Block 3709, lot 008
450 Mission St
- City’s use
- Commercial Office
- Built
- 1920
- Stories
- 5
- Units
- 3
- Rooms
- 28 bathrooms
- Building
- 77,369 sq ft
- Lot
- 14,676 sq ft
- Zoning
- C3O
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
96 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 12, 2026 | In progress filed Aug 2026, not yet issued | 450 Mission St | for verizon's das hub communication and hvac loads: install new 150 kw diesel standby generator with 140 gallon tank inside existing penthouse room; install new electrical panels; use existing fuel pump supply lines and return lines.Details
for verizon's das hub communication and hvac loads: install new 150 kw diesel standby generator with 140 gallon tank inside existing penthouse room; install new electrical panels; use existing fuel pump supply lines and return lines. | $148,000 | |
| Sep 27, 2024 | Completed final sign-off Jul 2025 | 450 Mission St | Gci, Inc | repair isolated concrete spalls replace broken window glass repair isolated damage to wood & steel windowsDetails
repair isolated concrete spalls replace broken window glass repair isolated damage to wood & steel windows | $100,000 |
| May 1, 2024 | Completed final sign-off Nov 2024 | 450 Mission St | Gci, Inc | reference pa 202312182688. for field coordination no sidewalk surface work. no work on topping slab under this permit. comply w/ nov 202310119 for sub-sidewalk repair under (2) elevator openings.Details
reference pa 202312182688. for field coordination no sidewalk surface work. no work on topping slab under this permit. comply w/ nov 202310119 for sub-sidewalk repair under (2) elevator openings. | $5,000 |
| Dec 18, 2023 | Completed final sign-off Nov 2024 | 450 Mission St | Gci, Inc | repair to (e) concrete slabs & beams below sidewalka along mission & 1st st in accomondate w/ ch 4 od sfbc, new metal decking, steele legger angles, steel beams, metal & wood shoring posts & concrete. comply w/ nov 202310119Details
repair to (e) concrete slabs & beams below sidewalka along mission & 1st st in accomondate w/ ch 4 od sfbc, new metal decking, steele legger angles, steel beams, metal & wood shoring posts & concrete. comply w/ nov 202310119 | $300,000 |
| Oct 26, 2020 | Completed final sign-off Feb 2021 | 450 Mission St | Liberty Fire Systems Inc | (e) pre action fire system ti, partial demo.Details
(e) pre action fire system ti, partial demo. | |
| Jan 7, 2020 | Completed final sign-off Dec 2020 | 450 Mission St | Premier Structures Inc | obtain final inspection for pa 2006 0131 3487. all work has been doneDetails
obtain final inspection for pa 2006 0131 3487. all work has been done | |
| Nov 28, 2017 | Expired or cancelled cancelled Aug 2023 | 450 Mission St | Liberty Fire Systems Inc | demo portion of existing single interlocked preaction system to accomodate reduced telecom room sizeDetails
demo portion of existing single interlocked preaction system to accomodate reduced telecom room size | $5,000 |
| Oct 26, 2017 | Never finaled issued Oct 2017, no final | 450 Mission St | Pyro-Comm Systems, Inc. | 4/f- fire alarm t.i., provide new devices & connect to existing fire alarm system. t.i. pa#201708114624. n/a ordinance #155-13Details
4/f- fire alarm t.i., provide new devices & connect to existing fire alarm system. t.i. pa#201708114624. n/a ordinance #155-13 | $20,000 |
| Sep 15, 2017 | Expired or cancelled cancelled Jan 2026 | 456 Mission St | subsidewalk basement roof repair to install compliant curb ramp.Details
subsidewalk basement roof repair to install compliant curb ramp. | $50,000 | |
| Aug 11, 2017 | Completed final sign-off Sep 2018 | 450 Mission St | Premier Structures Inc | 4th floor - new partitions, new accessible restroom, renovated restroom, new mechanical system, elect, no structural. ref t.i. #201705237368, ref accessible men's room #201504244586, ref ground floor accessibility #201307081256. maher n/aDetails
4th floor - new partitions, new accessible restroom, renovated restroom, new mechanical system, elect, no structural. ref t.i. #201705237368, ref accessible men's room #201504244586, ref ground floor accessibility #201307081256. maher n/a | $80,000 |
| May 23, 2017 | Completed final sign-off Nov 2017 | 450 Mission St | Premier Structures Inc | 4/f- demolition of non structural partitions in preparation of re-leasing and future t.i., non structural partitions and doors at new demising locations, ref. pa#201307081256 for g/f elv. accessibility. no mechanical, electrical under separate permit. n/a ordinance #155-13Details
4/f- demolition of non structural partitions in preparation of re-leasing and future t.i., non structural partitions and doors at new demising locations, ref. pa#201307081256 for g/f elv. accessibility. no mechanical, electrical under separate permit. n/a ordinance #155-13 | $18,000 |
| May 19, 2017 | Never finaled issued May 2017, no final | 450 Mission St | Intelligent Technologies & Services Inc | relocation of pre-action panel & monitoring modules to different location approx 8.6 ft down in the room and tie in to existing detection layout, remains in same room.Details
relocation of pre-action panel & monitoring modules to different location approx 8.6 ft down in the room and tie in to existing detection layout, remains in same room. | $26,799 |
| Oct 19, 2016 | Never finaled issued Oct 2016, no final | 450 Mission St | street spaceDetails
street space | ||
| Apr 22, 2016 | Never finaled issued Oct 2016, no final | 450 Mission St | Sf Gonzalez Concrete Inc. | repair structural slab and supporting beam in a select area of the 1st floor due to corrosion of the reinforcing steel. n/a for maher.Details
repair structural slab and supporting beam in a select area of the 1st floor due to corrosion of the reinforcing steel. n/a for maher. | $6,000 |
| Jan 6, 2016 | Completed final sign-off Jun 2016 | 450 Mission St | Costrotta Construc Management Inc | installation of a temp. t-mobiles antenna facility consisting of 1 db spectra antenna mounted the parapet at the sw corner of the roof. 1 microwave dish mounted to the main roof level. 1 new equipment cabinet & other misc small equipment including 6 rrus, 6 diplexers, 6 tmas, & 6 runs at 7/8 c0ax.Details
installation of a temp. t-mobiles antenna facility consisting of 1 db spectra antenna mounted the parapet at the sw corner of the roof. 1 microwave dish mounted to the main roof level. 1 new equipment cabinet & other misc small equipment including 6 rrus, 6 diplexers, 6 tmas, & 6 runs at 7/8 c0ax. | $18,000 |
| Dec 14, 2015 | Completed final sign-off Jun 2016 | 450 Mission St | Costrotta Construc Management Inc | install three 19" racks, one 6200 cabinet and one 200 amp electrical panel in extg t.i. space. n/a for maherDetails
install three 19" racks, one 6200 cabinet and one 200 amp electrical panel in extg t.i. space. n/a for maher | $15,000 |
| Nov 19, 2015 | Expired or cancelled cancelled Jan 2026 | 450 Mission St | Behan Construction | office #501: 1)to change extg kitchen cabinets in kind. 2)kitchen area 351. 3)no framing work to be done. n/a for maherDetails
office #501: 1)to change extg kitchen cabinets in kind. 2)kitchen area 351. 3)no framing work to be done. n/a for maher | $15,000 |
| Oct 27, 2015 | Completed final sign-off Nov 2015 | 450 Mission St | Pyro-Comm Systems, Inc. | 2nd floor - new fire alarm devices added to tenant improvement in an existing building to include: 1 power supply, 1 control relay, 1 smoke detector, 3 horn/strobes, 3 strobes. ref pa #201506027827.Details
2nd floor - new fire alarm devices added to tenant improvement in an existing building to include: 1 power supply, 1 control relay, 1 smoke detector, 3 horn/strobes, 3 strobes. ref pa #201506027827. | $4,300 |
| Sep 10, 2015 | Completed final sign-off Apr 2016 | 450 Mission St | Source Planning And Construction Inc | 2nd floor - electrical work for pa #201506027827. n/a maher ordinanceDetails
2nd floor - electrical work for pa #201506027827. n/a maher ordinance | $75,000 |
| Jun 2, 2015 | Completed final sign-off Apr 2016 | 450 Mission St | Source Planning And Construction Inc | 2nd flr: new interior partitions, doors, interior glazing, flooring, ele/hvac/plumb improvements. new fully compliant restrooms. remove (n) int. glazing frm scope; maher naDetails
2nd flr: new interior partitions, doors, interior glazing, flooring, ele/hvac/plumb improvements. new fully compliant restrooms. remove (n) int. glazing frm scope; maher na | $50,000 |
| Apr 24, 2015 | Completed final sign-off Oct 2016 | 450 Mission St | Engler Construction | 4th flr: revision to pa # 2013 1126 2837 minor non structural interior renovation, alter women's restroom in lieu of previously permitted men's restroom to meet 20% ada compliance rule. remove (e) toilet, nw toilet sink acces., new floor, wall and tile. compliance with maher ord 155-13 not required.Details
4th flr: revision to pa # 2013 1126 2837 minor non structural interior renovation, alter women's restroom in lieu of previously permitted men's restroom to meet 20% ada compliance rule. remove (e) toilet, nw toilet sink acces., new floor, wall and tile. compliance with maher ord 155-13 not required. | |
| May 23, 2014 | Completed final sign-off Jun 2014 | 456 Mission St | G P Fire Protection | relocate 1 existing sprinkler head for new consulting room, add 1 sprinker head. seismically upgrade 2" branch line that is being done off if needed. n/a maher ordinance - 155-13Details
relocate 1 existing sprinkler head for new consulting room, add 1 sprinker head. seismically upgrade 2" branch line that is being done off if needed. n/a maher ordinance - 155-13 | $3,260 |
| Apr 2, 2014 | Completed final sign-off Jul 2014 | 450 Mission St | K J Woods Construction Inc | installation of eyebolt for sfdpw & sfpuc project on the southern face of the building. n/a ordinance #155-13Details
installation of eyebolt for sfdpw & sfpuc project on the southern face of the building. n/a ordinance #155-13 | $10,000 |
| Mar 25, 2014 | Completed final sign-off Jul 2014 | 456 Mission St | Walgreen Company | remodel in an existing walgreens, work includes adding a consult room in the existing pharmacy, modifying shelving in the pharmacy to accomodate new room, an related work associated with modifications. maher not required. life safety under separate permit. less than 50 cu.yd.Details
remodel in an existing walgreens, work includes adding a consult room in the existing pharmacy, modifying shelving in the pharmacy to accomodate new room, an related work associated with modifications. maher not required. life safety under separate permit. less than 50 cu.yd. | $40,000 |
| Feb 19, 2014 | Never finaled issued Feb 2014, no final | 450 Mission St | street spaceDetails
street space | ||
| Jan 28, 2014 | Expired or cancelled cancelled Jan 2026 | 450 Mission St | modification to disabled access upgrades under approved pa#2013/11/26/2837.Details
modification to disabled access upgrades under approved pa#2013/11/26/2837. | $22,600 | |
| Dec 30, 2013 | Completed final sign-off Jan 2014 | 450 Mission St | Pyro-Comm Systems, Inc. | 4th floor: new fire alarm devices added to tenant build out on the 4th fl. 1 smoke detector, 1 relay module, 1 power supply, 3 horn/strobes, 1 strobeDetails
4th floor: new fire alarm devices added to tenant build out on the 4th fl. 1 smoke detector, 1 relay module, 1 power supply, 3 horn/strobes, 1 strobe | $6,000 |
| Dec 23, 2013 | Never finaled issued Dec 2013, no final | 450 Mission St | Liberty Fire Systems Inc | add and relocate fire sprinklers in elevator pit.Details
add and relocate fire sprinklers in elevator pit. | $500 |
| Nov 26, 2013 | Never finaled issued Dec 2013, no final | 450 Mission St | Hathaway Dinwiddie Co. | 4th floor suite 402 t.i. fo r3,116 sf office space, extent of work to include new aull height & partial height partitions & additoin of power/data as needed per layout shown on furniture plan. no new electrical fixtures, no plumbing.Details
4th floor suite 402 t.i. fo r3,116 sf office space, extent of work to include new aull height & partial height partitions & additoin of power/data as needed per layout shown on furniture plan. no new electrical fixtures, no plumbing. | $140,000 |
| Nov 15, 2013 | Completed final sign-off Dec 2013 | 450 Mission St | Premier Structures Inc | minor non-structural interior renovation, new demising partitions, no mechanical work, electrical and fire alarm and fire protection under seperate permit. exiting & accessibility ref. to pa#201212286939Details
minor non-structural interior renovation, new demising partitions, no mechanical work, electrical and fire alarm and fire protection under seperate permit. exiting & accessibility ref. to pa#201212286939 | $8,000 |
| Aug 30, 2013 | Never finaled issued Aug 2013, no final | 456 Mission St | street space permitDetails
street space permit | ||
| Aug 15, 2013 | Never finaled issued Aug 2013, no final | 450 Mission St | Pyro-Comm Systems, Inc. | add new devices to new tenant build-out. 6 smoke detectors & base. 2 duct detectors. 14 relay control modules. 1 rps. 11 horn/strobes. 15 strobes. 12 multi voltage relay. 4 door holders. ref pa# 2013-0708-1256.Details
add new devices to new tenant build-out. 6 smoke detectors & base. 2 duct detectors. 14 relay control modules. 1 rps. 11 horn/strobes. 15 strobes. 12 multi voltage relay. 4 door holders. ref pa# 2013-0708-1256. | $17,400 |
| Jul 25, 2013 | Never finaled issued Aug 2013, no final | 450 Mission St | Premier Structures Inc | mep scope for offices in approved permit #201307081256. minor interior renovation. new electrical outlets, new hvac system, new single occ. toilet room. new break room and wellness room sinks. fire alarm system under seperate permit.(new sinks and toilet room replace (e) fixtures)Details
mep scope for offices in approved permit #201307081256. minor interior renovation. new electrical outlets, new hvac system, new single occ. toilet room. new break room and wellness room sinks. fire alarm system under seperate permit.(new sinks and toilet room replace (e) fixtures) | $340,000 |
| Jul 8, 2013 | Completed final sign-off Nov 2013 | 450 Mission St | Premier Structures Inc | 3rd floor:interior renovation, new partitions and doors, non structural mechanical, electrical and plmg and fire alarm under seperate permits.Details
3rd floor:interior renovation, new partitions and doors, non structural mechanical, electrical and plmg and fire alarm under seperate permits. | $470,000 |
| Jun 20, 2013 | Completed final sign-off Nov 2013 | 450 Mission St | Data Processing Air Corp. | new hot water boiler on roof to serve water source heat pump loop. ref pa #2013.05.14.6881Details
new hot water boiler on roof to serve water source heat pump loop. ref pa #2013.05.14.6881 | |
| Jun 14, 2013 | Completed final sign-off Feb 2015 | 450 Mission St | Pyro-Comm Systems, Inc. | this is a one for one fire alarm replacement to provide a new facu to the capabiltes for new tenants build out which are forth coming.Details
this is a one for one fire alarm replacement to provide a new facu to the capabiltes for new tenants build out which are forth coming. | $18,000 |
| May 14, 2013 | Completed final sign-off Oct 2013 | 450 Mission St | Data Processing Air Corp. | 5th floor:gas line from basement to roof for boiler and down to 5th floor for kitchen range.Details
5th floor:gas line from basement to roof for boiler and down to 5th floor for kitchen range. | $37,000 |
| Apr 19, 2013 | Never finaled issued Apr 2013, no final | 450 Mission St | Pyro-Comm Systems, Inc. | add new fire alarm devices for new tenant build out 5th flr, 5 duct detectors, 1 field power supply, 11 horn/strobes, tenant improvement #201303212752Details
add new fire alarm devices for new tenant build out 5th flr, 5 duct detectors, 1 field power supply, 11 horn/strobes, tenant improvement #201303212752 | $7,000 |
| Apr 16, 2013 | Completed final sign-off Oct 2013 | 450 Mission St | International Fire Equip | installation of ul300 fire systemDetails
installation of ul300 fire system | $3,000 |
| Mar 21, 2013 | Never finaled issued Apr 2013, no final | 450 Mission St | minor interior renovation. new countertop and cabinets, new stove type 1 hood and exhaust fan added to extg employee work area. work area t obe used by staff chef to prepare food for photography and video shoots related to the tenant's media business. not for consumption or sale.Details
minor interior renovation. new countertop and cabinets, new stove type 1 hood and exhaust fan added to extg employee work area. work area t obe used by staff chef to prepare food for photography and video shoots related to the tenant's media business. not for consumption or sale. | $18,500 | |
| Jan 31, 2013 | Never finaled issued Jan 2013, no final | 450 Mission St | Western Roofing Service | reroofingDetails
reroofing | $300,000 |
| Dec 28, 2012 | Completed final sign-off Dec 2013 | 450 Mission St | minor interior renovation: new partitions, new electric outlets, new hvac system. fire alarm modifications under separate permit. no change to exterior.Details
minor interior renovation: new partitions, new electric outlets, new hvac system. fire alarm modifications under separate permit. no change to exterior. | $73,000 | |
| Dec 14, 2012 | Never finaled issued Aug 2013, no final | 456 Mission St | Walgreen Company, A M Rocca Inc. | 1st floor & roof-remove an (e) condensor unit & exhaust fam from stockroom, also remove vent louver from stocktroom window. install condesor unit on roof by extending steel roof top support frame one bay. run new roof top condensor pipes within exterior wall chaseDetails
1st floor & roof-remove an (e) condensor unit & exhaust fam from stockroom, also remove vent louver from stocktroom window. install condesor unit on roof by extending steel roof top support frame one bay. run new roof top condensor pipes within exterior wall chase | $40,000 |
| Dec 10, 2012 | Completed final sign-off Apr 2013 | 450 Mission St | minor non structural demo. remove non structrual partitions. small raised floors & plumbing fixtures in vacant tenant space. accessibility will be addressed inthe tenant improvement plans that will be filed for permit shortly. no mech system in this space. 5th flDetails
minor non structural demo. remove non structrual partitions. small raised floors & plumbing fixtures in vacant tenant space. accessibility will be addressed inthe tenant improvement plans that will be filed for permit shortly. no mech system in this space. 5th fl | $3,000 | |
| Oct 9, 2012 | Never finaled issued Oct 2012, no final | 450 Mission St | Tait Environmental Services Inc | under seperate dpw..etc permit removal of underground 2000 gal deisel fuel tank. remove fuel piping, repair public sidewalk(dpw permit) dbi permit scope: remove fuel piping in basement, associated with tankDetails
under seperate dpw..etc permit removal of underground 2000 gal deisel fuel tank. remove fuel piping, repair public sidewalk(dpw permit) dbi permit scope: remove fuel piping in basement, associated with tank | $98,000 |
| Aug 12, 2011 | Never finaled issued Sep 2011, no final | 450 Mission St | Electric Tech Construction Inc | installation of indoor equipment in the 2nd floor & 9 panel antennas on the rooftop of an (e) building.Details
installation of indoor equipment in the 2nd floor & 9 panel antennas on the rooftop of an (e) building. | $145,000 |
| Mar 16, 2011 | Completed final sign-off Nov 2011 | 456 Mission St | Walgreen Company | minor remodel of pharmacy, photo, market and general sale areaDetails
minor remodel of pharmacy, photo, market and general sale area | $140,000 |
| Apr 2, 2010 | Completed final sign-off Aug 2010 | 450 Mission St | A Cst Group Inc. | add 2 new hvac units for data rm cooling. add cooling tower + pumps on roof, condenser water pipes from roof to space & 2 new a/c units in space. add duct work. replace fan motors in (e) ac units. work is mech upgrade only. no accessibility requirementDetails
add 2 new hvac units for data rm cooling. add cooling tower + pumps on roof, condenser water pipes from roof to space & 2 new a/c units in space. add duct work. replace fan motors in (e) ac units. work is mech upgrade only. no accessibility requirement | $75,000 |
| Nov 10, 2009 | Never finaled issued Nov 2009, no final | 450 Mission St | Unger Construction Co | roof level-remove from roof the following equipment: 2 each generators with exhaust, 1 each day tank, 1 each battery charger & batteries. generator to be removed do not support any building life safety. equipment currently inside penthouse, penthouse to remain.Details
roof level-remove from roof the following equipment: 2 each generators with exhaust, 1 each day tank, 1 each battery charger & batteries. generator to be removed do not support any building life safety. equipment currently inside penthouse, penthouse to remain. | $30,000 |
| Jul 21, 2009 | Never finaled issued Aug 2009, no final | 450 Mission St | Tait Environmental Services Inc | remove 2000 gal. underground fuel tank and all associated above and below ground piping. replace public sidewalk. day tank removal. requires additional permits.Details
remove 2000 gal. underground fuel tank and all associated above and below ground piping. replace public sidewalk. day tank removal. requires additional permits. | $35,000 |
| May 9, 2008 | Never finaled issued May 2008, no final | 450 Mission St | 2nd floor: replace acoustic clg & light fixtures in office floor corridor; replace single door with double doorDetails
2nd floor: replace acoustic clg & light fixtures in office floor corridor; replace single door with double door | $14,000 | |
| Nov 16, 2007 | Never finaled issued Nov 2007, no final | 450 Mission St | renew pa#200002293071,#200003174681,#200003134189 for final inspection.Details
renew pa#200002293071,#200003174681,#200003134189 for final inspection. | ||
| Jul 16, 2007 | Completed final sign-off Nov 2007 | 450 Mission St | add 1st floor 6" concrete. slab in-fill, approx. 9'x8' per p/a# 200703216859.Details
add 1st floor 6" concrete. slab in-fill, approx. 9'x8' per p/a# 200703216859. | $10,000 | |
| May 24, 2007 | Completed final sign-off Nov 2007 | 450 Mission St | Dpw Inc. | 1st & 2nd floor: install a new wet type sprinkler system on 1st & 2nd floor sales office only.Details
1st & 2nd floor: install a new wet type sprinkler system on 1st & 2nd floor sales office only. | $25,000 |
| May 22, 2007 | Never finaled issued May 2007, no final | 450 Mission St | Pacific Auxiliary Fire Alarm | ground floor-additions to the (e) fire alarm system due to a tenant improvement on the ground floor & 2nd floor. additions include one power supply, one smoke detector, 2 strobes & 7 horn/strobesDetails
ground floor-additions to the (e) fire alarm system due to a tenant improvement on the ground floor & 2nd floor. additions include one power supply, one smoke detector, 2 strobes & 7 horn/strobes | $16,000 |
| May 17, 2007 | Completed final sign-off Nov 2007 | 450 Mission St | interior non-structural demo of ground fl tenant space.Details
interior non-structural demo of ground fl tenant space. | $20,000 | |
| May 15, 2007 | Never finaled issued May 2007, no final | 450 Mission St | Acco Engineered Systems Inc. Dba Acco En | installation of fan coil units, exhaust fans, outside air fans mechanical onlyDetails
installation of fan coil units, exhaust fans, outside air fans mechanical only | $176,870 |
| Mar 30, 2007 | Never finaled issued Mar 2007, no final | 450 Mission St | renew app #200601313487Details
renew app #200601313487 | ||
| Mar 21, 2007 | Completed final sign-off Nov 2007 | 450 Mission St | remodel ground floor space for new real estate office. mock kitchen and bathroom for new development sales. new unisex restroom. new storefront entry and glazing at ground floor facade.Details
remodel ground floor space for new real estate office. mock kitchen and bathroom for new development sales. new unisex restroom. new storefront entry and glazing at ground floor facade. | $176,000 | |
| Feb 22, 2007 | Completed final sign-off Nov 2007 | 450 Mission St | remodel partial 2nd floor office suite approx 1500, new lighting and paritions, no exterior workDetails
remodel partial 2nd floor office suite approx 1500, new lighting and paritions, no exterior work | $27,000 | |
| Sep 14, 2006 | Completed final sign-off Oct 2006 | 450 Mission St | Pribuss Engineering Inc | add 3 sprinklers, relocate 3 sprinklers, 4th floorDetails
add 3 sprinklers, relocate 3 sprinklers, 4th floor | $1,400 |
| Jul 7, 2006 | Completed final sign-off Oct 2006 | 450 Mission St | one interior non structural partitionDetails
one interior non structural partition | $5,000 | |
| Jun 5, 2006 | Completed final sign-off Oct 2006 | 450 Mission St | Oliver & Company Inc. | demo 2 non bearing interior walls. soft demo onlyDetails
demo 2 non bearing interior walls. soft demo only | $10,000 |
| Jan 31, 2006 | Expired or cancelled expired May 2007 | 450 Mission St | minor repair at extg conduit cores in conc. slab 1st, 2nd and 3rd floors/20% d.a. upgrades at 2nd and 4th restroomsDetails
minor repair at extg conduit cores in conc. slab 1st, 2nd and 3rd floors/20% d.a. upgrades at 2nd and 4th restrooms | $7,000 | |
| Aug 8, 2005 | Completed final sign-off Jan 2006 | 450 Mission St | renew permit#200408121457 & 200403199106 for final inspection.Details
renew permit#200408121457 & 200403199106 for final inspection. | ||
| Feb 1, 2005 | Completed final sign-off Jun 2005 | 450 Mission St | Comm Air Mechanical | replace existing 180 tons colling tower with 2 new 180 tons comparable.Details
replace existing 180 tons colling tower with 2 new 180 tons comparable. | $75,000 |
| Dec 1, 2004 | Completed final sign-off Jun 2005 | 450 Mission St | structural reinforncement of extg steel platform for replcmnt of ext cooling towers w/comparableDetails
structural reinforncement of extg steel platform for replcmnt of ext cooling towers w/comparable | $30,000 | |
| Aug 12, 2004 | Expired or cancelled expired Jan 2006 | 450 Mission St | repair cut rebar in conc.slabfrom coresfor conduit + pipes (e), in corridor on 4t & 5th floors .***Details
repair cut rebar in conc.slabfrom coresfor conduit + pipes (e), in corridor on 4t & 5th floors .*** | $5,500 | |
| Jun 10, 2004 | Expired or cancelled expired Nov 2005 | 450 Mission St | renew appl#200303280980Details
renew appl#200303280980 | $23,000 | |
| Mar 19, 2004 | Completed final sign-off Jan 2006 | 450 Mission St | repair cut rebar in conc slab from cores fsor extg pipes in rear stair well/floors 1-5/add signs toDetails
repair cut rebar in conc slab from cores fsor extg pipes in rear stair well/floors 1-5/add signs to | $3,000 | |
| Sep 23, 2003 | Never finaled issued Sep 2003, no final | 450 Mission St | street space permitDetails
street space permit | ||
| Aug 13, 2003 | Never finaled issued Aug 2003, no final | 450 Mission St | street spaceDetails
street space | ||
| Jun 10, 2003 | Never finaled issued Jun 2003, no final | 450 Mission St | scaffolding - street spaceDetails
scaffolding - street space | ||
| Apr 30, 2003 | Never finaled issued Apr 2003, no final | 450 Mission St | street spaceDetails
street space | ||
| Mar 28, 2003 | Expired or cancelled expired Nov 2005 | 450 Mission St | refill a plumbing trench in basement, repair concrete floor slab over trench.Details
refill a plumbing trench in basement, repair concrete floor slab over trench. | $23,000 | |
| Mar 5, 2002 | Expired or cancelled expired Jul 2005 | 450 Mission St | to renew pa#2001/05/23/9814 to complete work and for final insp.Details
to renew pa#2001/05/23/9814 to complete work and for final insp. | $46,800 | |
| Feb 8, 2002 | Never finaled issued Feb 2002, no final | 450 Mission St | street spaceDetails
street space | ||
| Jul 31, 2001 | Expired or cancelled expired Feb 2002 | 456 Mission St | to erect double faced electric signDetails
to erect double faced electric sign | $1,000 | |
| May 23, 2001 | Expired or cancelled expired Jul 2005 | 450 Mission St | installation of electrical conduit in expanded utility shaft wall/slab workDetails
installation of electrical conduit in expanded utility shaft wall/slab work | $16,000 | |
| Dec 15, 2000 | Expired or cancelled expired Sep 2003 | 450 Mission St | rev. to plan of accessible bathroom upgrade that was apprvd under pa#200002293071Details
rev. to plan of accessible bathroom upgrade that was apprvd under pa#200002293071 | $500 | |
| Dec 14, 2000 | Expired or cancelled expired Jan 2002 | 450 Mission St | Stenger Construction | oti-2 5th floor elDetails
oti-2 5th floor el | $85,000 |
| Nov 13, 2000 | Expired or cancelled expired Sep 2003 | 450 Mission St | Tishman Construction Corp Of Calif. | wall & door added to basement plan, revision to (e) permit 200003214967Details
wall & door added to basement plan, revision to (e) permit 200003214967 | $2,000 |
| Oct 19, 2000 | Expired or cancelled expired Sep 2003 | 450 Mission St | oti--1 5th floor el meDetails
oti--1 5th floor el me | $85,000 | |
| Oct 3, 2000 | Expired or cancelled expired Sep 2003 | 450 Mission St | interior demo partitions, floor finish. title 24 for ada compliance at 5th floor.Details
interior demo partitions, floor finish. title 24 for ada compliance at 5th floor. | $25,000 | |
| Aug 7, 2000 | Expired or cancelled expired Sep 2003 | 450 Mission St | Tishman Construction Corp Of Calif. | revision to app #200003214967Details
revision to app #200003214967 | $500 |
| Jun 27, 2000 | Expired or cancelled expired Sep 2003 | 450 Mission St | rev. to appn. 2000-03-21-4967Details
rev. to appn. 2000-03-21-4967 | $7,000 | |
| Apr 13, 2000 | Expired or cancelled expired Aug 2000 | 456 Mission St | address assignmentDetails
address assignment | ||
| Apr 13, 2000 | Completed final sign-off Feb 2001 | 456 Mission St | Fluoresco Lighting & Sign | erect a single faced electric wall signDetails
erect a single faced electric wall sign | |
| Mar 28, 2000 | Expired or cancelled expired Jul 2000 | 440 Mission St | Fluoresco Lighting & Sign | renew expired appl #9907754 & #9907753Details
renew expired appl #9907754 & #9907753 | |
| Mar 21, 2000 | Expired or cancelled expired Sep 2003 | 450 Mission St | Tishman Construction Corp Of Calif. | structural support for equipment @ 04th floor & roofDetails
structural support for equipment @ 04th floor & roof | $100,000 |
| Mar 17, 2000 | Expired or cancelled expired Sep 2003 | 450 Mission St | California Suppresion Dba Calif. Protect | install of pleasction sprinkler systemDetails
install of pleasction sprinkler system | $30,000 |
| Mar 14, 2000 | Expired or cancelled expired Sep 2003 | 450 Mission St | Tishman Construction Corp Of Calif. | oti-2 el me 4th floorDetails
oti-2 el me 4th floor | $80,000 |
| Mar 13, 2000 | Expired or cancelled expired Sep 2003 | 450 Mission St | California Suppresion Dba Calif. Protect | install preaction detection system @ 4th fl.Details
install preaction detection system @ 4th fl. | $75,000 |
| Mar 2, 2000 | Expired or cancelled expired Sep 2000 | 450 Mission St | install 10 awnings to (e) retail storeDetails
install 10 awnings to (e) retail store | $12,000 | |
| Feb 29, 2000 | Expired or cancelled expired Sep 2003 | 450 Mission St | Tishman Construction Corp Of Calif. | oti-1el, me, l/s, sp 4th floorDetails
oti-1el, me, l/s, sp 4th floor | $150,000 |
| Feb 25, 2000 | Expired or cancelled expired Jun 2000 | 450 Mission St | T C B Builders Inc | renewal of pa 9803990Details
renewal of pa 9803990 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.