Block 1939, lot 006
651 08th Ti St #bldg 229
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
24 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 8, 2025 | Completed final sign-off Apr 2026 | 849 Avenue D | Cabre Tech Solutions Inc | install 6 new antennas on pole. install 6 radios, install 2 cabinets, remove existing panel antennas, remove 1 cabinet existing.Details
install 6 new antennas on pole. install 6 radios, install 2 cabinets, remove existing panel antennas, remove 1 cabinet existing. | $25,000 |
| Feb 20, 2025 | In progress issued Feb 2025 | 449 Avenue H | Ferma Corporation | interior non structural demo per ab-017 bldg 258Details
interior non structural demo per ab-017 bldg 258 | $25,000 |
| May 23, 2024 | Completed final sign-off Aug 2024 | 1204 Mariner Dr | Cal C A D E Construction Inc | unit d: install insulation + sheetrock after fire damage to unit., install plumbing appliances in the same spots as before fire. reparir exterior siding in kind. no layout change - only remodel. maintain fire ratingDetails
unit d: install insulation + sheetrock after fire damage to unit., install plumbing appliances in the same spots as before fire. reparir exterior siding in kind. no layout change - only remodel. maintain fire rating | $25,000 |
| May 23, 2024 | Completed final sign-off Aug 2024 | 1204 Mariner Dr | Cal C A D E Construction Inc | unit c: install insulation + sheetrock after fire damage to unit., install plumbing appliances in the same spots as before fire. repair exterior siding in kind. no layout change - only remodel. maintain fire ratingDetails
unit c: install insulation + sheetrock after fire damage to unit., install plumbing appliances in the same spots as before fire. repair exterior siding in kind. no layout change - only remodel. maintain fire rating | $50,000 |
| Feb 1, 2023 | Never finaled issued Apr 2023, no final | 470 Avenue H | Ace Drilling & Excavation | asbestos removal from interior walls, floors, and ceilingDetails
asbestos removal from interior walls, floors, and ceiling | $20,000 |
| Nov 10, 2022 | Expired or cancelled cancelled Jan 2026 | 30 Avenue G | Galaxy Services Dba Galaxy Heating & Air | address: 351 avenue h, sf ca : replacement of 2 ductless heat pumps (1 indoor & 2 outdoor), install of 3 new heat pumps (1 outdoor & 2 indoor), replacement of 4 ductless heat pumps (3 indoor & 1 outdoor), install of 5 new heatpumps (1 outdoor & 4 indoors).Details
address: 351 avenue h, sf ca : replacement of 2 ductless heat pumps (1 indoor & 2 outdoor), install of 3 new heat pumps (1 outdoor & 2 indoor), replacement of 4 ductless heat pumps (3 indoor & 1 outdoor), install of 5 new heatpumps (1 outdoor & 4 indoors). | $20,000 |
| Sep 9, 2022 | Never finaled issued Sep 2022, no final | 849 13th Ti St | Cosco Fire Protection Inc. | treasure island, building 62, 849 13th street: upgrading the (e) fire alarm system. replacing the (e) pressure valve switches with new waterflow switches and replacing the (e) waterflow bell with new exterior horn strobeDetails
treasure island, building 62, 849 13th street: upgrading the (e) fire alarm system. replacing the (e) pressure valve switches with new waterflow switches and replacing the (e) waterflow bell with new exterior horn strobe | $20,000 |
| May 27, 2022 | Expired or cancelled cancelled Jan 2026 | 849 Avenue D | upgrade current equiptment wash area to food prep area, permit outdoor tasting room with food serviceDetails
upgrade current equiptment wash area to food prep area, permit outdoor tasting room with food service | $7,000 | |
| Apr 26, 2022 | Completed final sign-off Sep 2023 | 470 Avenue H | Ace Drilling & Excavation | treasure island. building# 99. to demolish 1 story commercial building.Details
treasure island. building# 99. to demolish 1 story commercial building. | $100,000 |
| Jul 15, 2021 | Never finaled issued Sep 2021, no final | 849 Avenue D | Yupana Inc | replace (3) antennas replace (3) rru radio units, replace (1) surge protector, replace (1) hybrid cable. at base: replace (1) surge proectorDetails
replace (3) antennas replace (3) rru radio units, replace (1) surge protector, replace (1) hybrid cable. at base: replace (1) surge proector | $73,500 |
| Jul 14, 2021 | Never finaled issued Sep 2021, no final | 600 California Av | Yupana Inc | verizon: modify an existing wireless comm. facility. replace 3 antennas, 4 surge protectors, 8 rrus. relocate 1 rru, remove 7 rrus. replace 4 hybrid cables. at base station, replace 4 surge protectors.Details
verizon: modify an existing wireless comm. facility. replace 3 antennas, 4 surge protectors, 8 rrus. relocate 1 rru, remove 7 rrus. replace 4 hybrid cables. at base station, replace 4 surge protectors. | $86,500 |
| Aug 6, 2020 | Completed final sign-off Sep 2020 | 651 08th Ti St | Skylor Construction Dba Skycore Constr | kitchen (~30'x20') : remove old/stained and damaged frp board (~15'x7') on walls and replace with same kind. repair broken floor tile. install new kitchen prep and hand washing sink. install new dink drain basket. update to proper size gas pipe. install gas earthquake valve. all work in kind.Details
kitchen (~30'x20') : remove old/stained and damaged frp board (~15'x7') on walls and replace with same kind. repair broken floor tile. install new kitchen prep and hand washing sink. install new dink drain basket. update to proper size gas pipe. install gas earthquake valve. all work in kind. | $5,500 |
| Jun 24, 2020 | Completed final sign-off Sep 2020 | 849 13th Ti St | Cal C A D E Construction Inc | bldg #62: demo of illegally built interior wall.Details
bldg #62: demo of illegally built interior wall. | $30,000 |
| Dec 24, 2019 | Expired or cancelled cancelled Dec 2022 | 651 08th Ti St | remove walkin fridges and elevated floor areas, renovate kitchen with new equipment, nw walkin, new mep. add one wall and door. relocate restroom sink and reverse door swing for ada compliance.Details
remove walkin fridges and elevated floor areas, renovate kitchen with new equipment, nw walkin, new mep. add one wall and door. relocate restroom sink and reverse door swing for ada compliance. | $102,808 | |
| Oct 3, 2019 | Never finaled issued Oct 2019, no final | 600 California Av | street spaceDetails
street space | ||
| Mar 22, 2019 | Expired or cancelled cancelled Jan 2026 | 401 13th Ti St | bldg a: change of occupancy classification from e to a-3 for 1 room wihin building b. room has already been approved by fire captain mary tse for max occupancy of 226. no work recalculated occupant load established at 267Details
bldg a: change of occupancy classification from e to a-3 for 1 room wihin building b. room has already been approved by fire captain mary tse for max occupancy of 226. no work recalculated occupant load established at 267 | ||
| Mar 22, 2019 | Expired or cancelled cancelled Jan 2026 | 401 13th Ti St | change of occupancy classification from e to a-2 for 1 room wihin building b. room has already been approved by fire captain mary tse for max occupancy of 99. no workDetails
change of occupancy classification from e to a-2 for 1 room wihin building b. room has already been approved by fire captain mary tse for max occupancy of 99. no work | ||
| Feb 14, 2019 | Completed final sign-off Jan 2020 | 1080 Avenue M | Ampco North Inc | demolish treasure island building 670. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.Details
demolish treasure island building 670. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m. | $50,000 |
| Feb 14, 2019 | Completed final sign-off Jan 2020 | 1080 Avenue M | Ampco North Inc | demolish treasure island building 330. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.Details
demolish treasure island building 330. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m. | $50,000 |
| Feb 14, 2019 | Completed final sign-off Jan 2020 | 1080 Avenue M | Ampco North Inc | demolish treasure island building 215. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.Details
demolish treasure island building 215. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m. | $50,000 |
| Feb 14, 2019 | Completed final sign-off Jan 2020 | 1080 Avenue M | Ampco North Inc | demolish treasure island building 671. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.Details
demolish treasure island building 671. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m. | $50,000 |
| Feb 14, 2019 | Completed final sign-off Jan 2020 | 1080 Avenue M | Ampco North Inc, De Silva Gates Construction | demolish treasure island building 216. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m.Details
demolish treasure island building 216. type v-b, 3-b, 1-a, 1-b. warehouse/office vacant building demolition for preparation of pad for new treasure island waste water treatment facility. 850 10th st, 880 ave m, 950 ave n, 1080 ave m. | $50,000 |
| Nov 15, 2017 | Completed final sign-off Nov 2017 | 30 Avenue G | revision to pa 2017-1020-1800 - add existing deck to occupant loadDetails
revision to pa 2017-1020-1800 - add existing deck to occupant load | ||
| Oct 20, 2017 | Completed final sign-off Nov 2017 | 30 Avenue G | adminstrative permit to obtain assembly permit for fire department. no constructionDetails
adminstrative permit to obtain assembly permit for fire department. no construction |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Ampco North Inc (5), Cal C A D E Construction Inc (3), Ace Drilling & Excavation (2), Yupana Inc (2), Cabre Tech Solutions Inc, Cosco Fire Protection Inc., De Silva Gates Construction, Ferma Corporation, Galaxy Services Dba Galaxy Heating & Air, Skylor Construction Dba Skycore Constr
- Architects
- Eric Zamb (2), Walter Alfaro (2), Katy Briggs
- Engineers
- Tomas R. Morse (5), Glen Hunt
- Authorized agent-otherss
- Behzad Khosrowmoabed
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.