Block 0260, lot 009
360 Pine St
- City’s use
- Commercial Office
- Built
- 1928
- Stories
- 7
- Units
- 8
- Rooms
- 8 bathrooms
- Building
- 18,312 sq ft
- Lot
- 2,696 sq ft
- Zoning
- C3O
- Construction type
- A
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 15, 2026 | In progress issued Sep 2026 | 360 Pine St | Ken O'sullivan Construction And Renovati | install phone booth on 7th floor.Details
install phone booth on 7th floor. | $2,500 |
| May 26, 2026 | Completed final sign-off Jun 2026 | 360 Pine St | Ken O'sullivan Construction And Renovati | legalizing phone booth pods on floors 2,5 and 6 due to nov from sffd high rise inspectionDetails
legalizing phone booth pods on floors 2,5 and 6 due to nov from sffd high rise inspection | $2,500 |
| May 8, 2026 | Completed final sign-off Jun 2026 | 360 Pine St | Ken O'sullivan Construction And Renovati | to obtain final inspection for pa# 200812168621. all work is complete.Details
to obtain final inspection for pa# 200812168621. all work is complete. | |
| Oct 12, 2021 | Completed final sign-off Feb 2022 | 360 Pine St | Johnson Controls Fire | modify extg fire alarm system due to an elevator modernization. provide 3 new relays for elevator control and 1 new smoke sensor/detector at the 1st floor elevator landing for alternate level recall. new elevator has ft 1 letter from the elevator contractor. no sprinkler in elevator.Details
modify extg fire alarm system due to an elevator modernization. provide 3 new relays for elevator control and 1 new smoke sensor/detector at the 1st floor elevator landing for alternate level recall. new elevator has ft 1 letter from the elevator contractor. no sprinkler in elevator. | $6,500 |
| Aug 12, 2016 | Expired or cancelled cancelled Jan 2026 | 360 Pine St | Premier Structures Inc | stair & elevator vestibule modification at 3rd floor.Details
stair & elevator vestibule modification at 3rd floor. | $10,000 |
| Sep 19, 2014 | Completed final sign-off Jun 2016 | 360 Pine St | Johnson Controls Fire | 2nd to 7th floor -revision to appl #2012.11.28.5045: notification appliance layout revised to match actual site conditions.Details
2nd to 7th floor -revision to appl #2012.11.28.5045: notification appliance layout revised to match actual site conditions. | $13,300 |
| Apr 4, 2014 | Never finaled issued Apr 2014, no final | 360 Pine St | Johnson Controls Fire | fire alarm tenant improvement to 3rd floor, provide & insall one relay, three strobes, one horn/strobe, one door holder. t./i on app# 201401307400Details
fire alarm tenant improvement to 3rd floor, provide & insall one relay, three strobes, one horn/strobe, one door holder. t./i on app# 201401307400 | $2,800 |
| Jan 30, 2014 | Never finaled issued Feb 2014, no final | 360 Pine St | Roebuck Construction | tenant improvement of 3rd floor suite. compliance with ordinance #155-13 not required.Details
tenant improvement of 3rd floor suite. compliance with ordinance #155-13 not required. | $135,000 |
| Dec 5, 2012 | Never finaled issued Dec 2012, no final | 360 Pine St | Roebuck Construction | comply with nov# 200799335-construct 1 conference room, some low height partitions, upgrade the finishes on the floor to clear novDetails
comply with nov# 200799335-construct 1 conference room, some low height partitions, upgrade the finishes on the floor to clear nov | |
| Dec 5, 2012 | Never finaled issued Dec 2012, no final | 360 Pine St | Roebuck Construction | comply with nov# 200799335-construct 1 conference room, some low height partitions, upgrade the finishes on the floor to clear novDetails
comply with nov# 200799335-construct 1 conference room, some low height partitions, upgrade the finishes on the floor to clear nov | |
| Nov 28, 2012 | Never finaled issued Nov 2012, no final | 360 Pine St | Simplexgrinnell Lp. | 2nd/3rd/4th/5th/6th/7th floors-fire alarm tenant improvement-18 strobes & 15 horn/strobes. final applications #2009-1015-9030 & 2012-1113-4074 to comply with field inspectionsDetails
2nd/3rd/4th/5th/6th/7th floors-fire alarm tenant improvement-18 strobes & 15 horn/strobes. final applications #2009-1015-9030 & 2012-1113-4074 to comply with field inspections | $13,300 |
| Nov 13, 2012 | Never finaled issued Nov 2012, no final | 360 Pine St | Simplexgrinnell Lp. | final inspection for work completed under pa# 2009-1015-9030. all work complete.Details
final inspection for work completed under pa# 2009-1015-9030. all work complete. | |
| Mar 31, 2010 | Never finaled issued Apr 2010, no final | 360 Pine St | Maguire Inc Dba Lahue And Associates | install an electrical illuminated double faced blade wall sign at front of building.Details
install an electrical illuminated double faced blade wall sign at front of building. | $5,000 |
| Dec 24, 2009 | Never finaled filed Dec 2009, never issued | 360 Pine St | Roebuck Construction | mechanical permit for kitchen hoodDetails
mechanical permit for kitchen hood | |
| Nov 12, 2009 | Never finaled issued Nov 2009, no final | 360 Pine St | Nielson Mechanical Inc. | install fire suppression system in kitchen hoodDetails
install fire suppression system in kitchen hood | $3,060 |
| Oct 15, 2009 | Never finaled issued Nov 2009, no final | 360 Pine St | Simplex Grinnell | install 1 facd ( fire alarm control palnel), 1 annunciator, 5 smoke detectors, 12 pull stations, 5 iam modules, 1 relay iam, 12 wall mounted speaker/strobes installed in the builidng on the basement, ground , 2nd,3rd, 4t,5th,6th,7th floor of bldgDetails
install 1 facd ( fire alarm control palnel), 1 annunciator, 5 smoke detectors, 12 pull stations, 5 iam modules, 1 relay iam, 12 wall mounted speaker/strobes installed in the builidng on the basement, ground , 2nd,3rd, 4t,5th,6th,7th floor of bldg | $8,000 |
| Aug 27, 2009 | Never finaled issued Aug 2009, no final | 360 Pine St | Simplex Grinnell | install 3 smoke sensor, 5 manual pull stations, 1 monitor module, 5 wall mount strobes, 12 wall mount horn/strobes and 3 ceiling mount horn/strobes on the 1st fl.Details
install 3 smoke sensor, 5 manual pull stations, 1 monitor module, 5 wall mount strobes, 12 wall mount horn/strobes and 3 ceiling mount horn/strobes on the 1st fl. | $8,000 |
| Jun 16, 2009 | Never finaled issued Jun 2009, no final | 360 Pine St | Value Fire Protection Inc | overhead fire sprinkler system. 22 heads, 13 relocatesDetails
overhead fire sprinkler system. 22 heads, 13 relocates | $7,500 |
| Dec 16, 2008 | Expired or cancelled expired Jun 2026 | 360 Pine St | Roebuck Construction | change of use b/m to b/a-2. occupancy load verification for p-142 assembly permit. new kitchen & restaurant dinining vacant space. new storage for propose restaurant in (e) basement. establish new occupancy load. (all interior work).Details
change of use b/m to b/a-2. occupancy load verification for p-142 assembly permit. new kitchen & restaurant dinining vacant space. new storage for propose restaurant in (e) basement. establish new occupancy load. (all interior work). | $500,000 |
| Oct 31, 2008 | Never finaled issued Oct 2008, no final | 360 Pine St | Roebuck Construction | on ground floor: revision to appl #200706194311 - change the entrance door to swing out and comply w/submit ab-011 for the front entry doors with powered door operator.Details
on ground floor: revision to appl #200706194311 - change the entrance door to swing out and comply w/submit ab-011 for the front entry doors with powered door operator. | $7,000 |
| Sep 9, 2008 | Never finaled issued Sep 2008, no final | 360 Pine St | Roebuck Construction | to complete work started under pa#200706194311.Details
to complete work started under pa#200706194311. | |
| Mar 27, 2008 | Never finaled issued Mar 2008, no final | 360 Pine St | street space permit only.Details
street space permit only. | ||
| Feb 19, 2008 | Never finaled issued Feb 2008, no final | 360 Pine St | street space onlyDetails
street space only | ||
| Jun 19, 2007 | Never finaled issued Jun 2007, no final | 360 Pine St | Roebuck Construction | 4th floor-construct one conference room, one private office, some low height partitions and upgrade the finishes in the (e) space.Details
4th floor-construct one conference room, one private office, some low height partitions and upgrade the finishes in the (e) space. | $47,000 |
| Jun 19, 2007 | Never finaled issued Jun 2007, no final | 360 Pine St | Roebuck Construction | 2nd floor-construct one conference room, some low height partitions and upgrade the finishes on the floor.Details
2nd floor-construct one conference room, some low height partitions and upgrade the finishes on the floor. | $35,000 |
| Jun 19, 2007 | Never finaled issued Jun 2007, no final | 360 Pine St | Roebuck Construction | demo (e) interior finishes, front entry door off lobby area & elevator cabin. refinish with all new materials. alter one partition wall to be move. door replacement & replace w/new door. accessible entrance reconstruction, elevator cab upgrade (e) accessible bathroom upgrade.Details
demo (e) interior finishes, front entry door off lobby area & elevator cabin. refinish with all new materials. alter one partition wall to be move. door replacement & replace w/new door. accessible entrance reconstruction, elevator cab upgrade (e) accessible bathroom upgrade. | $75,000 |
| Jul 18, 2003 | Never finaled issued Jul 2003, no final | 360 Pine St | Intellisec | one new door holder on the 2nd floor tied to (e) circuit, new interface relay to (e) stairwell lockDetails
one new door holder on the 2nd floor tied to (e) circuit, new interface relay to (e) stairwell lock | $2,993 |
| May 12, 2000 | Completed final sign-off Aug 2000 | 360 Pine St | remove existing steel sidewalk door replace with concrete pavementDetails
remove existing steel sidewalk door replace with concrete pavement | $5,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.