B. Uniacke Construction
- Based in
- South San Francisco
- On San Francisco permits
- Mar 2003 to Jun 2026
- Last 24 months
- 4 permits filed
60 permits since 2000: 51 completed, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 4 completed, 1 never finaled. Typically 106 days from filing to permit and 166 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 16, 2019 | Never finaled issued Jul 2019, no final | 1340 Sloat Bl | (74 sf) horizontal additon @ kitchen with wood deck to rear yard. new sliding glass door @ 1st fl media. new window @ 2nd fl bedroom. new powder room.Details
(74 sf) horizontal additon @ kitchen with wood deck to rear yard. new sliding glass door @ 1st fl media. new window @ 2nd fl bedroom. new powder room. | $55,000 |
| Dec 8, 2017 | Completed final sign-off Aug 2020 | 339 Ulloa St | main floor: 10' extension at rear. remodel bedrooms/bath proposed 2nd floor. add (2) bedrooms, (1) bath, partial top floor vertical add. rebuild deck @ rear.Details
main floor: 10' extension at rear. remodel bedrooms/bath proposed 2nd floor. add (2) bedrooms, (1) bath, partial top floor vertical add. rebuild deck @ rear. | $325,000 |
| May 14, 2010 | Completed final sign-off Sep 2010 | 235 Broderick St | remodel entry, entry stair from sidewalk, rear yard deck. solar thermal panels. revised t24, leed, gbr. to correct t24 from app#200904085875.Details
remodel entry, entry stair from sidewalk, rear yard deck. solar thermal panels. revised t24, leed, gbr. to correct t24 from app#200904085875. | $15,000 |
| Feb 10, 2010 | Completed final sign-off Sep 2010 | 235 Broderick St | revision to application # 200904085875. substitute wood deck for metal deck above mechanical vault.Details
revision to application # 200904085875. substitute wood deck for metal deck above mechanical vault. | |
| Mar 25, 2009 | Completed final sign-off Sep 2010 | 235 Broderick St | new rear deck at 3rd floor with a new skylight.Details
new rear deck at 3rd floor with a new skylight. | $60,000 |