Permit GraphShortlistSan Francisco building permits since 2000

Ronaldo Sotelo

License
E17229
Electrical engineer
About the Board for Professional Engineers, Land Surveyors, and Geologists
Look up E17229 at the Board for Professional Engineers
Listed as
engineer
On San Francisco permits
Oct 2017 to Apr 2019

2 permits since 2000 (engineer on 2 permits): 2 completed.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records

Worked with

Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.

Contractors
Tait Environmental Services Inc
Engineers
Abby Banerjee, Stanley Iverson

Where they worked

One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.

Most recent permits

FiledOutcomeAddressContractorWork described on the permitDeclared cost
Apr 25, 2019Completed
final sign-off Jun 2021
2225 Folsom StTait Environmental Services Incremove 10,000 gal underground storage tank & associated fuel piping, electrical & dispensing systems. install (n) 16,000 gal above ground fuel storage tank, associated piping electrical & tank sensor equipment. (n) tank will be 8,000 gal of diesel & 8,0000 gal unleaded
Details
Permit
201904258965
Permit issued
Mar 3, 2020
Final sign-off
Jun 4, 2021

remove 10,000 gal underground storage tank & associated fuel piping, electrical & dispensing systems. install (n) 16,000 gal above ground fuel storage tank, associated piping electrical & tank sensor equipment. (n) tank will be 8,000 gal of diesel & 8,0000 gal unleaded

Open the permit page

$400,000
Oct 12, 2017Completed
final sign-off Mar 2018
1 Avenue Of The Palmsmechanical/electrical (me) drawings for pa 2016-1216-5181. n/a ordinance #155-13
Details
Permit
201710121141
Permit issued
Oct 27, 2017
Final sign-off
Mar 1, 2018

mechanical/electrical (me) drawings for pa 2016-1216-5181. n/a ordinance #155-13

Open the permit page