Premier Structures Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2009 to Aug 2026
- Last 24 months
- 15 permits filed
121 permits since 2000: 64 completed, 7 in progress, 45 never finaled, 5 expired or cancelled.
Of the 45 never-finaled permits, 1 is 3 to 5 years old, 24 are 5 to 10 years old, 20 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
Showing the 100 most recent of 121.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 10, 2026 | Completed final sign-off Sep 2026 | 235 02nd St | to obtain final inspection for work approved under pa# 202504023592. all work is complete.Details
to obtain final inspection for work approved under pa# 202504023592. all work is complete. | |
| Aug 10, 2026 | In progress issued Aug 2026 | 235 02nd St | recommencement and completion of work approved under pa#'s 202410314101 and 202502261170.Details
recommencement and completion of work approved under pa#'s 202410314101 and 202502261170. | $18,750 |
| Mar 17, 2026 | Completed final sign-off Sep 2026 | 235 02nd St | ground floor ti for suite 1500 to include restroom on 1st floor of an (e) 6 story building. non structural demo, partitions, and (n) act ceiling tile and lighting fixtures, (n) and modified millwork and plumbing fixturesDetails
ground floor ti for suite 1500 to include restroom on 1st floor of an (e) 6 story building. non structural demo, partitions, and (n) act ceiling tile and lighting fixtures, (n) and modified millwork and plumbing fixtures | $525,000 |
| Nov 12, 2025 | In progress issued Dec 2025 | 235 02nd St | 5/f: new rated doors at passenger elevator lobby, card readers, and a door release button.Details
5/f: new rated doors at passenger elevator lobby, card readers, and a door release button. | $40,000 |
| Jun 18, 2025 | Completed final sign-off Jul 2026 | 235 02nd St | defer mech. & elec. drwngs - 202504255292. changes to exist. vav terminal units and rtus for 6th fl rms. power for workstations, breakroom, and pantry. new & updated lighting in select areas. revise scope to include new elevator lobby doors and card/emergency release devices and changes to rcp.Details
defer mech. & elec. drwngs - 202504255292. changes to exist. vav terminal units and rtus for 6th fl rms. power for workstations, breakroom, and pantry. new & updated lighting in select areas. revise scope to include new elevator lobby doors and card/emergency release devices and changes to rcp. | |
| Jun 3, 2025 | Completed final sign-off Mar 2026 | 801 Montgomery St | 3/fl- non structural interior modification to add an accessible shower to one of two (e) 3rd floor accessible restrooms.Details
3/fl- non structural interior modification to add an accessible shower to one of two (e) 3rd floor accessible restrooms. | $42,000 |
| May 9, 2025 | In progress issued Jun 2025 | 75 Geary St | minor interior renovation to extg retail space inc. lighting, cabinetry, finishes, & partition work. electrical will be modified for new lighting & power, low voltage systems will be installed, hvac existing & with the addtion of outside air & rework of distribution only.Details
minor interior renovation to extg retail space inc. lighting, cabinetry, finishes, & partition work. electrical will be modified for new lighting & power, low voltage systems will be installed, hvac existing & with the addtion of outside air & rework of distribution only. | $180,375 |
| Apr 25, 2025 | Completed final sign-off Jul 2026 | 235 02nd St | 6th/f:t.i. non structural partitions demo, ceilimg, flooring finishes demo. new non-structural partitions, new furnitures, finishes. revisions to main restrooms, new all gender restroom, new mother's room, new pantry, revision to breaks room, new conference & huddle rooms.Details
6th/f:t.i. non structural partitions demo, ceilimg, flooring finishes demo. new non-structural partitions, new furnitures, finishes. revisions to main restrooms, new all gender restroom, new mother's room, new pantry, revision to breaks room, new conference & huddle rooms. | $195,000 |
| Apr 22, 2025 | In progress issued Apr 2025 | 235 02nd St | ground floor-ti 202410314101 and 202502261170- deferred mechanical and electrical. ref ti 202410314101Details
ground floor-ti 202410314101 and 202502261170- deferred mechanical and electrical. ref ti 202410314101 | |
| Apr 22, 2025 | Completed final sign-off Oct 2025 | 235 02nd St | 5th/f: deferred mep & electrical for t.i. 202412237311Details
5th/f: deferred mep & electrical for t.i. 202412237311 | |
| Apr 2, 2025 | Expired or cancelled expired Sep 2026 | 235 02nd St | change of use from storage/loading dock to general office. total area of change is 3,482 gross sq ft. infill of existing roll-down garage door, non structural demo of loading dock door & new curtainwall infill of same, per planning commission motion 21168. loading dock area will become b-officeDetails
change of use from storage/loading dock to general office. total area of change is 3,482 gross sq ft. infill of existing roll-down garage door, non structural demo of loading dock door & new curtainwall infill of same, per planning commission motion 21168. loading dock area will become b-office | $40,000 |
| Mar 20, 2025 | In progress issued Mar 2025 | 235 02nd St | 6th fl-minor interior demo of a single story within 6 story building, scope includes non-structural partitions demolition, ceiling demolition, & flooring, finishes demolition. existing egress systems, fire rated wall systems, elevators, structural, sprinklers & existing use to remain. per ab-017,Details
6th fl-minor interior demo of a single story within 6 story building, scope includes non-structural partitions demolition, ceiling demolition, & flooring, finishes demolition. existing egress systems, fire rated wall systems, elevators, structural, sprinklers & existing use to remain. per ab-017, | $75,000 |
| Feb 26, 2025 | In progress issued Mar 2025 | 235 02nd St | revision to pa #202410314101 to include additional non structural demolition, nonstructural partition. new millwork and new act ceiling tile and lighting fixtures. mep deferred.Details
revision to pa #202410314101 to include additional non structural demolition, nonstructural partition. new millwork and new act ceiling tile and lighting fixtures. mep deferred. | $50,000 |
| Dec 23, 2024 | Completed final sign-off Oct 2025 | 235 02nd St | 5th floor; revision to pa#: 202407035769. new scope includes revisions main restrooms, all-gender restroom and the parents/mother room. mep deferred.Details
5th floor; revision to pa#: 202407035769. new scope includes revisions main restrooms, all-gender restroom and the parents/mother room. mep deferred. | $249,000 |
| Oct 31, 2024 | In progress issued Nov 2024 | 235 02nd St | ground floor- minor ti of a 6 story building to includes non structural demo, non structrual partitions and new millwork . (e) lighting, restroom fixtures, egress systems, fire rated wall systems , elevators, structure, and (e) use are to remain. mep deferredDetails
ground floor- minor ti of a 6 story building to includes non structural demo, non structrual partitions and new millwork . (e) lighting, restroom fixtures, egress systems, fire rated wall systems , elevators, structure, and (e) use are to remain. mep deferred | $75,000 |
| Aug 16, 2024 | Completed final sign-off Oct 2024 | 463 Jackson St | interior non-structural t.i. , partition demolition, new fitting room partitions, new lighting, ada restroom up grade. on mechanical and no exterior work.Details
interior non-structural t.i. , partition demolition, new fitting room partitions, new lighting, ada restroom up grade. on mechanical and no exterior work. | $198,000 |
| Jul 3, 2024 | Completed final sign-off Oct 2025 | 235 02nd St | 5th floor - office ti for minor improvement of a single story within a 6 story building. project scope includes non structrucal demo, non structural partitions, and new furniture and finishes thorughout. (e) restroom fixtures, egress, systems, fire rated wall system, elevators, structure & existingDetails
5th floor - office ti for minor improvement of a single story within a 6 story building. project scope includes non structrucal demo, non structural partitions, and new furniture and finishes thorughout. (e) restroom fixtures, egress, systems, fire rated wall system, elevators, structure & existing | $200,000 |
| Jun 11, 2024 | Completed final sign-off Oct 2024 | 555 California St | concourse space c133: tenant improvement work with plumbing and electrical. new built in cabinet and counter fixtures for coffee shop service.Details
concourse space c133: tenant improvement work with plumbing and electrical. new built in cabinet and counter fixtures for coffee shop service. | $350,000 |
| Aug 19, 2022 | Completed final sign-off Mar 2023 | 224 Grant Av | structural repair of ground floor slab supports in limited basement area. new hss beams and (e) concrete beam rapir.Details
structural repair of ground floor slab supports in limited basement area. new hss beams and (e) concrete beam rapir. | $30,000 |
| May 13, 2022 | Completed final sign-off Oct 2022 | 1 Bush St | ste 510/525: mod of hvac system to including 1 new colling only vav, 1 new exhaust fan & duct distribution to accommodate new layout. modifty power distribution & lighting to accomoodate new layout - title 24 compliance. ref to pa202204081879.Details
ste 510/525: mod of hvac system to including 1 new colling only vav, 1 new exhaust fan & duct distribution to accommodate new layout. modifty power distribution & lighting to accomoodate new layout - title 24 compliance. ref to pa202204081879. | $150,000 |
| Apr 25, 2022 | Never finaled issued Jul 2022, no final | 2109 Fillmore St | renovation to (e) retail space: lighting, cabinetry finishes & partition work. elec - (n) lighting, power & minor (n) plumbing added. low voltage systems. hvac will be split systems w/ air handlers & condension units. (n) storefront system. mino demolition. no change to occupancy. no structural workDetails
renovation to (e) retail space: lighting, cabinetry finishes & partition work. elec - (n) lighting, power & minor (n) plumbing added. low voltage systems. hvac will be split systems w/ air handlers & condension units. (n) storefront system. mino demolition. no change to occupancy. no structural work | $148,000 |
| Apr 8, 2022 | Completed final sign-off Oct 2022 | 1 Bush St | ste 510 and 525: demo and construction of partitions, doors, and finishes. patching of extg ceiling tile and grid. mechanical, electrical lifesafety and sprinkler under seperate permit. path of travel previously approved #202110623447.Details
ste 510 and 525: demo and construction of partitions, doors, and finishes. patching of extg ceiling tile and grid. mechanical, electrical lifesafety and sprinkler under seperate permit. path of travel previously approved #202110623447. | $180,000 |
| Sep 22, 2021 | Never finaled issued Sep 2021, no final | 333 Bush St | 25th fl, ste 2500 - new lighting & t24 controls throughout. additional circuits for new heat pump & appliances. provide & install new heat pump, vav & distribution as needed. ref pa 2021-0812-6332Details
25th fl, ste 2500 - new lighting & t24 controls throughout. additional circuits for new heat pump & appliances. provide & install new heat pump, vav & distribution as needed. ref pa 2021-0812-6332 | $150,000 |
| Aug 12, 2021 | Never finaled issued Sep 2021, no final | 333 Bush St | minor demolition of non structural elements. new office and millwork. upgrade new finshes and lighting throughout. mep ls, sprinkler under sep permit. pot approved 202002144567 restroom 201708114554Details
minor demolition of non structural elements. new office and millwork. upgrade new finshes and lighting throughout. mep ls, sprinkler under sep permit. pot approved 202002144567 restroom 201708114554 | $220,000 |
| Jul 30, 2021 | Completed final sign-off Oct 2021 | 3471 California St | non-strutural interior t.i.i: demo 2-built in workstations and replace with 4 work stations with pony wall. low partition enclosure. new elect & data outles. no cmehanical. ref pa201704033053. electrical under sep permit.Details
non-strutural interior t.i.i: demo 2-built in workstations and replace with 4 work stations with pony wall. low partition enclosure. new elect & data outles. no cmehanical. ref pa201704033053. electrical under sep permit. | $8,000 |
| Nov 3, 2020 | Completed final sign-off Dec 2022 | 442 Post St | to comply with accessible business entry program: install automatic door openers to 2 entry doors. remove one set of entry doors. replace with new accessible glass entry doors with transom. no structural or mechanical. no sidewalk work. elec under separate permit.Details
to comply with accessible business entry program: install automatic door openers to 2 entry doors. remove one set of entry doors. replace with new accessible glass entry doors with transom. no structural or mechanical. no sidewalk work. elec under separate permit. | $24,000 |
| Feb 10, 2020 | Completed final sign-off Nov 2021 | 2222 Bush St | renovation of 4395 sf retail space gr fl level on e 2 story plus basement building for cannabis use. new hvac, elec, plumbing per plans. new rear exterior door, demo of select interior walls, door, floor finishes, ceiling and windows. signage under sep permitDetails
renovation of 4395 sf retail space gr fl level on e 2 story plus basement building for cannabis use. new hvac, elec, plumbing per plans. new rear exterior door, demo of select interior walls, door, floor finishes, ceiling and windows. signage under sep permit | $495,000 |
| Jan 7, 2020 | Completed final sign-off Dec 2020 | 450 Mission St | obtain final inspection for pa 2006 0131 3487. all work has been doneDetails
obtain final inspection for pa 2006 0131 3487. all work has been done | |
| Oct 30, 2019 | Completed final sign-off Apr 2021 | 333 Bush St | revision to 201905079918: revision includes new technical infeasibility request for mens accessible toilet location.Details
revision to 201905079918: revision includes new technical infeasibility request for mens accessible toilet location. | |
| Oct 30, 2019 | Completed final sign-off Apr 2021 | 333 Bush St | revision to 201905079917: revision includes new technical infeasibility request for mens accessible toilet location.Details
revision to 201905079917: revision includes new technical infeasibility request for mens accessible toilet location. | |
| Oct 30, 2019 | Completed final sign-off Apr 2021 | 333 Bush St | revision to 201905079917: revision includes new technical infeasibility request for mens accessible toilet location.Details
revision to 201905079917: revision includes new technical infeasibility request for mens accessible toilet location. | |
| Oct 8, 2019 | Never finaled filed Oct 2019, never issued | 950 Gough St | scope of work under this permit includes: 1st time t.i. church/sanctuary, social/dining hall, kitchen and offices for st paulus lutheran church. seperate mechanical, electrical and plmg permits to be obtained. ref app#201510281089Details
scope of work under this permit includes: 1st time t.i. church/sanctuary, social/dining hall, kitchen and offices for st paulus lutheran church. seperate mechanical, electrical and plmg permits to be obtained. ref app#201510281089 | $2,500,000 |
| Aug 23, 2019 | Never finaled issued Sep 2019, no final | 1061 Market St | addition of 2 meeting rooms to existing office space on 2nd floor. no demo, existing ceiling, lighting & sprinklers to remain. work on 2nd story.Details
addition of 2 meeting rooms to existing office space on 2nd floor. no demo, existing ceiling, lighting & sprinklers to remain. work on 2nd story. | $8,838 |
| May 31, 2019 | Never finaled issued Jun 2019, no final | 333 Bush St | 16th flr - revision - new drinking and bottle filler ref 201905079916Details
16th flr - revision - new drinking and bottle filler ref 201905079916 | |
| May 31, 2019 | Never finaled issued Jun 2019, no final | 333 Bush St | 18th flr - revision - new drinking fountain and bottle filler ref 201905079918Details
18th flr - revision - new drinking fountain and bottle filler ref 201905079918 | |
| May 31, 2019 | Never finaled issued Jun 2019, no final | 333 Bush St | 17th flr - revision - new drinking fountain and bottle filler ref 201905079917Details
17th flr - revision - new drinking fountain and bottle filler ref 201905079917 | |
| May 7, 2019 | Completed final sign-off Apr 2021 | 333 Bush St | 18th flr - bathroom remodel. replace interior finishes such as, new lighting, new toilet, partitions, sinks and finished. (e) mech/ele, sprinklers system modification upgrade to current ada reqsDetails
18th flr - bathroom remodel. replace interior finishes such as, new lighting, new toilet, partitions, sinks and finished. (e) mech/ele, sprinklers system modification upgrade to current ada reqs | $85,000 |
| May 7, 2019 | Completed final sign-off Apr 2021 | 333 Bush St | 16th flr - bathroom remodel. replace interior finishes such as, new lighting, new toilet, partitions, sinks and finished. (e) mech/ele, sprinklers system modification upgrade to current ada reqsDetails
16th flr - bathroom remodel. replace interior finishes such as, new lighting, new toilet, partitions, sinks and finished. (e) mech/ele, sprinklers system modification upgrade to current ada reqs | $85,000 |
| May 7, 2019 | Completed final sign-off Apr 2021 | 333 Bush St | 17th flr - bathroom remodel. replace interior finishes such as, new lighting, new toilet, partitions, sinks and finished. (e) mech/ele, sprinklers system modification upgrade to current ada reqsDetails
17th flr - bathroom remodel. replace interior finishes such as, new lighting, new toilet, partitions, sinks and finished. (e) mech/ele, sprinklers system modification upgrade to current ada reqs | $85,000 |
| Apr 3, 2019 | Never finaled issued Apr 2019, no final | 1 Market St | selective demolition and construction of non-load bearing partitions, extg modification to ceiling grid & tile, new light fixtures & nw switching, nw office doors & frames, salvage & reuse of extg material, nw millwork, nw sink, nw finishes. n/a for maher suite cDetails
selective demolition and construction of non-load bearing partitions, extg modification to ceiling grid & tile, new light fixtures & nw switching, nw office doors & frames, salvage & reuse of extg material, nw millwork, nw sink, nw finishes. n/a for maher suite c | $65,000 |
| Mar 12, 2019 | Completed final sign-off Jun 2019 | 2280 Market St | revision to bpa 2018-0626-3037 to clarify that the building is and will remain as b occupancy class with 49 or lessDetails
revision to bpa 2018-0626-3037 to clarify that the building is and will remain as b occupancy class with 49 or less | |
| Feb 8, 2019 | Completed final sign-off Oct 2019 | 1685 Haight St | ground flr. interior tenant remodel. removal of interior non-structural partitions, ceilings & doors. new walls updating restroom, new ceilings, lighting & fixtures. no upgrading accessbile single-use bathroom. new break room w/ mill work. exterior work under this permitDetails
ground flr. interior tenant remodel. removal of interior non-structural partitions, ceilings & doors. new walls updating restroom, new ceilings, lighting & fixtures. no upgrading accessbile single-use bathroom. new break room w/ mill work. exterior work under this permit | $40,000 |
| Feb 8, 2019 | Never finaled issued Feb 2019, no final | 333 Bush St | 20/f: demo of non-structural partitions, doors, finishes, eletcrical 7 construction of new finishes. new lighiting & modifications to (e) havac system to accomodate new layout. maher n/a.Details
20/f: demo of non-structural partitions, doors, finishes, eletcrical 7 construction of new finishes. new lighiting & modifications to (e) havac system to accomodate new layout. maher n/a. | $120,000 |
| Feb 5, 2019 | Never finaled issued Feb 2019, no final | 333 Bush St | 23rd fl - project is barrier removal and consists of replacing interior restroom finishes. scope includes new lighting, new toilet partitions, sinks and finishes to upgrade ada requie mech, elec and sprinkler system under separate permit.Details
23rd fl - project is barrier removal and consists of replacing interior restroom finishes. scope includes new lighting, new toilet partitions, sinks and finishes to upgrade ada requie mech, elec and sprinkler system under separate permit. | $85,000 |
| Feb 5, 2019 | Never finaled issued Feb 2019, no final | 333 Bush St | 22nd fl - project is barrier removal and consists of replacing interior restroom finishes. scope includes new lighting, new toilet partitions, sinks and finishes to upgrade ada requirements. existing mech, elec and sprinkler system modification under separate permit.Details
22nd fl - project is barrier removal and consists of replacing interior restroom finishes. scope includes new lighting, new toilet partitions, sinks and finishes to upgrade ada requirements. existing mech, elec and sprinkler system modification under separate permit. | $85,000 |
| Feb 5, 2019 | Never finaled issued Feb 2019, no final | 333 Bush St | 24th fl - project is barrier removal and consists of replacing interior restroom finishes. scope includes new lighting, new toilet partitions, sinks and finishes to upgrade ada. existing mech, elect and sprinkler system modification under separate permit.Details
24th fl - project is barrier removal and consists of replacing interior restroom finishes. scope includes new lighting, new toilet partitions, sinks and finishes to upgrade ada. existing mech, elect and sprinkler system modification under separate permit. | $85,000 |
| Jan 18, 2019 | Completed final sign-off Jun 2019 | 60 Spear St | to obtain final inspection for all work completed under permit(s) 201609087023 and 201608255950.Details
to obtain final inspection for all work completed under permit(s) 201609087023 and 201608255950. | |
| Jan 11, 2019 | Never finaled issued Jan 2019, no final | 333 Bush St | 20th floor: revision to app#201809140208. scope to relocate women's ada stall water closet due to extg waste line conflict. maher n/a.Details
20th floor: revision to app#201809140208. scope to relocate women's ada stall water closet due to extg waste line conflict. maher n/a. | |
| Nov 8, 2018 | Never finaled issued Nov 2018, no final | 333 Bush St | 38/f: ref pa# 201810183524; electrical & lighting modifications & t24 upgrades as required for new office configuration, hvac modifications to include (1) new vav & adjustment to duct layout,Details
38/f: ref pa# 201810183524; electrical & lighting modifications & t24 upgrades as required for new office configuration, hvac modifications to include (1) new vav & adjustment to duct layout, | $100,000 |
| Oct 18, 2018 | Never finaled issued Nov 2018, no final | 333 Bush St | 12th floor: minor demo and new construction of doors, partitions, glazing and millwork. extg ceiling tile and grid to remain, new upgraded title 24 lighting only in area of scope. life safty, mech, plmg, & sprinkler modification are under seperate permit.Details
12th floor: minor demo and new construction of doors, partitions, glazing and millwork. extg ceiling tile and grid to remain, new upgraded title 24 lighting only in area of scope. life safty, mech, plmg, & sprinkler modification are under seperate permit. | $200,000 |
| Oct 10, 2018 | Never finaled issued Oct 2018, no final | 445 Hayes St | t.i. title 24 compliance electrical plans, in conection with # pa201808298629. maher n/a.Details
t.i. title 24 compliance electrical plans, in conection with # pa201808298629. maher n/a. | |
| Sep 20, 2018 | Completed final sign-off Aug 2019 | 1200 04th St | 1st time tenant improvement - pet supply store/grooming - new partitions, ceiling, flooring, new concrete floor slab, electrical plumbing, hvac, new restroom. sprinklers, fire alarm, signage under sep permit. **maher na**Details
1st time tenant improvement - pet supply store/grooming - new partitions, ceiling, flooring, new concrete floor slab, electrical plumbing, hvac, new restroom. sprinklers, fire alarm, signage under sep permit. **maher na** | $250,000 |
| Sep 14, 2018 | Never finaled issued Oct 2018, no final | 333 Bush St | demolition of existing elevator lobby finishes and existing restroom finishes. upgrade of new elevator lobby and restroom finishes at 20th fl. mep ls/sprinkler under sep permit. no change to e egress and exit occupancyDetails
demolition of existing elevator lobby finishes and existing restroom finishes. upgrade of new elevator lobby and restroom finishes at 20th fl. mep ls/sprinkler under sep permit. no change to e egress and exit occupancy | $90,000 |
| Aug 29, 2018 | Completed final sign-off Feb 2019 | 445 Hayes St | retail tenant improvement. of 1,225 sf , new wall at storage room, minor wall framing, new sink,add new lighting. no structrual work. electr, mech, plumbing under seperate permitDetails
retail tenant improvement. of 1,225 sf , new wall at storage room, minor wall framing, new sink,add new lighting. no structrual work. electr, mech, plumbing under seperate permit | $73,500 |
| Aug 29, 2018 | Never finaled issued Sep 2018, no final | 595 Market St | minor demolition of paritions, doors, glazing, and finishes. e celing ro remain. construction of new partitons, doors, finishes. replace e light fixtures with new led fixtures, t24 controls. redistribute hvac as required for new layhout. install new reheat vav box and exhaust fan. plumbinb sprinklerDetails
minor demolition of paritions, doors, glazing, and finishes. e celing ro remain. construction of new partitons, doors, finishes. replace e light fixtures with new led fixtures, t24 controls. redistribute hvac as required for new layhout. install new reheat vav box and exhaust fan. plumbinb sprinkler | $90,000 |
| Aug 29, 2018 | Never finaled issued Sep 2018, no final | 595 Market St | remove e light fixtures, replace with new led fixtures and t24 compliant controls. electrical only//including emergency lights.. vifDetails
remove e light fixtures, replace with new led fixtures and t24 compliant controls. electrical only//including emergency lights.. vif | $15,000 |
| Jul 12, 2018 | Never finaled issued Aug 2018, no final | 595 Market St | suite 1350 minor demo of partitions, doors, glazing and finishes. (e) ceiling and lighting to remain. construction of new partitions, doors and finishes. restroom barries removal, no new plm ot millwork. (e) mech, ele and sprinkler system modification under sep permitDetails
suite 1350 minor demo of partitions, doors, glazing and finishes. (e) ceiling and lighting to remain. construction of new partitions, doors and finishes. restroom barries removal, no new plm ot millwork. (e) mech, ele and sprinkler system modification under sep permit | $10,000 |
| Jun 27, 2018 | Completed final sign-off Sep 2019 | 3525 17th St | add units per ord 162-16. constr new interior for adu unit. complete mech,elec,plumb and life safety as req by permit document. this work is performed in conjuction with work permit 2018-01-31-0061. maher n/aDetails
add units per ord 162-16. constr new interior for adu unit. complete mech,elec,plumb and life safety as req by permit document. this work is performed in conjuction with work permit 2018-01-31-0061. maher n/a | |
| Jun 26, 2018 | Completed final sign-off Jun 2019 | 2280 Market St | tenant improvement ot an existing retail space for a new specialty fitness sutdio, work to include: gond fl, interior non-bearing partitions, millwork & interior finishes, electrical, plumbing & hvac, accoustical treatment for studio space. new fuel/juice barDetails
tenant improvement ot an existing retail space for a new specialty fitness sutdio, work to include: gond fl, interior non-bearing partitions, millwork & interior finishes, electrical, plumbing & hvac, accoustical treatment for studio space. new fuel/juice bar | $150,000 |
| Mar 19, 2018 | Completed final sign-off Nov 2019 | 246 02nd St | title 24 upgrade for new lighting & power distribution throughour retail ti space. refer to ref 201801047878Details
title 24 upgrade for new lighting & power distribution throughour retail ti space. refer to ref 201801047878 | $15,000 |
| Jan 31, 2018 | Completed final sign-off Sep 2019 | 3525 17th St | complete rehab of all areas with modern materials due to fire & water damage. restore historic features. create open flr plan btwn kitchen & lvg rm typical @ 2nd-4th flrs. optimize lvng space @1st flr. structural upgrades including seismic & framing repairs. (n) & upgraded mep.Details
complete rehab of all areas with modern materials due to fire & water damage. restore historic features. create open flr plan btwn kitchen & lvg rm typical @ 2nd-4th flrs. optimize lvng space @1st flr. structural upgrades including seismic & framing repairs. (n) & upgraded mep. | $3,275,000 |
| Jan 17, 2018 | Completed final sign-off May 2019 | 245 05th St | title 24 documentation for new power & lighting distribution for t.i. consiting of new offices, breakroom, conference room & shower restroom. refer to pa#201709087375.Details
title 24 documentation for new power & lighting distribution for t.i. consiting of new offices, breakroom, conference room & shower restroom. refer to pa#201709087375. | $40,000 |
| Dec 4, 2017 | Completed final sign-off Feb 2018 | 333 Bush St | 32/f: ste 3225 tenant improvement: non-structural elements including interior partitions & doors. construction consists of interior partitions, doors, finishes, celing lighting, electrical outlets & switches.r/r (e) vav's in the hvac system,add one (n) vav & exhaust fan. maher n/a.Details
32/f: ste 3225 tenant improvement: non-structural elements including interior partitions & doors. construction consists of interior partitions, doors, finishes, celing lighting, electrical outlets & switches.r/r (e) vav's in the hvac system,add one (n) vav & exhaust fan. maher n/a. | $175,000 |
| Sep 22, 2017 | Completed final sign-off Sep 2019 | 3525 17th St | to comply with nov #201612642. demolition of interior non-structural finishes, doors, casework, mep distribution & fixtures, non-load bearing partitions. separate remodel permit.Details
to comply with nov #201612642. demolition of interior non-structural finishes, doors, casework, mep distribution & fixtures, non-load bearing partitions. separate remodel permit. | $50,000 |
| Sep 8, 2017 | Completed final sign-off May 2019 | 245 05th St | interior ti of (e) office @ ground floor and 2nd floor; (n) non=rated partition walls for offices and conference rooms; (n) kitchenette and work room; (n) restroom with shower; (n) lighting. verify in field rated occupancy separation requirements between office and r-2.mep & sprinklers seprte prmt.Details
interior ti of (e) office @ ground floor and 2nd floor; (n) non=rated partition walls for offices and conference rooms; (n) kitchenette and work room; (n) restroom with shower; (n) lighting. verify in field rated occupancy separation requirements between office and r-2.mep & sprinklers seprte prmt. | $130,000 |
| Aug 15, 2017 | Never finaled issued Aug 2017, no final | 3004 16th St | 4/f- provide & install (n) hvac distribution from existing rooftop units. relocate existing lavatory to meet ada requirements. t.i. pa# 201707141867Details
4/f- provide & install (n) hvac distribution from existing rooftop units. relocate existing lavatory to meet ada requirements. t.i. pa# 201707141867 | $40,000 |
| Aug 11, 2017 | Completed final sign-off Sep 2018 | 450 Mission St | 4th floor - new partitions, new accessible restroom, renovated restroom, new mechanical system, elect, no structural. ref t.i. #201705237368, ref accessible men's room #201504244586, ref ground floor accessibility #201307081256. maher n/aDetails
4th floor - new partitions, new accessible restroom, renovated restroom, new mechanical system, elect, no structural. ref t.i. #201705237368, ref accessible men's room #201504244586, ref ground floor accessibility #201307081256. maher n/a | $80,000 |
| Jul 14, 2017 | Completed final sign-off Aug 2017 | 333 Bush St | syte 1480 partial office retrofit to include new lighting & controls, new receptacles. ref pa 2017-0504-5738Details
syte 1480 partial office retrofit to include new lighting & controls, new receptacles. ref pa 2017-0504-5738 | |
| Jul 14, 2017 | Never finaled issued Jul 2017, no final | 3004 16th St | ti to include upgrade to (1) existing single occupant toilet, new non-structural interior partitions. mep, fire alarm & sprinkler under separate permitDetails
ti to include upgrade to (1) existing single occupant toilet, new non-structural interior partitions. mep, fire alarm & sprinkler under separate permit | $200,000 |
| May 23, 2017 | Completed final sign-off Nov 2017 | 450 Mission St | 4/f- demolition of non structural partitions in preparation of re-leasing and future t.i., non structural partitions and doors at new demising locations, ref. pa#201307081256 for g/f elv. accessibility. no mechanical, electrical under separate permit. n/a ordinance #155-13Details
4/f- demolition of non structural partitions in preparation of re-leasing and future t.i., non structural partitions and doors at new demising locations, ref. pa#201307081256 for g/f elv. accessibility. no mechanical, electrical under separate permit. n/a ordinance #155-13 | $18,000 |
| May 9, 2017 | Completed final sign-off Sep 2017 | 221 Main St | revision to 201702280316 - partial demo of (e) planter wall and installation of a temp ada ramp with hand and guardrails maher naDetails
revision to 201702280316 - partial demo of (e) planter wall and installation of a temp ada ramp with hand and guardrails maher na | $5,000 |
| May 4, 2017 | Completed final sign-off Aug 2017 | 333 Bush St | 14/f #1480- interior demo of non structural elements, partitions, doors, finishes, ceilings, lighting, mechanical, electrical outlets & switches. mep. separate permit.Details
14/f #1480- interior demo of non structural elements, partitions, doors, finishes, ceilings, lighting, mechanical, electrical outlets & switches. mep. separate permit. | $243,648 |
| Apr 5, 2017 | Never finaled issued Apr 2017, no final | 221 Main St | change to temporary wall enclosure, 5 11'1/2, approved on previous permit 201702280316 for approved metal enclosed temporary playground.Details
change to temporary wall enclosure, 5 11'1/2, approved on previous permit 201702280316 for approved metal enclosed temporary playground. | |
| Mar 10, 2017 | Never finaled issued Mar 2017, no final | 221 Main St | demolish planter in preparation for temporary playground on a sep permit pa#2017 0228 0316Details
demolish planter in preparation for temporary playground on a sep permit pa#2017 0228 0316 | $1,000 |
| Feb 28, 2017 | Completed final sign-off Sep 2017 | 221 Main St | relocate exterior child care playground to (2) new play areas. work inlcludes new fence and gate and play structure. (e) playground to remain. ** maher: n/a **Details
relocate exterior child care playground to (2) new play areas. work inlcludes new fence and gate and play structure. (e) playground to remain. ** maher: n/a ** | $20,000 |
| Feb 22, 2017 | Completed final sign-off Mar 2022 | 761 Bryant St | change of use to medical cannabis dispensary. mechanical, electrical permit sets to be submitte separately. ** maher: n/a **Details
change of use to medical cannabis dispensary. mechanical, electrical permit sets to be submitte separately. ** maher: n/a ** | $1,000 |
| Jan 12, 2017 | Completed final sign-off Apr 2017 | 333 Bush St | provide (n) power & lighting ti to fitness center. provide new wshp's & hvac distribution throughout new fitness center. ref pa 2016-1121-3217Details
provide (n) power & lighting ti to fitness center. provide new wshp's & hvac distribution throughout new fitness center. ref pa 2016-1121-3217 | $200,000 |
| Dec 16, 2016 | Completed final sign-off Apr 2017 | 333 Bush St | conversion of (e) storage and bike storage for bld. tenant includes adding a new door, non door, non-structural partitions relocation of (e) fire alarm panels installation of bike racksDetails
conversion of (e) storage and bike storage for bld. tenant includes adding a new door, non door, non-structural partitions relocation of (e) fire alarm panels installation of bike racks | $60,000 |
| Nov 21, 2016 | Completed final sign-off Apr 2017 | 333 Bush St | g/f- conversion of (e) storage space into a fitness space for building occupants includes adding in a verticial lift, locker rooms and relocate (e) corridor and stairs. fire alarm, sprinklers and mep. under seperate permit.Details
g/f- conversion of (e) storage space into a fitness space for building occupants includes adding in a verticial lift, locker rooms and relocate (e) corridor and stairs. fire alarm, sprinklers and mep. under seperate permit. | $750,000 |
| Sep 8, 2016 | Completed final sign-off Jun 2019 | 60 Spear St | revision to ref pa 201608124896 & 201608255950 demo of non load bearing walls. remove & replace lighting & receptacles. re-distribution of hvac duct. new finishes maher naDetails
revision to ref pa 201608124896 & 201608255950 demo of non load bearing walls. remove & replace lighting & receptacles. re-distribution of hvac duct. new finishes maher na | $10,000 |
| Aug 25, 2016 | Completed final sign-off Jun 2019 | 60 Spear St | 2nd floor: electrical submittal to ref pa 201608124896(arch/mech): connecting power to new light fixtures, new & relocated outlets & tenant equip, all connections to be made to (e) electrical panels, no changes to base bld ele system. no fsd's maher naDetails
2nd floor: electrical submittal to ref pa 201608124896(arch/mech): connecting power to new light fixtures, new & relocated outlets & tenant equip, all connections to be made to (e) electrical panels, no changes to base bld ele system. no fsd's maher na | $30,000 |
| Aug 12, 2016 | Expired or cancelled cancelled Jan 2026 | 360 Pine St | stair & elevator vestibule modification at 3rd floor.Details
stair & elevator vestibule modification at 3rd floor. | $10,000 |
| Aug 12, 2016 | Completed final sign-off Jun 2019 | 60 Spear St | 2nd floor: ti-including demo, new walls and finishes. redistribution of hvac. elect, sprinklers, fire alarm under spe permit maher naDetails
2nd floor: ti-including demo, new walls and finishes. redistribution of hvac. elect, sprinklers, fire alarm under spe permit maher na | $150,000 |
| Jan 26, 2016 | Never finaled issued Jan 2016, no final | 60 Spear St | 6th floor: replace existing carpet, add low walls. n/a ordinance #155-13Details
6th floor: replace existing carpet, add low walls. n/a ordinance #155-13 | $20,000 |
| Jan 26, 2016 | Never finaled issued Jan 2016, no final | 60 Spear St | 5th floor: replace existing carpet, add low walls. n/a ordinance #155-13Details
5th floor: replace existing carpet, add low walls. n/a ordinance #155-13 | $50,000 |
| Oct 9, 2015 | Never finaled issued Oct 2015, no final | 60 Spear St | 8th floor, interior ti. sprinkler and fire alarm under separate permit. n/a maher ord. # 155-13Details
8th floor, interior ti. sprinkler and fire alarm under separate permit. n/a maher ord. # 155-13 | $1,000,000 |
| Jul 14, 2015 | Expired or cancelled cancelled Jan 2026 | 60 Spear St | 8th floor demolition of interior partitions, doors and ceiling only. deferred accessibility compliance by ab-017. (n/a for the maher). life safety deferred.Details
8th floor demolition of interior partitions, doors and ceiling only. deferred accessibility compliance by ab-017. (n/a for the maher). life safety deferred. | $50,000 |
| Mar 10, 2015 | Never finaled issued Mar 2015, no final | 60 Spear St | remove and replace electrical distribution equip for compliances with title 24 meter requirements. new light fixtures, furniture feeds, receptacles throughout to accommodate new layout. ref 201412224246. n/a ordinance #155-13Details
remove and replace electrical distribution equip for compliances with title 24 meter requirements. new light fixtures, furniture feeds, receptacles throughout to accommodate new layout. ref 201412224246. n/a ordinance #155-13 | $450,000 |
| Feb 25, 2015 | Never finaled issued Mar 2015, no final | 60 Spear St | modification of hvac throughout floor: new vavs & assoc ductwork to accomodate new layout: ref permit 2014 1222 4246. n/a ordinance #155-13Details
modification of hvac throughout floor: new vavs & assoc ductwork to accomodate new layout: ref permit 2014 1222 4246. n/a ordinance #155-13 | $100,000 |
| Feb 4, 2015 | Completed final sign-off Sep 2015 | 66 Cleary Ct | demolition of non structural partitions, fixtures, cabinets, construction of new partitions, doors, plumbing fixtures & finishes. remove & replace existing light fixtures. add new outlets per code as limited by existing poured in place concrete.Details
demolition of non structural partitions, fixtures, cabinets, construction of new partitions, doors, plumbing fixtures & finishes. remove & replace existing light fixtures. add new outlets per code as limited by existing poured in place concrete. | $100,000 |
| Jan 5, 2015 | Never finaled issued Jan 2015, no final | 60 Spear St | interior demo only. removeal of existing partitions, doors, flooring, ceiling. per ab-017. future ti, hvac ele, sprinkler, fire alarm under separate permit. n/a maher ordinanceDetails
interior demo only. removeal of existing partitions, doors, flooring, ceiling. per ab-017. future ti, hvac ele, sprinkler, fire alarm under separate permit. n/a maher ordinance | $50,000 |
| Dec 22, 2014 | Never finaled issued Feb 2015, no final | 60 Spear St | 9th floor: minor demolitoin of existing interior to accomodate office ti. new partitions, see pre-app mtg minutes for glass in lobby walls- doors/hardware, acoustic ceilings, finishes, lighting. mep and fire alarm, sprinkler under separate permit. n/a for the maher.Details
9th floor: minor demolitoin of existing interior to accomodate office ti. new partitions, see pre-app mtg minutes for glass in lobby walls- doors/hardware, acoustic ceilings, finishes, lighting. mep and fire alarm, sprinkler under separate permit. n/a for the maher. | $800,000 |
| Nov 26, 2014 | Expired or cancelled cancelled Jan 2026 | 463 Bush St | to erect electric double faced signDetails
to erect electric double faced sign | |
| Oct 3, 2014 | Completed final sign-off May 2015 | 444 De Haro St | revision to mechanical plans 201406259465 to include new exhaust on roof on fsd in elec room. n/a maher ordinance 155-13Details
revision to mechanical plans 201406259465 to include new exhaust on roof on fsd in elec room. n/a maher ordinance 155-13 | |
| Sep 8, 2014 | Completed final sign-off Dec 2014 | 444 De Haro St | infill of existing openings in slab located on ground floor. revision to pa#201405145691. n/a ordinance #155-13Details
infill of existing openings in slab located on ground floor. revision to pa#201405145691. n/a ordinance #155-13 | $10,000 |
| Aug 19, 2014 | Completed final sign-off Dec 2014 | 444 De Haro St | infill of existing concrete wall per plan. revision appl. 2014.0514.5691.Details
infill of existing concrete wall per plan. revision appl. 2014.0514.5691. | $10,000 |
| Jun 30, 2014 | Completed final sign-off Jul 2015 | 16 Maiden Ln | 3rd floor t.i. installation of new partitions, relocating lighting and new break room. maher n/a. compliance with maher ordinance no. 155-13 not required.Details
3rd floor t.i. installation of new partitions, relocating lighting and new break room. maher n/a. compliance with maher ordinance no. 155-13 not required. | $80,000 |
| Jun 25, 2014 | Completed final sign-off May 2015 | 444 De Haro St | g/f only- no work on 2/f -interior t.i. including minor demolition, new walls, and doors. sprinkler and fire alarm under seperate permit. n/a for the maher ordinance #155-13Details
g/f only- no work on 2/f -interior t.i. including minor demolition, new walls, and doors. sprinkler and fire alarm under seperate permit. n/a for the maher ordinance #155-13 | $1,400,000 |
| May 14, 2014 | Completed final sign-off May 2015 | 444 De Haro St | new a.d.a. ramp addition, no future hvac, electrical of fire alarm required, sprinkler system under seperate permit. n/a ordinance #155-13.Details
new a.d.a. ramp addition, no future hvac, electrical of fire alarm required, sprinkler system under seperate permit. n/a ordinance #155-13. | $80,000 |
| Apr 29, 2014 | Never finaled issued Apr 2014, no final | 463 Bush St | amendment to bldg permit #201312184447. documentation from architect the lifesafty and fire sprinklers are not required. this is to be removed from permit as part of scope. type 3a allows for a 4-story bldg w/o sprinklers. n/a for the maher ordidnance #155-13Details
amendment to bldg permit #201312184447. documentation from architect the lifesafty and fire sprinklers are not required. this is to be removed from permit as part of scope. type 3a allows for a 4-story bldg w/o sprinklers. n/a for the maher ordidnance #155-13 |