Block 3592, lot 031
2225 Folsom St
- City’s use
- Industrial
- Built
- 1946
- Stories
- 1
- Units
- 7
- Rooms
- 8 bathrooms
- Building
- 49,295 sq ft
- Lot
- 99,960 sq ft
- Zoning
- M1
- Construction type
- C
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
18 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 29, 2022 | Completed final sign-off Oct 2022 | 2225 Folsom St | Turner Construction Co | replacement of damaged bottom chord of 1 bowstring truss (in-kind or better); replacmenet of damaged diagonal member of 1 bowstring truss (in-kind or better); shoring of roof and truss members during construction;Details
replacement of damaged bottom chord of 1 bowstring truss (in-kind or better); replacmenet of damaged diagonal member of 1 bowstring truss (in-kind or better); shoring of roof and truss members during construction; | $107,500 |
| Feb 4, 2021 | Completed final sign-off Jun 2021 | 2225 Folsom St | Tait Environmental Services Inc | revision to pa #2019-0425-8965: revised plans due to fire inspector comments during final inspection to incorporate new tank equipment and fire documents.Details
revision to pa #2019-0425-8965: revised plans due to fire inspector comments during final inspection to incorporate new tank equipment and fire documents. | |
| Apr 25, 2019 | Completed final sign-off Jun 2021 | 2225 Folsom St | Tait Environmental Services Inc | remove 10,000 gal underground storage tank & associated fuel piping, electrical & dispensing systems. install (n) 16,000 gal above ground fuel storage tank, associated piping electrical & tank sensor equipment. (n) tank will be 8,000 gal of diesel & 8,0000 gal unleadedDetails
remove 10,000 gal underground storage tank & associated fuel piping, electrical & dispensing systems. install (n) 16,000 gal above ground fuel storage tank, associated piping electrical & tank sensor equipment. (n) tank will be 8,000 gal of diesel & 8,0000 gal unleaded | $400,000 |
| Mar 14, 2019 | Completed final sign-off Oct 2019 | 2225 Folsom St | Gowan Construction | consists of removal of (e) teller line & installation of a (n) ada compliant hi-low teller line.Details
consists of removal of (e) teller line & installation of a (n) ada compliant hi-low teller line. | $118,000 |
| Dec 15, 2017 | Completed final sign-off Apr 2019 | 2225 Folsom St | Turner Construction Co | site securtiy upgrade replace card readeres, bird spikes, new gate controller & new roll up door.Details
site securtiy upgrade replace card readeres, bird spikes, new gate controller & new roll up door. | $100,000 |
| Nov 28, 2017 | Never finaled issued Nov 2017, no final | 536 Treat Av | Roebbelen Contracting Inc | remove two vehicle lifts, install 1 new lift with associated electrical, air & hydraulicDetails
remove two vehicle lifts, install 1 new lift with associated electrical, air & hydraulic | $107,000 |
| Jul 23, 2015 | Expired or cancelled cancelled Aug 2023 | 2295 Folsom St | D'man-Burly Systems Inc. | remove and replace extg fire alarm system with initiation and notification devices connecting to a new facp with new devices. n/a for maher.Details
remove and replace extg fire alarm system with initiation and notification devices connecting to a new facp with new devices. n/a for maher. | $7,900 |
| Dec 26, 2014 | Never finaled issued Dec 2014, no final | 2225 Folsom St | street spaceDetails
street space | ||
| Oct 2, 2013 | Completed final sign-off Feb 2014 | 2225 Folsom St | D'man-Burly Systems Inc. | remove & replace existing fire alarm system, voluntary upgrade by owner. there is no record plan or ul certification for the existing fire alarm system.Details
remove & replace existing fire alarm system, voluntary upgrade by owner. there is no record plan or ul certification for the existing fire alarm system. | $9,800 |
| Feb 27, 2009 | Completed final sign-off Oct 2009 | 2225 Folsom St | Paradiso Mechanical, Inc, California Hazardous Services Inc | evr phase ii upgrade at gas station.Details
evr phase ii upgrade at gas station. | $20,000 |
| Jul 11, 2008 | Completed final sign-off Feb 2009 | 536 Treat Av | T Mitchell Engineers | upgrade existing compressed natural gas (cng) fuleing facility to allow system to fully fill newer cng powered vehicles operating at 360 psig. work will include the addition one cylindrical amse pressure vessel assembly.Details
upgrade existing compressed natural gas (cng) fuleing facility to allow system to fully fill newer cng powered vehicles operating at 360 psig. work will include the addition one cylindrical amse pressure vessel assembly. | $22,000 |
| Nov 21, 2007 | Never finaled issued Nov 2007, no final | 2225 Folsom St | Cosco Fire Protection Inc. | add sprinklers on first and seconf floor of an existing office.Details
add sprinklers on first and seconf floor of an existing office. | $90,000 |
| Nov 19, 2007 | Never finaled issued Nov 2007, no final | 2225 Folsom St | Cosco Fire Protection Inc. | provide sprinkler monitoring & alarms signals shall be automatically transmitted to u.l. listed central station monitoring co: calif security alarms. manual pull station at front lobby, water flow alarm on each floor, smike detector above control unit.Details
provide sprinkler monitoring & alarms signals shall be automatically transmitted to u.l. listed central station monitoring co: calif security alarms. manual pull station at front lobby, water flow alarm on each floor, smike detector above control unit. | $10,000 |
| Oct 31, 2007 | Expired or cancelled cancelled Jan 2026 | 2225 Folsom St | provide sprinkler monitoring & alarms, audible provided in normally occupied location on both floors. visual appliances added to meet ada. one smoke sensor above control panel within room & a readily visible sign identifying location of control panel.Details
provide sprinkler monitoring & alarms, audible provided in normally occupied location on both floors. visual appliances added to meet ada. one smoke sensor above control panel within room & a readily visible sign identifying location of control panel. | $10,000 | |
| Feb 8, 2006 | Completed final sign-off Mar 2006 | 2225 Folsom St | Paradigm General Contractors | revised d/a/ checklist or reflect apy phone will not be installed and not required by codeDetails
revised d/a/ checklist or reflect apy phone will not be installed and not required by code | |
| Sep 15, 2005 | Completed final sign-off Mar 2006 | 2225 Folsom St | Paradigm General Contractors | t.i. improvement of customer service office. demo partitions door, frame, hardware.Details
t.i. improvement of customer service office. demo partitions door, frame, hardware. | $88,000 |
| Aug 16, 2001 | Completed final sign-off Feb 2002 | 2225 Folsom St | Paradigm General Contractors | voluntary seismic upgrade rew 200008258933Details
voluntary seismic upgrade rew 200008258933 | $250,000 |
| Aug 25, 2000 | Expired or cancelled expired Feb 2002 | 2225 Folsom St | voluntary seismic ugrade as descri in drawings s1,s2 related prep work involving ex gas piping,ductiDetails
voluntary seismic ugrade as descri in drawings s1,s2 related prep work involving ex gas piping,ducti | $250,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.