Block 1440, lot 011
360 09th Ave
- City’s use
- Commercial Misc
- Built
- 1923
- Stories
- 3
- Units
- 5
- Rooms
- 17 bathrooms
- Building
- 68,065 sq ft
- Lot
- 65,980 sq ft
- Zoning
- RM1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
15 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 9, 2024 | Completed final sign-off Sep 2024 | 360 09th Av | Pioneer Contractors Inc | revision to pa# 202407196900; installation of tension ties use lttp2 tension ties at 2-0" with 0.148x21/2 nails above wood diaphram over each wood truss memberDetails
revision to pa# 202407196900; installation of tension ties use lttp2 tension ties at 2-0" with 0.148x21/2 nails above wood diaphram over each wood truss member | |
| Jul 22, 2024 | Completed final sign-off Sep 2024 | 360 09th Av | Pioneer Contractors Inc | revision to roofing permit 202407196900. adding extra 1/2 in for protection of plywood. panel sheating provide wood structural panels with appropriate trademak of ada. the engineered wood assoc and meet req of voluntary standard psi or ps 2 and apa prp 108 performance standard.Details
revision to roofing permit 202407196900. adding extra 1/2 in for protection of plywood. panel sheating provide wood structural panels with appropriate trademak of ada. the engineered wood assoc and meet req of voluntary standard psi or ps 2 and apa prp 108 performance standard. | |
| Jul 19, 2024 | Completed final sign-off Sep 2024 | 360 09th Av | Pioneer Contractors Inc | reroofingDetails
reroofing | $410,705 |
| Jul 20, 2023 | Completed final sign-off Apr 2024 | 350 09th Av | United Systems Fire And Security Llc | install (n) strobe in (n) restroom of (e) gymnasium. (1) (n) horn/strobe on mid floor enclosed elevator obby to be connected to (e) fire alarm system. (n) lula elevator not provided w/ firefighters emergency operation (feo) & therefore no interface w/ fa system is req'd to phase 1Details
install (n) strobe in (n) restroom of (e) gymnasium. (1) (n) horn/strobe on mid floor enclosed elevator obby to be connected to (e) fire alarm system. (n) lula elevator not provided w/ firefighters emergency operation (feo) & therefore no interface w/ fa system is req'd to phase 1 | $28,905 |
| Oct 31, 2022 | Never finaled issued Oct 2022, no final | 360 09th Av | Fire Alarm System Services | install fire alarm cellular transmitter to replace pots lines at star of the seaDetails
install fire alarm cellular transmitter to replace pots lines at star of the sea | |
| Apr 20, 2021 | Never finaled issued May 2021, no final | 360 09th Av | Exxell Corp. Dba Exxell Fire Systems | measure and test (e) system draw-up plans (as builts) will be making no changes to (e) systemDetails
measure and test (e) system draw-up plans (as builts) will be making no changes to (e) system | $2,500 |
| Dec 3, 2020 | Never finaled issued Jun 2021, no final | 350 09th Av | Thompson Builders Corp | priority process for school: voluntary structural strengthening, accessibility upgrades, installation of a lula.Details
priority process for school: voluntary structural strengthening, accessibility upgrades, installation of a lula. | $700,000 |
| Jul 17, 2019 | Never finaled issued Jul 2019, no final | 360 09th Av | Exxell Corp. Dba Exxell Fire Systems | hood & duct/fire upgrade extg system. new tank and 1 new nozzle/2 new fusable links and new link cable. ref app#201001305693. n/a for maherDetails
hood & duct/fire upgrade extg system. new tank and 1 new nozzle/2 new fusable links and new link cable. ref app#201001305693. n/a for maher | $2,500 |
| Apr 30, 2012 | Never finaled issued Jul 2012, no final | 360 09th Av | B. Uniacke Construction | remodel e 650 sf storage room located in basement, below preschool, new storage room includes 5 closets, new countertops, new cabinets with a sink, installation of washer/dryer, elec wall heaters, new lighting, finish floorDetails
remodel e 650 sf storage room located in basement, below preschool, new storage room includes 5 closets, new countertops, new cabinets with a sink, installation of washer/dryer, elec wall heaters, new lighting, finish floor | $40,000 |
| Jun 30, 2010 | Completed final sign-off Nov 2010 | 360 09th Av | Patrick Uniacke | remodel (e) 2nd fl classrooms and spaces into a single classroom. add new base cabinets, flooring,and lighting. replace (e) guard rail and handrail at exterior balcony and stairs. fire alarm on separate permit.Details
remodel (e) 2nd fl classrooms and spaces into a single classroom. add new base cabinets, flooring,and lighting. replace (e) guard rail and handrail at exterior balcony and stairs. fire alarm on separate permit. | $135,000 |
| Apr 26, 2007 | Never finaled issued Apr 2007, no final | 350 09th Av | non-structural interior remodel; new interior partitions/ doors; new ada signage and ada path of travel at area of remodel; new ada compliant drinking fountain; mep separate permit. school is k-8Details
non-structural interior remodel; new interior partitions/ doors; new ada signage and ada path of travel at area of remodel; new ada compliant drinking fountain; mep separate permit. school is k-8 | $98,350 | |
| Jun 28, 2006 | Completed final sign-off Feb 2007 | 360 09th Av | remove (e) non-accessible toilet room (barrier removal) and replace with 2 toilet rooms, one of which is accessibleDetails
remove (e) non-accessible toilet room (barrier removal) and replace with 2 toilet rooms, one of which is accessible | $32,000 | |
| Jun 28, 2006 | Completed final sign-off Feb 2007 | 360 09th Av | provide accessible entrance & vertical lift to existing kindergarten building.Details
provide accessible entrance & vertical lift to existing kindergarten building. | $18,300 | |
| May 15, 2006 | Completed final sign-off Aug 2006 | 350 09th Av | the renovation of the (e) toilet rooms for needed upgradess and to make them comply with accessibility requirementsDetails
the renovation of the (e) toilet rooms for needed upgradess and to make them comply with accessibility requirements | $108,500 | |
| Feb 3, 2003 | Completed final sign-off Apr 2003 | 350 09th Av | Sunset Glass Inc | repl windows in kind in front of bldg,1st & 2nd flr,20 total,bronze anodized alumDetails
repl windows in kind in front of bldg,1st & 2nd flr,20 total,bronze anodized alum | $19,150 |