Julie Momchlov Johnson
- Listed as
- architect
- Firm
- Jmj Studios
- On San Francisco permits
- May 2014 to Jul 2024
8 permits since 2000 (architect on 8 permits): 6 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 9, 2024 | Completed final sign-off Aug 2025 | 153 Duboce Av | Building Alchemy | create of a state adu(153a duboce ave)by dedicating the 1st story of current 2 story unit to an adu.create distinct entry to new adu,from 2nd story main entry.Details
create of a state adu(153a duboce ave)by dedicating the 1st story of current 2 story unit to an adu.create distinct entry to new adu,from 2nd story main entry. | $50,000 |
| Oct 11, 2018 | Completed final sign-off Jun 2019 | 220 Liberty St | Level 8 Construction Inc | kitchen and bath remodel and add full bathDetails
kitchen and bath remodel and add full bath | $75,000 |
| Sep 19, 2017 | Completed final sign-off Dec 2018 | 33 21st Av | Rozen Home Builders Inc | 3/f: add a master bathroom & closet.Details
3/f: add a master bathroom & closet. | $25,000 |
| Jul 21, 2017 | Completed final sign-off Apr 2019 | 691 Tennessee St | Redhorse Constructors Inc. | alterations to existing warehouse space. renovate existing bathroom. mezzanine platform for future mechanical units. mep deferredDetails
alterations to existing warehouse space. renovate existing bathroom. mezzanine platform for future mechanical units. mep deferred | $120,000 |
| Aug 12, 2016 | Expired or cancelled cancelled Jan 2026 | 360 Pine St | Premier Structures Inc | stair & elevator vestibule modification at 3rd floor.Details
stair & elevator vestibule modification at 3rd floor. | $10,000 |
| Apr 22, 2016 | Completed final sign-off Nov 2016 | 1932 Baker St | Fontana Construction, Inc. | remodel two (e) bathrooms @ level 3 & level 4. added lighting & elect outlets to bedroom level 2 guestroom.Details
remodel two (e) bathrooms @ level 3 & level 4. added lighting & elect outlets to bedroom level 2 guestroom. | $80,000 |
| Aug 27, 2015 | Completed final sign-off Jul 2016 | 2305 Scott St | Handelin Inc Dba Original Construction C | infill deck /lightwell for new full bath. remove non-rated lattice wall & construct new 1 hour wall assembly on bedroom deck.Details
infill deck /lightwell for new full bath. remove non-rated lattice wall & construct new 1 hour wall assembly on bedroom deck. | $50,000 |
| May 23, 2014 | Expired or cancelled cancelled Jan 2026 | 1998 Market St | #302- master bed & bath remodel. new bldg #20101217106. n/a ordinance #155-13.Details
#302- master bed & bath remodel. new bldg #20101217106. n/a ordinance #155-13. | $50,000 |