De Silva Gates Construction
- Based in
- Dublin
- On San Francisco permits
- Nov 2015 to Jan 2025
- Last 24 months
- 1 permit filed
42 permits since 2000: 24 completed, 16 never finaled, 2 expired or cancelled.
Of the 16 never-finaled permits, 2 are 3 to 5 years old, 8 are 5 to 10 years old, 6 are over 10 years old. 3 were filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 28, 2025 | Completed final sign-off Nov 2025 | 1201 Illinois St | priority - demolish a one story, type 5, office/warehouse building.Details
priority - demolish a one story, type 5, office/warehouse building. | $10,000 |
| Mar 10, 2023 | Completed final sign-off Jul 2023 | 60 Yerba Buena Rd | sffd review only: rev to pa: 201711204456 - revise water line details & layout of waterline connection to (e) water system. added permanent meter & backflow preventor on 2in domestic water service. rev location of proposed fire hydrant.Details
sffd review only: rev to pa: 201711204456 - revise water line details & layout of waterline connection to (e) water system. added permanent meter & backflow preventor on 2in domestic water service. rev location of proposed fire hydrant. | |
| Nov 30, 2022 | Completed final sign-off May 2023 | 236 North Gate Rd | north gate pump station - generator permit in support of puc infrastructure. plans previously reviewed and approved by dpw ahead on installation in filed. permit intended to facilitate fire dept inspection of as-built conditions.Details
north gate pump station - generator permit in support of puc infrastructure. plans previously reviewed and approved by dpw ahead on installation in filed. permit intended to facilitate fire dept inspection of as-built conditions. | |
| Nov 29, 2022 | Completed final sign-off Apr 2023 | 28 Bruton St | fire only review of generator & fuel storage only. bruton st. pump station generator permit in support of puc infrastructure, plans previosly reviewed& approved by dpw ahead of installation in field, permit intended to facilitate fire dept. inspection of as-built conditions.Details
fire only review of generator & fuel storage only. bruton st. pump station generator permit in support of puc infrastructure, plans previosly reviewed& approved by dpw ahead of installation in field, permit intended to facilitate fire dept. inspection of as-built conditions. | |
| Nov 29, 2022 | Never finaled issued Mar 2023, no final | 530 Macalla Rd | macalla rd pump station, generator permit in support of pac infrastructure. plans previously reviewed or approved by dpw. ahead of installation in field, permit intended to facilitate fire dept inspectionDetails
macalla rd pump station, generator permit in support of pac infrastructure. plans previously reviewed or approved by dpw. ahead of installation in field, permit intended to facilitate fire dept inspection | |
| Oct 28, 2022 | Never finaled issued Apr 2023, no final | 1201 Illinois St | mayor ed 13-01/17-02. rev. to pa# 202006198947, modif. to rough grading permit for potrero power station sud on apn 4175-002, 4175-017, 4232-001 & 4232-006. adjustment to specific qualities of the soil to be placed under the future lousiana rd. req'd by sfpuc's pending stormwater control permit &...Details
mayor ed 13-01/17-02. rev. to pa# 202006198947, modif. to rough grading permit for potrero power station sud on apn 4175-002, 4175-017, 4232-001 & 4232-006. adjustment to specific qualities of the soil to be placed under the future lousiana rd. req'd by sfpuc's pending stormwater control permit &... | |
| Apr 7, 2021 | Completed final sign-off Apr 2023 | 325 Yerba Buena Dr | installation of an emergency generator associated with the pump/storage facilities on ybi/ti. ref bpa#2017-0630-0838. project #proj-17-0178Details
installation of an emergency generator associated with the pump/storage facilities on ybi/ti. ref bpa#2017-0630-0838. project #proj-17-0178 | $125,000 |
| Jul 22, 2020 | Expired or cancelled expired Apr 2022 | 1201 Illinois St | bldg# 1-to demolish a 1-story, type 2, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as fire pump house on the dwgs)Details
bldg# 1-to demolish a 1-story, type 2, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as fire pump house on the dwgs) | $19,250 |
| Jul 22, 2020 | Completed final sign-off May 2022 | 1201 Illinois St | bldg# 5-to demolish a 1-story, type 3, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as gas compressor bldg on the dwgs)Details
bldg# 5-to demolish a 1-story, type 3, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as gas compressor bldg on the dwgs) | $82,500 |
| Jul 22, 2020 | Completed final sign-off Feb 2022 | 1201 Illinois St | bldg# 3-to demolish a 1-story, type 2, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as carpenter building on the dwgs)Details
bldg# 3-to demolish a 1-story, type 2, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as carpenter building on the dwgs) | $27,500 |
| Jul 22, 2020 | Completed final sign-off May 2022 | 1201 Illinois St | bldg# 4-to demolish a 1-story, type 3, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as gas meter shop on the dwgs)Details
bldg# 4-to demolish a 1-story, type 3, storage bldg. (total 4 bldgs to be demolished on the lot, this bldg named as gas meter shop on the dwgs) | $16,500 |
| Jul 20, 2020 | Completed final sign-off Feb 2022 | 420 23rd St | bldg# 16-to demolish a type2, 1-story office bldg.(total 5 bldgs to be demolished on the lot, this bldg named as cbc office on the dwgs)Details
bldg# 16-to demolish a type2, 1-story office bldg.(total 5 bldgs to be demolished on the lot, this bldg named as cbc office on the dwgs) | $13,750 |
| Jul 20, 2020 | Completed final sign-off Feb 2022 | 420 23rd St | bldg# 15-to demolish a type 3, 1-story office/electric shop bldg.(total 5 bldgs to be demolished on the lot. this bldg named as electric shot on the dwgs)Details
bldg# 15-to demolish a type 3, 1-story office/electric shop bldg.(total 5 bldgs to be demolished on the lot. this bldg named as electric shot on the dwgs) | $5,500 |
| Jul 20, 2020 | Completed final sign-off Feb 2022 | 420 23rd St | bldg# 18-to demolish a type 2, 1-story storage bldg.(total 5 bldgs to be demolished, this bldg named as abrasive blast blgd on the dwgs)Details
bldg# 18-to demolish a type 2, 1-story storage bldg.(total 5 bldgs to be demolished, this bldg named as abrasive blast blgd on the dwgs) | $27,500 |
| Jul 20, 2020 | Completed final sign-off Feb 2022 | 420 23rd St | bldg# 14-to demolish a type 2, 1-story sotrage bldg.(total 5 bldg to be demolished on the lot. this bldg named as machine shop on the dwgs)Details
bldg# 14-to demolish a type 2, 1-story sotrage bldg.(total 5 bldg to be demolished on the lot. this bldg named as machine shop on the dwgs) | $5,500 |
| Jun 19, 2020 | Completed final sign-off Nov 2025 | 1201 Illinois St | rough grading of proposed structs,alleys,open space & development block area for portion of pps svd on 4175/017 & 4175/002 also incld geo measures of surcharging bay mud within street/deep soil mixing along water front, interim drainage managed erosion sediment control measures will be implemented.*Details
rough grading of proposed structs,alleys,open space & development block area for portion of pps svd on 4175/017 & 4175/002 also incld geo measures of surcharging bay mud within street/deep soil mixing along water front, interim drainage managed erosion sediment control measures will be implemented.* | $8,798,092 |
| May 27, 2020 | Completed final sign-off Nov 2025 | 420 23rd St | rough grading of proposed structs,alleys,open space & development block area for portion of pps svd on 4232/006. also incld geo measures of surcharging bay mud within street/deep soil mixing along water front, interim drainage managed erosion sediment control measures will be implemented.Details
rough grading of proposed structs,alleys,open space & development block area for portion of pps svd on 4232/006. also incld geo measures of surcharging bay mud within street/deep soil mixing along water front, interim drainage managed erosion sediment control measures will be implemented. | $11,357,014 |
| May 11, 2020 | Completed final sign-off May 2023 | 60 Yerba Buena Rd | revision to pa #2018-0201-0178: incorporate site drainageDetails
revision to pa #2018-0201-0178: incorporate site drainage | |
| Feb 14, 2019 | Completed final sign-off Jan 2020 | 1080 Avenue M | demolish treasure island building 216. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.Details
demolish treasure island building 216. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m. | $50,000 |
| Dec 17, 2018 | Completed final sign-off Apr 2023 | 1 Avenue Of The Palms | bldg 243. demolish 1 story shed at 1 ave of palms, treasure islandDetails
bldg 243. demolish 1 story shed at 1 ave of palms, treasure island | $10,000 |
| Dec 17, 2018 | Completed final sign-off Apr 2023 | 1 Avenue Of The Palms | bldg 242t. demolish water tank at 1 ave of palms, treasure islandDetails
bldg 242t. demolish water tank at 1 ave of palms, treasure island | $100,000 |
| Dec 17, 2018 | Completed final sign-off Apr 2023 | 1 Avenue Of The Palms | bldg 261. demolish 1 story shed at 1 ave of palms, treasure islandDetails
bldg 261. demolish 1 story shed at 1 ave of palms, treasure island | $10,000 |
| Jul 3, 2018 | Never finaled filed Jul 2018, never issued | 1080 Avenue M | demolish treasure island buildings 215, 216, 330, 670, 671. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.Details
demolish treasure island buildings 215, 216, 330, 670, 671. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m. | $250,000 |
| Jun 29, 2018 | Never finaled filed Jun 2018, never issued | 1080 Avenue M | demolish treasure island builidngs 215, 216, 330, 670, 671, type vb,3b,1a,1b, warehouse/office vacant building. demolition for preparation of pad for new treasure island wastewater treatment facility.Details
demolish treasure island builidngs 215, 216, 330, 670, 671, type vb,3b,1a,1b, warehouse/office vacant building. demolition for preparation of pad for new treasure island wastewater treatment facility. | $250,000 |
| Feb 14, 2018 | Never finaled issued Mar 2018, no final | 490 Jamestown Av | revision to 201511172873 revision to soil nail wall and temp shoring maher naDetails
revision to 201511172873 revision to soil nail wall and temp shoring maher na | $500,000 |
| Feb 1, 2018 | Completed final sign-off Sep 2022 | 60 Yerba Buena Rd | proj-18-0192, construction of soil nail wall at 301 macalla road.Details
proj-18-0192, construction of soil nail wall at 301 macalla road. | $150,000 |
| Jan 10, 2018 | Completed final sign-off Nov 2021 | 60 Yerba Buena Rd | proj-18-0188. yerba buena island special project. removal of water tank.Details
proj-18-0188. yerba buena island special project. removal of water tank. | $175,000 |
| Aug 16, 2017 | Expired or cancelled cancelled Jan 2026 | 490 Jamestown Av | revision to 201703282573. revisions to grading, plan layout for alice griffith community garden. per eas lot 001 now lot 002Details
revision to 201703282573. revisions to grading, plan layout for alice griffith community garden. per eas lot 001 now lot 002 | |
| Jul 6, 2017 | Never finaled issued Jul 2017, no final | 101 09th Ti St | 101 ninth ave: treasure island: set-up temp construction trailers & hook-up power.Details
101 ninth ave: treasure island: set-up temp construction trailers & hook-up power. | $15,000 |
| Jun 30, 2017 | Completed final sign-off Apr 2023 | 325 Yerba Buena Rd | construct 3 - 1.37mg water tanks, pump station utility vaults, booster pump station, chemical buildig for water supply to ybi/ti. project #proj-17-0178.Details
construct 3 - 1.37mg water tanks, pump station utility vaults, booster pump station, chemical buildig for water supply to ybi/ti. project #proj-17-0178. | $1,500,000 |
| May 8, 2017 | Completed final sign-off Sep 2022 | 60 Yerba Buena Rd | soil nail wall, exavation, grading, utility relocation to accommodate the construction of futher water tanks.Details
soil nail wall, exavation, grading, utility relocation to accommodate the construction of futher water tanks. | $250,000 |
| Mar 28, 2017 | Never finaled issued Mar 2017, no final | 490 Jamestown Av | revision to app#201607071783. revisions to grading, plant layout for alice griffith community garden. per eas lot 001 is now lot 002. n/a for maherDetails
revision to app#201607071783. revisions to grading, plant layout for alice griffith community garden. per eas lot 001 is now lot 002. n/a for maher | |
| Mar 27, 2017 | Completed final sign-off Sep 2017 | 490 Jamestown Av | revision to 201411252500 & 201512185482 & 201605268480: revisions to surcharge limits and heights to accomodate future land use plans for mini-wedge park & fall out #2, stage 1. per eas. lot 001 is now lot 002Details
revision to 201411252500 & 201512185482 & 201605268480: revisions to surcharge limits and heights to accomodate future land use plans for mini-wedge park & fall out #2, stage 1. per eas. lot 001 is now lot 002 | |
| Oct 14, 2016 | Never finaled filed Oct 2016, never issued | 2201 Bay Shore Bl | construction of 240 feet of ultrablock wall. n/a for maher ordinance no.155-13Details
construction of 240 feet of ultrablock wall. n/a for maher ordinance no.155-13 | $120,000 |
| Aug 15, 2016 | Never finaled issued Oct 2016, no final | 2201 Bay Shore Bl | rough grading for future utilities n/a for maher ordinance no.155-13.Details
rough grading for future utilities n/a for maher ordinance no.155-13. | $60,000 |
| Jul 18, 2016 | Never finaled issued Jul 2016, no final | 2201 Bay Shore Bl | revision to 201604195141: change to direction of retaining wall, southern termination of wall. maher on previous permitDetails
revision to 201604195141: change to direction of retaining wall, southern termination of wall. maher on previous permit | |
| Jul 7, 2016 | Never finaled issued Dec 2016, no final | 490 Jamestown Av | grading. ** maher: disturbance of at least 50 cu.yd of soil, route to dph **Details
grading. ** maher: disturbance of at least 50 cu.yd of soil, route to dph ** | $450,000 |
| Apr 19, 2016 | Never finaled issued May 2016, no final | 2201 Bay Shore Bl | construction of 2 retaining walls - cast in place concrete and versa-lok wall. cast in place wall is 315 feet long and versa lock is 324 feet long. guard rail installed for total length of wall. maher reqDetails
construction of 2 retaining walls - cast in place concrete and versa-lok wall. cast in place wall is 315 feet long and versa lock is 324 feet long. guard rail installed for total length of wall. maher req | $750,000 |
| Apr 11, 2016 | Never finaled issued Apr 2016, no final | 2201 Bay Shore Bl | site clearing of vegetation and preparing for future grading work. no soil import or exportDetails
site clearing of vegetation and preparing for future grading work. no soil import or export | $28,000 |
| Apr 8, 2016 | Never finaled issued Apr 2016, no final | 2445 Bay Shore Bl | to complete work and to obtain final inspection for work approved under pa# 200907172928.Details
to complete work and to obtain final inspection for work approved under pa# 200907172928. | $517,000 |
| Apr 8, 2016 | Never finaled issued Apr 2016, no final | 220 Tunnel Av | to complete work and to obtain final inspection for work approved under pa# 200907172930.Details
to complete work and to obtain final inspection for work approved under pa# 200907172930. | $147,000 |
| Nov 17, 2015 | Never finaled issued Dec 2015, no final | 490 Jamestown Av | construction of permanent soil nail wall (retaining wall). maher naDetails
construction of permanent soil nail wall (retaining wall). maher na | $3,300,000 |