Block 1939, lot 001
150 04th Ti St #bldg 449
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
86 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 14, 2025 | In progress issued Jan 2026 | 150 04th Ti St | Nibbi Bros Assoc Inc. | priority 100% affortable project - erect a 5-story, no basement, type ii-a, 100 units of affordable senior housing with associated community and management spaces. (r-2,s-2,b)Details
priority 100% affortable project - erect a 5-story, no basement, type ii-a, 100 units of affordable senior housing with associated community and management spaces. (r-2,s-2,b) | $40,000,000 |
| Oct 16, 2024 | In progress issued Feb 2025 | 150 04th Ti St | Cahill Contractors Llc. | mayoral ed 13-01/17-02: erect new 6-story bldg. levels 02-06 provides 120 residential sleeping units, group training rooms & therapist offices to support the residential use. level 01 amenities include a full service kitchen, dining, staff lounge, fitness, multipurpose rooms, & outdoor space.Details
mayoral ed 13-01/17-02: erect new 6-story bldg. levels 02-06 provides 120 residential sleeping units, group training rooms & therapist offices to support the residential use. level 01 amenities include a full service kitchen, dining, staff lounge, fitness, multipurpose rooms, & outdoor space. | $40,000,000 |
| Aug 29, 2022 | Completed final sign-off Jul 2025 | 150 04th Ti St | James E Roberts-Obayashi Corporation | parcel c2.1 - shoring companion permit associated with building parcel c2.2 (55-77 bruton st under pa# 202205174388.Details
parcel c2.1 - shoring companion permit associated with building parcel c2.2 (55-77 bruton st under pa# 202205174388. | |
| May 20, 2022 | Completed final sign-off May 2024 | 150 04th Ti St | Webcor Construction Lp | parcel c2.4- production pile submission associated with new building under 201912169619.Details
parcel c2.4- production pile submission associated with new building under 201912169619. | $2,660,000 |
| Jul 19, 2021 | Completed final sign-off Oct 2021 | 150 04th Ti St | Canning Electric Inc | 900 avenue d, bldg #33a/ treasture island- kitchen remodel. no exterior work. (e) kitchen of treasure island school (closed). remodeled appliances replaced in-kind. epoxy repair to concrete floor. mep by others.Details
900 avenue d, bldg #33a/ treasture island- kitchen remodel. no exterior work. (e) kitchen of treasure island school (closed). remodeled appliances replaced in-kind. epoxy repair to concrete floor. mep by others. | $300,000 |
| Mar 27, 2019 | Never finaled filed Mar 2019, never issued | 150 04th Ti St | tida project. building 344. to demolish a type 5-b, 1-story bldg.Details
tida project. building 344. to demolish a type 5-b, 1-story bldg. | $3,000 | |
| Mar 27, 2019 | Never finaled filed Mar 2019, never issued | 150 04th Ti St | tida project. building 458. to demolish a type 3-b, 1-story bldg.Details
tida project. building 458. to demolish a type 3-b, 1-story bldg. | $2,000 | |
| Mar 27, 2019 | Never finaled filed Mar 2019, never issued | 150 04th Ti St | tida project. building 69. to demolish a type 5-b, 1-story bldg.Details
tida project. building 69. to demolish a type 5-b, 1-story bldg. | $10,000 | |
| Mar 27, 2019 | Never finaled filed Mar 2019, never issued | 150 04th Ti St | building 343. to demolish a type 5-b, 1-story bldg. | $15,000 | |
| Mar 27, 2019 | Never finaled filed Mar 2019, never issued | 150 04th Ti St | tida project. hydraulic training school. to demolish a type 1-b, 1-story bldg.Details
tida project. hydraulic training school. to demolish a type 1-b, 1-story bldg. | $20,000 | |
| Mar 27, 2019 | Never finaled filed Mar 2019, never issued | 150 04th Ti St | tida project. building 342. to demolish a a type 5-b, 1-story bldg.Details
tida project. building 342. to demolish a a type 5-b, 1-story bldg. | $15,000 | |
| Aug 28, 2018 | Never finaled issued Aug 2018, no final | 651 08th Ti St | J. Flores Construction Company Inc | install new fire water service undergrounf including 1 back floe preventer and fire riser. no inside bld work sprinkler permit # 201806050966.Details
install new fire water service undergrounf including 1 back floe preventer and fire riser. no inside bld work sprinkler permit # 201806050966. | $39,900 |
| Jul 3, 2018 | Never finaled filed Jul 2018, never issued | 1080 Avenue M | De Silva Gates Construction | demolish treasure island buildings 215, 216, 330, 670, 671. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.Details
demolish treasure island buildings 215, 216, 330, 670, 671. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m. | $250,000 |
| Jun 29, 2018 | Never finaled filed Jun 2018, never issued | 1080 Avenue M | De Silva Gates Construction | demolish treasure island builidngs 215, 216, 330, 670, 671, type vb,3b,1a,1b, warehouse/office vacant building. demolition for preparation of pad for new treasure island wastewater treatment facility.Details
demolish treasure island builidngs 215, 216, 330, 670, 671, type vb,3b,1a,1b, warehouse/office vacant building. demolition for preparation of pad for new treasure island wastewater treatment facility. | $250,000 |
| Jun 5, 2018 | Completed final sign-off Apr 2019 | 651 08th Ti St | Bay Cities Fire Protection | install fire sprinklers for new dormitory per nfpa 13. underground and sprinkler monitoring separate permit ref 201706290654- hydro required.Details
install fire sprinklers for new dormitory per nfpa 13. underground and sprinkler monitoring separate permit ref 201706290654- hydro required. | $78,500 |
| Feb 15, 2018 | Never finaled issued Jun 2018, no final | 1 Avenue Of The Palms | installation of temporary public art sculpture in private property pursuant to lease agreement with tidaDetails
installation of temporary public art sculpture in private property pursuant to lease agreement with tida | $15,000 | |
| Feb 14, 2018 | Expired or cancelled cancelled Sep 2025 | 651 08th Ti St | stormwater control plan | ||
| Jan 8, 2018 | Completed final sign-off Mar 2018 | 1 Avenue Of The Palms | as built drawings for app#201612165181. n/a for maherDetails
as built drawings for app#201612165181. n/a for maher | ||
| Oct 30, 2017 | Expired or cancelled cancelled Jan 2026 | 1 Avenue Of The Palms | permit requested by health inspector for administrative review to open snack shop, 8'x14'. maher naDetails
permit requested by health inspector for administrative review to open snack shop, 8'x14'. maher na | $4,500 | |
| Oct 12, 2017 | Completed final sign-off Mar 2018 | 1 Avenue Of The Palms | mechanical/electrical (me) drawings for pa 2016-1216-5181. n/a ordinance #155-13Details
mechanical/electrical (me) drawings for pa 2016-1216-5181. n/a ordinance #155-13 | ||
| Sep 7, 2017 | Completed final sign-off Dec 2017 | 1 Avenue Of The Palms | Firemaster | revised pa#201706220146, add coverage to ducts, redesigned piping, change k guard and pull station location. n/a ordinance #155-13//mep issued #201710121141Details
revised pa#201706220146, add coverage to ducts, redesigned piping, change k guard and pull station location. n/a ordinance #155-13//mep issued #201710121141 | |
| Jul 6, 2017 | Never finaled issued Jul 2017, no final | 101 09th Ti St | De Silva Gates Construction | 101 ninth ave: treasure island: set-up temp construction trailers & hook-up power.Details
101 ninth ave: treasure island: set-up temp construction trailers & hook-up power. | $15,000 |
| Jun 29, 2017 | Completed final sign-off Aug 2019 | 651 08th Ti St | Oliver & Company Inc. | erect 1 stories 9 dwelling units type 5 construction for student dormitory. n/a for maher ordinance.Details
erect 1 stories 9 dwelling units type 5 construction for student dormitory. n/a for maher ordinance. | $2,000,000 |
| Jun 22, 2017 | Never finaled issued Jun 2017, no final | 1 Avenue Of The Palms | Firemaster | furnish & install one ansul r102 fire suppression system in th emain kitchen area. ref #201612165181 (under 699 avenue of the palms). n/a maher ordinanceDetails
furnish & install one ansul r102 fire suppression system in th emain kitchen area. ref #201612165181 (under 699 avenue of the palms). n/a maher ordinance | $3,500 |
| Jun 21, 2017 | Completed final sign-off Sep 2017 | 1 Avenue Of The Palms | Who Built Creative Builders | demo (e) play structure & construct (n) play structure in its place. (n) accessible path of travel to (n) play structure. location is at treasure island.Details
demo (e) play structure & construct (n) play structure in its place. (n) accessible path of travel to (n) play structure. location is at treasure island. | $40,000 |
| Apr 11, 2017 | Expired or cancelled cancelled Jan 2026 | 300 California Av | demolition of 2 concrete infills on battery st and 1 conc infill on halleck ally. new storefrontin openings to match adjacent storefrontDetails
demolition of 2 concrete infills on battery st and 1 conc infill on halleck ally. new storefrontin openings to match adjacent storefront | $35,000 | |
| Jan 9, 2017 | Never finaled issued Jan 2017, no final | 1411 Flounder Ct | Jon K Takata Corp Dba Restoration Mgmt | unit a & c: water damage to exterior wall remove and replace joists & 2x4 framing. some sheetrock cabinets & floor sheeting. half inch exterior sheer and patch stucco. n/a maherDetails
unit a & c: water damage to exterior wall remove and replace joists & 2x4 framing. some sheetrock cabinets & floor sheeting. half inch exterior sheer and patch stucco. n/a maher | $4,000 |
| Dec 16, 2016 | Completed final sign-off Mar 2018 | 1 Avenue Of The Palms | placement of temporary shipping container restuarant mep scope of work to be complete under sep permit. maherDetails
placement of temporary shipping container restuarant mep scope of work to be complete under sep permit. maher | $110,000 | |
| Nov 2, 2016 | Completed final sign-off Dec 2016 | 1226 Bayside Dr | Home Safety Services Inc | install ada compliant ramp at entrance to propertyDetails
install ada compliant ramp at entrance to property | $23,327 |
| Jun 29, 2016 | Completed final sign-off Oct 2016 | 800 Avenue H | H K Fire Protection Inc.* Check I.D. *** | installed a kitchen automatic fire suppression system to the cooking hood. n/a maher ordinanceDetails
installed a kitchen automatic fire suppression system to the cooking hood. n/a maher ordinance | $3,500 |
| May 16, 2016 | Expired or cancelled cancelled Jan 2026 | 850 Avenue I | Mission Constructors Inc | add new office at existing multi purpose room, add high efficiently fluorescent lighting, supply ventilation to new addition; maher n/aDetails
add new office at existing multi purpose room, add high efficiently fluorescent lighting, supply ventilation to new addition; maher n/a | $5,000 |
| Apr 1, 2016 | Never finaled issued Apr 2016, no final | 401 13th Ti St | Bay Alarm Company | voluntary upgrade fire alarm communication technology.Details
voluntary upgrade fire alarm communication technology. | $1,000 |
| Apr 1, 2016 | Never finaled issued Apr 2016, no final | 849 13th Ti St | Bay Alarm Company | voluntary upgrade of fire alarm communication technology. n/a for maherDetails
voluntary upgrade of fire alarm communication technology. n/a for maher | $1,000 |
| Feb 18, 2016 | Expired or cancelled cancelled Sep 2022 | 849 Avenue D | add generator to (e) verizon wireless facility @ pa# 2015/08/13/4144. ** maher: n/a **Details
add generator to (e) verizon wireless facility @ pa# 2015/08/13/4144. ** maher: n/a ** | $15,000 | |
| Jan 22, 2016 | Completed final sign-off Feb 2016 | 1 Avenue Of The Palms | Wong John B/Boxer Group | reference pa 2016-01136986, temporary platform (floor) - date from: 1/22/16 thru 2/9/2016. maher naDetails
reference pa 2016-01136986, temporary platform (floor) - date from: 1/22/16 thru 2/9/2016. maher na | $50,000 |
| Jan 19, 2016 | Completed final sign-off Oct 2016 | 1419 Striped Bass St | Jon K Takata Corp Dba Restoration Mgmt | revision to pa#2015-1217-5369 to correct address to 1419 striped bass. n/a for maher.Details
revision to pa#2015-1217-5369 to correct address to 1419 striped bass. n/a for maher. | |
| Jan 13, 2016 | Completed final sign-off Feb 2016 | 1 Avenue Of The Palms | Wong John B/Boxer Group | lantier tent structures will be providing the tent (shell only) 131'x197' for the nfl's commisioners party at one avenue of the palms (parking lot)treasure island.installation 1/25/16-2/4/16 for an event date of 2/5/16, removal will take place from 2/6/16-2/9/16; maher n/aDetails
lantier tent structures will be providing the tent (shell only) 131'x197' for the nfl's commisioners party at one avenue of the palms (parking lot)treasure island.installation 1/25/16-2/4/16 for an event date of 2/5/16, removal will take place from 2/6/16-2/9/16; maher n/a | $18,000 |
| Jan 7, 2016 | Completed final sign-off Apr 2016 | 1443 Chinook Ct | Belfor Usa Group Inc | fire damage new interior finishes less kitchen and living room. replace like and kind 4x6 beam at rear patio supporting rear balcony above. no plans reqd. n/a maher ord. 155-13Details
fire damage new interior finishes less kitchen and living room. replace like and kind 4x6 beam at rear patio supporting rear balcony above. no plans reqd. n/a maher ord. 155-13 | $50,000 |
| Jan 4, 2016 | Completed final sign-off Aug 2022 | 1 Avenue Of The Palms | geotechnical mitigation improvementsDetails
geotechnical mitigation improvements | $1,000,000 | |
| Dec 17, 2015 | Completed final sign-off Oct 2016 | 1409 Flounder Ct | Jon K Takata Corp Dba Restoration Mgmt | replace water damaged header at top of stairs, new posts and spread footings. n/a maher ordinanceDetails
replace water damaged header at top of stairs, new posts and spread footings. n/a maher ordinance | $500 |
| Dec 17, 2015 | Never finaled issued Dec 2015, no final | 1403 Sturgeon St | Jon K Takata Corp Dba Restoration Mgmt | replace water damaged header at top of stairs. n/a maher ordinanceDetails
replace water damaged header at top of stairs. n/a maher ordinance | $500 |
| Nov 16, 2015 | Completed final sign-off Dec 2015 | 401 13th Ti St | Baywood Building & Design Inc | revision to 201507131368. add strap to beamDetails
revision to 201507131368. add strap to beam | |
| Oct 22, 2015 | Completed final sign-off Feb 2017 | 849 Avenue D | Firemaster | install r102 ansul system maher naDetails
install r102 ansul system maher na | $3,500 |
| Oct 22, 2015 | Never finaled issued Oct 2015, no final | 1443 Chinook Ct | Belfor Usa Group Inc | remove fire damaged drywall (300 sqft) insulation (200 sq ft), unit 1443. remove interior doors, floor finishes, carpet, bathroom tile walls. remove hvac duct and seven registers, remove 4 windows, 1 set patio doors at deck soffit. soft demo of fire damagedDetails
remove fire damaged drywall (300 sqft) insulation (200 sq ft), unit 1443. remove interior doors, floor finishes, carpet, bathroom tile walls. remove hvac duct and seven registers, remove 4 windows, 1 set patio doors at deck soffit. soft demo of fire damaged | $40,000 |
| Oct 15, 2015 | Completed final sign-off Feb 2019 | 600 California Av | Jfc Construction Inc. | verizon: installation of telecommunication facility, antenna, rrm, surge protection, gps & power and fiber connections. hanger 3Details
verizon: installation of telecommunication facility, antenna, rrm, surge protection, gps & power and fiber connections. hanger 3 | $125,000 |
| Aug 13, 2015 | Never finaled issued Nov 2015, no final | 849 Avenue D | Full Signal Construction Inc. | bldg 157: installation of verixon telecommuniations facility cell block foundation w 40' monopole. 12 antennas, 12 rrus, 25 surge, 2 gps, 30kw generator w/power & fiber connect. nov 2014 3161 on prop. - not assoc with this projectDetails
bldg 157: installation of verixon telecommuniations facility cell block foundation w 40' monopole. 12 antennas, 12 rrus, 25 surge, 2 gps, 30kw generator w/power & fiber connect. nov 2014 3161 on prop. - not assoc with this project | $125,000 |
| Jul 13, 2015 | Completed final sign-off Dec 2015 | 401 13th Ti St | Baywood Building & Design Inc | bldg 33; replace intermediate bearing partition with engineered glu-lam beams, posts and concrete footings. add shear walls. repair and upgrade existing electrical and plumbing systems. misc. minor tenant improvements. remodel single-use bathroom for ada compliance.Details
bldg 33; replace intermediate bearing partition with engineered glu-lam beams, posts and concrete footings. add shear walls. repair and upgrade existing electrical and plumbing systems. misc. minor tenant improvements. remodel single-use bathroom for ada compliance. | $55,000 |
| Apr 17, 2015 | Completed final sign-off Dec 2015 | 401 13th Ti St | Rise Building | treasure island 33a - soft demo fo rexploration of structural condition, sections of drywall only. n/a maher ordinanceDetails
treasure island 33a - soft demo fo rexploration of structural condition, sections of drywall only. n/a maher ordinance | $4,000 |
| Apr 9, 2015 | Expired or cancelled cancelled Jan 2026 | 150 04th Ti St | Discount Signs & Neon Inc | install 2 illum wall signs. maher - not req'd | $5,000 |
| Apr 3, 2015 | Completed final sign-off Jun 2015 | 600 California Av | Siemens Industry, Inc. | 15th flr: fire alarm work for ti "spec suite" - 1 strobe power supply, 1 module, 14 speakers, 18 speaker strobes, 2 strobes. maher - not req'dDetails
15th flr: fire alarm work for ti "spec suite" - 1 strobe power supply, 1 module, 14 speakers, 18 speaker strobes, 2 strobes. maher - not req'd | $18,200 |
| Apr 2, 2015 | Never finaled issued Apr 2015, no final | 600 California Av | Siemens Industry, Inc. | 19th & 20th flr: fire alarm work to ti - "veritas"; additions are 1 smoke detector, 1 module, 1 speaker, and 6 speaker/strobes. maher - not req'dDetails
19th & 20th flr: fire alarm work to ti - "veritas"; additions are 1 smoke detector, 1 module, 1 speaker, and 6 speaker/strobes. maher - not req'd | $4,500 |
| Jan 20, 2015 | Never finaled issued Jan 2015, no final | 1219 Mariner Dr | Bens Roofing Inc | reroofing | $6,897 |
| Jan 20, 2015 | Never finaled issued Jan 2015, no final | 1208 Mariner Dr | Bens Roofing Inc | reroofing | $19,800 |
| Oct 28, 2014 | Never finaled issued Oct 2014, no final | 1404 Sturgeon St | Bens Roofing Inc | reroofing | $30,000 |
| Oct 28, 2014 | Never finaled issued Oct 2014, no final | 1437 Chinook Ct | Bens Roofing Inc | reroofing | $30,000 |
| Oct 8, 2014 | Completed final sign-off Dec 2014 | 1316 Gateview Av | Bens Roofing Inc | #d treasure island -reroofing. n/a ordinance #155-13Details
#d treasure island -reroofing. n/a ordinance #155-13 | $8,000 |
| Aug 8, 2014 | Completed final sign-off Sep 2014 | 150 04th Ti St | Andes General Construction | retrofit exit doors as need for 201309126712 lower occupancy to 292Details
retrofit exit doors as need for 201309126712 lower occupancy to 292 | $100 |
| Jul 15, 2014 | Never finaled filed Jul 2014, never issued | 401 13th Ti St | change of use from school to church. | ||
| Jun 20, 2014 | Never finaled issued Jun 2014, no final | 1250 Exposition Dr | Bens Roofing Inc | reroofing | $26,000 |
| Jun 20, 2014 | Never finaled issued Jun 2014, no final | 1224 Bayside Dr | Bens Roofing Inc | reroofing | $29,400 |
| May 5, 2014 | Completed final sign-off Nov 2019 | 401 13th Ti St | comply with nov 201463161. install new lighting, remodel bathroom/grab bars, tile. dining room remodel, add bar top/cabinetDetails
comply with nov 201463161. install new lighting, remodel bathroom/grab bars, tile. dining room remodel, add bar top/cabinet | $7,500 | |
| Apr 29, 2014 | Completed final sign-off Jun 2014 | 1307 Gateview Av | Bens Roofing Inc | reroofingDetails
reroofing | $50,000 |
| Apr 29, 2014 | Completed final sign-off Jun 2014 | 1309 Gateview Av | Bens Roofing Inc | reroofingDetails
reroofing | $50,000 |
| Feb 20, 2014 | Completed final sign-off Jun 2014 | 1418 Striped Bass St | Bens Roofing Inc | reroofingDetails
reroofing | $38,000 |
| Feb 5, 2014 | Never finaled issued Feb 2014, no final | 1253 Exposition Dr | W. Wong Construction Co. Inc. | unit c: remodel kitchen, replace cabinet, replace electrical outlets to gfi, replace kitchen sink, no layout change, patch 2/f gypsum wall board, painting; compliance with ord 155-13 not requiredDetails
unit c: remodel kitchen, replace cabinet, replace electrical outlets to gfi, replace kitchen sink, no layout change, patch 2/f gypsum wall board, painting; compliance with ord 155-13 not required | $7,500 |
| Jan 14, 2014 | Completed final sign-off Feb 2014 | 401 13th Ti St | Automatic Fire Sprinklers Inc. | upgrade the fire suppression system in the existing hood. compliance with ordinance #155-13 not required. excavation <50 cu.yd.Details
upgrade the fire suppression system in the existing hood. compliance with ordinance #155-13 not required. excavation <50 cu.yd. | $3,400 |
| Dec 13, 2013 | Never finaled issued Dec 2013, no final | 401 13th Ti St | Fire & Security & Alarm Co/ F.S.A.C. | as- builts ot pa #2012.0509.0135 - add 3 new smoke detectors & 2 pull stations due to the remodeling in the kitchen area. tie-in new devices to existing control pnael.Details
as- builts ot pa #2012.0509.0135 - add 3 new smoke detectors & 2 pull stations due to the remodeling in the kitchen area. tie-in new devices to existing control pnael. | |
| Dec 6, 2013 | Never finaled issued Dec 2013, no final | 849 13th Ti St | Bay Alarm Company | replace failing sprinkler monitoring system with new.Details
replace failing sprinkler monitoring system with new. | $3,045 |
| Nov 26, 2013 | Never finaled issued Nov 2013, no final | 851 11th Ti St | W. Wong Construction Co. Inc. | emergency order to demo a one story warehouse property.Details
emergency order to demo a one story warehouse property. | $10,000 |
| Nov 19, 2013 | Never finaled issued Nov 2013, no final | 1253 Exposition Dr | Har Bro Of No. California | fire damage repair 2 bedrooms insulation & drywall paint interior complete & flooring change in unit cDetails
fire damage repair 2 bedrooms insulation & drywall paint interior complete & flooring change in unit c | $49,000 |
| Nov 7, 2013 | Never finaled issued Dec 2013, no final | 1115 Keppler Ct | W. Wong Construction Co. Inc. | restore facade siding, window and roof after fire damage. this permit is for weather protection of the building only and no interior work to be performed.Details
restore facade siding, window and roof after fire damage. this permit is for weather protection of the building only and no interior work to be performed. | $25,000 |
| Nov 5, 2013 | Completed final sign-off Jan 2014 | 850 Avenue I | remodel restrooms and replace fixtures, 'in-kind'; cosmetic work, only.Details
remodel restrooms and replace fixtures, 'in-kind'; cosmetic work, only. | $20,000 | |
| Oct 17, 2013 | Never finaled issued Oct 2013, no final | 1223 Mariner Dr | W. Wong Construction Co. Inc. | to provide additional roof truss detail to revised building pa#201309106434 - structural only.Details
to provide additional roof truss detail to revised building pa#201309106434 - structural only. | |
| Sep 26, 2013 | Never finaled issued Oct 2013, no final | 1402 Sturgeon St | Har Bro Of No. California | fire damage repair like for like with truss calculations and simple drawings.Details
fire damage repair like for like with truss calculations and simple drawings. | $105,000 |
| Sep 26, 2013 | Completed final sign-off Mar 2014 | 191 Avenue Of The Palms | Aaa Restaurant Fire Control/Dba Aaa Fire | install 1 ansul r102 fire suppression system in the main kitchen areaDetails
install 1 ansul r102 fire suppression system in the main kitchen area | $3,000 |
| Sep 12, 2013 | Completed final sign-off Sep 2014 | 150 04th Ti St | Andes General Construction | bldg #449-the scope of work is limited to minor remodeling of the existing building concrete walls including cutting 3.5'x7' doors at north of south walls and 2 11'x7' openings for 2 sets of double doors at west wall, design of the new steel header jamb complies with provisions of 2010 ca bldg. codeDetails
bldg #449-the scope of work is limited to minor remodeling of the existing building concrete walls including cutting 3.5'x7' doors at north of south walls and 2 11'x7' openings for 2 sets of double doors at west wall, design of the new steel header jamb complies with provisions of 2010 ca bldg. code | $42,859 |
| Sep 10, 2013 | Completed final sign-off Feb 2014 | 1223 Mariner Dr | W. Wong Construction Co. Inc. | reconstruct fire damaged unit c in-kind. repair fire damage for units b & d. remodel for units a, e & f.Details
reconstruct fire damaged unit c in-kind. repair fire damage for units b & d. remodel for units a, e & f. | $350,000 |
| Jul 9, 2013 | Completed final sign-off Aug 2013 | 600 California Av | Siemens Industry, Inc. | removal of 2 smoke detectors and 1 speaker/strobe for the sute 560 remodel on floor 5. no new fire alarm devices are being added with this work. pa ref# 201306068829Details
removal of 2 smoke detectors and 1 speaker/strobe for the sute 560 remodel on floor 5. no new fire alarm devices are being added with this work. pa ref# 201306068829 | $500 |
| Jun 21, 2013 | Completed final sign-off Jul 2013 | 1202 Mariner Dr | Bens Roofing Inc | reroofingDetails
reroofing | $20,000 |
| Jun 21, 2013 | Completed final sign-off Jul 2013 | 1210 Mariner Dr | Bens Roofing Inc | reroofingDetails
reroofing | $15,000 |
| Jan 7, 2013 | Completed final sign-off Feb 2013 | 1315 Gateview Av | Bens Roofing Inc | reroofingDetails
reroofing | $40,000 |
| May 9, 2012 | Never finaled issued May 2012, no final | 401 13th Ti St | Fire & Security & Alarm Co/ F.S.A.C. | install new control panel and fire protection devices throughout the floor area. connect existing sprinkler devices, duct detectors and ansul systems to new panel for monitoringDetails
install new control panel and fire protection devices throughout the floor area. connect existing sprinkler devices, duct detectors and ansul systems to new panel for monitoring | $90,000 |
| Apr 3, 2012 | Expired or cancelled cancelled Jan 2026 | 150 04th Ti St | proposed grocery market/restaurant in existing vacant building.Details
proposed grocery market/restaurant in existing vacant building. | $40,000 | |
| Jan 4, 2011 | Expired or cancelled cancelled Jan 2026 | 401 California Av | International Commercial Awning, Inc. | painted copy to new canopy | $500 |
| Jan 4, 2011 | Expired or cancelled cancelled Jan 2026 | 401 California Av | International Commercial Awning, Inc. | scope of work. custom build and install a new canvas canopy over front entrance doorDetails
scope of work. custom build and install a new canvas canopy over front entrance door | $3,350 |
| Aug 20, 2010 | Completed final sign-off Sep 2010 | 401 California Av | International Fire Equip | installation of ul-300 kitchen fire system. fire alarm connection separate permit - 2 systems.Details
installation of ul-300 kitchen fire system. fire alarm connection separate permit - 2 systems. | $3,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Bens Roofing Inc (13), W. Wong Construction Co. Inc. (5), Jon K Takata Corp Dba Restoration Mgmt (4), Bay Alarm Company (3), De Silva Gates Construction (3), Firemaster (3), Siemens Industry, Inc. (3), Andes General Construction (2), Baywood Building & Design Inc (2), Belfor Usa Group Inc (2), Fire & Security & Alarm Co/ F.S.A.C. (2), Har Bro Of No. California (2), International Commercial Awning, Inc. (2), Wong John B/Boxer Group (2), Aaa Restaurant Fire Control/Dba Aaa Fire, Automatic Fire Sprinklers Inc., Bay Cities Fire Protection, Cahill Contractors Llc., Canning Electric Inc, Discount Signs & Neon Inc, Full Signal Construction Inc., H K Fire Protection Inc.* Check I.D. ***, Home Safety Services Inc, International Fire Equip, J. Flores Construction Company Inc, James E Roberts-Obayashi Corporation, Jfc Construction Inc., Mission Constructors Inc, Nibbi Bros Assoc Inc., Oliver & Company Inc., Rise Building, Webcor Construction Lp, Who Built Creative Builders
- Architects
- Bruce Prescott, Daniel Simons, Douglas Brandon Zucker, J Lee Stickles, Jacqueline K. Lingweiluk, Keith Plymale, Leighton Lee, Paul Okamoto, Walter Alfaro
- Engineers
- Thomas Morse (8), Dave Nguyen (2), Abby Banerjee, Bennett Hasseldeck, Daniel Connell, Daniel Michael Connell, David Yadegar, Gabriel Ng, Jacqueline K. Lingweiluk, James T. Simpson, Jeffrey Brink, John Mcerlean, Luyao Zhang, Ronaldo Sotelo, Stefanos Papadopulos, Vahid Sattary
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.