21 permits since 2000: 17 completed, 2 never finaled, 2 expired or cancelled.

Of the 2 never-finaled permits, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

All
FiledOutcomeAddressWork described on the permitDeclared cost
Apr 28, 2022Completed
final sign-off Jan 2024
6150 03rd Stconnect temp. generator to bldg tap box. cut over to temp generator. remove (e) supply & return piping from ast to genset inside bldg. install new piping containment box. install new supply & return secondary piping from newly installed containment box on ast to inside bldg to the genset. install...
Details
Permit
202204283253
Permit issued
Oct 18, 2023
Final sign-off
Jan 18, 2024

connect temp. generator to bldg tap box. cut over to temp generator. remove (e) supply & return piping from ast to genset inside bldg. install new piping containment box. install new supply & return secondary piping from newly installed containment box on ast to inside bldg to the genset. install...

Open the permit page

$16,000
Feb 4, 2021Completed
final sign-off Jun 2021
2225 Folsom Strevision to pa #2019-0425-8965: revised plans due to fire inspector comments during final inspection to incorporate new tank equipment and fire documents.
Details
Permit
202102043983
Permit issued
Apr 22, 2021
Final sign-off
Jun 4, 2021

revision to pa #2019-0425-8965: revised plans due to fire inspector comments during final inspection to incorporate new tank equipment and fire documents.

Open the permit page

Apr 25, 2019Completed
final sign-off Jun 2021
2225 Folsom Stremove 10,000 gal underground storage tank & associated fuel piping, electrical & dispensing systems. install (n) 16,000 gal above ground fuel storage tank, associated piping electrical & tank sensor equipment. (n) tank will be 8,000 gal of diesel & 8,0000 gal unleaded
Details
Permit
201904258965
Permit issued
Mar 3, 2020
Final sign-off
Jun 4, 2021

remove 10,000 gal underground storage tank & associated fuel piping, electrical & dispensing systems. install (n) 16,000 gal above ground fuel storage tank, associated piping electrical & tank sensor equipment. (n) tank will be 8,000 gal of diesel & 8,0000 gal unleaded

Open the permit page

$400,000
Oct 9, 2012Never finaled
issued Oct 2012, no final
450 Mission Stunder seperate dpw..etc permit removal of underground 2000 gal deisel fuel tank. remove fuel piping, repair public sidewalk(dpw permit) dbi permit scope: remove fuel piping in basement, associated with tank
Details
Permit
201210091630
Permit issued
Oct 10, 2012

under seperate dpw..etc permit removal of underground 2000 gal deisel fuel tank. remove fuel piping, repair public sidewalk(dpw permit) dbi permit scope: remove fuel piping in basement, associated with tank

Open the permit page

$98,000
Jul 21, 2009Never finaled
issued Aug 2009, no final
450 Mission Stremove 2000 gal. underground fuel tank and all associated above and below ground piping. replace public sidewalk. day tank removal. requires additional permits.
Details
Permit
200907213051
Permit issued
Aug 13, 2009

remove 2000 gal. underground fuel tank and all associated above and below ground piping. replace public sidewalk. day tank removal. requires additional permits.

Open the permit page

$35,000
Mar 18, 2009Completed
final sign-off Jun 2009
2222 17th Stinstall phase ii evr system: carbon canister, sensors, electronics,software, wiring, hanging hardware
Details
Permit
200903184400
Permit issued
Mar 24, 2009
Final sign-off
Jun 9, 2009

install phase ii evr system: carbon canister, sensors, electronics,software, wiring, hanging hardware

Open the permit page

$16,850
Nov 20, 2008Expired or cancelled
expired Jan 2010
800 Folsom Stinstall veeder root "in station diagnostics" (isd) at existing fuel dispenser & monitoring panel. all low voltage wiring.
Details
Permit
200811207017
Permit issued
Nov 20, 2008

install veeder root "in station diagnostics" (isd) at existing fuel dispenser & monitoring panel. all low voltage wiring.

Open the permit page

$5,000
Sep 16, 2008Completed
final sign-off Apr 2009
390 01st Stinstall enhanced vapor recovery system as per california state mandate with instore diagnostic system.
Details
Permit
200809161722
Permit issued
Sep 16, 2008
Final sign-off
Apr 29, 2009

install enhanced vapor recovery system as per california state mandate with instore diagnostic system.

Open the permit page

$17,000
Sep 3, 2008Completed
final sign-off Nov 2008
4850 Geary Blinstall enhanced vapor recovery system as per california state mandate.
Details
Permit
200809030712
Permit issued
Sep 16, 2008
Final sign-off
Nov 6, 2008

install enhanced vapor recovery system as per california state mandate.

Open the permit page

$17,000
Jun 18, 2008Completed
final sign-off Jan 2009
1700 Noriega Stinstall enhanced vapor recovery system as per california state mandate. install enclosure.
Details
Permit
200806184749
Permit issued
Oct 22, 2008
Final sign-off
Jan 27, 2009

install enhanced vapor recovery system as per california state mandate. install enclosure.

Open the permit page

$17,000
Jun 18, 2008Completed
final sign-off Nov 2008
1798 Alemany Blinstall enhanced vapor recovery system as per california state mandate.
Details
Permit
200806184748
Permit issued
Aug 8, 2008
Final sign-off
Nov 18, 2008

install enhanced vapor recovery system as per california state mandate.

Open the permit page

$17,000
Jun 18, 2008Completed
final sign-off Nov 2008
800 Folsom Stinstall enhanced vapor recovery system as per california state mandate.
Details
Permit
200806184753
Permit issued
Aug 8, 2008
Final sign-off
Nov 20, 2008

install enhanced vapor recovery system as per california state mandate.

Open the permit page

$17,000
Jun 18, 2008Completed
final sign-off Mar 2009
490 Bay Stinstall enhanced vapor recovery system as per california state mandate.
Details
Permit
200806184746
Permit issued
Jul 10, 2008
Final sign-off
Mar 6, 2009

install enhanced vapor recovery system as per california state mandate.

Open the permit page

$17,000
Jun 18, 2008Completed
final sign-off Aug 2008
1200 La Playainstall enhanced vapor recovery system as per california state mandate.
Details
Permit
200806184743
Permit issued
Jul 10, 2008
Final sign-off
Aug 11, 2008

install enhanced vapor recovery system as per california state mandate.

Open the permit page

$17,000
Apr 25, 2008Completed
final sign-off Nov 2008
1855 Taraval Stinstall enhanced vapor recovery system with isd.
Details
Permit
200804250640
Permit issued
Jun 18, 2008
Final sign-off
Nov 7, 2008

install enhanced vapor recovery system with isd.

Open the permit page

$19,000
Mar 25, 2008Expired or cancelled
expired Jun 2010
3800 03rd Stinstall enhanced vapor recovery system in existing gas station
Details
Permit
200803257905
Permit issued
Apr 18, 2008

install enhanced vapor recovery system in existing gas station

Open the permit page

$17,000
Mar 25, 2008Completed
final sign-off Aug 2008
1401 19th Avinstall enhanced vapor recovery system with isd in existing gas station
Details
Permit
200803257908
Permit issued
Apr 18, 2008
Final sign-off
Aug 8, 2008

install enhanced vapor recovery system with isd in existing gas station

Open the permit page

$18,000
Mar 25, 2008Completed
final sign-off Jul 2008
1400 19th Avinstall enhanced vapor recovery system with isd in existing gas station
Details
Permit
200803257906
Permit issued
Apr 18, 2008
Final sign-off
Jul 31, 2008

install enhanced vapor recovery system with isd in existing gas station

Open the permit page

$18,000
May 10, 2005Completed
final sign-off Jun 2005
555 Pine Stremove/replace fuel piping underground. install monitoring
Details
Permit
200505102038
Permit issued
May 10, 2005
Final sign-off
Jun 8, 2005

remove/replace fuel piping underground. install monitoring

Open the permit page

$40,000
Sep 7, 2004Completed
final sign-off Jun 2005
555 Pine Stremove diesel tank slab, piping & sumps . replace tank slab, piping + sumps from tank to building.
Details
Permit
200409073475
Permit issued
Apr 7, 2005
Final sign-off
Jun 8, 2005

remove diesel tank slab, piping & sumps . replace tank slab, piping + sumps from tank to building.

Open the permit page

$100,000
Mar 1, 2001Completed
final sign-off Jan 2002
6150 03rd Streplace existing above grnd diesel storage tank, remove 2,000 gal & install 6,000 gal tank
Details
Permit
200103013258
Permit issued
Oct 4, 2001
Final sign-off
Jan 8, 2002

replace existing above grnd diesel storage tank, remove 2,000 gal & install 6,000 gal tank

Open the permit page

$130,000