Back to bathroom remodel contractors
B. Uniacke Construction
- Based in
- South San Francisco
- On San Francisco permits
- Mar 2003 to Jun 2026
- Last 24 months
- 4 permits filed
60 permits since 2000: 51 completed, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 19 completed, 1 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 247 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 19, 2025 | Completed final sign-off Jun 2026 | 2344 Cecilia Av | (n) conditioned living space at the back of (e) garage the work will include plumbing for bathroom, sauna, and electrical work.Details
(n) conditioned living space at the back of (e) garage the work will include plumbing for bathroom, sauna, and electrical work. | $130,000 |
| May 22, 2024 | Completed final sign-off Jan 2025 | 2311 Cecilia Av | remodel existing basement living room space. remodel bathroom. change window to sliding door. window faces the back. new lighting. add a partion wall for bedroom.Details
remodel existing basement living room space. remodel bathroom. change window to sliding door. window faces the back. new lighting. add a partion wall for bedroom. | $45,000 |
| Apr 22, 2024 | Completed final sign-off Jan 2025 | 2311 Cecilia Av | remodel 1 bathroom (new plumbing, new electrical , tile and shower.) remodel in-kind.Details
remodel 1 bathroom (new plumbing, new electrical , tile and shower.) remodel in-kind. | $25,000 |
| Oct 6, 2022 | Completed final sign-off Jan 2023 | 2344 Cecilia Av | remodel kitchen and one and one half bathrooms, in kind. repair damaged dry rot at lightwell to match existing siding.Details
remodel kitchen and one and one half bathrooms, in kind. repair damaged dry rot at lightwell to match existing siding. | $35,000 |
| Nov 18, 2021 | Completed final sign-off Jan 2023 | 342 Miramar Av | remodel kitchen & (e) master bathroom in-kind. remodel guest bathroom and add shower (relocate non-structural wall between closet)Details
remodel kitchen & (e) master bathroom in-kind. remodel guest bathroom and add shower (relocate non-structural wall between closet) | $55,000 |
| May 4, 2021 | Completed final sign-off Oct 2021 | 1825 Turk St | unit 203: remodel kitchen and 2 baths, new lightingDetails
unit 203: remodel kitchen and 2 baths, new lighting | $55,000 |
| Apr 16, 2021 | Never finaled issued Apr 2022, no final | 2700 43rd Av | 11/4/21: reduced scope: interior remodel of (e) kitchen and hall bath; raise kitchen ceiling by 12"; remove (e) chainlink fence at front yardDetails
11/4/21: reduced scope: interior remodel of (e) kitchen and hall bath; raise kitchen ceiling by 12"; remove (e) chainlink fence at front yard | $50,000 |
| Dec 7, 2020 | Completed final sign-off Sep 2022 | 414 Rivera St | remove e gr fl living room and utility hall to provide new bedroom w full bath, office and 1/2 bath, laundry rm. replace roof deck at 2nd fl provide new retaining wall at side yard.Details
remove e gr fl living room and utility hall to provide new bedroom w full bath, office and 1/2 bath, laundry rm. replace roof deck at 2nd fl provide new retaining wall at side yard. | $90,000 |
| Nov 30, 2020 | Completed final sign-off Jan 2021 | 3515 25th St | unit#101: replace kitchen cabinets, counter tops. replace bathroom tile. replace carpet, paint apartment.Details
unit#101: replace kitchen cabinets, counter tops. replace bathroom tile. replace carpet, paint apartment. | $15,000 |
| Dec 19, 2018 | Completed final sign-off May 2019 | 1621 18th St | replace kitchen cabinets. replace bathroom tiles in (2) bathrooms. replace flooring. change lighting in kitchen. no structural work. no framing changes.Details
replace kitchen cabinets. replace bathroom tiles in (2) bathrooms. replace flooring. change lighting in kitchen. no structural work. no framing changes. | $45,500 |
| Dec 8, 2017 | Completed final sign-off Aug 2020 | 339 Ulloa St | main floor: 10' extension at rear. remodel bedrooms/bath proposed 2nd floor. add (2) bedrooms, (1) bath, partial top floor vertical add. rebuild deck @ rear.Details
main floor: 10' extension at rear. remodel bedrooms/bath proposed 2nd floor. add (2) bedrooms, (1) bath, partial top floor vertical add. rebuild deck @ rear. | $325,000 |
| Jun 25, 2015 | Completed final sign-off Nov 2017 | 2510 Diamond St | revision to appln #201312124060. reduce size of horizontal addition to 9' @ levels 1 & 2. (n) 3rd story convert to 3-bedroom, 3-bathroom w/ family room @ ground floor.Details
revision to appln #201312124060. reduce size of horizontal addition to 9' @ levels 1 & 2. (n) 3rd story convert to 3-bedroom, 3-bathroom w/ family room @ ground floor. | |
| Jun 9, 2015 | Completed final sign-off Feb 2016 | 1441 Jones St | unit # 403: remodel kitchen, 2 bathrooms, master bed closet.full new lighting. n/a for maher.Details
unit # 403: remodel kitchen, 2 bathrooms, master bed closet.full new lighting. n/a for maher. | $55,000 |
| Mar 4, 2015 | Expired or cancelled expired Jan 2019 | 1347 Green St | remodel (e) bathroom -add a wall for additional bathroom with shower, toilet & sink. replace (e) window with vinyl same size & style.Details
remodel (e) bathroom -add a wall for additional bathroom with shower, toilet & sink. replace (e) window with vinyl same size & style. | $21,500 |
| May 5, 2014 | Completed final sign-off Sep 2014 | 26 Conrad St | excavate for new family room. install 1/2 bath. relocate laundry.Details
excavate for new family room. install 1/2 bath. relocate laundry. | $68,250 |
| Apr 15, 2014 | Completed final sign-off Jun 2016 | 26 Conrad St | remodel main floor, relocate kitchen/bath, addition to main floor, construct new second story, change from 1 bedroom 1 bath to 4 bedrooms and 2 bathrooms. mechanical is under separate permit.Details
remodel main floor, relocate kitchen/bath, addition to main floor, construct new second story, change from 1 bedroom 1 bath to 4 bedrooms and 2 bathrooms. mechanical is under separate permit. | $166,625 |
| Jul 25, 2013 | Completed final sign-off Oct 2013 | 2970 Pine St | bathroom remodel - new plumbing - electrical - drywall - tile - shower pan. no change on walls.Details
bathroom remodel - new plumbing - electrical - drywall - tile - shower pan. no change on walls. | $15,000 |
| Sep 6, 2012 | Completed final sign-off Sep 2013 | 531 Grove St | repair damaged one post due to dryrot supporting bathroom at rear of bldg (in the exterior).Details
repair damaged one post due to dryrot supporting bathroom at rear of bldg (in the exterior). | $3,000 |
| May 29, 2009 | Completed final sign-off Dec 2009 | 348 06th St | rev. to 200809222270. all work on 1st. fl. work involves demo of (e) stairs, handicap lift,flooring on upper level, tile (e) accessible bath. install 2 new lifts, 2 new stairs, 1 non-accessible delivery ramp. new guard rails, 2 new steel glass partitions. new tile in bathroom.Details
rev. to 200809222270. all work on 1st. fl. work involves demo of (e) stairs, handicap lift,flooring on upper level, tile (e) accessible bath. install 2 new lifts, 2 new stairs, 1 non-accessible delivery ramp. new guard rails, 2 new steel glass partitions. new tile in bathroom. | $20,000 |
| Apr 8, 2009 | Completed final sign-off Sep 2010 | 235 Broderick St | revision to appl #200807096275 - replace entry stair, garage siding, add mech vault radiant heat, moment frame @1st/2nd floor, remodel bath, remove fire escapes,rear dormer, part of roof for new green roof, relocate 3rd floor bath, bedroom, add skylights.Details
revision to appl #200807096275 - replace entry stair, garage siding, add mech vault radiant heat, moment frame @1st/2nd floor, remodel bath, remove fire escapes,rear dormer, part of roof for new green roof, relocate 3rd floor bath, bedroom, add skylights. | $35,000 |
| Mar 1, 2007 | Completed final sign-off Apr 2007 | 54 Kempton Av | bathroom remodel -tile fixtures, electrical-plumbing paint.Details
bathroom remodel -tile fixtures, electrical-plumbing paint. | $12,000 |