38 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 27, 2026 | In progress issued May 2026 | 1212 Maryland St | Swinerton Builders | deferred mep for permit 202601304958.Details
deferred mep for permit 202601304958. | |
| Jan 30, 2026 | In progress issued Mar 2026 | 1212 Maryland St | Swinerton Builders | tenant improvement at ground fl of the sophie maxwell building. work includes buildout of retail display area, showroom, sales center, bathroom, support spaces.Details
tenant improvement at ground fl of the sophie maxwell building. work includes buildout of retail display area, showroom, sales center, bathroom, support spaces. | $225,000 |
| Sep 16, 2025 | Completed final sign-off Aug 2026 | 1212 Maryland St | Swinerton Builders | revision to mep drawings 202212229038 to update t-24 compliance forms & hers testingDetails
revision to mep drawings 202212229038 to update t-24 compliance forms & hers testing | |
| Aug 1, 2025 | In progress issued Aug 2025 | 1212 Maryland St | De Silva Gates Construction Llc | temp parking lot to serve housing development (sophie maxwell building). will provide 63 parking spaces w/ fencing , all access gate & an artificial turf area designed for dog use.Details
temp parking lot to serve housing development (sophie maxwell building). will provide 63 parking spaces w/ fencing , all access gate & an artificial turf area designed for dog use. | $20,000 |
| Mar 25, 2025 | Completed final sign-off Aug 2026 | 1212 Maryland St | Swinerton Builders | revision to arch and mep drawings for 2 hours fire resistive riser. ref pa# 202212229038 s5.Details
revision to arch and mep drawings for 2 hours fire resistive riser. ref pa# 202212229038 s5. | $2,000 |
| Mar 19, 2025 | Completed final sign-off Sep 2025 | 1212 Maryland St | Swinerton Builders | priority 100% affordable housing: twenty-six (26) evacuation maps for levels 1 thru 8, plus a roof terrace. reference site permit pa# 202212229038.Details
priority 100% affordable housing: twenty-six (26) evacuation maps for levels 1 thru 8, plus a roof terrace. reference site permit pa# 202212229038. | $5,000 |
| Jan 3, 2025 | Completed final sign-off Aug 2026 | 1212 Maryland St | Swinerton Builders | revision to arch & mep drawings for boa/electrical room ratings ref pa 202212229038s5Details
revision to arch & mep drawings for boa/electrical room ratings ref pa 202212229038s5 | |
| Apr 1, 2024 | Completed final sign-off Aug 2026 | 1212 Maryland St | Swinerton Builders | priority per ab-004. tower crane erection for contruction of project,tower crane dismantleDetails
priority per ab-004. tower crane erection for contruction of project,tower crane dismantle | $888,000 |
| Jan 30, 2024 | Completed final sign-off Sep 2025 | 1212 Maryland St | Value Fire Protection Inc | install 6" underground fire line. point of connection at street curb left off by water dept. ref site# 202212229038. fire sprinklers under addenda.Details
install 6" underground fire line. point of connection at street curb left off by water dept. ref site# 202212229038. fire sprinklers under addenda. | $5,000 |
| Jan 2, 2024 | Completed final sign-off Dec 2024 | 420 23rd St | Brandenburg Industrial Service Company | revision to 202305057250 due field condition for additional details for resupport of e walkways south of existing control roomDetails
revision to 202305057250 due field condition for additional details for resupport of e walkways south of existing control room | $7,000 |
| Nov 16, 2023 | In progress filed Nov 2023, not yet issued | 420 23rd St | Brandenburg Industrial Service Company | added demo scope to pa# 202308305599Details
added demo scope to pa# 202308305599 | $80,000 |
| Oct 2, 2023 | In progress issued Nov 2023 | 211 Humboldt St | per enc request, created address 211 humboldt st, 1201, 1212 maryland st at apn 4232/006.Details
per enc request, created address 211 humboldt st, 1201, 1212 maryland st at apn 4232/006. | ||
| Aug 30, 2023 | Completed final sign-off Oct 2024 | 420 23rd St | Brandenburg Industrial Service Company | select demolition includes removal of selected concrete walls to create (n) openins thru (e) concrete turbine platform.Details
select demolition includes removal of selected concrete walls to create (n) openins thru (e) concrete turbine platform. | $200,000 |
| Jun 27, 2023 | Completed final sign-off Feb 2024 | 420 23rd St | Pullman Power Llc | mayoral ed-17-02: removal of interior flum gas exhaust duct, typically referred to as chimney liver, & water tank structure inside of chimney. all nonstructural demo.Details
mayoral ed-17-02: removal of interior flum gas exhaust duct, typically referred to as chimney liver, & water tank structure inside of chimney. all nonstructural demo. | $180,000 |
| May 5, 2023 | Completed final sign-off May 2024 | 420 23rd St | Brandenburg Industrial Service Company | mayoral ed-17-02 removal of existing concrete encased partial steel control room building to slab on grade. 2. floating concrete slab connecting control room back to turbine platform. per ab-017.Details
mayoral ed-17-02 removal of existing concrete encased partial steel control room building to slab on grade. 2. floating concrete slab connecting control room back to turbine platform. per ab-017. | $30,000 |
| May 5, 2023 | Completed final sign-off May 2024 | 420 23rd St | Brandenburg Industrial Service Company | unit 3 bldg - mayoral ed 17-02. removal (e) steel boiler unit, and all associated non-structral equipment. a condenser unit, three intake pumps cooking water heat exchanger per ab-017Details
unit 3 bldg - mayoral ed 17-02. removal (e) steel boiler unit, and all associated non-structral equipment. a condenser unit, three intake pumps cooking water heat exchanger per ab-017 | $600,000 |
| May 4, 2023 | Completed final sign-off Jun 2024 | 420 23rd St | Brandenburg Industrial Service Company | mayoral ed-17-02: removal of cutout demo of (e) office building only non-structurl demo to remove partitions within building, removal of rooftop locker wash house room located on top of office building roofDetails
mayoral ed-17-02: removal of cutout demo of (e) office building only non-structurl demo to remove partitions within building, removal of rooftop locker wash house room located on top of office building roof | $40,000 |
| Apr 3, 2023 | Never finaled issued Jun 2023, no final | 420 23rd St | De Silva Gates Construction Llc | mayor ed 13-01/17-02 priority permit: street improvements of the phase 1 potrero power station project that are on private property (23rd st, craig ln, & louisiana st). this is a subset of the drawings that were already reviewed & approved by task force, under city of sf permit 221e-005511.Details
mayor ed 13-01/17-02 priority permit: street improvements of the phase 1 potrero power station project that are on private property (23rd st, craig ln, & louisiana st). this is a subset of the drawings that were already reviewed & approved by task force, under city of sf permit 221e-005511. | |
| Dec 22, 2022 | Completed final sign-off Aug 2026 | 1212 Maryland St | Swinerton Builders | mayor dir 13-01 & 17-02 priority project: erect a 8-story, type 1b, residential/mixed use building, with 105 residential units, retail, assembly, office. (block 7b)Details
mayor dir 13-01 & 17-02 priority project: erect a 8-story, type 1b, residential/mixed use building, with 105 residential units, retail, assembly, office. (block 7b) | $35,000,000 |
| Oct 28, 2022 | Never finaled issued Apr 2023, no final | 420 23rd St | mayor ed 13-01/17-02. rev. to pa# 202005277886, modif. to rough grading permit for potrero power station sud on apn 4175-002, 4175-017, 4232-001 & 4232-006. adjustment to specific qualities of the soil to be placed under the future lousiana rd. req'd by sfpuc's pending stormwater control permit &...Details
mayor ed 13-01/17-02. rev. to pa# 202005277886, modif. to rough grading permit for potrero power station sud on apn 4175-002, 4175-017, 4232-001 & 4232-006. adjustment to specific qualities of the soil to be placed under the future lousiana rd. req'd by sfpuc's pending stormwater control permit &... | ||
| Jan 7, 2021 | Expired or cancelled cancelled Jan 2026 | 420 23rd St | Plant Construction Co, Lp | 2nd fl: select demolition, construction of new interior walls, finishes, and lighting. mep under a separate permit.Details
2nd fl: select demolition, construction of new interior walls, finishes, and lighting. mep under a separate permit. | $25,000 |
| Dec 23, 2020 | Expired or cancelled cancelled Jan 2026 | 420 23rd St | Plant Construction Co, Lp | select demolition, construction of new interior walls, finishes, lighting. mechanical, electrical, plumbing to be submitted under a separate permitDetails
select demolition, construction of new interior walls, finishes, lighting. mechanical, electrical, plumbing to be submitted under a separate permit | $25,000 |
| Aug 31, 2020 | Never finaled filed Aug 2020, never issued | 420 23rd St | rough grading of open space area for portion of pps sud on port of sf property. the activities will also include the geotechnical measures of deep soil mixing along the waterfront. interim drainage will be managed and erosion and sediment control measures will be implemented.Details
rough grading of open space area for portion of pps sud on port of sf property. the activities will also include the geotechnical measures of deep soil mixing along the waterfront. interim drainage will be managed and erosion and sediment control measures will be implemented. | $816,325 | |
| Jul 20, 2020 | Completed final sign-off Feb 2022 | 420 23rd St | De Silva Gates Construction | bldg# 16-to demolish a type2, 1-story office bldg.(total 5 bldgs to be demolished on the lot, this bldg named as cbc office on the dwgs)Details
bldg# 16-to demolish a type2, 1-story office bldg.(total 5 bldgs to be demolished on the lot, this bldg named as cbc office on the dwgs) | $13,750 |
| Jul 20, 2020 | Completed final sign-off Feb 2022 | 420 23rd St | De Silva Gates Construction | bldg# 15-to demolish a type 3, 1-story office/electric shop bldg.(total 5 bldgs to be demolished on the lot. this bldg named as electric shot on the dwgs)Details
bldg# 15-to demolish a type 3, 1-story office/electric shop bldg.(total 5 bldgs to be demolished on the lot. this bldg named as electric shot on the dwgs) | $5,500 |
| Jul 20, 2020 | Completed final sign-off May 2021 | 420 23rd St | Plant Construction Co, Lp | bldg# 12-to demolish a type 3b, 1-story currently unoccupied bldg.(total 5 bldgs to be demolished on this lot, this bldg named as station a gate house on the dwgs)Details
bldg# 12-to demolish a type 3b, 1-story currently unoccupied bldg.(total 5 bldgs to be demolished on this lot, this bldg named as station a gate house on the dwgs) | $2,750 |
| Jul 20, 2020 | Completed final sign-off Feb 2022 | 420 23rd St | De Silva Gates Construction | bldg# 18-to demolish a type 2, 1-story storage bldg.(total 5 bldgs to be demolished, this bldg named as abrasive blast blgd on the dwgs)Details
bldg# 18-to demolish a type 2, 1-story storage bldg.(total 5 bldgs to be demolished, this bldg named as abrasive blast blgd on the dwgs) | $27,500 |
| Jul 20, 2020 | Completed final sign-off Feb 2022 | 420 23rd St | De Silva Gates Construction | bldg# 14-to demolish a type 2, 1-story sotrage bldg.(total 5 bldg to be demolished on the lot. this bldg named as machine shop on the dwgs)Details
bldg# 14-to demolish a type 2, 1-story sotrage bldg.(total 5 bldg to be demolished on the lot. this bldg named as machine shop on the dwgs) | $5,500 |
| May 27, 2020 | Completed final sign-off Nov 2025 | 420 23rd St | De Silva Gates Construction | rough grading of proposed structs,alleys,open space & development block area for portion of pps svd on 4232/006. also incld geo measures of surcharging bay mud within street/deep soil mixing along water front, interim drainage managed erosion sediment control measures will be implemented.Details
rough grading of proposed structs,alleys,open space & development block area for portion of pps svd on 4232/006. also incld geo measures of surcharging bay mud within street/deep soil mixing along water front, interim drainage managed erosion sediment control measures will be implemented. | $11,357,014 |
| Apr 19, 2017 | Never finaled issued Apr 2017, no final | 420 23rd St | per request form california barrel company, at block 4232, lot 006, create new address as; 420 3rd streetDetails
per request form california barrel company, at block 4232, lot 006, create new address as; 420 3rd street | ||
| Mar 10, 2017 | Never finaled issued Jun 2017, no final | 1301 Illinois St | American Integrated Services Inc, Haley & Aldrich Construction Services | soil remediation:remove (e)utilities&buried strucs,excavate soil to 5-8' below grd surface,in-site soil solidification,remove&cap a sec of abandoned undergrd concrete intake pipe,backfill w/clean imported fill,&instl&/or repair durable covers crushed stone,or asphalt pavement.elec&plum sep.Details
soil remediation:remove (e)utilities&buried strucs,excavate soil to 5-8' below grd surface,in-site soil solidification,remove&cap a sec of abandoned undergrd concrete intake pipe,backfill w/clean imported fill,&instl&/or repair durable covers crushed stone,or asphalt pavement.elec&plum sep. | $5,448,339 |
| Mar 16, 2015 | Completed final sign-off Dec 2015 | 1301 Illinois St | Centric Construction Inc | to erect new storage shedDetails
to erect new storage shed | $25,000 |
| Feb 18, 2015 | Expired or cancelled cancelled Mar 2020 | 1301 Illinois St | Centric Construction Inc | construct new 1-story, no basement, office building.Details
construct new 1-story, no basement, office building. | $29,395 |
| Sep 17, 2014 | Completed final sign-off Dec 2015 | 1301 Illinois St | Centric Construction Inc | to erect 1 story, no basement, type ii, solar canopy. no occupancy under. ** maher: compliance with ordinance no# 155-13 not required **Details
to erect 1 story, no basement, type ii, solar canopy. no occupancy under. ** maher: compliance with ordinance no# 155-13 not required ** | $50,000 |
| Sep 11, 2014 | Completed final sign-off Jun 2015 | 1301 Illinois St | Centric Construction Inc | temporary foundation for the exhibition structure.; maher n/aDetails
temporary foundation for the exhibition structure.; maher n/a | $88,000 |
| Aug 7, 2013 | Never finaled issued Aug 2013, no final | 1301 Illinois St | Pacific Auxiliary Fire Alarm | installation of new voluntary fire alarm system, ref pa #2013.06.21.0243Details
installation of new voluntary fire alarm system, ref pa #2013.06.21.0243 | $11,000 |
| Jun 21, 2013 | Completed final sign-off Dec 2013 | 1301 Illinois St | Centric Construction Inc | office tenant improvement. 2 new accessible restrooms, 2 new accessible parking spots, new glazing and glazing upgrades, new elec distribution. lighting upgrades, new ceiling fans, new coffee room with sink, dishwasher, and refrigeratorDetails
office tenant improvement. 2 new accessible restrooms, 2 new accessible parking spots, new glazing and glazing upgrades, new elec distribution. lighting upgrades, new ceiling fans, new coffee room with sink, dishwasher, and refrigerator | $270,000 |
| May 31, 2013 | Never finaled issued May 2013, no final | 1301 Illinois St | correct address on pa #9104810, building is at blk 4232, lot 006 as 1301 a illinois st. previous record at 1201 illions st at blk 4175, lot 003 was wrong parcel.Details
correct address on pa #9104810, building is at blk 4232, lot 006 as 1301 a illinois st. previous record at 1201 illions st at blk 4175, lot 003 was wrong parcel. |