Block 0222, lot 016
1190 Sacramento St
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
40 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 26, 2020 | Never finaled issued Jun 2020, no final | 1190 Sacramento St | street spaceDetails
street space | ||
| Jan 22, 2019 | Never finaled issued Jan 2019, no final | 1190 Sacramento St | Firelectric | replace (e) wired fire alarm system with new wireless fire alarm system.Details
replace (e) wired fire alarm system with new wireless fire alarm system. | $28,300 |
| Jul 5, 2016 | Never finaled issued Jul 2016, no final | 1190 Sacramento St | street spaceDetails
street space | ||
| Sep 10, 2009 | Completed final sign-off Sep 2009 | 1190 Sacramento St | International Fire Equip | to obtain final inspection for work approved under pa#200807015709. wll work is complete.Details
to obtain final inspection for work approved under pa#200807015709. wll work is complete. | |
| Dec 22, 2008 | Never finaled issued Dec 2008, no final | 1190 Sacramento St | street space permit only.Details
street space permit only. | ||
| Oct 16, 2008 | Never finaled issued Oct 2008, no final | 1190 Sacramento St | street space permit only.Details
street space permit only. | ||
| Aug 27, 2008 | Never finaled issued Aug 2008, no final | 1190 Sacramento St | street space permit only.Details
street space permit only. | ||
| Jul 1, 2008 | Expired or cancelled expired Sep 2009 | 1190 Sacramento St | International Fire Equip | unit #9- relocate sprinkler heads & replace sidewall with pendents due to interior remodel. add 1 head in basement, relocate 2 side wall & recessed head w/concealedor on 9th floor.Details
unit #9- relocate sprinkler heads & replace sidewall with pendents due to interior remodel. add 1 head in basement, relocate 2 side wall & recessed head w/concealedor on 9th floor. | $1,500 |
| Jun 26, 2008 | Never finaled issued Jun 2008, no final | 1190 Sacramento St | street spaceDetails
street space | ||
| Jun 5, 2008 | Completed final sign-off Oct 2008 | 1190 Sacramento St | Everest Waterproofing & Restoration Inc. | to comply with nov (# not assigned) exterior waterproofing. non-structural concrete patching. wall coating, sealant & window sealant & installation. (remove & replace glass as necessary).Details
to comply with nov (# not assigned) exterior waterproofing. non-structural concrete patching. wall coating, sealant & window sealant & installation. (remove & replace glass as necessary). | $33,000 |
| Aug 8, 2007 | Never finaled issued Aug 2007, no final | 1190 Sacramento St | street space permit only.Details
street space permit only. | ||
| Jun 21, 2007 | Never finaled issued Jun 2007, no final | 1190 Sacramento St | street spaceDetails
street space | ||
| Sep 27, 2006 | Completed final sign-off Oct 2006 | 1190 Sacramento St | B. Uniacke Construction | replace 1 60 min door from fire escape to roof. replace in kind.Details
replace 1 60 min door from fire escape to roof. replace in kind. | $550 |
| Dec 8, 2005 | Never finaled issued Dec 2005, no final | 1190 Sacramento St | N Saylor Consulting Group Inc. | cover fire hose cabinet with mirror cover. plumbing & tile in 2 bathrooms.general remodel.no structural works.Details
cover fire hose cabinet with mirror cover. plumbing & tile in 2 bathrooms.general remodel.no structural works. | $270 |
| Dec 1, 2005 | Never finaled issued Dec 2005, no final | 1190 Sacramento St | sidewalk permitDetails
sidewalk permit | ||
| Aug 22, 2005 | Never finaled issued Aug 2005, no final | 1190 Sacramento St | streetspaceDetails
streetspace | ||
| Jan 24, 2005 | Never finaled issued Jan 2005, no final | 1190 Sacramento St | 6/fl - revise 200401285021 to document egress width. not a required egress or fire escape.Details
6/fl - revise 200401285021 to document egress width. not a required egress or fire escape. | ||
| Jan 28, 2004 | Completed final sign-off Jun 2004 | 1190 Sacramento St | add fire rated door and smoke detector/door release per planDetails
add fire rated door and smoke detector/door release per plan | $500 | |
| Sep 10, 2003 | Completed final sign-off Sep 2003 | 1190 Sacramento St | Pacific Thunder | renew 200207080820 for final inspection only no work under this permitDetails
renew 200207080820 for final inspection only no work under this permit | |
| Jul 21, 2003 | Expired or cancelled expired Aug 2007 | 1190 Sacramento St | kitchen remodel-replace cabinets & appliances and floorcovering on the 10th floor unitDetails
kitchen remodel-replace cabinets & appliances and floorcovering on the 10th floor unit | $32,000 | |
| Mar 19, 2003 | Never finaled issued Mar 2003, no final | 1190 Sacramento St | replace 4 doors with fire rated door/1 hour rated/these are front doors to the individual apt unitsDetails
replace 4 doors with fire rated door/1 hour rated/these are front doors to the individual apt units | $2,000 | |
| Mar 13, 2003 | Expired or cancelled expired Aug 2005 | 1190 Sacramento St | B. Uniacke Construction | change existing secondary fire exit door w/new 45 min metal door onlyDetails
change existing secondary fire exit door w/new 45 min metal door only | $500 |
| Mar 13, 2003 | Expired or cancelled expired Aug 2005 | 1190 Sacramento St | B. Uniacke Construction | change existing secondary fire exit door only, with new 45 min metal door, change existing smoke dooDetails
change existing secondary fire exit door only, with new 45 min metal door, change existing smoke doo | $900 |
| Feb 25, 2003 | Never finaled issued Feb 2003, no final | 1190 Sacramento St | replace a fire door going out of the water bedroom. 1 hour door. exit doorDetails
replace a fire door going out of the water bedroom. 1 hour door. exit door | $500 | |
| Dec 18, 2002 | Never finaled issued Dec 2002, no final | 1190 Sacramento St | streetspaceDetails
streetspace | ||
| Dec 17, 2002 | Completed final sign-off Sep 2003 | 1190 Sacramento St | Pacific Thunder | interior remodel:2 new bathrooms, 1 new kitchen all new doors & moldings. new electrical & plumbingDetails
interior remodel:2 new bathrooms, 1 new kitchen all new doors & moldings. new electrical & plumbing | $125,000 |
| Jul 8, 2002 | Expired or cancelled expired Sep 2003 | 1190 Sacramento St | Pacific Thunder | master bath remodel: new shaver (where tub used to be installed. new sink (replaces old sink). new tDetails
master bath remodel: new shaver (where tub used to be installed. new sink (replaces old sink). new t | $20,000 |
| Apr 29, 2002 | Expired or cancelled expired Oct 2002 | 1190 Sacramento St | street spaceDetails
street space | ||
| Dec 19, 2001 | Completed final sign-off Apr 2002 | 1190 Sacramento St | renew:200107194082Details
renew:200107194082 | $2,500 | |
| Dec 19, 2001 | Expired or cancelled cancelled Nov 2024 | 1190 Sacramento St | renew 2001/0719/4082. reverse swing of kitchen door only.Details
renew 2001/0719/4082. reverse swing of kitchen door only. | ||
| Sep 7, 2001 | Completed final sign-off Sep 2001 | 1190 Sacramento St | revisoin 200102142137 door at elevator lobby 3rd fl,drawings of new installation fire door submittedDetails
revisoin 200102142137 door at elevator lobby 3rd fl,drawings of new installation fire door submitted | ||
| Jul 19, 2001 | Expired or cancelled expired Nov 2001 | 1190 Sacramento St | install 2 each doors at elevator lobby to comply w/ violation notice at unit 11.Details
install 2 each doors at elevator lobby to comply w/ violation notice at unit 11. | $2,500 | |
| May 16, 2001 | Completed final sign-off Jul 2001 | 1190 Sacramento St | modify elevator lobby door to comply with nov & for sf fire dept reviewDetails
modify elevator lobby door to comply with nov & for sf fire dept review | ||
| Mar 30, 2001 | Completed final sign-off Jun 2001 | 1190 Sacramento St | modify elevator lobby doorDetails
modify elevator lobby door | $500 | |
| Mar 28, 2001 | Expired or cancelled expired Jul 2001 | 1190 Sacramento St | modify elavator lobby door to comply with violation noticeDetails
modify elavator lobby door to comply with violation notice | $500 | |
| Mar 28, 2001 | Expired or cancelled expired Sep 2001 | 1190 Sacramento St | modify the elavator lobby door to comply with violation notice at unit #6Details
modify the elavator lobby door to comply with violation notice at unit #6 | $500 | |
| Mar 1, 2001 | Completed final sign-off Mar 2001 | 1190 Sacramento St | replace existing door with fire rated doorDetails
replace existing door with fire rated door | $250 | |
| Feb 14, 2001 | Completed final sign-off Sep 2001 | 1190 Sacramento St | install new 20 min firedoor betwn entry and elevator-to create elevator lobby, door to be unlocked wDetails
install new 20 min firedoor betwn entry and elevator-to create elevator lobby, door to be unlocked w | $500 | |
| Dec 27, 2000 | Expired or cancelled expired Apr 2001 | 1190 Sacramento St | install a new fire door between entry at elevator & residential flat.Details
install a new fire door between entry at elevator & residential flat. | $500 | |
| Aug 14, 2000 | Expired or cancelled expired Dec 2000 | 1190 Sacramento St | street space useDetails
street space use |
Find contractors for work like this