Back to kitchen remodel contractors
B. Uniacke Construction
- Based in
- South San Francisco
- On San Francisco permits
- Mar 2003 to Jun 2026
- Last 24 months
- 4 permits filed
60 permits since 2000: 51 completed, 4 never finaled, 5 expired or cancelled.
Of the 4 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 10 completed, 3 never finaled. Typically 0 days from filing to permit and 142 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2026 | Completed final sign-off Aug 2026 | 2687 California St | unit 2687- add washer and dryer in kitchen .Details
unit 2687- add washer and dryer in kitchen . | $7,500 |
| Jan 6, 2025 | Completed final sign-off Jan 2025 | 1754 Greenwich St | work performed under this application to comply with nov 202431975. refinish (e) wallboard at oppening between kitchen and hall infill upper portion of pony wall between kitchen and dining area and install wall baord and paintDetails
work performed under this application to comply with nov 202431975. refinish (e) wallboard at oppening between kitchen and hall infill upper portion of pony wall between kitchen and dining area and install wall baord and paint | |
| Oct 6, 2022 | Completed final sign-off Jan 2023 | 2344 Cecilia Av | remodel kitchen and one and one half bathrooms, in kind. repair damaged dry rot at lightwell to match existing siding.Details
remodel kitchen and one and one half bathrooms, in kind. repair damaged dry rot at lightwell to match existing siding. | $35,000 |
| Nov 18, 2021 | Completed final sign-off Jan 2023 | 342 Miramar Av | remodel kitchen & (e) master bathroom in-kind. remodel guest bathroom and add shower (relocate non-structural wall between closet)Details
remodel kitchen & (e) master bathroom in-kind. remodel guest bathroom and add shower (relocate non-structural wall between closet) | $55,000 |
| May 4, 2021 | Completed final sign-off Oct 2021 | 1825 Turk St | unit 203: remodel kitchen and 2 baths, new lightingDetails
unit 203: remodel kitchen and 2 baths, new lighting | $55,000 |
| Apr 16, 2021 | Never finaled issued Apr 2022, no final | 2700 43rd Av | 11/4/21: reduced scope: interior remodel of (e) kitchen and hall bath; raise kitchen ceiling by 12"; remove (e) chainlink fence at front yardDetails
11/4/21: reduced scope: interior remodel of (e) kitchen and hall bath; raise kitchen ceiling by 12"; remove (e) chainlink fence at front yard | $50,000 |
| Nov 30, 2020 | Completed final sign-off Jan 2021 | 3515 25th St | unit#101: replace kitchen cabinets, counter tops. replace bathroom tile. replace carpet, paint apartment.Details
unit#101: replace kitchen cabinets, counter tops. replace bathroom tile. replace carpet, paint apartment. | $15,000 |
| Apr 16, 2019 | Never finaled issued Jul 2019, no final | 1340 Sloat Bl | (74 sf) horizontal additon @ kitchen with wood deck to rear yard. new sliding glass door @ 1st fl media. new window @ 2nd fl bedroom. new powder room.Details
(74 sf) horizontal additon @ kitchen with wood deck to rear yard. new sliding glass door @ 1st fl media. new window @ 2nd fl bedroom. new powder room. | $55,000 |
| Dec 19, 2018 | Completed final sign-off May 2019 | 1621 18th St | replace kitchen cabinets. replace bathroom tiles in (2) bathrooms. replace flooring. change lighting in kitchen. no structural work. no framing changes.Details
replace kitchen cabinets. replace bathroom tiles in (2) bathrooms. replace flooring. change lighting in kitchen. no structural work. no framing changes. | $45,500 |
| Dec 28, 2016 | Never finaled issued Dec 2016, no final | 3626 20th St | kitchen remodel, laundry room and pantry, replace window at rear of unit, new plumbing and electrical.Details
kitchen remodel, laundry room and pantry, replace window at rear of unit, new plumbing and electrical. | $45,000 |
| Jun 9, 2015 | Completed final sign-off Feb 2016 | 1441 Jones St | unit # 403: remodel kitchen, 2 bathrooms, master bed closet.full new lighting. n/a for maher.Details
unit # 403: remodel kitchen, 2 bathrooms, master bed closet.full new lighting. n/a for maher. | $55,000 |
| Apr 15, 2014 | Completed final sign-off Jun 2016 | 26 Conrad St | remodel main floor, relocate kitchen/bath, addition to main floor, construct new second story, change from 1 bedroom 1 bath to 4 bedrooms and 2 bathrooms. mechanical is under separate permit.Details
remodel main floor, relocate kitchen/bath, addition to main floor, construct new second story, change from 1 bedroom 1 bath to 4 bedrooms and 2 bathrooms. mechanical is under separate permit. | $166,625 |
| Apr 14, 2011 | Completed final sign-off Aug 2011 | 1351 Green St | revision to pa#2011-0411-3830-replace kitchen windows & door, add cabinets & hood in kitchen, widen dining room doorways, increase in lightwell windows from 1 to 3 windows.Details
revision to pa#2011-0411-3830-replace kitchen windows & door, add cabinets & hood in kitchen, widen dining room doorways, increase in lightwell windows from 1 to 3 windows. | $8,000 |