Permit GraphShortlistSan Francisco building permits since 2000

Robert Hayes

License
C19256
Architect or Civil engineer: both boards write C before the number, and the roles on the permits do not settle which
About the two boards
Look the license up with the state (Architects Board)
Look up C19256 at the Board for Professional Engineers
Listed as
architect, engineer
Firm
Robert W. Hayes & Assoc
Based in
Sausalito
On San Francisco permits
Dec 2007 to Dec 2020

8 permits since 2000 (architect on 7 permits, engineer on 1 permit): 4 completed, 1 never finaled, 3 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Nibbi Bros Assoc Inc. (2), Demex Engineering, Inc, R W Collings General Contractor, Sc Builders, Inc, Thompson Builders Corp
Engineers
Stephen Harris (2)

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Dec 3, 2020Never finaled
issued Jun 2021, no final
350 09th AvThompson Builders Corppriority process for school: voluntary structural strengthening, accessibility upgrades, installation of a lula.
Details
Permit
202012030172
Permit issued
Jun 16, 2021

priority process for school: voluntary structural strengthening, accessibility upgrades, installation of a lula.

Open the permit page

$700,000
Sep 10, 2019Expired or cancelled
withdrawn Nov 2019
2550 18th Avvoluntary seismic strengthening of st cecillia school per ord# 202-14. this permit is for phase 3 exterior construction to be completed summer of 2020.
Details
Permit
201909101125

voluntary seismic strengthening of st cecillia school per ord# 202-14. this permit is for phase 3 exterior construction to be completed summer of 2020.

Open the permit page

$485,000
Mar 26, 2018Completed
final sign-off Sep 2018
2550 18th AvSc Builders, Incpriority processing. voluntary structural strengthening per ord#202-14 summer 2018 scope at interior & roof only. remove interior clay tile & replace w/ steel,studs and jepwalls. no final completion until required accessibility upgrade are completed under permits. non-struct items not retrofitted
Details
Permit
201803264577
Permit issued
Jun 28, 2018
Final sign-off
Sep 19, 2018

priority processing. voluntary structural strengthening per ord#202-14 summer 2018 scope at interior & roof only. remove interior clay tile & replace w/ steel,studs and jepwalls. no final completion until required accessibility upgrade are completed under permits. non-struct items not retrofitted

Open the permit page

$825,000
Nov 10, 2017Completed
final sign-off Dec 2020
2550 18th Avthis is a site permit. project is the voluntary seismic strenghtening for st. cecilia school. the project includes new concrete shear walls & new wheelchair lift and enclosure.
Details
Permit
201711103724
Permit issued
Dec 19, 2019
Final sign-off
Dec 28, 2020

this is a site permit. project is the voluntary seismic strenghtening for st. cecilia school. the project includes new concrete shear walls & new wheelchair lift and enclosure.

Open the permit page

$50,000
Aug 12, 2013Completed
final sign-off Jun 2014
1045 Mason StR W Collings General Contractorrenovation of extg apartment with new finishes at master bathroom, bathroom and powder room, new cabinetry at kitchen, new light fixtures. replace in kind and new plmbg fixtures replaced in kind throughout.
Details
Permit
201308124125
Permit issued
Aug 15, 2013
Final sign-off
Jun 2, 2014

renovation of extg apartment with new finishes at master bathroom, bathroom and powder room, new cabinetry at kitchen, new light fixtures. replace in kind and new plmbg fixtures replaced in kind throughout.

Open the permit page

$45,000
Jan 12, 2010Expired or cancelled
cancelled Dec 2011
473 Eucalyptus DrNibbi Bros Assoc Inc.new statue pedestal to be used as sign. no electrification. no obstructions shown on plan. no fire inspection required. reference p/a 201001124608 form 4 (green sheet-sign)
Details
Permit
201001124615

new statue pedestal to be used as sign. no electrification. no obstructions shown on plan. no fire inspection required. reference p/a 201001124608 form 4 (green sheet-sign)

Open the permit page

$5,500
Jan 12, 2010Expired or cancelled
cancelled Jan 2012
473 Eucalyptus DrNibbi Bros Assoc Inc.to erect non electric, single face sign.
Details
Permit
201001124608

to erect non electric, single face sign.

Open the permit page

$1,000
Dec 4, 2007Completed
final sign-off May 2010
473 Eucalyptus DrDemex Engineering, Incerect a 2 story gymnasium / assembly hall.
Details
Permit
200712049575
Permit issued
Mar 13, 2008
Final sign-off
May 12, 2010

erect a 2 story gymnasium / assembly hall.

Open the permit page

$3,500,000