Block 3533, lot 064
153 Duboce Ave
- City’s use
- Multi-Family Residential
- Built
- 1910
- Stories
- 2
- Units
- 2
- Rooms
- 9 bedrooms, 6 bathrooms
- Building
- 3,395 sq ft
- Lot
- 2,495 sq ft
- Zoning
- RM2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
13 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 15, 2024 | Completed final sign-off Jul 2025 | 153 Duboce Av | Building Alchemy | renovate 4 full bathrooms like for like including replacing & repairing tile, toilet & vanity. replace 6 upper unit street facing windows (al-cl-wd)Details
renovate 4 full bathrooms like for like including replacing & repairing tile, toilet & vanity. replace 6 upper unit street facing windows (al-cl-wd) | $20,000 |
| Jul 9, 2024 | Completed final sign-off Aug 2025 | 153 Duboce Av | Building Alchemy | create of a state adu(153a duboce ave)by dedicating the 1st story of current 2 story unit to an adu.create distinct entry to new adu,from 2nd story main entry.Details
create of a state adu(153a duboce ave)by dedicating the 1st story of current 2 story unit to an adu.create distinct entry to new adu,from 2nd story main entry. | $50,000 |
| May 21, 2024 | Completed final sign-off Jul 2025 | 153 Duboce Av | Building Alchemy | kitchen remodel unit 153 and 155 duboce street. enlarged door opening and add sink for both units.Details
kitchen remodel unit 153 and 155 duboce street. enlarged door opening and add sink for both units. | $45,000 |
| Jan 31, 2013 | Completed final sign-off Nov 2013 | 153 Duboce Av | Y D Construction Co. Inc. | ground floor improvement. new interior stair from 2nd to 1st floor. add 3 new bedrooms, 2 new baths, connecting to 1st floor rear storage and converting to habitable spaceDetails
ground floor improvement. new interior stair from 2nd to 1st floor. add 3 new bedrooms, 2 new baths, connecting to 1st floor rear storage and converting to habitable space | $60,000 |
| Nov 15, 2012 | Completed final sign-off Nov 2013 | 153 Duboce Av | Y D Construction Co. Inc. | 2nd & 3rd floors-interior remodel-adding 1 bathroom on 2nd floor & adding 1 bathroom on 3rd floorDetails
2nd & 3rd floors-interior remodel-adding 1 bathroom on 2nd floor & adding 1 bathroom on 3rd floor | $3,000 |
| Nov 13, 2002 | Completed final sign-off Dec 2002 | 153 Duboce Av | install "36 door (interior). 1 hour pated door between units in existing door wayDetails
install "36 door (interior). 1 hour pated door between units in existing door way | $650 | |
| Sep 25, 2002 | Completed final sign-off Dec 2002 | 153 Duboce Av | Solid Builders | remove existing tile flr & wall in bathroom install (n)insulation,water proof flr,install bldg paperDetails
remove existing tile flr & wall in bathroom install (n)insulation,water proof flr,install bldg paper | $8,500 |
| Jul 5, 2002 | Completed final sign-off Oct 2002 | 153 Duboce Av | install 2 metal handrail in garden area (rear)on stairs,handrail is above stepDetails
install 2 metal handrail in garden area (rear)on stairs,handrail is above step | $150 | |
| Jan 12, 2001 | Expired or cancelled expired Jul 2001 | 153 Duboce Av | street spaceDetails
street space | ||
| Sep 22, 2000 | Completed final sign-off Mar 2001 | 153 Duboce Av | Cheng Chang Construction | repair rear stairs, repair in kind, reinstall hot tub, outlet rear yard, repair sidewalk, additionalDetails
repair rear stairs, repair in kind, reinstall hot tub, outlet rear yard, repair sidewalk, additional | $6,000 |
| Sep 13, 2000 | Expired or cancelled expired Sep 2001 | 153 Duboce Av | street spaceDetails
street space | ||
| May 24, 2000 | Completed final sign-off Jul 2000 | 155 Duboce Av | replacement of windows in kindDetails
replacement of windows in kind | $1,500 | |
| May 8, 2000 | Completed final sign-off Jul 2000 | 155 Duboce Av | Cheng Chang Construction | increase est. cost 3,000 under orig appl #9927009Details
increase est. cost 3,000 under orig appl #9927009 | $3,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Building Alchemy (3), Cheng Chang Construction (2), Y D Construction Co. Inc. (2), Solid Builders
- Architects
- Julie Momchlov Johnson
- Engineers
- Horon Lee (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.