Tait Environmental Services Inc
- Based in
- Santa Ana
- On San Francisco permits
- Mar 2001 to Apr 2022
- Last 24 months
- 0 permits filed
21 permits since 2000: 17 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 28, 2022 | Completed final sign-off Jan 2024 | 6150 03rd St | connect temp. generator to bldg tap box. cut over to temp generator. remove (e) supply & return piping from ast to genset inside bldg. install new piping containment box. install new supply & return secondary piping from newly installed containment box on ast to inside bldg to the genset. install...Details
connect temp. generator to bldg tap box. cut over to temp generator. remove (e) supply & return piping from ast to genset inside bldg. install new piping containment box. install new supply & return secondary piping from newly installed containment box on ast to inside bldg to the genset. install... | $16,000 |
| Feb 4, 2021 | Completed final sign-off Jun 2021 | 2225 Folsom St | revision to pa #2019-0425-8965: revised plans due to fire inspector comments during final inspection to incorporate new tank equipment and fire documents.Details
revision to pa #2019-0425-8965: revised plans due to fire inspector comments during final inspection to incorporate new tank equipment and fire documents. | |
| Apr 25, 2019 | Completed final sign-off Jun 2021 | 2225 Folsom St | remove 10,000 gal underground storage tank & associated fuel piping, electrical & dispensing systems. install (n) 16,000 gal above ground fuel storage tank, associated piping electrical & tank sensor equipment. (n) tank will be 8,000 gal of diesel & 8,0000 gal unleadedDetails
remove 10,000 gal underground storage tank & associated fuel piping, electrical & dispensing systems. install (n) 16,000 gal above ground fuel storage tank, associated piping electrical & tank sensor equipment. (n) tank will be 8,000 gal of diesel & 8,0000 gal unleaded | $400,000 |
| Oct 9, 2012 | Never finaled issued Oct 2012, no final | 450 Mission St | under seperate dpw..etc permit removal of underground 2000 gal deisel fuel tank. remove fuel piping, repair public sidewalk(dpw permit) dbi permit scope: remove fuel piping in basement, associated with tankDetails
under seperate dpw..etc permit removal of underground 2000 gal deisel fuel tank. remove fuel piping, repair public sidewalk(dpw permit) dbi permit scope: remove fuel piping in basement, associated with tank | $98,000 |
| Jul 21, 2009 | Never finaled issued Aug 2009, no final | 450 Mission St | remove 2000 gal. underground fuel tank and all associated above and below ground piping. replace public sidewalk. day tank removal. requires additional permits.Details
remove 2000 gal. underground fuel tank and all associated above and below ground piping. replace public sidewalk. day tank removal. requires additional permits. | $35,000 |
| Mar 18, 2009 | Completed final sign-off Jun 2009 | 2222 17th St | install phase ii evr system: carbon canister, sensors, electronics,software, wiring, hanging hardwareDetails
install phase ii evr system: carbon canister, sensors, electronics,software, wiring, hanging hardware | $16,850 |
| Nov 20, 2008 | Expired or cancelled expired Jan 2010 | 800 Folsom St | install veeder root "in station diagnostics" (isd) at existing fuel dispenser & monitoring panel. all low voltage wiring.Details
install veeder root "in station diagnostics" (isd) at existing fuel dispenser & monitoring panel. all low voltage wiring. | $5,000 |
| Sep 16, 2008 | Completed final sign-off Apr 2009 | 390 01st St | install enhanced vapor recovery system as per california state mandate with instore diagnostic system.Details
install enhanced vapor recovery system as per california state mandate with instore diagnostic system. | $17,000 |
| Sep 3, 2008 | Completed final sign-off Nov 2008 | 4850 Geary Bl | install enhanced vapor recovery system as per california state mandate.Details
install enhanced vapor recovery system as per california state mandate. | $17,000 |
| Jun 18, 2008 | Completed final sign-off Mar 2009 | 490 Bay St | install enhanced vapor recovery system as per california state mandate.Details
install enhanced vapor recovery system as per california state mandate. | $17,000 |
| Jun 18, 2008 | Completed final sign-off Aug 2008 | 1200 La Playa | install enhanced vapor recovery system as per california state mandate.Details
install enhanced vapor recovery system as per california state mandate. | $17,000 |
| Jun 18, 2008 | Completed final sign-off Nov 2008 | 1798 Alemany Bl | install enhanced vapor recovery system as per california state mandate.Details
install enhanced vapor recovery system as per california state mandate. | $17,000 |
| Jun 18, 2008 | Completed final sign-off Jan 2009 | 1700 Noriega St | install enhanced vapor recovery system as per california state mandate. install enclosure.Details
install enhanced vapor recovery system as per california state mandate. install enclosure. | $17,000 |
| Jun 18, 2008 | Completed final sign-off Nov 2008 | 800 Folsom St | install enhanced vapor recovery system as per california state mandate.Details
install enhanced vapor recovery system as per california state mandate. | $17,000 |
| Apr 25, 2008 | Completed final sign-off Nov 2008 | 1855 Taraval St | install enhanced vapor recovery system with isd.Details
install enhanced vapor recovery system with isd. | $19,000 |
| Mar 25, 2008 | Completed final sign-off Aug 2008 | 1401 19th Av | install enhanced vapor recovery system with isd in existing gas stationDetails
install enhanced vapor recovery system with isd in existing gas station | $18,000 |
| Mar 25, 2008 | Expired or cancelled expired Jun 2010 | 3800 03rd St | install enhanced vapor recovery system in existing gas stationDetails
install enhanced vapor recovery system in existing gas station | $17,000 |
| Mar 25, 2008 | Completed final sign-off Jul 2008 | 1400 19th Av | install enhanced vapor recovery system with isd in existing gas stationDetails
install enhanced vapor recovery system with isd in existing gas station | $18,000 |
| May 10, 2005 | Completed final sign-off Jun 2005 | 555 Pine St | remove/replace fuel piping underground. install monitoringDetails
remove/replace fuel piping underground. install monitoring | $40,000 |
| Sep 7, 2004 | Completed final sign-off Jun 2005 | 555 Pine St | remove diesel tank slab, piping & sumps . replace tank slab, piping + sumps from tank to building.Details
remove diesel tank slab, piping & sumps . replace tank slab, piping + sumps from tank to building. | $100,000 |
| Mar 1, 2001 | Completed final sign-off Jan 2002 | 6150 03rd St | replace existing above grnd diesel storage tank, remove 2,000 gal & install 6,000 gal tankDetails
replace existing above grnd diesel storage tank, remove 2,000 gal & install 6,000 gal tank | $130,000 |