Permit GraphShortlistSan Francisco building permits since 2000

Block 4232, lot 006

211 Humboldt St

The city’s assessor roll has no record for this parcel.

Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

38 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Mar 27, 2026In progress
issued May 2026
1212 Maryland StSwinerton Buildersdeferred mep for permit 202601304958.
Details
Permit
202603278461
Permit issued
May 8, 2026

deferred mep for permit 202601304958.

Open the permit page

Jan 30, 2026In progress
issued Mar 2026
1212 Maryland StSwinerton Builderstenant improvement at ground fl of the sophie maxwell building. work includes buildout of retail display area, showroom, sales center, bathroom, support spaces.
Details
Permit
202601304958
Permit issued
Mar 27, 2026

tenant improvement at ground fl of the sophie maxwell building. work includes buildout of retail display area, showroom, sales center, bathroom, support spaces.

Open the permit page

$225,000
Sep 16, 2025Completed
final sign-off Aug 2026
1212 Maryland StSwinerton Buildersrevision to mep drawings 202212229038 to update t-24 compliance forms & hers testing
Details
Permit
202509165370
Permit issued
Sep 16, 2025
Final sign-off
Aug 28, 2026

revision to mep drawings 202212229038 to update t-24 compliance forms & hers testing

Open the permit page

Aug 1, 2025In progress
issued Aug 2025
1212 Maryland StDe Silva Gates Construction Llctemp parking lot to serve housing development (sophie maxwell building). will provide 63 parking spaces w/ fencing , all access gate & an artificial turf area designed for dog use.
Details
Permit
202508012157
Permit issued
Aug 25, 2025

temp parking lot to serve housing development (sophie maxwell building). will provide 63 parking spaces w/ fencing , all access gate & an artificial turf area designed for dog use.

Open the permit page

$20,000
Mar 25, 2025Completed
final sign-off Aug 2026
1212 Maryland StSwinerton Buildersrevision to arch and mep drawings for 2 hours fire resistive riser. ref pa# 202212229038 s5.
Details
Permit
202503253002
Permit issued
Mar 27, 2025
Final sign-off
Aug 28, 2026

revision to arch and mep drawings for 2 hours fire resistive riser. ref pa# 202212229038 s5.

Open the permit page

$2,000
Mar 19, 2025Completed
final sign-off Sep 2025
1212 Maryland StSwinerton Builderspriority 100% affordable housing: twenty-six (26) evacuation maps for levels 1 thru 8, plus a roof terrace. reference site permit pa# 202212229038.
Details
Permit
202503182441
Permit issued
May 1, 2025
Final sign-off
Sep 17, 2025

priority 100% affordable housing: twenty-six (26) evacuation maps for levels 1 thru 8, plus a roof terrace. reference site permit pa# 202212229038.

Open the permit page

$5,000
Jan 3, 2025Completed
final sign-off Aug 2026
1212 Maryland StSwinerton Buildersrevision to arch & mep drawings for boa/electrical room ratings ref pa 202212229038s5
Details
Permit
202501037717
Permit issued
Jan 13, 2025
Final sign-off
Aug 28, 2026

revision to arch & mep drawings for boa/electrical room ratings ref pa 202212229038s5

Open the permit page

Apr 1, 2024Completed
final sign-off Aug 2026
1212 Maryland StSwinerton Builderspriority per ab-004. tower crane erection for contruction of project,tower crane dismantle
Details
Permit
202403137665
Permit issued
Jun 14, 2024
Final sign-off
Aug 28, 2026

priority per ab-004. tower crane erection for contruction of project,tower crane dismantle

Open the permit page

$888,000
Jan 30, 2024Completed
final sign-off Sep 2025
1212 Maryland StValue Fire Protection Incinstall 6" underground fire line. point of connection at street curb left off by water dept. ref site# 202212229038. fire sprinklers under addenda.
Details
Permit
202401304897
Permit issued
Feb 14, 2024
Final sign-off
Sep 17, 2025

install 6" underground fire line. point of connection at street curb left off by water dept. ref site# 202212229038. fire sprinklers under addenda.

Open the permit page

$5,000
Jan 2, 2024Completed
final sign-off Dec 2024
420 23rd StBrandenburg Industrial Service Companyrevision to 202305057250 due field condition for additional details for resupport of e walkways south of existing control room
Details
Permit
202401023318
Permit issued
Jan 5, 2024
Final sign-off
Dec 2, 2024

revision to 202305057250 due field condition for additional details for resupport of e walkways south of existing control room

Open the permit page

$7,000
Nov 16, 2023Never finaled
filed Nov 2023, never issued
420 23rd StBrandenburg Industrial Service Companyadded demo scope to pa# 202308305599
Details
Permit
202311160960

added demo scope to pa# 202308305599

Open the permit page

$80,000
Oct 2, 2023In progress
issued Nov 2023
211 Humboldt Stper enc request, created address 211 humboldt st, 1201, 1212 maryland st at apn 4232/006.
Details
Permit
M1231927
Permit issued
Nov 21, 2023

per enc request, created address 211 humboldt st, 1201, 1212 maryland st at apn 4232/006.

Open the permit page

Aug 30, 2023Completed
final sign-off Oct 2024
420 23rd StBrandenburg Industrial Service Companyselect demolition includes removal of selected concrete walls to create (n) openins thru (e) concrete turbine platform.
Details
Permit
202308305599
Permit issued
Sep 14, 2023
Final sign-off
Oct 31, 2024

select demolition includes removal of selected concrete walls to create (n) openins thru (e) concrete turbine platform.

Open the permit page

$200,000
Jun 27, 2023Completed
final sign-off Feb 2024
420 23rd StPullman Power Llcmayoral ed-17-02: removal of interior flum gas exhaust duct, typically referred to as chimney liver, & water tank structure inside of chimney. all nonstructural demo.
Details
Permit
202306270985
Permit issued
Sep 5, 2023
Final sign-off
Feb 16, 2024

mayoral ed-17-02: removal of interior flum gas exhaust duct, typically referred to as chimney liver, & water tank structure inside of chimney. all nonstructural demo.

Open the permit page

$180,000
May 5, 2023Completed
final sign-off May 2024
420 23rd StBrandenburg Industrial Service Companymayoral ed-17-02 removal of existing concrete encased partial steel control room building to slab on grade. 2. floating concrete slab connecting control room back to turbine platform. per ab-017.
Details
Permit
202305057250
Permit issued
Jun 12, 2023
Final sign-off
May 28, 2024

mayoral ed-17-02 removal of existing concrete encased partial steel control room building to slab on grade. 2. floating concrete slab connecting control room back to turbine platform. per ab-017.

Open the permit page

$30,000
May 5, 2023Completed
final sign-off May 2024
420 23rd StBrandenburg Industrial Service Companyunit 3 bldg - mayoral ed 17-02. removal (e) steel boiler unit, and all associated non-structral equipment. a condenser unit, three intake pumps cooking water heat exchanger per ab-017
Details
Permit
202305057239
Permit issued
Jun 12, 2023
Final sign-off
May 28, 2024

unit 3 bldg - mayoral ed 17-02. removal (e) steel boiler unit, and all associated non-structral equipment. a condenser unit, three intake pumps cooking water heat exchanger per ab-017

Open the permit page

$600,000
May 4, 2023Completed
final sign-off Jun 2024
420 23rd StBrandenburg Industrial Service Companymayoral ed-17-02: removal of cutout demo of (e) office building only non-structurl demo to remove partitions within building, removal of rooftop locker wash house room located on top of office building roof
Details
Permit
202305047141
Permit issued
May 18, 2023
Final sign-off
Jun 24, 2024

mayoral ed-17-02: removal of cutout demo of (e) office building only non-structurl demo to remove partitions within building, removal of rooftop locker wash house room located on top of office building roof

Open the permit page

$40,000
Apr 3, 2023Never finaled
issued Jun 2023, no final
420 23rd StDe Silva Gates Construction Llcmayor ed 13-01/17-02 priority permit: street improvements of the phase 1 potrero power station project that are on private property (23rd st, craig ln, & louisiana st). this is a subset of the drawings that were already reviewed & approved by task force, under city of sf permit 221e-005511.
Details
Permit
202304034936
Permit issued
Jun 23, 2023

mayor ed 13-01/17-02 priority permit: street improvements of the phase 1 potrero power station project that are on private property (23rd st, craig ln, & louisiana st). this is a subset of the drawings that were already reviewed & approved by task force, under city of sf permit 221e-005511.

Open the permit page

Dec 22, 2022Completed
final sign-off Aug 2026
1212 Maryland StSwinerton Buildersmayor dir 13-01 & 17-02 priority project: erect a 8-story, type 1b, residential/mixed use building, with 105 residential units, retail, assembly, office. (block 7b)
Details
Permit
202212229038
Permit issued
Oct 25, 2023
Final sign-off
Aug 28, 2026

mayor dir 13-01 & 17-02 priority project: erect a 8-story, type 1b, residential/mixed use building, with 105 residential units, retail, assembly, office. (block 7b)

Open the permit page

$35,000,000
Oct 28, 2022Never finaled
issued Apr 2023, no final
420 23rd Stmayor ed 13-01/17-02. rev. to pa# 202005277886, modif. to rough grading permit for potrero power station sud on apn 4175-002, 4175-017, 4232-001 & 4232-006. adjustment to specific qualities of the soil to be placed under the future lousiana rd. req'd by sfpuc's pending stormwater control permit &...
Details
Permit
202210285409
Permit issued
Apr 20, 2023

mayor ed 13-01/17-02. rev. to pa# 202005277886, modif. to rough grading permit for potrero power station sud on apn 4175-002, 4175-017, 4232-001 & 4232-006. adjustment to specific qualities of the soil to be placed under the future lousiana rd. req'd by sfpuc's pending stormwater control permit &...

Open the permit page

Jan 7, 2021Expired or cancelled
cancelled Jan 2026
420 23rd StPlant Construction Co, Lp2nd fl: select demolition, construction of new interior walls, finishes, and lighting. mep under a separate permit.
Details
Permit
202101072276

2nd fl: select demolition, construction of new interior walls, finishes, and lighting. mep under a separate permit.

Open the permit page

$25,000
Dec 23, 2020Expired or cancelled
cancelled Jan 2026
420 23rd StPlant Construction Co, Lpselect demolition, construction of new interior walls, finishes, lighting. mechanical, electrical, plumbing to be submitted under a separate permit
Details
Permit
202012231614

select demolition, construction of new interior walls, finishes, lighting. mechanical, electrical, plumbing to be submitted under a separate permit

Open the permit page

$25,000
Aug 31, 2020Never finaled
filed Aug 2020, never issued
420 23rd Strough grading of open space area for portion of pps sud on port of sf property. the activities will also include the geotechnical measures of deep soil mixing along the waterfront. interim drainage will be managed and erosion and sediment control measures will be implemented.
Details
Permit
202008312988

rough grading of open space area for portion of pps sud on port of sf property. the activities will also include the geotechnical measures of deep soil mixing along the waterfront. interim drainage will be managed and erosion and sediment control measures will be implemented.

Open the permit page

$816,325
Jul 20, 2020Completed
final sign-off Feb 2022
420 23rd StDe Silva Gates Constructionbldg# 16-to demolish a type2, 1-story office bldg.(total 5 bldgs to be demolished on the lot, this bldg named as cbc office on the dwgs)
Details
Permit
202007200491
Permit issued
Dec 18, 2020
Final sign-off
Feb 14, 2022

bldg# 16-to demolish a type2, 1-story office bldg.(total 5 bldgs to be demolished on the lot, this bldg named as cbc office on the dwgs)

Open the permit page

$13,750
Jul 20, 2020Completed
final sign-off May 2021
420 23rd StPlant Construction Co, Lpbldg# 12-to demolish a type 3b, 1-story currently unoccupied bldg.(total 5 bldgs to be demolished on this lot, this bldg named as station a gate house on the dwgs)
Details
Permit
202007200487
Permit issued
Dec 18, 2020
Final sign-off
May 10, 2021

bldg# 12-to demolish a type 3b, 1-story currently unoccupied bldg.(total 5 bldgs to be demolished on this lot, this bldg named as station a gate house on the dwgs)

Open the permit page

$2,750
Jul 20, 2020Completed
final sign-off Feb 2022
420 23rd StDe Silva Gates Constructionbldg# 14-to demolish a type 2, 1-story sotrage bldg.(total 5 bldg to be demolished on the lot. this bldg named as machine shop on the dwgs)
Details
Permit
202007200489
Permit issued
Dec 18, 2020
Final sign-off
Feb 14, 2022

bldg# 14-to demolish a type 2, 1-story sotrage bldg.(total 5 bldg to be demolished on the lot. this bldg named as machine shop on the dwgs)

Open the permit page

$5,500
Jul 20, 2020Completed
final sign-off Feb 2022
420 23rd StDe Silva Gates Constructionbldg# 18-to demolish a type 2, 1-story storage bldg.(total 5 bldgs to be demolished, this bldg named as abrasive blast blgd on the dwgs)
Details
Permit
202007200493
Permit issued
Dec 18, 2020
Final sign-off
Feb 14, 2022

bldg# 18-to demolish a type 2, 1-story storage bldg.(total 5 bldgs to be demolished, this bldg named as abrasive blast blgd on the dwgs)

Open the permit page

$27,500
Jul 20, 2020Completed
final sign-off Feb 2022
420 23rd StDe Silva Gates Constructionbldg# 15-to demolish a type 3, 1-story office/electric shop bldg.(total 5 bldgs to be demolished on the lot. this bldg named as electric shot on the dwgs)
Details
Permit
202007200490
Permit issued
Dec 18, 2020
Final sign-off
Feb 14, 2022

bldg# 15-to demolish a type 3, 1-story office/electric shop bldg.(total 5 bldgs to be demolished on the lot. this bldg named as electric shot on the dwgs)

Open the permit page

$5,500
May 27, 2020Completed
final sign-off Nov 2025
420 23rd StDe Silva Gates Constructionrough grading of proposed structs,alleys,open space & development block area for portion of pps svd on 4232/006. also incld geo measures of surcharging bay mud within street/deep soil mixing along water front, interim drainage managed erosion sediment control measures will be implemented.
Details
Permit
202005277886
Permit issued
Feb 10, 2021
Final sign-off
Nov 20, 2025

rough grading of proposed structs,alleys,open space & development block area for portion of pps svd on 4232/006. also incld geo measures of surcharging bay mud within street/deep soil mixing along water front, interim drainage managed erosion sediment control measures will be implemented.

Open the permit page

$11,357,014
Apr 19, 2017Never finaled
issued Apr 2017, no final
420 23rd Stper request form california barrel company, at block 4232, lot 006, create new address as; 420 3rd street
Details
Permit
M779268
Permit issued
Apr 19, 2017

per request form california barrel company, at block 4232, lot 006, create new address as; 420 3rd street

Open the permit page

Mar 10, 2017Never finaled
issued Jun 2017, no final
1301 Illinois StAmerican Integrated Services Inc, Haley & Aldrich Construction Servicessoil remediation:remove (e)utilities&buried strucs,excavate soil to 5-8' below grd surface,in-site soil solidification,remove&cap a sec of abandoned undergrd concrete intake pipe,backfill w/clean imported fill,&instl&/or repair durable covers crushed stone,or asphalt pavement.elec&plum sep.
Details
Permit
201703101168
Permit issued
Jun 16, 2017

soil remediation:remove (e)utilities&buried strucs,excavate soil to 5-8' below grd surface,in-site soil solidification,remove&cap a sec of abandoned undergrd concrete intake pipe,backfill w/clean imported fill,&instl&/or repair durable covers crushed stone,or asphalt pavement.elec&plum sep.

Open the permit page

$5,448,339
Mar 16, 2015Completed
final sign-off Dec 2015
1301 Illinois StCentric Construction Incto erect new storage shed
Details
Permit
201503161011
Permit issued
Mar 18, 2015
Final sign-off
Dec 14, 2015

to erect new storage shed

Open the permit page

$25,000
Feb 18, 2015Expired or cancelled
cancelled Mar 2020
1301 Illinois StCentric Construction Incconstruct new 1-story, no basement, office building.
Details
Permit
201502188569

construct new 1-story, no basement, office building.

Open the permit page

$29,395
Sep 17, 2014Completed
final sign-off Dec 2015
1301 Illinois StCentric Construction Incto erect 1 story, no basement, type ii, solar canopy. no occupancy under. ** maher: compliance with ordinance no# 155-13 not required **
Details
Permit
201409176513
Permit issued
Dec 1, 2014
Final sign-off
Dec 14, 2015

to erect 1 story, no basement, type ii, solar canopy. no occupancy under. ** maher: compliance with ordinance no# 155-13 not required **

Open the permit page

$50,000
Sep 11, 2014Completed
final sign-off Jun 2015
1301 Illinois StCentric Construction Inctemporary foundation for the exhibition structure.; maher n/a
Details
Permit
201409116038
Permit issued
Sep 18, 2014
Final sign-off
Jun 23, 2015

temporary foundation for the exhibition structure.; maher n/a

Open the permit page

$88,000
Aug 7, 2013Never finaled
issued Aug 2013, no final
1301 Illinois StPacific Auxiliary Fire Alarminstallation of new voluntary fire alarm system, ref pa #2013.06.21.0243
Details
Permit
201308073713
Permit issued
Aug 8, 2013

installation of new voluntary fire alarm system, ref pa #2013.06.21.0243

Open the permit page

$11,000
Jun 21, 2013Completed
final sign-off Dec 2013
1301 Illinois StCentric Construction Incoffice tenant improvement. 2 new accessible restrooms, 2 new accessible parking spots, new glazing and glazing upgrades, new elec distribution. lighting upgrades, new ceiling fans, new coffee room with sink, dishwasher, and refrigerator
Details
Permit
201306210243
Permit issued
Jul 5, 2013
Final sign-off
Dec 3, 2013

office tenant improvement. 2 new accessible restrooms, 2 new accessible parking spots, new glazing and glazing upgrades, new elec distribution. lighting upgrades, new ceiling fans, new coffee room with sink, dishwasher, and refrigerator

Open the permit page

$270,000
May 31, 2013Never finaled
issued May 2013, no final
1301 Illinois Stcorrect address on pa #9104810, building is at blk 4232, lot 006 as 1301 a illinois st. previous record at 1201 illions st at blk 4175, lot 003 was wrong parcel.
Details
Permit
M399127
Permit issued
May 31, 2013

correct address on pa #9104810, building is at blk 4232, lot 006 as 1301 a illinois st. previous record at 1201 illions st at blk 4175, lot 003 was wrong parcel.

Open the permit page

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
Swinerton Builders (8), Brandenburg Industrial Service Company (6), Centric Construction Inc (5), De Silva Gates Construction (5), Plant Construction Co, Lp (3), De Silva Gates Construction Llc (2), American Integrated Services Inc, Haley & Aldrich Construction Services, Pacific Auxiliary Fire Alarm, Pullman Power Llc, Value Fire Protection Inc
Architects
Ryan Jang (5), Thomas Lundberg (2), Mario Russo, Michael Wilk
Engineers
Paul Littler (5), Angelo Obertello (4), Eugene Tuan (2), Benjamin Noggle, Carl Milsum, David Charles Fields, Eric Loos, Hui Li, Jacob E Finkler, Jason Tornquist, Paul Littler, Randy Girouard, Robert Zamudio, Ryan Jang, Stephen Shaffer, Syed Rehand
Authorized agents
Paul A. Hinz

Find contractors for work like this