. front and rear. replace stucco at front of bldg. - paint building. approx. 40 x 35 sq. ft. visible from street. maintain egress window requirementDetails
replace (e) windows (24) with new vinyl double glazed. front and rear. replace stucco at front of bldg. - paint building. approx. 40 x 35 sq. ft. visible from street. maintain egress window requirement | $25,000 |
| Nov 28, 2007 | Completed final sign-off Apr 2014 | 248 Ocean Av | new construction of a 4-story over basement, mixed use building consisting of 5-dwelling units and an office commercial use on the ground floor.Details
new construction of a 4-story over basement, mixed use building consisting of 5-dwelling units and an office commercial use on the ground floor. | $1,500,000 |
| Nov 28, 2007 | Completed final sign-off Oct 2011 | 248 Ocean Av | demolish a two-story, single-family builidng and replace it with a nea 4-story over basement mixed-use builidng consisting of 5 dwelling units and an office/commercial use at ground floor.Details
demolish a two-story, single-family builidng and replace it with a nea 4-story over basement mixed-use builidng consisting of 5 dwelling units and an office/commercial use at ground floor. | $1,000 |
| Nov 13, 2007 | Completed final sign-off Jan 2008 | 978 Prague St | repair dry rot patches at s.w. wall at stair wall & s.e. wall at down spout. repair any damaged studs & plywood. r-stucco to match. repair side wood gate & 4' of fence. repair in kind.Details
repair dry rot patches at s.w. wall at stair wall & s.e. wall at down spout. repair any damaged studs & plywood. r-stucco to match. repair side wood gate & 4' of fence. repair in kind. | $1,800 |
| Mar 13, 2007 | Completed final sign-off Jul 2007 | 2626 Kirkham St | 410 sf living space built in (e) garage. new window/door at rear and enclose mechanical space.Details
410 sf living space built in (e) garage. new window/door at rear and enclose mechanical space. | $34,000 |
| Mar 1, 2007 | Completed final sign-off Apr 2007 | 54 Kempton Av | bathroom remodel -tile fixtures, electrical-plumbing paint.Details
bathroom remodel -tile fixtures, electrical-plumbing paint. | $12,000 |
| Jan 4, 2007 | Completed final sign-off Feb 2007 | 1245 Ulloa St | rev. to pa#2005/12/29/1265: underpin (e) bldng. foundation at rear wall (7' in length) as per engineerDetails
rev. to pa#2005/12/29/1265: underpin (e) bldng. foundation at rear wall (7' in length) as per engineer | $800 |
| Sep 27, 2006 | Completed final sign-off Oct 2006 | 1190 Sacramento St | replace 1 60 min door from fire escape to roof. replace in kind.Details
replace 1 60 min door from fire escape to roof. replace in kind. | $550 |
| Sep 21, 2006 | Completed final sign-off Nov 2006 | 215 Juanita Wy | remove brick repair membrane repair stucco install new brick and point. repair work is less than 50% of extgDetails
remove brick repair membrane repair stucco install new brick and point. repair work is less than 50% of extg | $3,600 |
| Jan 6, 2005 | Completed final sign-off Jan 2005 | 114 Jasper Pl | general maintenance and paint exterior rear stairs, less than 50% of structureDetails
general maintenance and paint exterior rear stairs, less than 50% of structure | $850 |
| Mar 13, 2003 | Expired or cancelled expired Aug 2005 | 1190 Sacramento St | change existing secondary fire exit door only, with new 45 min metal door, change existing smoke dooDetails
change existing secondary fire exit door only, with new 45 min metal door, change existing smoke doo | $900 |
| Mar 13, 2003 | Expired or cancelled expired Aug 2005 | 1190 Sacramento St | change existing secondary fire exit door w/new 45 min metal door onlyDetails
change existing secondary fire exit door w/new 45 min metal door only | $500 |